Está en la página 1de 8

CRONOGRAMA EJECUTADO

PROYECTO: MEJORAMIENTO DE LAS VIAS SECUDARIAS EN LA RESIDENCIAL POSADA DEL SOL DEL DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO

TIEMPO DE EJECUCION
ITEM

DESCRIPCION

UND

METRADO

ABRIL

PU
SEM 1

01
02
02.01

SEM 2

MAYO
SEM 3

SEM 4

03

03.01

CARTEL DE OBRA 2.40m x1.80m

ALQUILER DE OFICINA

LIMPIEZA DE TERRENO MANUAL


TRAZO, NIVELACION Y REPLANTEO

03.03.01
03.04
03.04.01

03.04.02

SEM 8

SEM 9

SEM 10

JULIO
SEM 11

SEM 12

SEM 13

SEM 14

SEM 15

SEM 16

und

3.00

mes

33%
1,159.50
1.00
12.50%
500.00
1.00

500.00

12.50%
500.00
1.00

1.73

18%
3304.56
1910.15

18%
3304.56
1910.15

18%
3304.56
1910.15

18%
3304.56
1910.15

6.36%
1137.28
657.39

6.36%
1137.28
657.39

6.36%
1137.28
657.39

6.36%
1137.28
657.39

0.16%
28.61
16.54

0.16%
28.61
16.54

0.16%
28.61
16.54

0.16%
28.61
16.54

0.43

7.65%
676.56
1,573.39

7.65%
676.56
1,573.39

7.65%
676.56
1,573.39

7.65%
676.56
1,573.39

4.5%
397.98
925.52

4.5%
397.98
925.52

4.5%
397.98
925.52

4.5%
397.98
925.52

9.2%
816.29
1,898.35

9.2%
816.29
1,898.35

9.2%
816.29
1,898.35

9.2%
816.29
1,898.35

2,000.00

12.5%
250.00
0.13

12.5%
250.00
0.13

12.5%
250.00
0.13

12.5%
250.00
0.13

7.50

25%
94.07
12.54

25%
94.07
12.54

25%
94.07
12.54

25%
94.07
12.54

8.00

12.50%
500.00
1.00

12.50%
500.00
1.00

LIMPIEZA GENERAL DE OBRA

03.02

03.03

JUNIO
SEM 7

OBRAS PRELIMINARES

03.01.01

03.02.01

SEM 6

INFRAESTRUCTURA VEHICULAR
OBRAS PROVISIONALES
1,159.62

02.02

SEM 5

TRAZO NIVELACION Y REPLANTEO PRELIMINAR

m2

m2

10,336.30

20,567.20

1.23%
108.78
252.98

1.23%
108.78
252.98

1.23%
108.78
252.98

1.23%
108.78
252.98

12.5%
250.00
0.13

12.5%
250.00
0.13

12.5%
250.00
0.13

12.5%
250.00
0.13

MOVILIZACION DE EQUIPOS
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

GLB

1.00

DEMOLICION DE BUZONES EXISTENTES


DEMOLICION DE ESTRUCTURAS DE CONCRETO MANUALMENTE

ENCOFRADO Y DESENCOFRADO EN BUZONES - PROVISIONAL

m3

50.17

m2

6.27

und

10.00

GLB

1.00

36.83
03.05
03.05.01

REUBICACION DE POSTES
REUBICACION DE POSTES DE ENERGIA ELECTRICA

899.00
03.06
03.06.01

RECONEXIONES DOMICILIARIAS
RECONEXIONES DOMICILIARIAS DE AGUA

3,000.00
03.06.02

RECONEXIONES DOMICILIARIAS DE DESAGUE

GLB

1.00

GLB

1.00

3,000.00
03.07
03.07.01

CAPACITACION EN SEGURIDAD Y SALUD

03.07.02

SEALIZACION TEMPORAL DE SEGURIDAD

03.07.03

EQUIPOS DE PROTECCION COLECTIVA

1,602.59

1.88
GLB

1.00

2,500.00
EQUIPOS DE PROTECCION INDIVIDUAL (EPI)

jgo

60.00

228.00
03.07.05

ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO


GLB

3%
342.00
1.50

3%
90.00
1.50

3%
90.00
1.50

3%
90.00
1.50

3.13%
200.00
0.25

3.13%
200.00
0.25

3.13%
200.00
0.25

3.13%
200.00
0.25

1.00

1,500.00
03.08
03.08.01

04.01
04.01.01

AGUA, DESAGUE Y ENERGIA PARA LA CONSTRUCCION

mes

8.00

1.75%
52.50
0.02
3.75%
112.50
0.04

1.75%
52.50
0.02
3.75%
112.50
0.04

1.75%
52.50
0.02
3.75%
112.50
0.04

1.75%
52.50
0.02
3.75%
112.50
0.04

13.73%
413.67
220.04
25.00%
625.00
0.25
8.33%
299.88
5.00
12.50%
187.50
0.13

13.73%
413.67
220.04
25.00%
625.00
0.25
8.33%
299.88
5.00
12.50%
187.50
0.13

13.73%
413.67
220.04
25.00%
625.00
0.25
8.33%
299.88
5.00
12.50%
187.50
0.13

13.73%
413.67
220.04
25.00%
625.00
0.25
8.33%
299.88
5.00
12.50%
187.50
0.13

12.5%
187.50
0.125

12.5%
187.50
0.125

12.5%
187.50
0.125

12.5%
187.50
0.125

12.5%
187.50
0.125

12.5%
187.50
0.125

12.5%
187.50
0.125

12.5%
187.50
0.125

6.25%
225.00
3.75

5.83%
209.88
3.50

5.83%
209.88
3.50

5.83%
209.88
3.50

6.25%
225.00
3.75

6.25%
225.00
3.75

6.25%
225.00
3.75

6.25%
225.00
3.75

6.25%
400.00
0.50

6.25%
400.00
0.50

6.25%
400.00
0.50

6.25%
400.00
0.50

3.13%
200.00
0.25

3.13%
200.00
0.25

3.13%
200.00
0.25

3.13%
200.00
0.25

3.13%
200.32
0.25

3.13%
200.32
0.25

3.13%
200.32
0.25

3.13%
200.32
0.25

25%
836.90
1,780.65
25%
6384.71
977.75
10%
6459.62
103.42
15%
4617.35
1,047.02
11%
277.18
769.95
25%
25369.20
1,080.00

25%
836.90
1,780.65
25%
6384.71
977.75
10%
6459.62
103.42
15%
4617.35
1,047.02
11%
277.18
769.95
25%
25369.20
1,080.00

25%
836.90
1,780.65
25%
6384.71
977.75
10%
6459.62
103.42
15%
4617.35
1,047.02
11%
277.18
769.95
25%
25369.20
1,080.00

25%
836.90
1,780.65
25%
6384.71
977.75
10%
6459.62
103.42
15%
4617.35
1,047.02
11%
277.18
769.95
25%
25369.20
1,080.00

