PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
ITEM
DESCRIPCIN
2
3
4
5
6
7
8
9
10
11
12
13
14
TOTAL COSTO
434,159,278.00
61,926,330.00
48,920,827.00
398,394,774.00
32,663,880.00
748,957,141.00
223,050,809.00
94,584,540.00
1,111,703,546.00
108,660,528.00
152,507,700.00
173,224,806.00
137,539,938.00
93,862,638.00
3,820,156,735.00
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
1. CONSTRUCCION DE POZO PROFUNDO LA UNION (SEV 4)
ITEM
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
1.
1.1
GLB
1.00
$ 3,000,000.00
3,000,000
1.2
GLB
1.00
$ 2,000,000.00
2,000,000
1.3
ML
8.00
$ 650,000.00
5,200,000
$ 180,000.00
$ 200,000.00
$ 220,000.00
$ 8,000,000.00
4,000,000.00
$
$
$
$
$
18,000,000
20,000,000
15,400,000
8,000,000
4,000,000
$ 300,000.00
$ 250,000.00
$
$
52,200,000
24,000,000
$ 260,000.00
31,200,000
$ 180,000.00
12,060,000
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
ML
45.00
$ 900,000.00
40,500,000
ML
33.00
$ 700,000.00
23,100,000
UN
1.00
$ 206,000.00
206,000
ML
18.00
$ 29,360.00
528,480
M3
M3
UN
38.00
2.00
1.00
$ 157,267.00
$ 515,370.00
$ 682,350.00
$
$
$
5,976,146
1,030,740
682,350
1.20
ML
70.00
$ 5,547.00
388,290
1.21
GLB
1.00
$ 11,466,524.00
11,466,524
1.22
GLB
1.00
$ 471,743.00
471,743
1.23
GLB
1.00
$ 7,462,865.00
7,462,865
UN
1.00
$ 15,280,037.00
15,280,037
UN
30.00
$ 545,722.00
16,371,660
2
2.1
2.2
2.3
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
1. CONSTRUCCION DE POZO PROFUNDO LA UNION (SEV 4)
ITEM
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
3
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
UN
31.00
$ 91,500.00
2,836,500
UN
1.00
$ 700,000.00
700,000
UN
1.00
$ 465,280.00
465,280
UN
1.00
$ 134,680.00
134,680
UN
1.00
$ 887,238.00
887,238
UN
1.00
$ 339,536.00
339,536
UN
1.00
$ 253,120.00
253,120
UN
1.00
$ 767,114.00
767,114
UN
1.00
$ 267,040.00
267,040
UN
1.00
$ 821,640.00
821,640
UN
1.00
$ 870,120.00
870,120
UN
1.00
$ 180,000.00
180,000
UN
1.00
$ 4,200,000.00
4,200,000
UN
2.00
$ 301,720.00
603,440
UN
2.00
$ 254,160.00
508,320
UN
1.00
$ 260,080.00
260,080
UN
1.00
329,680.00
329,680
ML
100.00
$ 10,350.00
1,035,000
ML
100.00
$ 3,400.00
340,000
UN
1.00
50,000.00
50,000
M2
M3
43.00
1.00
$
$
3,000.00
30,000.00
$
$
129,000
30,000
M3
0.50
30,000.00
15,000
PRELIMINARES
3.1
3.2
3.3
LOCALIZACION Y REPLANTEO
EXCAVACION PARA CIMIENTACION DE 0.4X0.4
EXCAVACION PARA CIMENTACION DE ANDEN DE
0.2X0.2
CIMIENTOS
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
1. CONSTRUCCION DE POZO PROFUNDO LA UNION (SEV 4)
ITEM
3.4
3.5
3.6
3.7
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
ML
9.00
120,000.00
1,080,000
ML
12.00
40,000.00
480,000
ML
9.00
18,000.00
162,000
M3
1.30
45,000.00
58,500
M2
17.00
18,000.00
306,000
M2
14.00
15,000.00
210,000
MAMPOSTERIA
3.8
PAETE
3.9
ESTRUCTURAS
3.10
ML
9.00
50,000.00
450,000
3.11
ML
1.50
60,000.00
90,000
3.12
M2
9.00
150,000.00
1,350,000
3.13
3.14
M2
M2
5.00
5.60
$
$
40,000.00
90,000.00
$
$
200,000
504,000
3.15
3.16
VENTANA EN ALUMINIO
PUERTA EN LAMINA METLICA NO. 20 (2,0X1.0M)
UN
UN
2.00
1.00
$
$
180,000.00
300,000.00
$
$
360,000
300,000
3.17
3.18
4
4.1
4,1,1
4.2
M2
M2
17.00
17.00
$
$
10,000.00
10,000.00
$
$
170,000
170,000
M3
26.00
30,000.00
780,000
ML
26.00
120,000.00
3,120,000
ML
26.00
18,000.00
468,000
M2
7.80
18,000.00
140,400
CUBIERTA
PISOS
CARPINTERIA
PINTURA
4,2,1
4,2,2
4.3
4,3,1
4.4
4,4,1
ML
14.50
70,000.00
1,015,000
4,4,2
ML
3.00
70,000.00
210,000
M2
15.30
15,000.00
229,500
ML
26.00
80,000.00
2,080,000
ML
26.00
40,000.00
1,040,000
UN
2.00
1,500,000.00
3,000,000
4.5
PAETE
4,5,1
4.6
4.8
MALLA ESLABONADA
SUMINISTRO E INSTALACION DE MALLA ESLABANADA
PARA CERRAMIENTO H = 2,00 M
CONCERTINA DE SEGURIDAD
CONCERTINA DE 18", PARA SEGURIDAD EN LA PARTE
SUPERIOR DEL MURO
CARPINTERIA METALICA
4,8,1
4,6,1
4.7
4,7,1
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
1. CONSTRUCCION DE POZO PROFUNDO LA UNION (SEV 4)
ITEM
4,8,2
4.9
4,9,1
4,9,2
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
UN
1.00
300,000.00
300,000
M2
M2
7.70
7.70
$
$
10,000.00
10,000.00
$
$
77,000
77,000
352,975,023
81,184,255
TOTAL PRESUPUESTO $
434,159,278
AIU:
23.00%
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
2. LINEA DE IMPULSION DEL POZO LA UNION (SEV 4) HASTA EL TANQUE SEMIENTERRADO SAN FELIPE (V=1200M3)
ITEM
DESCRIPCIN
1.
