Está en la página 1de 13

5.

53
0.39
0.636

3000 lb/plg2
6.39 SACO/CEMENTO
0.36 Y3 DE ARENA
0.633 Y3 DE PIEDRA

.103

2500 lb/plg2
Y3 DE HORM.
Y3 DE HORM.
Y3 DE HORM.

RELLENO HORMIGN
1 BLOQUE 'S' (0.15) RELLENO 0.0037 M3
0.0037 x1.31= 0.0075 y3 c/u
0.0075x11= 0.08y3/ m2 DE HORMIGN
1 m2 x0.15x0.50(%)x1.31=y3/m2 HORM. C/DESPERDICIO

FACTOR
RESISTENCIA 3000 2000 lb/plg2
10% DESPERDICIO
(0.45)%= NETO
1 BLQ=0.0109 m3
M ACERO= M.L.x 3.28:(30)O(20)=BARRAS
A BLOQUE=CEMENTO 11BLOQUES /M2 (0.10)O(0.15)x0.20x0.45
(M.L.:0.45=BLOQUES/M.L.)
T
ARCILLA 11.7/M2 (0.095)O (0.143)x0.292x0.292 (M.L.:0.292= BLOQUES/M.L.)
E MADERA= 1"x4"x144":144"XB/./PIE2=B/.
1"x4"X12': 12' xB/./PIE2= B/.
R TEJA (0.28x0.35)=13/M2 , LIMA 0.30=3M.L., CABALLETE 0.30=3M.L., TAPN BAJO(0.20)=5/M.L.
I TAPN ALTO (0.20)=5M.L., ASFALTO N 4= 3 LB/M2, ASFALTO N10 = 3 LB/M2
A LADRILLO 5.5x10x20=72/M2, CHAPAS 5.5x1.5x20=72/M2, BALDOSAS 30x30 = 10/M2
L ALAMBRE #16 REFUERZO 1LB=70', 2 LBS C/100LB ACERO
E PEGAMENTO P.V.C.: TUBERIA SANITARIA UNA PINTA POR JUEGO SANITARIO
S
TUBERIA HIDRAULICA 1/2 PINTA POR JUEGO SANITARIO
SOLDADURA PARA TUBERIA DE COBRE=1 LB DE SOLDADURA POR JUEGO SANITARIO
FIBRA DE VIDRIO 4'x90'x1 1/2"= 32.40/M2, TELA DE FIBRA DE VIDRIO 442x3yd= 3.07/M2
JUNTA LISA 00.02 SACOS/M2 RELACIN 1:3
RESANE= 0.05SACOS/M2 RELACIN 1:3 (CUBRE POROSIDAD Y JUNTAS )
REPELLO=5M2/SACO 0.2 SACO/M2: RELACION 1:3 M2: 5=SACOS SACOS X3:27= Y3 DE ARENA
PEGUE/BLOQUES REL.1:3
CIRCULO: S=R2 LONG. CIRCUNF.:2R
#/4": 75=BLOQ'S/SACOS 70MAX. RENDIMIENTO
CILINDRO (D2/4) h r2h ( VOLUMEN)
#/ORNAM.:50=ORNAM/SACOS CEM.
S.L.= 2 Rh S.T.= S.L. + 2R
#/6":65=BLOQ'S/SACOS (60 MAX. RENDIMIENTO)
CILINDRO HUECO: V= h(R2-r2)
SACOS x3/27= Y3 ARENA
CORONA CIRCULAR:S=(R2-r2)
BALDOSAS : 0.21 SACOS/M2 REL. 1:4 (MORTERO/PISO)
TRAPECIO: S=(a+b) h/2
BALDOSAS: (LECHADA)= 30 M2/SACO CEM. BLANCO x UNIN
ROMBO: S=(?xd)/2
ZOCALO= 0.013 SACO/M.L. REL. 1:3 (MORTERO/PARED)
ESFERA:S=4R2
AZULEJO: 11x11=82/M2 10M2/SACO (CEM. BLANCO)
TRIANGULO RECT. B2=a2+b2 h= a2+b2
CERAMICA: 1 PLANCHA 0.30x0.30 PLANCHA/M2=10.8
A=(a+b)/2
15M2/SACO (CEMENTO BLANCO)
PIRAMIDE: V=???
BESTON:3"=(3.75x7.5x45)= 27/M2 0.22 SAC/M2
TRIANGULO EQUILATERO: A=(h2/3)3
REL. 1:3
A=(L2/4)3
CLAVOS ALAMBRE/GALV.
CLAVOS ACERO
CLAVOS ZINC
TORNILLO GALV. CON ARANDELA NEOPRENE
1 1/2"=300LB c/c 1"= 1330 /LB s/c
2 1/2"=60/LB
2"= 60/LB
2"= 40 torn/LB
2"=180/LB
1 1/2"= 580/LB
3"= 48/LB
2 1/2"=52/LB
2 1/2"= 32/LB
2 1/2"= 80 LB