13.29%
8868.63
141.99
10.30%
3235.29
733.63
1.55%
39.74
110.40

13.29%
8868.63
141.99
10.30%
3235.29
733.63
1.55%
39.74
110.40

13.29%
8868.63
141.99
10.30%
3235.29
733.63
1.55%
39.74
110.40

13.29%
8868.63
141.99
10.30%
3235.29
733.63
1.55%
39.74
110.40

2.03%
1354.65
21.69

2.03%
1354.65
21.69

2.03%
1354.65
21.69

2.03%
1354.65
21.69

21.64%
14731.97
462.40
1.35%
1005.01
37.50
0.04%
8.40
2.85

21.64%
14731.97
462.40
1.35%
1005.01
37.50
0.04%
8.40
2.85

21.64%
14731.97
462.40
1.35%
1005.01
37.50
0.04%
8.40
2.85

21.64%
14731.97
462.40
1.35%
1005.01
37.50
0.04%
8.40
2.85

5.62%
188.14
400.29
3.36%
2287.40
71.80
10.80%
8040.09
300.00
10.78%
2265.05
767.81
5.95%
152.57
423.79

5.62%
188.14
400.29
3.36%
2287.40
71.80
10.80%
8040.09
300.00
10.78%
2265.05
767.81
5.95%
152.57
423.79

5.62%
188.14
400.29
3.36%
2287.40
71.80
10.80%
8040.09
300.00
10.78%
2265.05
767.81
5.95%
152.57
423.79

5.62%
188.14
400.29
3.36%
2287.40
71.80
10.80%
8040.09
300.00
10.78%
2265.05
767.81
5.95%
152.57
423.79

SUBRASANTE
TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

7,122.58

04.01.02

CORTE DE TERRENO A NIVEL DE SUB RASANTE

m3

3,911.00

04.01.03

MEJORAMIENTO Y ESTABILIZACION DE SUB RAZANTE

m3

1,068.39

6.53
62.46
04.01.04

PERFILADO Y COMPACTADO DE SUB RASANTE

m2

7,122.58

04.01.05

RIEGO DE SUB RASANTE

m2

7,122.58

04.01.06

ELIMINACION DE MATERIAL EXCEDENTE

m3

4,320.00

4.41
0.36
23.49
04.02

23.25%
697.50
0.23
21.25%
637.50
0.21

MOVIMIENTO DE TIERRAS

0.47

04.02.01

23.25%
697.50
0.23
21.25%
637.50
0.21

INSTALACIONES PROVISIONALES

800.00
04

23.25%
697.50
0.23
21.25%
637.50
0.21

SEGURIDAD Y SALUD

1,500.00

03.07.04

23.25%
697.50
0.23
21.25%
637.50
0.21

BASE GRANULAR e= 0.30 m


TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

7,122.58

0.47
04.02.02

EXTRACCION Y APILAMIENTO DE MATERIAL PARA BASE

m3

2,136.77

04.02.03

CARGUIO Y TRANSPORTE DE MATERIAL BASE R =300M3/DIA

m3

2,777.81

31.86

26.80
04.02.04

BASE DE ESPESOR 0.30m (extendido riego y compactado)

m2

7,122.58

04.02.05

RIEGO DE BASE

m2

7,122.58

2.95

0.36

CRONOGRAMA EJECUTADO
PROYECTO: MEJORAMIENTO DE LAS VIAS SECUDARIAS EN LA RESIDENCIAL POSADA DEL SOL DEL DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO

TIEMPO DE EJECUCION
ITEM

DESCRIPCION

UND

METRADO

ABRIL

PU
SEM 1

05

SEM 2

MAYO
SEM 3

SEM 4

JUNIO

JULIO

SEM 5

SEM 6

SEM 7

SEM 8

SEM 9

SEM 10

SEM 11

SEM 12

15%
506.69
11.00

15%
506.69
11.00

15%
506.69
11.00

15%
506.69
11.00

14%
474.80
10.31

14%
474.80
10.31

14%
474.80
10.31

14%
474.80
10.31

9.75%
2151.73
71.75
0.98%
49.04
36.06

9.75%
2151.73
71.75
0.98%
49.04
36.06

9.75%
2151.73
71.75
0.98%
49.04
36.06

9.75%
2151.73
71.75
0.98%
49.04
36.06

2.61%
282.14
24.97

2.61%
282.14
24.97

2.61%
282.14
24.97

2.61%
282.14
24.97

SEM 13

SEM 14

SEM 15

SEM 16

4.55%
227.68
167.41
2.45%
1005.28
15.02
2.58%
2012.50
94.93

4.55%
227.68
167.41
2.45%
1005.28
15.02
2.58%
2012.50
94.93

4.55%
227.68
167.41
2.45%
1005.28
15.02
2.58%
2012.50
94.93

4.55%
227.68
167.41
2.45%
1005.28
15.02
2.58%
2012.50
94.93

7.03%
759.95
67.25

7.03%
759.95
67.25

7.03%
759.95
67.25

7.03%
759.95
67.25

LOSA DE PAVIMENTO
05.01

TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

6,592.28

05.02

ENCOFRADO Y DESENCOFRADO EN LOSA DE PAVIMENTO

m2

195.15

0.47
48.10
05.03

CONCRETO F'C = 210 KG/CM2

m3

1,318.46

05.04

ACERO DE TEMPERATURA DE 1/4" MALLA @ 0.40M

kg

6,867.12

05.05

ACERO CORRUGADO G-60 DE 1/2" EN JUNTA LONGITUDINAL

kg

292.63

05.06

ACERO LISO DE 3/4" EN JUNTA CONSTRUCCION Y CONTRACCION

kg

3,302.08

05.07

ACERO LISO DE 1" EN JUNTA DE DILATACION

kg

236.39

05.08

CURADO DE LOSA DE CONCRETO

m2

6,592.28

05.09

SELLADO DE JUNTAS EN DILATACION EN LOSA E= 3/4", H=0.04M

975.73

05.10

SELLADO DE JUNTAS LONGIT Y CONTRACCION E= 0.006M, H=0.06M

1,463.59

425.69
4.50
4.40
4.33
4.33
0.71
4.32

4.32
06

SEALIZACION
06.01

PINTADO DE SARDINELES

3,066.18

06.02

PINTADO DE EJE DE VIA

511.03

06.03

PLACA RECORDATORIA

und

1.00

1.64
1.64
500.00
07

CONTROL DE CALIDAD
07.01

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

und

50.00

07.02

PRUEBA COMPACTACION SUELOS(PROCTOR MODIFICADO DENSIDAD CAMPO)

und

102.21

07.03

DISEO DE MEZCLAS

und

2.00

45.00
45.00
350.00
08
09
09.01

INFRAESTRUCTURA PEATONAL
OBRAS DE CONCRETO SIMPLE
SARDINEL DE CONCRETO - MONOLITICO

09.01.01

TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

480.78

09.01.02

EXCAVACION DE ZANJAS (MANUAL) PARA SARDINELES

m3

72.12

0.47
46.07
09.01.03

ENCOFRADO Y DESENCOFRADO PARA SARDINELES

m2

2,243.63

09.01.04

CONCRETO EN SARDINELES F'C =175 KG/CM2

m3

240.39

65.81

367.66
09.01.05

CURADO DE SARDINELES

m2

2,724.40

09.01.06

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

93.75

0.70
11.30
09.01.07

SELLADO DE JUNTAS EN SARDINELES

480.78

m2

3,679.42

4.88
09.02
09.02.01

VEREDAS
TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

0.47
09.02.02

EXCAVACION MANUAL DE VEREDAS

m3

735.88

29.99
09.02.03

NIVELACION Y COMPACTACION MANUAL

m2

3,679.42

1.36
09.02.04

ENCOFRADO Y DESENCOFRADO EN VEREDAS

m2

613.24

09.02.05

EMPEDRADO DE 6"

m2

3,679.42

09.02.06

CONCRETO EN VEREDAS F'C = 175KG/CM2

m3

257.56

24.99%
432.16
919.49

24.99%
432.16
919.49

24.99%
432.16
919.49

24.99%
432.16
919.49

66.91
21.20
367.66
09.02.07

CURADO DE VEREDAS

m2

3,679.42

09.02.08

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

956.65

0.70
11.30
09.02.09

SELLADO DE JUNTAS E = 3/4", H =0.05M

1,226.47

CRONOGRAMA EJECUTADO
PROYECTO: MEJORAMIENTO DE LAS VIAS SECUDARIAS EN LA RESIDENCIAL POSADA DEL SOL DEL DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO

TIEMPO DE EJECUCION
ITEM

09.02.09

DESCRIPCION

SELLADO DE JUNTAS E = 3/4", H =0.05M

UND

METRADO

ABRIL

PU
SEM 1

1,226.47

SEM 2

MAYO
SEM 3

SEM 4

SEM 5

SEM 6

JUNIO
SEM 7

SEM 8

JULIO

SEM 9

SEM 10

SEM 11

SEM 12

2.74%
47.51
1.37

2.74%
47.51
1.37

2.74%
47.51
1.37

2.74%
47.51
1.37

2.11%
15.55
1.38

2.11%
15.55
1.38

2.11%
15.55
1.38

2.11%
15.55
1.38

25%
364.45
38.12

25%
364.45
38.12

25%
364.45
38.12

25%
364.45
38.12

SEM 13

SEM 14

SEM 15

SEM 16

4.8%
5.10
3.75

4.8%
5.10
3.75

4.8%
5.10
3.75

4.8%
5.10
3.75

4.40
09.03

REPOSICION DE BUZONES DE CONCRETO

09.03.01

EXCAVACION MANUAL EN TERRENO COMPACTO

m3

50.17

09.03.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

167.39

09.03.03

CONCRETO EN BUZONES F'C = 175KG/CM2

m3

25.11

34.56
42.76
367.66
09.03.04

ACERO GRADO 60, DE 1/2" EN LOSAS MACIZAS

kg

357.05

09.03.05

CURADO DE BUZONES

m2

167.39

09.03.06

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

65.22

4.57
0.70
11.30
10

10.01

MUROS
MURO DE CONCRETO CICLOPEO

10.01.01

TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

78.20

10.01.02

EXCAVACION DE ZANJAS CON EQUIPO

m3

152.49

25%
9.19
19.55

0.47
9.56
10.01.03

NIVELACION Y COMPACTACION MANUAL DE FONDO

m2

25%
9.19
19.55

25%
9.19
19.55

25%
9.19
19.55

78.20

1.36
10.01.04

ACARREO DE MATERIAL EXCAVADO CON CARRETILLA

m3

59.67

10.01.05

ENTIBADO DE TALUD DE MURO DE SOSTENIMIENTO

m2

9.45

13.57
106.49
10.01.06

PERFILADO DE TALUD

m2

25%
76.27
22.70

90.80

3.36
10.01.07

SOLADO EN MURO DE 3" MEZCLA 1:12

m2

71.40

10.01.08

ENCOFRADO Y DESENCOFRADO DE MURO

m2

90.80

10.01.09

CONCRETO CICLOPEO f'c=175KG/CM2 + 30 % PM.

m3

61.12

38.10
61.53
257.37
10.01.10

CURADO DE MURO

m2

162.20

10.01.11

SUMINISTRO Y COLOCACION TUB. P.V.C. 2" (LLORONES)

30.40

0.70
16.09
10.01.12

SUMINISTRO E INST. DE TUBERIA CRIBADA 4" (DRENAJE)

34.00

10.01.13

RELLENO CON MATERIAL SELECCIONADO (FILTRO)

m3

15.89

10.01.14

RELLENO Y COMP.MAT.PROPIO EN ZANJAS C/0.30 m

m2

64.26

10.01.15

BARANDA DE TUBO METALICO DE 2 1/2"

34.00

29.74
50.32
1.74
107.85
11
11.01
11.01.01

SISTEMA DE EVACUACION DE AGUAS PLUVIALES


SUMIDEROS
TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

47.04

0.47
11.01.02

EXCAVACION EN ZANJAS MANUAL

m3

42.34

11.01.03

NIVELACION Y COMPACTACION MANUAL

m2

47.04

11.01.04

SOLADO DE SUMIDEROS DE 3" MEZCLA 1:12

m2

47.04

22.60
1.36
38.10
11.01.05

ENCOFRADO Y DESENCOFRADO DE SUMIDEROS

m2

141.12

11.01.06

CONCRETO f'c = 175kg/cm PARA SUMIDEROS

m3

22.46

42.76
367.66
11.01.07

ACERO DE REGUERZO G-60

kg

1,315.66

11.01.08

REJILLA SUMIDERO CON PLAT 2" X 1/2" MARCO L 2 X 3/8"

m2

47.04

4.69
934.03
11.01.09

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

55.04

11.01.10

CURADO DE SUMIDEROS

m2

94.08

11.30

25%
5.53
11.76

25%
5.53
11.76

25%
5.53
11.76

25%
5.53
11.76

25%
76.27
22.70

25%
76.27
22.70

25%
76.27
22.70

CRONOGRAMA EJECUTADO
PROYECTO: MEJORAMIENTO DE LAS VIAS SECUDARIAS EN LA RESIDENCIAL POSADA DEL SOL DEL DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO

TIEMPO DE EJECUCION
ITEM

11.01.10

DESCRIPCION

UND

CURADO DE SUMIDEROS

METRADO

m2

ABRIL

PU

MAYO

SEM 1

SEM 2

SEM 3

SEM 4

14%
33.85
72.02
2%
197.57
8.74

14%
33.85
72.02
2%
197.57
8.74

14%
33.85
72.02
2%
197.57
8.74

14%
33.85
72.02
2%
197.57
8.74

SEM 5

SEM 6

JUNIO
SEM 7

SEM 8

JULIO

SEM 9

SEM 10

SEM 11

SEM 12

SEM 13

SEM 14

SEM 15

SEM 16

9.84

11.49%
28.79
61.25
9.12%
1098.70
48.62
13.71%
99.39
73.08
13.53%
327.44
72.12
13.37%
6050.83
142.54
5.39%
407.12
41.37

11.49%
28.79
61.25
9.12%
1098.70
48.62
13.71%
99.39
73.08
13.53%
327.44
72.12
13.37%
6050.83
142.54
5.39%
407.12
41.37

11.49%
28.79
61.25
9.12%
1098.70
48.62
13.71%
99.39
73.08
13.53%
327.44
72.12
13.37%
6050.83
142.54
5.39%
407.12
41.37

11.49%
28.79
61.25
9.12%
1098.70
48.62
13.71%
99.39
73.08
13.53%
327.44
72.12
13.37%
6050.83
142.54
5.39%
407.12
41.37