1.1
1.2
OBRAS PRELIMINARES
LOCALIZACION Y REPLANTEO DE ACUEDUCTO
EXCAVACION PARA INSTALACION DE TUBERIA
RELLENO
CON
MATERIAL
SELECCIONADO
COMPACTADO AL 90%
RELLENO ARENA GRIS
RETIRO DE SOBRANTES DE LA EXCAVACION
SUMINISTRO E INSTALACION DE ACCESORIOS
1.3
1.4
1.5
2
2,1
2,2
3
3.1
3.2
4
4.1
5
5.1
6
6.1
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
ML
M3
517.00
246.00
$
$
3,000.00
26,000.00
$
$
1,551,000
6,396,000
M3
214.00
40,000.00
8,560,000
M3
M3
24.00
44.00
$
$
40,000.00
15,000.00
$
$
960,000
660,000
2.00 $
171,039.04 $
342,078
1.00 $
201,563.28 $
201,563
UND
UND
UND
UND
2,500,000
2,200,000
4,000,000
6,204,000
16,771,969
50,346,610
1.00
2,200,000.00
2.00
2,000,000.00
ML
517.00
12,000.00
ML
517.00
32,440.95
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIA PVC 6", RDE 32.5, 125PSI,
UNION MECANICA.
SUMINISTRO DE TUBERIA
SUMINISTRO DE TUBERIA PVC 6", RDE 32.5, 125PSI, UNION
MECANICA.
11,579,720
TOTAL PRESUPUESTO $
61,926,330
AIU:
23.00%
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
3. SUMINISTRO DE EQUIPO DE BOMBEO Y ACCESORIOS, POZO PROFUNDO DE VILLASOL.
ITEM
DESCRIPCIN
1.
1.1
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
UNIDAD
UND
1.00
Vr. UNITARIO
$
1.00
UND
UND
UND
UND
25,000,000
$ 700,000.00
700,000
1.00
1.00
$
$
644,040.00
138,740.00
$
$
644,040
138,740
1.00
917,238.00
917,238
1.00
797,114.00
797,114
1.00
301,840.00
301,840
1.00
917,238.00
917,238
1.00
260,080.00
260,080
1.00
867,920.00
867,920
1.00
726,400.00
726,400
$ 180,000.00
180,000
1.00
UND
UND
UND
UND
1.00
4,500,000.00
4,500,000
2.00
464,240.00
928,480
2.00
329,680.00
659,360
1.00
588,080.00
588,080
110.00
$ 10,350.00
1,138,500
120.00
$ 3,400.00
408,000
50,000.00
100,000
39,773,030
23.00%
$
AIU:
TOTAL PRESUPUESTO $
48,920,827
M
UND
Vr. TOTAL
25,000,000.00
UND
CANTIDAD
2.00
9,147,797
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
4. LINEA DE IMPULSION DESDE EL POZO VILLASOL HASTA EL TANQUE SEMIENTERRADO SAN FELIPE (V=1200M3)
ITEM
DESCRIPCIN
1.
1.1
1.2
OBRAS PRELIMINARES
LOCALIZACION Y REPLANTEO DE ACUEDUCTO
EXCAVACION PARA INSTALACION DE TUBERIA
RELLENO
CON
MATERIAL
SELECCIONADO
COMPACTADO AL 90%
RELLENO ARENA DE GRIS
RETIRO DE SOBRANTES DE LA EXCAVACION
SUMINISTRO E INSTALACION DE ACCESORIOS
1.3
1.4
1.5
2
2,1
2,2
2,3
2,4
3
3.1
3.2
4
4.1
5
5.1
6
6.1
UNIDAD
CANTIDAD
Vr. UNITARIO
ML
M3
2,500.00
1,400.00
$
$
3,000.00
26,000.00
$
$
7,500,000
36,400,000
M3
1,180.00
40,000.00
47,200,000
M3
M3
130.00
270.00
$
$
40,000.00
15,000.00
$
$
5,200,000
4,050,000
9.00 $
595,336.24 $
5,358,026
1.00 $
429,092.00 $
429,092
5.00 $
356,104.80 $
1,780,524
UND
UND
UND
UND
SUMINISTRO E INSTALACION DE CODO PVC DE
9.00 $
319,912.80
8"X11.25
SUMINISTRO E INSTALACION DE VALVULAS DE AISLAMIENTO POR DAOS, FUGAS O MANTENIMIENTO
SUMINISTRO E INSTALACION DE VALVULA DE VENTOSA DE 2" DE
UND
5.00 $
2,500,000.00
DIAMETRO, INCLUYE TODOS LOS ACCESORIOS PARA SU
INSTALACION
SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE 3" DE
UND
3.00 $
2,200,000.00
DIAMETRO, INCLUYE TODOS LOS ACCESORIOS PARA SU
INSTALACION.
CAJAS PARA VALVULAS DE VENTOSAS
CAJA PARA PROTECCION DE VALVULAS DE VENTOSA Y
UND
8.00 $
2,000,000.00
PURGA, SEGUN DISEOS.
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIA PVC 8", RDE 32.5
SUMINISTRO DE TUBERIA
SUMINISTRO DE TUBERIA PVC 8", RDE 32.5, 125PSI, UNION
MECANICA
Vr. TOTAL
2,879,215
12,500,000
6,600,000
16,000,000
40,000,000
138,001,333
323,898,190
74,496,584
398,394,774
ML
2,500.00
16,000.00
ML
2,500.00
55,200.53
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
5. INSTALACION DE ACCESORIOS EN LA LINEA DE IMPULSION ENTRE EL POZO PROFUNDO EL REPARO Y EL TANQUE
SEMIENTERRADO SAN FELIPE (V=1200M3)
ITEM
DESCRIPCIN
1.
1.2
2
OBRAS PRELIMINARES
EXCAVACION PARA INSTALACION DE TUBERIA
SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE VALVULA DE VENTOSA DE 2" DE
DIAMETRO, INCLUYE TODOS LOS ACCESORIOS PARA SU
INSTALACION
SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE 3" DE
DIAMETRO, INCLUYE TODOS LOS ACCESORIOS PARA SU
INSTALACION.