2"=265/LB
3 1/2"=24/LB
3"=45/LB
3"=24/LB
3"=60/LB
2 1/2"= 135/LB
2"=84/LB
31/2"=38/LB
8 TORNILLO/M2
3 1/2" =35 LB
3"= 72/LB
8 CLAVOS/M2
TECHO/CARRIOLA
3 1/2"=58/LB
TECHO/MADERA
P
BASE (PARED C/REPELLO O RESANE) = 30M2/GAL.
ACRILICA=1/4 GAL. AGUA/GAL.PINT.
I
BASE (PARED C/REPELLO O RESANE) = 20M2/GAL.
VINIL=1/4 GAL.AGUA/GAL.PINT.
N
CADA 10 GAL. BASE= 1 SACO CEM. BLANCO
AGUARRAS
MINIO=1/4 GAL.AGUARRAS/GAL.PINT.
T
VINIL 1ra. MANO=40M2/GAL
2da. MANO= 40M2/GAL.
(S/LENTO)
BARNIZ=1/4GAL.AGUARRAS/GAL.BARNIZ
U
ACEITE (IDENTICO/VINIL)
MINIO ROJO=40M2/GAL.
THINNER
SELLADOR= 1/4GAL.AGUARRAS/GAL.3
R
BARNIZ=40M2/GAL.
P. ALUMINIO=40M2/GAL
(S/RAPIDO)
ACEITE=1/8GAL.AGUARRAS/GAL.PINT.
A
SELLADOR= 40M2/GAL.
P.EPOXICA= 55M2/GAL
ESMALTE=1/8 GAL.AGUARRAS/GAL.PINT.
P./ESMALTE= 50 M2/GALN
EPOXICA= 1/8 GAL.THINNER/GAL.EPOX.
SELLALOTODO(TECHO,ZINC,GALVANIZADO)= 100M2/GAL
CURASIL(RETARDADOR/EVAPORACIN DE SUPERFICIE DE HORMIGON)= 48M2/GALN
FELPA N 15(LB)=(0.92x43.35)= 39.00M2/ROLLO, N 30 (LB)= 18M2/ROLLO TACHUELA 1LB/ROLLO
SLDADURA ELECTRODOS /LB 2 ELECTRODOS/P.L. 2"/PUNTO TIPO 60-13
LIJA0 1 YD=16 HOJAS= 1333M2/YD= 0.075 YD/M2 4PTA/MCO=20M2 EXPLOSIVO=1 KG/M3 DE ROCA
P
LOSA NETA (SIN VIGA)0 2.65 PUNTALES/M2
16 CLAVOS /PUNTAL. (LOSA)10(3 1/2") + 6(2 1/2)"
U
LOSA BRUTA( CON VIGA )0 2.31 PUNTALES/M2
35 CLAVOS/PUNTAL (VIGA)25(3 1/2)"+10(2 1/2)"
N
LOSA NETA(CON VIGUETA PRETENSADA)=1.2 PUNTAL/M2 (0.60) SEPARACION/PUNTAL
T
LOSA DOBLE"T"(FORMALETA=1.04P2/M2)
PUNTAL=1.80 P.L./M2
A
VIGA 0.30x0.50=FORMALETA=5.23P2/M2
PUNTAL=2.27 P.L./M2
L
LOSA/VIGUETA PRETENSADA=FORMALETA=0.85P2/M2/USA PUNTAL=1.30P.L./M2
H
BLOQ'S CEM. CORR.
BLOQ'S CEM./VIGUETA
BLOQ'S ARCILLA/VIGUETA
O
4"x8"x24"+2"= 10.28M2/Y3
6"x8"x233/8+0.04=0.08Y3/M2
4 3/4"x131/2"=0.08Y3/M2
R
6"x8"x24"+2"=8.70M2/Y3
5"x8"x233/8+0.03=.095y3/m2
6"x131/2"x10"+2"=0.09Y3/M2
M (0.20x0.61 , 8 blqs /m2
8"x8"x233/8+0.04=0.085 Y3/M2
8"x131/2"x10"+.04=0.10Y3/M2
/
8"x8"x233/8+0.05=0.098 Y3/M2
(0.20x.47x.25)=7blq/m2
L
(0.60x0.20)=7 BLOQ'S/M2
O
S
0.61
.715
A
0.47
TECHOS
ANCHO UTIL
PANALIT CORRUGADO 5 ONDAS
0.7
PANALIT CORRUGADO 6 ONDAS
0.885
TEJALIT 5 ONDAS
0.7
ZINC CORRUGADO 9 ONDAS
0.64
ZINC CORRUGADO 14 ONDAS
0.97
CORREAGUA TROPICAL 5 ONDAS
0.98
CORREAGUA TROPICAL 8 ONDAS
0.97
CORREAGUA FAMETECHO 6 ONDAS
0.98
PANALETA
0.9
SUPERLIT
0.42
1 P3 CONCRETO 120-140 LBS
1P3 ARENMA 62.5 LBS
1P3 PIEDRA 100 LBS
1 P3 AGUA
62.4
1P3 TIERRA 70-120 LBS
1 P3 ASFALTO100 LBS
1 P3 MADERA 30-60 LBS