0.94%
113.24
5.01
0%
1.52
1.12
0%
5.08
1.12
0.28%
126.72
2.99
0.75%
56.65
5.76

0.94%
113.24
5.01
0%
1.52
1.12
0%
5.08
1.12
0.28%
126.72
2.99
0.75%
56.65
5.76

0.94%
113.24
5.01
0%
1.52
1.12
0%
5.08
1.12
0.28%
126.72
2.99
0.75%
56.65
5.76

0.94%
113.24
5.01
0%
1.52
1.12
0%
5.08
1.12
0.28%
126.72
2.99
0.75%
56.65
5.76

0.47

25%
11.11
23.64

25%
11.11
23.64

25%
11.11
23.64

25%
11.11
23.64

94.08

0.37
11.02
11.02.01

TUBERIA PARA EVACUACION DE AGUAS PLUVIALES


TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

533.06

0.47
11.02.02

EXCAVACION EN ZANJAS MANUAL

m3

533.06

22.60
11.02.03

NIVELACION Y COMPACTACION MANUAL

m2

533.06

11.02.04

CAMA DE APOYO

m2

533.06

11.02.05

TUBERIA DE PVC SAL 8"

1,066.12

11.02.06

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

767.61

11.03

CANAL DE EVACUACION DE AGUAS PLUVIALES


m2

94.54

1.36

4.54

42.45

11.03.01

TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

11.03.02

EXCAVACION EN ZANJAS MANUAL

m3

85.09

11.03.03

NIVELACION Y COMPACTACION MANUAL

m2

94.54

11.03.04

SOLADO EN CANAL E= 3" MEZCLA 1:12

m2

94.54

22.60
1.36
38.10
11.03.05

ENCOFRADO Y DESENCOFRADO NORMAL

m2

189.09

11.03.06

CONCRETO f'c = 175kg/cm

m3

99.27

42.76

367.66
11.03.07

ACERO DE REGUERZO G-60

kg

1,977.43

11.03.08

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

110.62

4.69

11.30
11.03.09

CURADO DE CANALES

m2

283.63

0.37
11.04

CAJA DE REUNION (DESARENADOR)

11.04.01

TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

2.43

11.04.02

EXCAVACION EN ZANJAS MANUAL

m3

2.67

0.47

22.60
11.04.03

NIVELACION Y COMPACTACION MANUAL

m2

2.43

11.04.04

SOLADO EN CANAL E= 3" MEZCLA 1:12

m2

2.43

1.36

38.10
11.04.05

ENCOFRADO Y DESENCOFRADO NORMAL

m2

3.12

11.04.06

CONCRETO f'c = 175kg/cm

m3

0.93

42.76

367.66
11.04.07

ACERO DE REGUERZO G-60

kg

24.15

11.04.08

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

3.47

11.04.09

CURADO

m2

7.83

4.69

11.30

0.37
12

MITIGACION DE IMPACTOS
12.01

TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO

m2

20,567.20

12.02

LIMPIEZA FINAL DE OBRA

m2

20,567.20

0.47

1.29

AVANCE PARCIAL

AVANCE TOTAL

PARCIAL

0.33%

0.26%

0.26%

0.26%

3.36%

2.51%

2.51%

2.51%

2.34%

2.19%

2.19%

2.19%

1.19%

1.02%

1.02%

1.02%

ACUMULADO

0.33%

0.59%

0.84%

1.10%

4.46%

6.97%

9.47%

11.98%

14.32%

16.51%

18.69%

20.88%

22.07%

23.10%

24.12%

25.15%

PARCIAL

1.10%

ACUMULADO

1.10%

10.88%

8.91%

4.26%

11.98%

20.88%

25.15%

AGOSTO
SEM 17

SEM 18

SEPTIEMBRE
SEM 19

SEM 20

SEM 21

25.00%
1,000.00
2.00

0.20%
17.69
41.13

11.43%
382.63
814.11

11.43%
382.63
814.11

11.43%
382.63
814.11

11.43%
382.63
814.11

8.22%
1727.15
585.48
2.35%
60.26
167.38

8.22%
1727.15
585.48
2.35%
60.26
167.38

8.22%
1727.15
585.48
2.35%
60.26
167.38

8.22%
1727.15
585.48
2.35%
60.26
167.38

SEM 22

0.20%
17.69
41.13

OCUTBRE

SEM 23

0.20%
17.69
41.13

SEM 24

2.81%
84.66
45.03

2.81%
84.66
45.03

2.81%
84.66
45.03

12.50%
187.50
0.13

12.50%
187.50
0.13

12.50%
187.50
0.13

12.50%
187.50
0.13

6.25%
400.00
0.50

6.25%
400.00
0.50

6.25%
400.00
0.50

6.25%
400.00
0.50

4.53%
3372.37
125.83

4.53%
3372.37
125.83

12.50%
500.00
1.00

SEM 26

NOVIEMBRE
SEM 27

SEM 28

SEM 29

12.50%
500.00
1.00

SEM 30

DICIEMBRE

SEM 31

SEM 32

SEM 33

SEM 34

ENERO

SEM 35

SEM36

SEM 37

SEM 38

FEBRERO
SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

SEM 44

0.20%
17.69
41.13

2.81%
84.66
45.03

4.53%
3372.37
125.83

SEM 25

4.53%
3372.37
125.83

3.95%
119.01
63.30

3.13%
200.00
0.25

3.95%
119.01
63.30

3.13%
200.00
0.25

3.95%
119.01
63.30

3.13%
200.00
0.25

3.95%
119.01
63.30

3.13%
200.00
0.25

3.11%
93.70
49.84

3.11%
93.70
49.84

3.11%
93.70
49.84

3.11%
93.70
49.84

2.08%
74.88
1.25

2.08%
74.88
1.25

2.08%
74.88
1.25

2.08%
74.88
1.25

3.13%
200.00
0.25

3.13%
200.00
0.25

3.13%
200.00
0.25

3.13%
200.00
0.25

7.95%
266.14
566.25

7.95%
266.14
566.25

7.95%
266.14
566.25

7.95%
266.14
566.25

8.32%
6193.85
231.11

8.32%
6193.85
231.11

8.32%
6193.85
231.11

8.32%
6193.85
231.11

16.70%
428.21
1,189.47

16.70%
428.21
1,189.47

16.70%
428.21
1,189.47

16.70%
428.21
1,189.47

25.00%
57.73
1.57

25.00%
57.73
1.57

25.00%
57.73
1.57

25.00%
57.73
1.57

1.40%
42.18
22.44

1.40%
42.18
22.44

1.40%
42.18
22.44

1.40%
42.18
22.44

0.74%
155.49
52.71

0.74%
155.49
52.71

0.74%
155.49
52.71

0.74%
155.49
52.71

1.37%
287.86
97.58

1.37%
287.86
97.58

1.37%
287.86
97.58

1.37%
287.86
97.58

AGOSTO
SEM 17

4.88%
1508.02
335.12

23%
52.24
111.16
11%
377.11
8.19
4.39%
6481.98
98.50
4.49%
3968.34
10.79
5.35%
102.03
145.76
11.30%
119.71
10.59

6.16%
308.25
226.65
18.63%
7644.24
114.25
5.52%
4305.80
203.10
5.56%
5265.01
14.32
4.51%
116.16
165.94
6.98%
754.55
66.77