CAJAS PARA VALVULAS DE AISLAMIENTO
CAJA PARA PROTECCION DE VALVULAS DE CONTROL
SECTORIAL, SEGUN DISEOS.
2.1
2.2
3
3.1
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
M3
6.00
26,000.00
156,000
UND
4.00
2,500,000.00
10,000,000
UND
2.00
2,200,000.00
4,400,000
UND
6.00
2,000,000.00
12,000,000
26,556,000
6,107,880
32,663,880
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
6. CONSTRUCCION DE TANQUE SEMIENTERRADO SAN FELIPE v=1200M3.
ITEM
1
1.1
1.2
1.3
1.4
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
PRELIMINARES
LOCALIZACION Y REPLANTEO
DESCAPOTE MANUAL MAS RETIRO H= 0.20 MTS
EXCAVACION A MAQUINA SIN RETIRO
RETIRO SOBRANTES MAQUINA
M2
M2
M3
M3
407.00
407.00
730.00
950.00
3,000.00
10,000.00
25,000.00
15,000.00
$
$
$
$
1,221,000
4,070,000
18,250,000
14,250,000
2.1
M2
366.00
30,000.00
10,980,000
2.2
M3
122.00
750,000.00
91,500,000
2.4
M2
17.40
197,500.00
3,436,500
2.5
M2
420.00
295,000.00
123,900,000
2.8
ML
38.50
100,000.00
3,850,000
2.9
ML
117.50
100,000.00
11,750,000
M2
361.14
197,500.00
71,325,150
ML
401.00
40,000.00
16,040,000
KG
29,600.00
4,000.00
118,400,000
UND
6.00
464,240.00
2,785,440
UND
1.00
555,880.00
555,880
UND
1.00
816,880.00
816,880
UND
4.00
308,800.00
1,235,200
UND
2.00
867,920.00
1,735,840
UND
2.00
355,200.00
710,400
UND
4.00
320,400.00
1,281,600
UND
2.00
470,827.00
941,654
UND
2.00
476,720.00
953,440
UND
2.00
320,400.00
640,800
UND
1.00
$ 180,000.00
180,000
UND
2.00
$ 4,200,000.00
8,400,000
UND
2.00
320,400.00
640,800
UND
2.00
316,800.00
633,600
UND
2.00
495,440.00
990,880
2.10
2.11
2.12
3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.1.11
3.1.12
3.1.13
3.1.14
3.1.15
10
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
6. CONSTRUCCION DE TANQUE SEMIENTERRADO SAN FELIPE v=1200M3.
ITEM
3.1.16
3.1.17
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.2.8
3.2.9
3.2.10
3.2.11
3.2.12
3.2.13
3.2.14
3.2.15
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
UND
2.00
334,320.00
668,640
UND
2.00
320,400.00
640,800
UND
4.00
742,640.00
2,970,560
UND
1.00
555,880.00
555,880
UND
1.00
816,880.00
816,880
UND
2.00
427,120.00
854,240
UND
1.00
1,252,000.00
1,252,000
UND
1.00
464,240.00
464,240
UND
2.00
477,000.00
954,000
UND
1.00
308,800.00
308,800
UND
1.00
253,120.00
253,120
UND
1.00
$ 180,000.00
180,000
UND
1.00
4,500,000.00
4,500,000
UND
2.00
267,040.00
534,080
UND
1.00
106,840.00
106,840
UND
1.00
420,160.00
420,160
UND
1.00
464,240.00
464,240
UND
1.00
316,920.00
316,920
UND
1.00
464,240.00
464,240
UND
1.00
1,190,400.00
1,190,400
UND
1.00
373,760.00
373,760
UND
1.00
867,920.00
867,920
UND
1.00
251,960.00
251,960
UND
1.00
608,080.00
608,080
UND
1.00
1,174,160.00
1,174,160
UND
1.00
448,000.00
448,000
UND
3.00
742,640.00
2,227,920
UND
1.00
555,880.00
555,880
UND
1.00
1,645,806.00
1,645,806
UND
1.00
1,371,940.00
1,371,940
11
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
6. CONSTRUCCION DE TANQUE SEMIENTERRADO SAN FELIPE v=1200M3.
ITEM
DESCRIPCIN
UNIDAD
4.14
UND
1.00
454,800.00
454,800
M3
5.00
700,000.00
3,500,000
M2
23.00
280,000.00
6,440,000
M2
15.00
190,000.00
2,850,000
KG
400.00
4,000.00
1,600,000
M3
1.60
700,000.00
1,120,000
M2
37.00
280,000.00
10,360,000
M2
8.00
190,000.00
1,520,000
KG
384.00
4,000.00
1,536,000
M3
3.00
25,000.00
75,000
UND
1.00
3,000,000.00
3,000,000
5
5.1
5.2
5.3
5.4
6
6.1
6.2
6.3
6.4
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
7.1
7.2
7.3
ML
40.00
48,208.05
1,928,322
7.4
UND
1.00
700,000.00
700,000
UND
8.00
249,640.00
1,997,120
UND
16.00
464,240.00
7,427,840
M2
M2
496.00
496.00
5,000.00
15,149.00
$
$
2,480,000
7,513,904
ML
85.10
178,494.00
15,189,839
ML
6.20
48,208.05
298,890
608,908,245
8
8.1
8.2
9
9.1
9.2
9.3
9.4
AIU:
23.00%
140,048,896
TOTAL PRESUPUESTO $
748,957,141
12
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
7. CONSTRUCCION DE CASETA DE REBOMBEO, CASETA DE CLORACION, SISTEMA DE CLORACION Y ACCESORIOS, EN EL
TANQUE SEMIENTERRADO SAN FELIPE
ITEM
1
1.1
1.1.1
1.1.2
1.1.3
1.2
1.2.1
1.2.2
1.2.3
1.3
1.3.1
1.3.2
1.4
1.4.1
1.4.2
1.5
1.5.1
1.6
1.6.1
1.7
1.7.1
1.7.2
1.7.3
1.7.4
1.7.5
1.8
1.8.1
1.8.2
1.8.3
1.9
1.9.1
1.9.1.1
1.9.1.2
1.9.1.3
1.9.1.4
1.9.2
1.9.2.1
1.9.2.2
1.9.2.3
1.9.2.4
1.9.2.5
1.9.2.6
1.10
1.10.1
2
2.1
2.1.1
2.1.2
2.1.3
2.2
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
CASETA DE REBOMBEO
PRELIMINARES
LOCALIZACION Y REPLANTEO
EXCAVACION PARA CIMIENTACION DE 0.4X0.4
EXCAVACION PARA CIMENTACION DE ANDEN DE 0.2X0.2
CIMIENTOS
VIGA DE AMARRE EN CONCRETO EN FORMA DE T DE 0.2X0.4 Y
ALAS DE 0.1X0.2M CON 4 1/2", 2 3/8" Y AROS DE 3/8",
SEGUN PLANOS.