BLOQ'S ARCILLA CORR.


4"x12"X12"+2"=0.108 Y3/M2
8"x12"x12"+2"=0.11Y3/M2
8"x12"x12"+2"=0.152Y3/M2
(.15x.30x.30)=11 BLOQ'S/M2

MOLDE REMOVIBLE
HORM.RECUBR=0.108Y3/M2
MOLDES=1.33ML/M2
VIGUETA=1.33ML/M2

VIGUETA (.15x.20)

<<
0.915 <)15-40% MIN
1.06
0.915 <)30%MIN
.685? <) 10% MIN
1.06
1.02 <) 10%MIN
0.99
1.06
1.02 <)5% MIN
0.49 <)5%MIN

TORNILLO/M2
CORR.TROPICAL
ONDULADO

PAR@.60=10T.
PAR@1.00=8T.

PAR @1.00=11T
PAR @0.60=13T
CABALLETE
PANALETAS(5-10)%1.11P?/ML
PANALIT-15%MIN 1.176 P?/ML
CORR.TROP(24"-30"-48")x4'
ONDULADO(15"x24"-48)x20"

9.166666667
1.111111111

38.64
46
6.133333333
5.777777778
15.55
43.54
522.48
18.2868
16.51376147

PRESUPUESTO PISCINA
ING. APOLAYO
CARACTERISTICAS GEOMETRICAS
LONG
6M
ANCHO
4M
PROFUNDIDAD
1.2 M
PERIMETRO
AREA PLANTA
VOL EXCA
VOL relleno
CORONA PERIMETRAL
AREA DE PAREDES

20
20.16
28.8
8.51
3.00
24

M
M2
M3
M3
M3

ACABADOS
PERIMETRO INTERIOR
Area interior a repellar

18.4
22.08

CALCULO DE MATERIALES
CALCULOS MATERERIALES ALBAILERIA

0.125
2.52
CEMENTO
20.16
ARENA
1.3608
PIEDRA
2.15208
MALLA ELECTROSOLD 4.5 MM
2.7
ACERO REFUERZO
5 # LINEAS DE REF HOR
HORIZONTAL
10
VERTICAL
10
ALAMBRE DE REF
5
MADERA 1X 6X12'
5
2X2 X12'
4
CLAVOS 3" ALAMBRE
3
CLAVODE ACERO 3"
2
REGLA PARA RESASNE 1*3*16
2
ESPESOR PLANCHON