SEM 18

4.88%
1508.02
335.12

23%
52.24
111.16
11%
377.11
8.19
4.39%
6481.98
98.50
4.49%
3968.34
10.79
5.35%
102.03
145.76
11.30%
119.71
10.59

6.16%
308.25
226.65
18.63%
7644.24
114.25
5.52%
4305.80
203.10
5.56%
5265.01
14.32
4.51%
116.16
165.94
6.98%
754.55
66.77

SEPTIEMBRE
SEM 19

4.88%
1508.02
335.12

23%
52.24
111.16
11%
377.11
8.19
4.39%
6481.98
98.50
4.49%
3968.34
10.79
5.35%
102.03
145.76
11.30%
119.71
10.59

6.16%
308.25
226.65
18.63%
7644.24
114.25
5.52%
4305.80
203.10
5.56%
5265.01
14.32
4.51%
116.16
165.94
6.98%
754.55
66.77

SEM 20

4.88%
1508.02
335.12

23%
52.24
111.16
11%
377.11
8.19
4.39%
6481.98
98.50
4.49%
3968.34
10.79
5.35%
102.03
145.76
11.30%
119.71
10.59

6.16%
308.25
226.65
18.63%
7644.24
114.25
5.52%
4305.80
203.10
5.56%
5265.01
14.32
4.51%
116.16
165.94
6.98%
754.55
66.77

OCUTBRE

NOVIEMBRE

SEM 21

SEM 22

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

8.79%
272.35
579.46
17.64%
1655.82
34.42
9.38%
52645.74
123.67
14.22%
4394.27
976.50
24.22%
311.85
70.87
8.30%
1186.73
274.07

8.79%
272.35
579.46
17.64%
1655.82
34.42
9.38%
52645.74
123.67
14.22%
4394.27
976.50
24.22%
311.85
70.87
8.30%
1186.73
274.07

8.79%
272.35
579.46
17.64%
1655.82
34.42
9.38%
52645.74
123.67
14.22%
4394.27
976.50
24.22%
311.85
70.87
8.30%
1186.73
274.07

8.79%
272.35
579.46
17.64%
1655.82
34.42
9.38%
52645.74
123.67
14.22%
4394.27
976.50
24.22%
311.85
70.87
8.30%
1186.73
274.07

5.21%
161.43
343.46
0.56%
52.57
1.09
5.29%
29690.40
69.75
5.77%
1783.05
396.23

5.21%
161.43
343.46
0.56%
52.57
1.09
5.29%
29690.40
69.75
5.77%
1783.05
396.23

5.21%
161.43
343.46
0.56%
52.57
1.09
5.29%
29690.40
69.75
5.77%
1783.05
396.23

5.21%
161.43
343.46
0.56%
52.57
1.09
5.29%
29690.40
69.75
5.77%
1783.05
396.23

5.45%
779.24
179.96

5.45%
779.24
179.96

5.45%
779.24
179.96

5.45%
779.24
179.96

4.73%
221.39
311.81

4.73%
221.39
311.81

4.73%
221.39
311.81

4.73%
221.39
311.81

7.47%
349.63
492.44

7.47%
349.63
492.44

7.47%
349.63
492.44

7.47%
349.63
492.44

1.88%
4.25
9.04
5.60%
186.06
4.04
6.09%
8992.09
136.64
6.73%
5948.09
16.18
13.81%
263.37
376.24
4.50%
47.67
4.22

4.01%
200.66
147.54
3.78%
1551.01
23.18
1.20%
936.04
44.15
4.95%
4687.38
12.75
10.61%
273.27
390.39
1.86%
201.07
17.79

1.88%
4.25
9.04
5.60%
186.06
4.04
6.09%
8992.09
136.64
6.73%
5948.09
16.18
13.81%
263.37
376.24
4.50%
47.67
4.22

4.01%
200.66
147.54
3.78%
1551.01
23.18
1.20%
936.04
44.15
4.95%
4687.38
12.75
10.61%
273.27
390.39
1.86%
201.07
17.79

1.88%
4.25
9.04
5.60%
186.06
4.04
6.09%
8992.09
136.64
6.73%
5948.09
16.18
13.81%
263.37
376.24
4.50%
47.67
4.22

4.01%
200.66
147.54
3.78%
1551.01
23.18
1.20%
936.04
44.15
4.95%
4687.38
12.75
10.61%
273.27
390.39
1.86%
201.07
17.79

1.88%
4.25
9.04
5.60%
186.06
4.04
6.09%
8992.09
136.64
6.73%
5948.09
16.18
13.81%
263.37
376.24
4.50%
47.67
4.22

4.01%
200.66
147.54
3.78%
1551.01
23.18
1.20%
936.04
44.15
4.95%
4687.38
12.75
10.61%
273.27
390.39
1.86%
201.07
17.79

14.43%
663.70
14.75
25%
175.00
0.50

14.43%
663.70
14.75
25%
175.00
0.50

14.43%
663.70
14.75
25%
175.00
0.50

14.43%
663.70
14.75
25%
175.00
0.50

2.92%
97.02
2.11
6.23%
9198.80
139.78
4.38%
3871.12
10.53
2.58%
49.20
70.29
5.64%
59.75
5.29

2.92%
97.02
2.11
6.23%
9198.80
139.78
4.38%
3871.12
10.53
2.58%
49.20
70.29
5.64%
59.75
5.29

2.92%
97.02
2.11
6.23%
9198.80
139.78
4.38%
3871.12
10.53
2.58%
49.20
70.29
5.64%
59.75
5.29

2.92%
97.02
2.11
6.23%
9198.80
139.78
4.38%
3871.12
10.53
2.58%
49.20
70.29
5.64%
59.75
5.29

0.00%
0.01
0.02

0.00%
0.01
0.02

0.00%
0.01
0.02

0.00%
0.01
0.02

1.96%
98.08
72.12

1.96%
98.08
72.12

1.96%
98.08
72.12

1.96%
98.08
72.12

0.94%
733.23
34.59
4.70%
4450.64
12.11
4.60%
118.48
169.25
1.39%
150.26
13.30

0.94%
733.23
34.59
4.70%
4450.64
12.11
4.60%
118.48
169.25
1.39%
150.26
13.30

0.94%
733.23
34.59
4.70%
4450.64
12.11
4.60%
118.48
169.25
1.39%
150.26
13.30

0.94%
733.23
34.59
4.70%
4450.64
12.11
4.60%
118.48
169.25
1.39%
150.26
13.30

SEM 29

6.74%
208.83
444.32

SEM 30

6.74%
208.83
444.32

SEM 31

6.74%
208.83
444.32

DICIEMBRE
SEM 32

6.74%
208.83
444.32

ENERO

SEM 33

SEM 34

SEM 35

SEM36

3.20%
99.15
210.95

3.20%
99.15
210.95

3.20%
99.15
210.95

3.20%
99.15
210.95

3.65%
20485.82
48.12

3.65%
20485.82
48.12

3.65%
20485.82
48.12

3.65%
20485.82
48.12

4.22%
23684.97
55.64

4.22%
23684.97
55.64

4.22%
23684.97
55.64

4.22%
23684.97
55.64

4.21%
601.95
139.02
20.78%

4.21%
601.95
139.02
20.78%

4.21%
601.95
139.02
20.78%

4.21%
601.95
139.02
20.78%

3.84%
549.04
126.80

3.84%
549.04
126.80

3.84%
549.04
126.80

3.84%
549.04
126.80

49.12
8.43%
394.57
555.73

49.12
8.43%
394.57
555.73

49.12
8.43%
394.57
555.73

49.12
8.43%
394.57
555.73

3.37%
157.73
222.16

3.37%
157.73
222.16

3.37%
157.73
222.16

3.37%
157.73
222.16

25%
562.50
12.50
10.57%
486.16
10.80

25%
562.50
12.50
10.57%
486.16
10.80

25%
562.50
12.50
10.57%
486.16
10.80

25%
562.50
12.50
10.57%
486.16
10.80

3.23%
107.32
2.33
4.31%
6363.86
96.70
3.93%
3473.40
9.45
1.91%
36.43
52.04
3.00%
31.78
2.81