VIGA DE AMARRE 0,1X0,2 PARA ANDEN, CON 4 3/8" Y AROS
DE 1/4" CADA 0.2M
SOBRECIMIENTO EN BLOQUE DE ARENA-CEMENTO DE 0.09
MORTERO DE PEGA 1:3 ALTURA 2 HILADAS.
MAMPOSTERIA
LEVANTE EN BLOQUE 0.09 MORTERO DE PEGA 1:3
ALFAGIA EN CONCRETO DE 0.15X0.1M Y REMATE 0,05M, CON
43/8" Y AROS DE 1/4" CADA 0.2M.
ESTRUCTURAS
COLUMNAS EN CONCRETO DE 0,15X0,15 H=2,0M CON
43/8" Y AROS DE 1/4" CADA 0.2M PARA CASETA
VIGA DE AMARRE SUPERIOR 0,1X0,2, CON 4 3/8" Y AROS DE
1/4" CADA 0.2M
CUBIERTA
CUBIERTA EN LAMINA TERMOACUSTICA, INCLUYE FERFILES DE
SOPORTE, CABALLETE Y TORNILLOS AUTOPERFORANTES
PAETE
PAETE ALLANADO PARA MURO INTERIOR Y EXTERIORES
CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE VENTANERIA EN ALUMINIO,
SEGUN DISEOS.
PUERTA DOBLE EN LAMINA METALICA DE 2,0X2.15M
PUERTA EN LAMINA METLICA DE 1X2.15M
PUERTA EN LAMINA METLICA DE 0.75X2.15M PARA BAO
SUMINISTRO E INSTALACION DE MESON EN ACERO
INOXIDABLE DE 0.6X4.8M, EN FORMA DE L, CON UNA (1)
POSETA, PARA LABORATORIO.
PISOS Y ENCHAPES LABORATORIO Y BAOS
PISOS EN CONCRETO ALLANADO ESPESOR 6 CMS
ENCHAPE DE PISO PARA INTERIOR EN CERAMICA TRAF. 4 DE
40X40CM.
ENCHAPE DE PARED PARA INTERIOR DE LABORATORIO DE
40X40CM HASTA 1.8M DE ALTURA
SUMINISTRO E INSTALACIONES SANITARIAS E HIDRAULICAS
HIDRAULICAS
SUMINISTRO E INSTALACION DE TUBERIA PVC DE 3/4", PRS
SUMINISTRO E INSTALACION DE CODO DE 3/4" PVC PRS
SUMINISTRO E INSTALACION DE TEE 3/4" PVC PRS
PUNTOS HIDRAULICOS
SANITARIAS
SUMINISTRO E INSTALACION DE LAVAMANOS
SUMINISTRO E INSTALACION DE SANITARIO
SUMINISTRO E INSTALACION DE TUBERIA PVC SAN 4"
SUMINISTRO E INSTALACION DE TUBERIA SAN 2"
PUNTOS SANITARIOS DE 2 Y 4"
CAJA DE REGISTRO DE 80X80CM (60X60CM MEDIDAS
INTERNAS )
PINTURAS
PINTURA EN VINILO PARA MUROS INTERIORES Y EXTERIORES
M2
M3
M3
138.00
72.00
138.00
$
$
$
3,000.00
30,000.00
30,000.00
$
$
$
414,000
2,160,000
4,140,000
ML
72.00
120,000.00
8,640,000
ML
138.00
40,000.00
5,520,000
ML
72.00
18,000.00
1,296,000
M2
141.00
18,000.00
2,538,000
ML
19.00
60,000.00
1,140,000
ML
48.00
86,750.00
4,164,000
ML
72.00
40,000.00
2,880,000
M2
144.00
120,000.00
17,280,000
M2
282.00
15,000.00
4,230,000
M2
33.00
180,000.00
5,940,000
UND
UND
UND
2.00
6.00
1.00
$
$
$
1,500,000.00
350,000.00
300,000.00
$
$
$
3,000,000
2,100,000
300,000
UND
1.00
1,200,000.00
1,200,000
M2
124.00
40,000.00
4,960,000
M2
12.00
45,000.00
540,000
M2
30.00
45,000.00
1,350,000
ML
UND
UND
UND
40.00
4.00
5.00
4.00
$
$
$
$
8,000.00
2,674.00
2,940.00
30,000.00
$
$
$
$
320,000
10,696
14,700
120,000
UND
UND
M
ML
UND
1.00
1.00
38.00
9.00
5.00
$
$
$
$
$
200,000.00
250,000.00
33,647.00
20,321.00
55,000.00
$
$
$
$
$
200,000
250,000
1,278,586
182,889
275,000
UND
1.00
300,000.00
300,000
M2
282.00
10,000.00
2,820,000
M2
M3
M3
18.00
12.00
17.00
$
$
$
3,000.00
30,000.00
30,000.00
$
$
$
54,000
360,000
510,000
CASETA DE CLORACION
PRELIMINARES
LOCALIZACION Y REPLANTEO
EXCAVACION PARA CIMIENTACION DE 0.4X0.4
EXCAVACION PARA CIMENTACION DE ANDEN DE 0.2X0.2
CIMIENTOS
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
7. CONSTRUCCION DE CASETA DE REBOMBEO, CASETA DE CLORACION, SISTEMA DE CLORACION Y ACCESORIOS, EN EL
TANQUE SEMIENTERRADO SAN FELIPE
ITEM
2.2.1
2.2.2
2.2.3
2.3
2.3.1
2.4
2.4.1
2.5
2.5.1
2.6
2.6.1
2.6.2
2.7
2.7.1
2.8
2.8.1
2.9
2.9.1
3.1
3.2
3.4
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
ML
12.00
120,000.00
1,440,000
ML
12.00
18,000.00
216,000
ML
17.00
40,000.00
680,000
ML
11.00
86,750.00
954,250
M2
24.00
40,000.00
960,000
M2
16.00
150,000.00
2,400,000
UND
UND
1.00
1.00
$
$
180,000.00
300,000.00
$
$
180,000
300,000
M2
17.00
40,000.00
680,000
M2
49.00
15,000.00
735,000
M2
49.00
10,000.00
490,000
UND
1.00
13,000,000.00
13,000,000
UND
6.00
3,000,000.00
18,000,000
UND
1.00
5,000,000.00
5,000,000
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
7. CONSTRUCCION DE CASETA DE REBOMBEO, CASETA DE CLORACION, SISTEMA DE CLORACION Y ACCESORIOS, EN EL
TANQUE SEMIENTERRADO SAN FELIPE
ITEM
DESCRIPCIN
UNIDAD
3.6
UND
3.7
3.8
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
CANTIDAD
1.00
Vr. UNITARIO
Vr. TOTAL
10,000,000.00
10,000,000
UND
1.00
800,000
800,000
20.00
92,245.00
1,844,900
M3
M2
114.00
26.00
$
$
30,000.00
30,000.00
$
$
3,420,000
780,000
M3
8.00
750,000.00
6,000,000
M2
78.00
295,000.00
23,010,000
KG
1,417.00
4,000.00
5,668,000
M2
3.00
197,500.00
592,500
UND
1.00
2,500,000.00
2,500,000
M3
1.20
1,000,000.00
1,203,600
181,342,121
AIU:
23.00%
41,708,688
TOTAL PRESUPUESTO $
223,050,809
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
8. CONSTRUCCION DEL MURO DE CERRAMIENTO PERIMETRAL EN EL TANQUE SAN FELIPE.
ITEM
DESCRIPCIN
1.1
1.1.1
1.1.2
1.2
PRELIMINARES
LOCALIZACION Y REPLANTEO
EXCAVACION PARA CIMIENTACION DE 0.4X0.4
CIMIENTOS
VIGA DE AMARRE EN CONCRETO EN FORMA DE T DE 0.2X0.4 Y ALAS DE 0.1X0.2M
1.2.1
CON 4 1/2", 2 3/8" Y AROS DE 3/8", SEGUN PLANOS.
SOBRECIMIENTO EN BLOQUE DE ARENA-CEMENTO DE 0.09 MORTERO DE PEGA 1:3
1.2.2
ALTURA 2 HILADAS.
1.3 MAMPOSTERIA Y ALFAGIA
1.3.1 LEVANTE EN BLOQUE 0.09 MORTERO DE PEGA 1:3
1.3.2 VIGA DE AMARRE SUPERIOR DE 0,1X0,2M, CON 43/8" Y AROS DE 1/4" CADA 0.2M
1.4
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
186.00
186.00
$
$
3,000.00
6,000.00
$
$
558,000
1,116,000
ML
186.00
120,000.00
22,320,000
ML
182.00
18,000.00
3,276,000
M2
486.00
18,000.00
8,748,000
ML
168.00
40,000.00
6,720,000
ML
200.00
70,000.00
14,000,000
ML
186.00
40,000.00
7,440,000
M2
M2
972.00
120.00
$
$
10,000.00
10,000.00
$
$
9,720,000
1,200,000
1,500,000
ESTRUCTURAS
1.4.1
1.5
1.5.1
1.6
1.6.1
1.6.2
1.7
CONCERTINA DE SEGURIDAD
CONCERTINA DE 18" PARA SEGURIDAD EN LA PARTE SUPERIOR DEL MURO
PINTURA PARA MUROS Y ESTRUCTURAS
PINTURA EN VINILO TIPO I PARA MUROS INTERIORES Y EXTERIORES
PINTURA EN VINILO TIPO I PARA MUROS ESTRUCTURAS
CARPINTERIA METALICA
UND
1.00
1,500,000.00
UND
1.00
300,000.00
300,000
76,898,000
AIU:
17,686,540
TOTAL PRESUPUESTO $
23.00%
94,584,540
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
9. OPTIMIZACION REDES DE DISTRIBUCION DE AGUA POTABLE Y REDES DE AGUA POTABLE
ITEM
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
1.
OBRAS PRELIMINARES
1.1
ML
8,354.00
3,000.00
1.2
M3
3,238.00
26,000.00
84,188,000
M3
2,845.00
40,000.00
113,800,000
M3
M3
ML
325.00
512.00
2,230.00
$
$
$
40,000.00
15,000.00
8,000.00
$
$
$
13,000,000
7,680,000
17,840,000
M2
560.00
90,000.00
50,400,000
M2
560.00
15,000.00
8,400,000
M3
120.00
20,000.00
2,400,000
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
25,062,000
2.00
27,639.00 $
55,278
4.00
28,655.00 $
114,620
11.00
23.00
1.00
3.00
1.00
9.00
4.00
31.00
7.00
2.00
6.00
2.00
5.00
4.00
3.00
3.00
1.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
27,223.00
32,426.00
37,244.00
161,563.00
339,092.00
123,436.00
103,622.00
102,504.00
136,404.00
125,825.00
166,171.00
184,727.00
339,092.00
377,355.00
391,464.00
619,335.00
649,551.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
299,453
745,798
37,244
484,689
339,092
1,110,924
414,488
3,177,624
954,828
251,650
997,026
369,454
1,695,460
1,509,420
1,174,392
1,858,005
649,551
1.00
287,800.00 $
287,800
2.00
513,840.00 $
1,027,680
1.00
600,840.00 $
600,840
1.00
672,760.00 $
672,760
1.00
1,066,280.00 $
1,066,280
2.00
1,066,280.00 $
2,132,560
72.00
55,947.60 $
4,028,227
2.00
97,052.20 $
194,104
1.00
62,234.80 $
62,235
3.00
97,052.20 $
291,157
2.00
258,145.68 $
516,291
1.00
258,145.68 $
258,146
1.00
301,970.88 $
301,971
28.00
2.00
$
$
27,977.00 $
92,245.00 $
783,356
184,490
17
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
9. OPTIMIZACION REDES DE DISTRIBUCION DE AGUA POTABLE Y REDES DE AGUA POTABLE
ITEM
3
3.1
3.2
4
4.1
4.2
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
210,000.00
64,680,000
100,000.00
166,400,000
5,000,000.00
5,000,000
UND
1.00
464,240.00
464,240
UND
2.00
608,080.00
1,216,160
UND
2.00
797,114.00
1,594,228
UND
1.00
1,295,680.00
1,295,680
UND
1.00
301,840.00
301,840
UND
1.00
633,320.00
633,320
UND
1.00
366,800.00
366,800
UND
1.00
320,400.00
320,400
UND
1.00
180,000.00
180,000
UND
1.00
867,920.00
867,920
UND
1.00
427,120.00
427,120
M3
2.00
700,000.00
1,400,000
M2
20.00
280,000.00
5,600,000
M2
7.00
190,000.00
1,330,000
KG
244.00 $
4,000.00
SUMINISTRO E INSTALACION DE VALVULAS DE AISLAMIENTO POR DAOS, FUGAS O MANTENIMIENTO
976,000
6.1
UND
1.00
543,480.00
543,480
6.2
UND
3.00
675,720.00
2,027,160
6.3
UND
4.00
802,160.00
3,208,640
6.4
UND
4.00
867,920.00
3,471,680
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
5
5.1
5.2
5.3
5.4
6
18
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
9. OPTIMIZACION REDES DE DISTRIBUCION DE AGUA POTABLE Y REDES DE AGUA POTABLE
ITEM
DESCRIPCIN
UNIDAD
7.1
UND
12.00
2,000,000.00
UND
10.00
5,000,000.00
UND
10.00
1,921,200.00
8
8.1
9
10
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIA PVC 2 1/2" RDE 32.5
MECANICA.