VOL PLANCHON DE CONCRETO

BOLQUES DE 8"
TILE CERAMICA

45 M2

CORALINA PERIMETRAL

8 M2

CORALINA ROMPEOLAS

20 ML

PEGAMENTO JAMO

18 BOLSAS

LECHADA BLANCA
CENEFA

RELLENO BLOQ
SACOS DE CEMENTO

ARENA

REPELLIO
PEDRA #3/4

1 BOLSAS
1.38 M2

ARENA

PEGAR BLOQ

CEMENTO

ARENA
ARENA
CORONA PERIMETRAL
CEMENTO
AREANA

M3
SACOS
YD3
YD3
UNID
33 # LINEAS REF VERTICAL
BARRAS 3/8
BARRAS 1/2"
LIBRAS
REGLAS
PIEZAS
LBS
LBS
PIEZAS

290 BLQ
0.01
6
1.94 YD3
0.64
3.06 YD3
6 SACOS
0.72 YD3
18
1.62

3.59 YD3

CEMENTO

PIEDRA

4.416

2.55

PLOMERIA
TUBO PVC SHC 40 2"
TUBO PVC SHC 40 1 1/2"
TUBO PVC SHC 40 3/4"
TUBO PVC SHC 401 1/4"
CODO 90 2"
CODO 90 1 1/2"
CODO 90 11/2"x2"
TEE 2"
TEE 1 1/2"
PEGAMENTO PVC CLEAR WET

ELECTRICIDAD
10 pies
5.5 tramos
1 tramos
pies

VALVULAS DE GLOBO "2


VALV. DE GLOBO "1 1/2"

CHECK VALVE 1 1/ 2"


union univ 2"
union univ 1 1/2"

tub pvc elect 3/4


nicho
alambre 12 rojo
alambre 12 negro

10
2
1
3
2 pintas

alambre 12 blanco
breaker 20 amp
breaker 40 amp
varilla de ground 5/8 x 8'
alambre 10 rojo
alambre 10 negro

4
1
1
4

panel 4 circuitos

alambre 10 blanco
alambre 12 desnudo

3
1
40
40
40
2
1
1

tramos
unid
pies
pies
pies
unid
unid
unid
pies
pies
pies
80 pies

REF VERTICAL

CALCULOS DE COSTOS
MATERIAL
EXCAVACION
MADERA 1X 6X12'
2X2 X12'
CLAVOS 3" ALAMBRE
CLAVODE ACERO 3"
REGLA PARA RESASNE 1*3*16
ALAMBRE DE REF
BOLQUES DE 8"
SACOS DE CEMENTO

ARENA
PEDRA #3/4
MALLA ELECTROSOLD 4.5 MM
ACERO REFUERZO # 4
ACERO REFUERZO # 3
TILE CERAMICA
CORALINA PERIMETRAL 40*40
CORALINA ROMPEOLAS 15*40
PEGAMENTO JAMO
LECHADA BLANCA
sika 1 8impermeabilizante
KOOL DECK

CANTIDAD
28.8
5
4
3
2
2
5
290
55
6.28
7.77
2.7
10
10
45
8
20
18
1
1
1

UNIDAD
M3
PIEZAS
PIEZAS
LBS
LBS
PIEZAS
LBS
UNID
BOLSAS
YD3
YD3
UNID
BARRAS
BARRAS
M2
M2
ML
BOLSAS
BOLSAS
galon
BOLSAS

PRECIO UNIT.

COSTO

14.5
6.95
3.95
1.25
1.3
8.95
1
1.1
10
22
28
38.95
7.95
4.75
12.95
39.97
22.87
8.95
8.95
12.95
89

B/. 417.60
B/. 37.99
B/. 15.80
B/. 3.75
B/. 2.60
B/. 17.90
B/. 5.00
B/. 318.78
B/. 550.16
B/. 138.08
B/. 217.44
B/. 106.83
B/. 79.50
B/. 47.50
B/. 576.79
B/. 319.76
B/. 457.40
B/. 162.31
B/. 13.29
B/. 12.95
B/. 89.00
B/. 3,590.44

17
8
7

B/. 408.00
B/. 172.00
B/. 77.00

TOTAL
MANO DE OBRA

BOLQUEO
CERAMICA
PISO PREIMETRAL
TOTAL
EQUIPO

24 M2
21.5 M2
11 M2

B/. 657.00

BOMBA DE 22
FILTRO DE ARENA
ARENA FILTRO
LAMPARA
NICHO
TRANSFORMADOR
DREN DE PISO
RETORNOS
ASPIRACION BARRER
REBOSADERO
SKIMMER
PLOMERIA
TUBO PVC SHC 40 2"
TUBO PVC SHC 40 1 1/2"
TUBO PVC SHC 40 3/4"
TUBO PVC SHC 401 1/4"
CODO 90 2"
CODO 90 1 1/2"
CODO 90 11/2"x2"
TEE 2"
TEE 1 1/2"
PEGAMENTO PVC CLEAR WET