3.23%
107.32
2.33
4.31%
6363.86
96.70
3.93%
3473.40
9.45
1.91%
36.43
52.04
3.00%
31.78
2.81

3.23%
107.32
2.33
4.31%
6363.86
96.70
3.93%
3473.40
9.45
1.91%
36.43
52.04
3.00%
31.78
2.81

3.23%
107.32
2.33
4.31%
6363.86
96.70
3.93%
3473.40
9.45
1.91%
36.43
52.04
3.00%
31.78
2.81

4.57%
228.68
168.15
0.004%
1.64
0.02
3.35%
2613.12
123.26
4.80%
4545.34
12.36
5.07%
130.58
186.55
2.29%
247.55
21.91

4.57%
228.68
168.15
0.004%
1.64
0.02
3.35%
2613.12
123.26
4.80%
4545.34
12.36
5.07%
130.58
186.55
2.29%
247.55
21.91

4.57%
228.68
168.15
0.004%
1.64
0.02
3.35%
2613.12
123.26
4.80%
4545.34
12.36
5.07%
130.58
186.55
2.29%
247.55
21.91

4.57%
228.68
168.15
0.004%
1.64
0.02
3.35%
2613.12
123.26
4.80%
4545.34
12.36
5.07%
130.58
186.55
2.29%
247.55
21.91

1.73%
57.48
1.25
0.60%
885.92
13.46
5.12%
4525.15
12.31
0.55%
10.49
14.98
0.56%
5.93
0.53

1.73%
57.48
1.25
0.60%
885.92
13.46
5.12%
4525.15
12.31
0.55%
10.49
14.98
0.56%
5.93
0.53

1.73%
57.48
1.25
0.60%
885.92
13.46
5.12%
4525.15
12.31
0.55%
10.49
14.98
0.56%
5.93
0.53

1.73%
57.48
1.25
0.60%
885.92
13.46
5.12%
4525.15
12.31
0.55%
10.49
14.98
0.56%
5.93
0.53

0.011%
0.19
0.40

0.011%
0.19
0.40

0.011%
0.19
0.40

0.011%
0.19
0.40

1.81%
90.57
66.60

1.81%
90.57
66.60

1.81%
90.57
66.60

1.81%
90.57
66.60

0.00

0.00

0.00

0.00

1.80%
1404.07
66.23
2.23%
2111.69
5.74
0.14%
3.61
5.15
1.36%
147.02
13.01

1.80%
1404.07
66.23
2.23%
2111.69
5.74
0.14%
3.61
5.15
1.36%
147.02
13.01

1.80%
1404.07
66.23
2.23%
2111.69
5.74
0.14%
3.61
5.15
1.36%
147.02
13.01

1.80%
1404.07
66.23
2.23%
2111.69
5.74
0.14%
3.61
5.15
1.36%
147.02
13.01

SEM 37

SEM 38

FEBRERO
SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

SEM 44

1.06%
32.84
69.88
2.56%
240.30
5.00
0.87%
4882.92
11.47
0.13%
40.17
8.93

1.06%
32.84
69.88
2.56%
240.30
5.00
0.87%
4882.92
11.47
0.13%
40.17
8.93

1.06%
32.84
69.88
2.56%
240.30
5.00
0.87%
4882.92
11.47
0.13%
40.17
8.93

1.06%
32.84
69.88
2.56%
240.30
5.00
0.87%
4882.92
11.47
0.13%
40.17
8.93

0.60%
28.08
39.55
11.20%
472.10
109.28
14.45%
913.63
211.49

0.60%
28.08
39.55
11.20%
472.10
109.28
14.45%
913.63
211.49

0.60%
28.08
39.55
11.20%
472.10
109.28
14.45%
913.63
211.49

0.60%
28.08
39.55
11.20%
472.10
109.28
14.45%
913.63
211.49

1.16%
1712.78
26.03

1.16%
1712.78
26.03

1.16%
1712.78
26.03

1.16%
1712.78
26.03

0.25%
4.77
6.81

0.25%
4.77
6.81

0.25%
4.77
6.81

0.25%
4.77
6.81

11.18%
262.31
53.75

11.18%
262.31
53.75

11.18%
262.31
53.75

11.18%
262.31
53.75

3.80%
2964.14
139.82
0.73%
691.27
1.88

3.80%
2964.14
139.82
0.73%
691.27
1.88

3.80%
2964.14
139.82
0.73%
691.27
1.88

3.80%
2964.14
139.82
0.73%
691.27
1.88

15.86%
855.88

15.86%
855.88

15.86%
855.88

15.86%
855.88

3.84%
360.45
7.49
0.09%
505.13
1.19

3.84%
360.45
7.49
0.09%
505.13
1.19

3.84%
360.45
7.49
0.09%
505.13
1.19

3.84%
360.45
7.49
0.09%
505.13
1.19

0.09%
4.21
5.93

0.09%
4.21
5.93

0.09%
4.21
5.93

0.09%
4.21
5.93

10.55%
667.05
154.41

10.55%
667.05
154.41

10.55%
667.05
154.41

10.55%
667.05
154.41

0.18%
5.98
0.13
1.19%
1757.07
26.70
0.34%
300.50
0.82
0.31%
5.91
8.45

0.18%
5.98
0.13
1.19%
1757.07
26.70
0.34%
300.50
0.82
0.31%
5.91
8.45

0.18%
5.98
0.13
1.19%
1757.07
26.70
0.34%
300.50
0.82
0.31%
5.91
8.45

0.18%
5.98
0.13
1.19%
1757.07
26.70
0.34%
300.50
0.82
0.31%
5.91
8.45

1.60%
37.54
7.69

1.60%
37.54
7.69

1.60%
37.54
7.69

1.60%
37.54
7.69

0.97%
48.54
35.69
0.14%
55.39
0.83
4.68%
3650.57
172.20
1.01%
956.41
2.60
0.06%
1.55
2.21
1.48%
159.99
14.16
5.11%
275.76

0.97%
48.54
35.69
0.14%
55.39
0.83
4.68%
3650.57
172.20
1.01%
956.41
2.60
0.06%
1.55
2.21
1.48%
159.99
14.16
5.11%
275.76

0.97%
48.54
35.69
0.14%
55.39
0.83
4.68%
3650.57
172.20
1.01%
956.41
2.60
0.06%
1.55
2.21
1.48%
159.99
14.16
5.11%
275.76