INSTALACION DE TUBERIA PVC 4" RDE 32.5
MECANICA.
INSTALACION DE TUBERIA PVC 6", RDE 32.5, 125PSI,
MECANICA.
INSTALACION DE TUBERIA PVC 8", RDE 32.5,
MECANICA.
10.2
10.3
10.4
11
11.1
11.2
Vr. UNITARIO
Vr. TOTAL
$
24,000,000
50,000,000
19,212,000
32,300,000
160,000
11,112,000
15,216,000
55,846,700
295,580
29,830,164
52,130,016
903,824,021
9.1
10.1
CANTIDAD
UNION
ML
6,460.00
5,000.00
UNION
ML
20.00
8,000.00
UNION
ML
926.00
12,000.00
UNION
ML
951.00
16,000.00
SUMINISTRO DE TUBERIA
SUMINISTRO DE TUBERIA PVC 2 1/2" RDE 32.5 UNION
MECANICA.
ML
6,460.00
8,645.00
ML
20.00
14,779.00
ML
926.00
32,214.00
ML
951.00
54,816.00
11.3
11.4
207,879,525
TOTAL PRESUPUESTO $
1,111,703,546
AIU:
23.00%
19
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
10. SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO Y ACCESORIOS DE LA ESTACION DE REBOMBEO SAN FELIPE
ITEM
DESCRIPCIN
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
UND
3.00
16,000,000.00
48,000,000
UND
4.00
464,240.00
1,856,960
UND
2.00
366,800.00
733,600
UND
1.00
797,114.00
797,114
UND
3.00
867,920.00
2,603,760
UND
3.00
726,400.00
2,179,200
UND
3.00
329,680.00
989,040
UND
1.00
138,740.00
138,740
UND
1.00
797,114.00
797,114
UND
3.00
1,077,880.00
3,233,640
UND
3.00
1,239,660.00
3,718,980
UND
1.00
917,238.00
917,238
UND
2.00
260,080.00
520,160
UND
1.00
644,040.00
644,040
UND
3.00
476,720.00
1,430,160
UND
3.00
1,911,769.00
5,735,307
UND
3.00
1,295,680.00
3,887,040
UND
3.00
236,600.00
709,800
UND
1.00
450,000.00
450,000
UND
1.00
8,000,000.00
8,000,000
UND
1.00
1,000,000.00
1,000,000
88,341,893
AIU:
23.00%
20,318,635
TOTAL PRESUPUESTO $
108,660,528
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
11. INSTRUMENTACION Y EQUIPOS DE TELEMETRIA DEL POZO PROFUNDO EL REPARO, POZO PROFUNDO LA UNION (SEV 4) Y
DEL POZO PROFUNDO DE VILLASOL
ITEM
1.1
1.2
1.3
1.4
1.5
DESCRIPCIN
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
UND
3.00
1,330,000
3,990,000
UND
3.00
7,000,000
21,000,000
UND
UND
3.00
3.00
$
$
6,000,000
2,000,000
$
$
18,000,000
6,000,000
UND
3.00
25,000,000
75,000,000
123,990,000
28,517,700
TOTAL PRESUPUESTO $
152,507,700
AIU:
23.00%
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
12. INSTALACIONES ELECTRICAS ESTACION DE REBOMBEO DESDE TANQUE BAJO A TANQUE ELEVADO
ITEM
DESCRIPCIN
1.0
1.0
A. INSTALACIONES ELECTRICAS
LINEA PRIMARIA DE MT
ARREGLO TRANSFORMADOR TRIFASICO DE 75 KVA 13200/456-254V
EXISTENTE, SUMINISTRO E INSTALACION DE PROTECCIONES Y PUESTA A
TIERRA EN MEDIA TENSION
SUMINISTRO E INSTALACION DE ESTRIBOS EN CALIENTE
CAJA DE INSPECCION
SUMINISTRO E INSTALACION DE CAJAS DE REGISTRO EN MAMPOSTERIA EN
DE 0,60x0,60x0,80 M
MALLA A TIERRA
SUMINISTRO E INSTALACION DE UNA MALLA A TIERRA COMPUESTA POR
SEIS VARILLAS COOPERWELD DE 5/8"x2,4m, CABLE DE COBRE DESNUDO
No. 2/0 Y SOLDADURA CADWELL
ACOMETIDA SECUNDARIA DESDE TRANSFORMADOR A TRANSFERENCIA
AUTOMATICA
SUMINISTRO DE ACOMETIDA SUBTERRANEA EN CABLE DE COBRE THHN 3x
No.1/0 + 1x No 1/0 + 1 x No. 2 THHN EN DUCTO METALICO DE 2" Y PVC
ENTERRADO 2". DESDE TRANSFORMADOR A TRANSFERENCIA
AUTOMATICA
TRANSFERENCIA AUTOMATICA
GABINETE METALICO INCLUYE TRANSFRENCIA AUTOMATICA PARA
PLANTA DE EMERGENCIA 100 KVA Y ANALIZADOR DE RED
ALIMENTACION DESDE TRANSFERENCIA A CENTRO DE CONTROL DE
MOTORES CCM1
SUMINISTRO DE ACOMETIDA SUBTERRANEA EN CABLE DE COBRE THHN 3x
No.2/0 + 1x No 2/0 + 1 x No. 2 THHN EN DUCTO METALICO DE 3" Y PVC
ENTERRADO 3". DESDE TRANSFERENCIA A CENTRO DE CONTROL DE
MOTORES
PLANTA ELECTRICA
PLANTA DE EMERGENCIA DIESEL DE 100 KVA TRIFASICA, CUATRO HILOS,
460/230 -120VOLTIOS, 1800 RPM, INCLUYE TANQUE DE
COMBUSTIBLE,PROTECCION ELECTROMAGNETICA, BATERIA Y
CARGADOR.