1
1
1
1
2
4
1
1
1

MANO DE OBRA
10
5.5
1

CHECK VALVE 1 1/ 2"


union univ 2"
union univ 1 1/2"

EXCAVACION
OBRA GRIS

B/. 417.60
900

PLANCHON

10
2
1
3
2

VALVULAS DE GLOBO "2


VALV. DE GLOBO "1 1/2"

UNID
UNID
BOLSA
UNID
UNID
UNID
UNID
UNID
UNID
UNID
UNID

BLOQUEO
REBORDE
ACABADOS AZULEJOS
ELECTRICIDAD
PLOMERIA
GRAMA

3
1
1
4

456.06
0
0
0

COSTO MATERIALES OBRA GRIS


B/. 1,487.55
900
B/. 2,387.55

RA GRIS

CALCULOS DE COSTOS
MATERIAL
CANTIDAD

UNIDAD

#REF!
MADERA 1X 6X12'
#REF!
2X2 X12'
#REF!
CLAVOS 3" ALAMBRE
#REF!
CLAVODE ACERO 3"
#REF!
REGLA PARA RESASNE 1*3*16
#REF!
ALAMBRE DE REF
#REF!
BOLQUES DE 8"
#REF!
SACOS DE CEMENTO
#REF!
ARENA
#REF!
PEDRA #3/4
#REF!
MALLA ELECTROSOLD 4.5#REF!
MM
EXCAVACION

10
10

ACERO REFUERZO # 4
ACERO REFUERZO # 3
TILE CERAMICA

#REF!

CORALINA PERIMETRAL 40*40


#REF!
CORALINA ROMPEOLAS 15*40
#REF!
PEGAMENTO JAMO
LECHADA BLANCA

#REF!
#REF!

sika 1 8impermeabilizante
KOOL DECK

1
1

M3
PIEZAS
PIEZAS
LBS
LBS
PIEZAS
LBS
UNID
BOLSAS
YD3
YD3
UNID
BARRAS
BARRAS
M2
M2
ML
BOLSAS
BOLSAS
galon
BOLSAS

PRECIO UNIT.

COSTO

14.5
6.95
3.95
1.25
1.3
8.95
1
1.1
10
22
28
38.95
7.95
4.75
12.95
39.97
22.87
8.95
8.95
12.95
89

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
B/. 79.50
B/. 47.50
#REF!
#REF!
#REF!
#REF!
#REF!
B/. 12.95
B/. 89.00
#REF!

TOTAL
MANO DE OBRA

BOLQUEO
#REF!
CERAMICA
#REF!
PISO PREIMETRAL #REF!

M2
M2
M2

TOTAL
EQUIPO
BOMBA DE 22
FILTRO DE ARENA
ARENA FILTRO
LAMPARA
NICHO
TRANSFORMADOR
DREN DE PISO
RETORNOS
ASPIRACION BARRER
REBOSADERO
SKIMMER
PLOMERIA
TUBO PVC SHC 40 2"

17
8
7

#REF!
#REF!
#REF!
#REF!

1
1
1
1
2
4
1
1
1
10

UNID
UNID
BOLSA
UNID
UNID
UNID
UNID
UNID
UNID
UNID
UNID

TUBO PVC SHC 40 1 1/2"5.5


TUBO PVC SHC 40 3/4"
1
TUBO PVC SHC 401 1/4"
CODO 90 2"
CODO 90 1 1/2"
10
CODO 90 11/2"x2"
2
TEE 2"
1
TEE 1 1/2"
3
PEGAMENTO PVC CLEAR WET
2
VALVULAS DE GLOBO "2
VALV. DE GLOBO "1 1/2"

CHECK VALVE 1 1/ 2"


union univ 2"
union univ 1 1/2"

3
1
1
4

ELECTRICIDAD
panel 4 circuitos
tub pvc elect 3/4
nicho
alambre 12 rojo
alambre 12 negro
alambre 12 blanco
breaker 20 amp
breaker 40 amp
varilla de ground 5/8 x 8'

3
1
40
40
40
2
1
1

alambre 10 rojo
alambre 10 negro
alambre 10 blanco
alambre 12 desnudo

80