0.97%
48.54
35.69
0.14%
55.39
0.83
4.68%
3650.57
172.20
1.01%
956.41
2.60
0.06%
1.55
2.21
1.48%
159.99
14.16
5.11%
275.76

AGOSTO
SEM 17

SEM 18

SEPTIEMBRE
SEM 19

SEM 20

2.87%
27.46
1.22

2.87%
27.46
1.22

2.87%
27.46
1.22

2.87%
27.46
1.22

1.70%
102.58
2.40

1.70%
102.58
2.40

1.70%
102.58
2.40

1.70%
102.58
2.40

1.53%
94.41
20.13

1.53%
94.41
20.13

1.53%
94.41
20.13

1.53%
94.41
20.13

SEM 21

SEM 22

SEM 23

OCUTBRE
SEM 24

4.82%
83.57
2.42
1.22%
87.32
2.04
5.71%
527.14
1.43

4.82%
83.57
2.42
1.22%
87.32
2.04
5.71%
527.14
1.43

4.82%
83.57
2.42
1.22%
87.32
2.04
5.71%
527.14
1.43

4.82%
83.57
2.42
1.22%
87.32
2.04
5.71%
527.14
1.43

10.68%
12.51
17.88

10.68%
12.51
17.88

10.68%
12.51
17.88

10.68%
12.51
17.88

1.70%
102.58
2.40

1.70%
102.58
2.40

1.70%
102.58
2.40

1.70%
102.58
2.40

SEM 25

1.51%
139.40
0.38

SEM 26

1.51%
139.40
0.38

NOVIEMBRE
SEM 27

1.51%
139.40
0.38

SEM 28

1.51%
139.40
0.38

20.20%
21.48
15.80
25.00%
202.43
14.92
25.00%
251.58
2.36

20.20%
21.48
15.80
25.00%
202.43
14.92
25.00%
251.58
2.36

20.20%
21.48
15.80
25.00%
202.43
14.92
25.00%
251.58
2.36

20.20%
21.48
15.80
25.00%
202.43
14.92
25.00%
251.58
2.36

25.00%
680.09
17.85
25.00%
1396.73
22.70
25.00%
3932.61
15.28
25.00%
28.39
40.55
25.00%
122.28
7.60

25.00%
680.09
17.85
25.00%
1396.73
22.70
25.00%
3932.61
15.28
25.00%
28.39
40.55
25.00%
122.28
7.60

25.00%
680.09
17.85
25.00%
1396.73
22.70
25.00%
3932.61
15.28
25.00%
28.39
40.55
25.00%
122.28
7.60

25.00%
680.09
17.85
25.00%
1396.73
22.70
25.00%
3932.61
15.28
25.00%
28.39
40.55
25.00%
122.28
7.60

SEM 29

SEM 30

SEM 31

DICIEMBRE
SEM 32

12.96%
224.71
6.50
9.39%
672.10
15.72
8.12%
749.63
2.04
12.00%
195.81
42.85
14.32%
16.78
23.97
17.14%
126.32
11.18

12.96%
224.71
6.50
9.39%
672.10
15.72
8.12%
749.63
2.04
12.00%
195.81
42.85
14.32%
16.78
23.97
17.14%
126.32
11.18

12.96%
224.71
6.50
9.39%
672.10
15.72
8.12%
749.63
2.04
12.00%
195.81
42.85
14.32%
16.78
23.97
17.14%
126.32
11.18

12.96%
224.71
6.50
9.39%
672.10
15.72
8.12%
749.63
2.04
12.00%
195.81
42.85
14.32%
16.78
23.97
17.14%
126.32
11.18

5.48%
55.41
1.86
25.00%
199.90
3.97
25.00%
27.95
16.07

5.48%
55.41
1.86
25.00%
199.90
3.97
25.00%
27.95
16.07

5.48%
55.41
1.86
25.00%
199.90
3.97
25.00%
27.95
16.07

5.48%
55.41
1.86
25.00%
199.90
3.97
25.00%
27.95
16.07

SEM 33

SEM 34

SEM 35

ENERO
SEM36

1.66%
118.82
2.78
2.03%
187.41
0.51
3.00%
48.95
10.71

1.66%
118.82
2.78
2.03%
187.41
0.51
3.00%
48.95
10.71

1.66%
118.82
2.78
2.03%
187.41
0.51
3.00%
48.95
10.71

1.66%
118.82
2.78
2.03%
187.41
0.51
3.00%
48.95
10.71

2.30%
16.95
1.50

2.30%
16.95
1.50

2.30%
16.95
1.50

2.30%
16.95
1.50

FEBRERO

SEM 37

SEM 38

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

SEM 44

62.67

62.67

62.67

62.67

194.52

194.52

194.52

194.52

8.27%
591.93
13.84

8.27%
591.93
13.84

8.27%
591.93
13.84

8.27%
591.93
13.84

1.58%
27.40
0.79
1.34%
95.91
2.24
0.88%
81.24
0.22
0.56%
9.14
2.00

1.58%
27.40
0.79
1.34%
95.91
2.24
0.88%
81.24
0.22
0.56%
9.14
2.00

1.58%
27.40
0.79
1.34%
95.91
2.24
0.88%
81.24
0.22
0.56%
9.14
2.00

1.58%
27.40
0.79
1.34%
95.91
2.24
0.88%
81.24
0.22
0.56%
9.14
2.00

0.98%
7.22
0.64

0.98%
7.22
0.64

0.98%
7.22
0.64

0.98%
7.22
0.64

5.65%
54.06
2.39
1.67%
1.07
0.79
2.38%
42.65
1.12
7.71%
465.24
10.88
1.67%
137.90
0.38
1.68%
103.66
22.10

5.65%
54.06
2.39
1.67%
1.07
0.79
2.38%
42.65
1.12
7.71%
465.24
10.88
1.67%
137.90
0.38
1.68%
103.66
22.10

5.65%
54.06
2.39
1.67%
1.07
0.79
2.38%
42.65
1.12
7.71%
465.24
10.88
1.67%
137.90
0.38
1.68%
103.66
22.10

5.65%
54.06
2.39
1.67%
1.07
0.79
2.38%
42.65
1.12
7.71%
465.24
10.88
1.67%
137.90
0.38
1.68%
103.66
22.10

2.36%
22.58
1.00
2.13%
1.36
1.00
0.26%
4.66
0.12
7.94%
479.12
11.20
6.13%
506.19
1.38
1.26%
77.75
16.58

2.36%
22.58
1.00
2.13%
1.36
1.00
0.26%
4.66
0.12
7.94%
479.12
11.20
6.13%
506.19
1.38
1.26%
77.75
16.58

2.36%
22.58
1.00
2.13%
1.36
1.00
0.26%
4.66
0.12
7.94%
479.12
11.20
6.13%
506.19
1.38
1.26%
77.75
16.58

2.36%
22.58
1.00
2.13%
1.36
1.00
0.26%
4.66
0.12
7.94%
479.12
11.20
6.13%
506.19
1.38
1.26%
77.75
16.58

1.36%
13.01
0.58
1.72%
1.10
0.81
1.72%
30.83
0.81
1.11%
66.98
1.57
1.77%
146.16
0.40
1.22%
75.28
16.05

1.36%
13.01
0.58
1.72%
1.10
0.81
1.72%
30.83
0.81
1.11%
66.98
1.57
1.77%
146.16
0.40
1.22%
75.28
16.05