1.1
1.2
2.0
2.1
3.0
3.1
4.0
4.1
5.0
5.1
6.0
6.1
7.0
7.1
8.0
8.1
9.0
9.1
10.0
10.1
11.0
11.1
11.2
11.3
11.4
UNIDAD
CANTIDAD
Vr. UNITARIO
Vr. TOTAL
UND
1.00
9,000,000.00 $
9,000,000
UND
3.00
151,000.00 $
453,000
UND
3.00
300,000.00 $
900,000
UND
1.00
4,000,000.00 $
4,000,000
ML
40.00
450,000.00 $
18,000,000
UND
1.00
5,000,000.00 $
5,000,000
ML
10.00
400,000.00 $
4,000,000
UND
1.00
50,000,000.00 $
50,000,000
ML
6.00
400,000.00 $
2,400,000
UND
1.00
15,000,000.00 $
15,000,000
ML
15.00
300,000.00 $
4,500,000
ML
4.00
102,544.00 $
410,176
UND
1.00
500,000.00 $
500,000
UND
18.00
69,000.00 $
1,242,000
1.00
14.00
72,000.00 $
1,008,000
22
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
12. INSTALACIONES ELECTRICAS ESTACION DE REBOMBEO DESDE TANQUE BAJO A TANQUE ELEVADO
ITEM
DESCRIPCIN
UNIDAD
11.5
UND
2.00
105,000.00 $
210,000
11.6
UND
10.00
131,000.00 $
1,310,000
11.7
ML
120.00
85,000.00 $
10,200,000
Und
6.00
450,000.00 $
2,700,000
GL
1.00
10,000,000.00 $
10,000,000
140,833,176
11.8
12.0
12.1
CANTIDAD
AIU:
Vr. UNITARIO
23.00%
Vr. TOTAL
32,391,630
TOTAL PRESUPUESTO $
173,224,806
23
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
13. INSTALACIONES ELECTRICAS ESTACION DE BOMBEO "LA UNION" EN EL SISTEMA DEL POZO PROFUNDO
ITEM
1.0
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
2.0
2.1
3.0
3.1
4.0
4.1
5.0
5.1
6.0
6.1
7.0
7.1
7.2
7.3
DESCRIPCIN
UNIDAD
CANTIDAD
A. INSTALACIONES ELECTRICAS
LINEA PRIMARIA DE MT
SUMINISTRO Y ARMADO DE ESTRUCTURA DE MEDIA TENSION TRES
UND
FASES TIPO FIN DE LINEA EN POSTE EXISTENTE
SUMINISTRO Y ARMADO DE ESTRUCTURA DE MEDIA TENSION TRES
UND
FASES TIPO ALINEACION ANGULO < 5 EN POSTE PROYECTADO
SUMINISTRO Y ARMADO DE ESTRUCTURA DE MEDIA TENSION TRES
UND
FASES TIPO ALINEACION ANGULO ENTRE 5 Y 19 EN POSTE
PROYECTADO
SUMINISTRO Y ARMADO DE ESTRUCTURA DE MEDIA TENSION TRES
UND
FASES TIPO FIN DE LINEA EN POSTE PROYECTADO
UND
SUMINISTRO E INSTALACION DE TEMPLETE DIRECTO A TIERRA
ML
RIEGA TENDIDO Y TENSIONADO DE CONDUCTOR ACSR No. 1/0
SUMINISTRO E INSTALACION DE TRANSFORMADOR TRIFASICO DE 45
UND
KVA 13200/460-265V PROTECCIONES Y PUESTA A TIERRA EN MEDIA
TENSION
UND
SUMINISTRO E INSTALACION DE ESTRIBOS EN CALIENTE
CAJA DE INSPECCION
SUMINISTRO E INSTALACION DE CAJAS DE REGISTRO EN
UND
MAMPOSTERIA EN DE 0,60x0,60x0,60 M
MALLA A TIERRA
SUMINISTRO E INSTALACION DE UNA MALLA A TIERRA COMPUESTA
UND
POR CUATRO VARILLAS COOPERWELD DE 5/8"x2,4m, CABLE DE
COBRE DESNUDO No. 2/0 Y SOLDADURA CADWELL
ACOMETIDA SECUNDARIA DESDE TRANSFORMADOR A CENTRO DE CONTROL DE MOTORES
SUMINISTRO DE ACOMETIDA SUBTERRANEA EN CABLE DE COBRE
THHN 3x No.4 + 1x No.4 + 1 x No. 2 THHN EN DUCTO METALICO DE 1
ML
1/2" Y PVC ENTERRADO 1 1/2". DESDE TRANSFORMADOR A CENTRO
DE CONTROL DE MOTORES
TABLERO GENERAL EN CASETA DE BOMBEO
SUMINISTRO E INSTALACION DE TABLERO DE CONTROL DE
MOTORES,INCLUYE PROTECCION PRINCIPAL DE 75 A. BREAKER DE
PROTECCION PARA ARRANCADOR DE 50 AMP, BARRAJE DE COBRE,
ELEMENTOS DE MEDIDA (VOLTIMETRO, AMPERIMETROS, SELECTORES),
ANALIZADOR DE RED, CONTROL DE NIVEL, MONITOR DE VOLTAJE, UN
(1) ARRANCADOR SUAVE PARA MOTOR TRIFASICO DE 30 HP-460V
INCLUYE: INTERRUPTORES, CONTACTORES, PULSADORES Y BANCO
CAPACITOR AUTOMATICO
ACOMETIDAS A MOTORES
SUMINISTRO E INSTALACION DE ACOMETIDA A MOTOR EN CABLE DE
FUERZA SUMERGIBLE CLASE B TIPO ENCAUCHETADO FLEXIBLE CON
AISLAMIENTO TIPO SEOOW - 600V, CALIBRE 4xNo.4 , DUCTO PVC DE
1 1/2"
SALIDAS PARA ALUMBRADO Y TOMAS
SUMINISTRO E INSTALACION DE ACOMETIDA DESDE TABLERO
GENERAL A TABLEROS ALUMBRADO Y TOMAS TD-1 EN CABLE DE
COBRE CALIBRE 4xNo 8 AWG Y EN DUCTO PVC DE 1"
SUMINISTRO E INSTALACION DE UN TABLERO BIFASICO CON PUERTA
DE 8 CIRCUITOS CON BARRAJE DE 125 A, BARRA NEUTRO Y TIERRA.
