OBRA

ENTIDAD
CONTRATISTA
CONTRATO
LUGAR

RESUMEN DE LIQUIDACION DE OBRA


Item

Concepto

Costo
de Obra
S/.

Montos
Pagados
S/.

Saldo
por Pagar
S/.
0.00
0.00
0.00

1.00 ADELANTOS OTORGADOS


1.10 Adelanto Directo
1.20 Adelanto de Materiales

0.00
0.00

0.00
0.00

2.00 DE LAS VALORIZACIONES


2.20 Valorizaciones Ppto. Principal
2.20 Valorizacin Adicionales

305,321.38
286,296.39
19,024.99

304,850.69
285,925.45
18,925.24

470.69
370.94
99.75

578.31
483.18
95.13

544.37
450.25
94.12

33.94
32.93
1.01

4,294.95
0.00
4,294.95

32,922.85
28,629.64
4,293.21

-28,627.90
-28,629.64
1.74

-81.95
-94.36
12.41

-92.25
-92.25
0.00

10.30
-2.11
12.41

301,522.79

272,379.96

29,142.83

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

301,522.79

272,379.96

29,142.83

57,289.33
57,289.33
358,812.12

51,752.19
51,752.19
324,132.15

5,537.14
5,537.14
34,679.97

3.00 REAJUSTE DE PRECIOS


3.10 Reintegros Ppto. Principal
3.20 Reintegros Adicionales
4.00 AMORTIZACIONES
4.10 Amortizacin Adelanto Directo
4.20 Amortizacin Adel. Para Materiales
5.00 DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE
Por Adelanto en Efectivo
Por Adelanto de Materiales
6.00 MONTO BRUTO VALORIZ. REAJUSTADO (1+2+3-4+5)
7.00
7.10
7.15
7.40
7.41
7.42

OTROS
VAL. MAYORES GASTOS GENERALES
Val. May Gastos Generales (Ampl. N 6)
INTERESES
Intereses por demora en pago de Val C.P.
Intereses por demora en pago de Val Adic.

8.00 LIQUIDACION NETA SIN IGV (6+7)


9.00 IGV (18%)
18% Liquidacin Neta
10.00 COSTO TOTAL DE OBRA (8+9)

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONTRATISTA

#REF!

CONTRATO

#REF!

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO

OBRA

PPTO. REFERENCIAL
PPTO. CONTRATO
FACTOR RELACION

#REF!

Item
DESCRIPCION
01
OBRAS PRELIMINARES
01.01
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
01.02
TRAZO Y REPLANTEO
01.03
MANTENIMIENTO DE TRANSITO YSEGURIDAD VIAL
01.04
ACCESO A CANTERAS, DME,PLANTAS DE PROCESO, FUENTES DE AGUA

Und.
GLB
KM
GLB
KM

Metrado
0.80
2.65
0.80
0.38

COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD

TOTAL

Parcial (S/.)

Set -09

Oct-09

Nov-09

TOTALES

247,476.18
1,560.77
58,131.36
8,945.78

197,980.94
4,136.04
46,505.09
3,399.40

39,596.19
827.21
9,301.02
679.88

98,990.47
2,068.02
23,252.55
1,699.70

59,394.28
1,240.81
13,951.53
1,019.82

197,980.94
4,136.04
46,505.09
3,399.40

252,021.47
3,780.32
5,292.46
25,202.14
286,296.39
51,533.36
337,829.75

S/.

252,021.47

50,404.29

126,010.74

75,606.44

1.50%

S/.

3,780.32

756.06

1,890.16

1,134.10

2.10%

S/.

5,292.45

1,058.49

2,646.23

1,587.74

10.00%

S/.

25,202.15

5,040.43

12,601.07

7,560.64

S/.

286,296.39

57,259.27

143,148.20

85,888.92

51,533.35

10,306.67

25,766.68

15,460.01

337,829.74

67,565.94

168,914.88

101,348.93

SUB TOTAL
IGV

P.U.

337,829.74
337,829.74
1.00000

18%

OBRA

#REF!

ENTIDAD CONTR: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL ( MTC - PROVIAS NACIONAL )
CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

VALORIZACIONES RECALCULADAS
OBRAS DE PAVIMENTACIN
VALORIZACIONES DE OBRA
tem

Descripcin

Und.

Metrado

P. Unit.

Costo

VAL. N 01 Set-09

Total

01

Metrado

VAL. N 02 Oct-09

S/.

Metrado

VAL. N 03 Nov-09

S/.

Metrado

S/.

VALORIZACIN

SALDO

ACUMULADA

POR VALORIZAR

Metrado

S/.

Metrado

S/.