1.36%
13.01
0.58
1.72%
1.10
0.81
1.72%
30.83
0.81
1.11%
66.98
1.57
1.77%
146.16
0.40
1.22%
75.28
16.05

1.36%
13.01
0.58
1.72%
1.10
0.81
1.72%
30.83
0.81
1.11%
66.98
1.57
1.77%
146.16
0.40
1.22%
75.28
16.05

9.65%
92.34
4.09
11.70%
7.49
5.50
8.58%
153.77
4.04
4.34%
261.89
6.12
11.57%
955.41
2.60
19.32%
1192.13
254.19

9.65%
92.34
4.09
11.70%
7.49
5.50
8.58%
153.77
4.04
4.34%
261.89
6.12
11.57%
955.41
2.60
19.32%
1192.13
254.19

9.65%
92.34
4.09
11.70%
7.49
5.50
8.58%
153.77
4.04
4.34%
261.89
6.12
11.57%
955.41
2.60
19.32%
1192.13
254.19

9.65%
92.34
4.09
11.70%
7.49
5.50
8.58%
153.77
4.04
4.34%
261.89
6.12
11.57%
955.41
2.60
19.32%
1192.13
254.19

5.11%
31.79
2.81
1.83%
0.64

5.11%
31.79
2.81
1.83%
0.64

5.11%
31.79
2.81
1.83%
0.64

5.11%
31.79
2.81
1.83%
0.64

2.18%
13.56
1.20

2.18%
13.56
1.20

2.18%
13.56
1.20

2.18%
13.56
1.20

0.72%
4.48
0.40
2.66%
0.93

0.72%
4.48
0.40
2.66%
0.93

0.72%
4.48
0.40
2.66%
0.93

0.72%
4.48
0.40
2.66%
0.93

5.88%
36.57
3.24
15.15%
5.27

5.88%
36.57
3.24
15.15%
5.27

5.88%
36.57
3.24
15.15%
5.27

5.88%
36.57
3.24
15.15%
5.27

AGOSTO
SEM 17

SEPTIEMBRE

SEM 18

SEM 19

SEM 20

SEM 21

SEM 22

SEM 23

OCUTBRE
SEM 24

NOVIEMBRE

SEM 25

SEM 26

SEM 27

SEM 28

1.72

1.72

1.72

1.72

SEM 29

SEM 30

SEM 31

DICIEMBRE
SEM 32

SEM 33

1.06%
127.70
5.65
1.13%
8.19
6.02
0.23%
5.57
1.23
1.13%
511.40
12.05
0.63%
47.59
4.84

13%
0.15
0.33
1.03%
0.62
0.03
7.51%
0.25
0.18

13%
0.15
0.33
1.03%
0.62
0.03
7.51%
0.25
0.18

13%
0.15
0.33
1.03%
0.62
0.03
7.51%
0.25
0.18

SEM 34

SEM 35

1.06%
127.70
5.65
1.13%
8.19
6.02
0.23%
5.57
1.23
1.13%
511.40
12.05
0.63%
47.59
4.84

1.06%
127.70
5.65
1.13%
8.19
6.02
0.23%
5.57
1.23
1.13%
511.40
12.05
0.63%
47.59
4.84

ENERO
SEM36

1.06%
127.70
5.65
1.13%
8.19
6.02
0.23%
5.57
1.23
1.13%
511.40
12.05
0.63%
47.59
4.84

13%
0.15
0.33
1.03%
0.62
0.03
7.51%
0.25
0.18

0.00

0.00

0.00

0.00

7.85%
10.47
0.24

7.85%
10.47
0.24

7.85%
10.47
0.24

7.85%
10.47
0.24

FEBRERO

SEM 37

SEM 38

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

SEM 44

2.50

2.50

2.50

2.50

14.25

14.25

14.25

14.25

0.02%
2.41
0.11
1.13%

0.02%
2.41
0.11
1.13%

0.02%
2.41
0.11
1.13%

0.02%
2.41
0.11
1.13%

1.91%
230.10
10.18
1.74%
12.61
9.28
1.74%
42.11
9.28
1.76%
796.52
18.76
1.98%
149.55
15.20

1.91%
230.10
10.18
1.74%
12.61
9.28
1.74%
42.11
9.28
1.76%
796.52
18.76
1.98%
149.55
15.20

1.91%
230.10
10.18
1.74%
12.61
9.28
1.74%
42.11
9.28
1.76%
796.52
18.76
1.98%
149.55
15.20

1.91%
230.10
10.18
1.74%
12.61
9.28
1.74%
42.11
9.28
1.76%
796.52
18.76
1.98%
149.55
15.20

11.52%
0.13
0.28
23.97%
14.46
0.64
17.49%
0.58
0.43
25.00%
23.15
0.61
17.15%
22.88
0.54
25.00%
85.48
0.23
25.00%
28.32
6.04
25.00%
9.80
0.87
25.00%
0.72
1.96

11.52%
0.13
0.28
23.97%
14.46
0.64
17.49%
0.58
0.43
25.00%
23.15
0.61
17.15%
22.88
0.54
25.00%
85.48
0.23
25.00%
28.32
6.04
25.00%
9.80
0.87
25.00%
0.72
1.96

11.52%
0.13
0.28
23.97%
14.46
0.64
17.49%
0.58
0.43
25.00%
23.15
0.61
17.15%
22.88
0.54
25.00%
85.48
0.23
25.00%
28.32
6.04
25.00%
9.80
0.87
25.00%
0.72
1.96

11.52%
0.13
0.28
23.97%
14.46
0.64
17.49%
0.58
0.43
25.00%
23.15
0.61
17.15%
22.88
0.54
25.00%
85.48
0.23
25.00%
28.32
6.04
25.00%
9.80
0.87
25.00%
0.72
1.96

22.46%
2171.11
4,619.39
18.42%
4887.14
3,788.48

22.46%
2171.11
4,619.39
18.42%
4887.14
3,788.48

22.46%
2171.11
4,619.39
18.42%
4887.14
3,788.48

22.46%
2171.11
4,619.39
18.42%
4887.14
3,788.48

1.27%
122.77
261.20
3.64%
965.75
748.65

1.27%
122.77
261.20
3.64%
965.75
748.65

1.27%
122.77
261.20
3.64%
965.75
748.65

1.27%
122.77
261.20
3.64%
965.75
748.65

1.93%

1.73%

1.73%

1.73%

4.68%

4.61%

4.61%

4.61%

3.58%

3.14%

3.14%

3.14%

2.88%

2.60%

2.60%

2.60%

1.88%

1.88%

1.88%

1.88%

0.88%

0.88%

0.88%

0.88%

0.97%

0.97%

0.97%

0.97%

27.08%

28.81%

30.54%

32.28%

36.95%

41.57%

46.18%

50.79%

54.38%

57.51%

60.65%

63.79%

66.67%

69.27%

71.87%

74.46%

76.34%

78.22%

80.09%

81.97%

82.85%

83.73%

84.62%

85.50%

86.46%

87.43%

88.40%

89.37%

7.13%

18.51%

13.00%

10.68%

7.51%

3.52%

3.87%

32.28%

50.79%

63.79%

74.46%

81.97%

85.50%

89.37%