INCLUYE: INTERRUPTORES TERMOMAGNETICOS ENCHUFABLES
UNIPOLARES Y BIPOLARES.
SALIDA ELECTRICA PARA ALUMBRADO INCLUYE: TUBERIA CONDUIT
PVC, CON ACCESORIOS Y ALAMBRE THWN N 12
Vr. UNITARIO
Vr. TOTAL
1.00
1,700,000.00 $
1,700,000
5.00
4,850,000.00 $
24,250,000
1.00
4,650,000.00 $
4,650,000
1.00
4,650,000.00 $
4,650,000
3.00
1,650.00
$
$
570,000.00 $
5,000.00 $
1,710,000
8,250,000
1.00
$ 20,000,000.00 $
20,000,000
3.00
151,000.00 $
453,000
2.00
300,000.00 $
600,000
1.00
4,000,000.00 $
4,000,000
30.00
350,000.00 $
10,500,000
$ 15,000,000.00 $
15,000,000
UND
1.00
ML
70.00
212,000.00 $
14,840,000
ML
2.00
102,544.00 $
205,088
UND
1.00
500,000.00 $
500,000
UND
3.00
69,000.00 $
207,000
7.4
1.00
1.00
72,000.00 $
72,000
7.5
UND
1.00
103,000.00 $
103,000
7.6
UND
1.00
131,000.00 $
131,000
111,821,088
23.00%
$
AIU:
TOTAL PRESUPUESTO $
137,539,938
25,718,850
24
PRESUPUESTO
OPTIMIZACION DEL SISTEMA DE ACUEDUCTO DE LA CABECERA MUNICIPAL DE LOS PALMITOS
14. INSTALACIONES ELECTRICAS ESTACION DE BOMBEO "VILLA SOL" EN EL SISTEMA DEL POZO PROFUNDO
ITEM
DESCRIPCIN
1.0
1.0
A. INSTALACIONES ELECTRICAS
LINEA PRIMARIA DE MT
SUMINISTRO Y ARMADO DE ESTRUCTURA DE MEDIA TENSION TRES
FASES TIPO FIN DE LINEA EN POSTE PROYECTADO 12MX1.050 KGF
SUMINISTRO E INSTALACION DE TRANSFORMADOR TRIFASICO DE
112,5 KVA 13200/460-265V PROTECCIONES Y PUESTA A TIERRA EN
MEDIA TENSION
SUMINISTRO E INSTALACION DE ESTRIBOS EN CALIENTE
CAJA DE INSPECCION
SUMINISTRO E INSTALACION DE CAJAS DE REGISTRO EN
MAMPOSTERIA EN DE 0,60x0,60x0,60 M
MALLA A TIERRA
1.1
1.2
1.3
2.0
2.1
3.0
3.1
4.0
4.1
5.0
5.1
6.0
6.1
7.0
7.1
7.2
7.3
UNIDAD
CANTIDAD
ACOMETIDAS A MOTORES
SUMINISTRO E INSTALACION DE ACOMETIDA A MOTOR EN CABLE DE
FUERZA SUMERGIBLE CLASE B TIPO ENCAUCHETADO FLEXIBLE CON
AISLAMIENTO TIPO SEOOW - 600V, CALIBRE 4xNo.1/0 , DUCTO PVC
DE 2
SALIDAS PARA ALUMBRADO Y TOMAS
SUMINISTRO E INSTALACION DE ACOMETIDA DESDE TABLERO
GENERAL A TABLEROS ALUMBRADO Y TOMAS TD-1 EN CABLE DE
COBRE CALIBRE 4xNo 8 AWG Y EN DUCTO PVC DE 1"
SUMINISTRO E INSTALACION DE UN TABLERO BIFASICO CON PUERTA
DE 8 CIRCUITOS CON BARRAJE DE 125 A, BARRA NEUTRO Y TIERRA.
INCLUYE: INTERRUPTORES TERMOMAGNETICOS ENCHUFABLES
UNIPOLARES Y BIPOLARES.
SALIDA ELECTRICA PARA ALUMBRADO INCLUYE: TUBERIA CONDUIT
PVC, CON ACCESORIOS Y ALAMBRE THWN N 12
Vr. TOTAL
UND
1.00
1,700,000.00 $
1,700,000
UND
1.00
28,000,000.00 $
28,000,000
UND
3.00
151,000.00 $
453,000
UND
2.00
300,000.00 $
600,000
UND
1.00
4,000,000.00 $
4,000,000
30.00
350,000.00 $
10,500,000
UND
1.00
15,000,000.00 $
15,000,000
ML
70.00
212,000.00 $
14,840,000
ML
2.00
102,544.00 $
205,088
UND
1.00
500,000.00 $
500,000
UND
3.00
69,000.00 $
207,000
Vr. UNITARIO
7.4
1.00
1.00
72,000.00 $
72,000
7.5
UND
1.00
103,000.00 $
103,000
7.6
UND
1.00
131,000.00 $
131,000
76,311,088
AIU:
23.00%
17,551,550
TOTAL PRESUPUESTO $
93,862,638