OBRAS PRELIMINARES

01.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

GLB

0.80

247,476.18

197,980.94

0.08

19,798.09

0.35

86,616.66

0.37

91,566.19

0.80

197,980.94

0.00

0.00

01.02

TRAZO Y REPLANTEO

KM

2.65

1,560.77

4,136.04

1.24

1,935.35

1.00

1,560.77

0.41

639.92

2.65

4,136.04

0.00

0.00

01.03

MANTENIMIENTO DE TRANSITO YSEGURIDAD VIAL

GLB

0.80

58,131.36

46,505.09

0.30

17,439.41

0.3000

17,439.41

0.2000

11,626.27

0.80

46,505.09

0.0000

0.00

01.04

ACCESO A CANTERAS, DME,PLANTAS DE PROCESO, FUENTES DE AG

KM

0.38

8,945.78

3,399.40

0.02

178.92

0.10

894.58

0.26

2,325.90

0.38

3,399.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

COSTO DIRECTO

252,021.47

39,351.77

106,511.42

106,158.28

252,021.47

0.00

GASTOS GENERALES FIJOS

1.50%

3,780.32

590.28

1,597.67

1,592.37

3,780.32

0.00

GASTOS GENERALES VARIABLES

2.10%

5,292.45

826.39

2,236.74

2,229.32

5,292.45

0.00

10.00%

25,202.15

3,935.18

10,651.14

10,615.83

25,202.15

0.00

286,296.39

44,703.62

120,996.97

120,595.80

286,296.39

0.00

51,533.35

8,046.65

21,779.45

21,707.24

51,533.35

0.00

337,829.74

52,750.27

142,776.42

142,303.04

337,829.74

0.00

UTILIDAD
SUB TOTAL
IGV
TOTAL

18%

OBRA

#REF!

ENTIDAD CONTRATANTE

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL ( MTC - PROVIAS NACIONAL )

CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

VALORIZACIONES RECALCULADAS DEL PRESUPUESTO ADICIONAL N 01


VALORIZACIONES DE OBRA
tem

Descripcin

Und.

Metrado

Precio

Costo

Unitario

Total

Val. N 01

Val. N 02

Nov-09

Dec-09

Metrado

S/.

Metrado

S/.

VALORIACIN

SALDO POR

ACUMULADA

VALORIZAR

Metrado

S/.

Metrado

S/.

6.00

TRANSPORTES

6.03

TRANSPORTE DE MATERIAL GRANULAR D<1 KM

M3-KM

310.11

6.36

1,972.30

235.24

1,496.13

66.00

419.76

301.24

1,915.89

8.87

56.41

6.04

TRANSPORTE DE MATERIAL GRANULAR D>1 KM

M3-KM

12,040.63

1.15

13,846.72

5,925.80

6,814.67

5,515.06

6,342.32

11,440.86

13,156.99

599.77

689.73

S/.

15,819.02

8,310.80

2,565.85

1,348.01

COSTO DIRECTO
GASTOS GENERALES FIJOS

S/.

6,762.08
-

16.22%

S/.

UTILIDAD

10.00%

S/.

1,581.90

831.08

676.21

1,507.29

74.61

S/.

19,966.77

10,489.89

8,535.10

19,024.99

941.77

IGV
TOTAL VALORIZADO

19%

2,444.82

746.14

GASTOS GENERALES VARIABLES

SUB TOTAL

1,096.81

15,072.88

121.02

3,793.69

1,993.08

1,621.67

3,614.75

178.94

23,760.46

12,482.97

10,156.77

22,639.74

1,120.71

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

CLCULO DE LOS COEFICIENTES DE REAJUSTES K DEL CONTRATO PRINCIPAL

K =
OBRAS DE PAVIMENTACIN
Monomio
Elemento representativo
1 Mano de obra inc. Leyes sociales
2 Madera nacional para encof.
Acero de Construccin corrugado
Cemento Portland Tipo I
3 Dinamita
Dlar (General Promedio)
4 Maquinaria y Equipo Importado
Maquinaria y Equipo Nacional
Flete Terrestre
5 Indice General de Precios al consumido

INDICE
47
43
3
21
28
30
49
48
32
39

0.086 MOr + 0.270 CMAr + 0.120 DOr + 0.297 EQyFr + 0.227 Ir


MOo
CMAo
CCDo
EQyF
Io

SIMBOLO

INCIDENCIA

MO
CAM

100.000%
7.778%
10.370%
81.852%
10.000%
90.000%
49.832%
42.424%
7.744%
100.000%

DO
EQyF

GGU

K=

FACTOR
0.086
0.270

0.120
0.297

0.227

INDICE BASE INDICE REAJ.


May-09
Sep-09
397.23
413.41
670.87
690.97
453.81
457.29
350.43
346.98
380.97
385.88
364.25
365.90
251.25
250.16
330.15
331.98
415.24
418.41
344.25
346.32

Coef
INDICE REAJ.
Kr
Oct-09
0.090
413.41
680.35
451.47
0.269
346.98
380.97
0.121
361.48
246.98
330.43
0.297
418.41
0.228
346.32
1.005

Coef
INDICE REAJ.
Kr
Nov-09
0.090
413.41
668.44
452.34
0.268
346.98
382.69
0.119
363.47
247.72
330.19
0.295
418.41
0.228
346.35
1.000

Coef
INDICE REAJ.
Kr
Dec-09
0.090
413.41
665.00
443.96
0.268
346.98
381.63
0.120
362.71
247.22
329.98
0.296
418.25
0.228
347.45
1.002

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONTRATIST

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

CLCULO DEL COEFICIENTE DE REAJUSTE K DEL PRESUPUESTO ADICIONAL N 1


K =

Monomio

Elemento representativo
1 Mano de obra inc. Leyes sociales
2

Dlar ms Inflacin Mercado USA


Maquinaria y Equipo Importado
Maquinaria y Equipo Nacional

3 Indice General de Precios al consumidor

INDICE

SIMBOLO

INCIDENCIA

0.169 MOr + 0.623 DMyQr + 0.276 GGUr


MOo
DMyQo
GGUo
FACTOR

IND. BASE

IND. REAJ.

Coef

IND. REAJ.

Coef

IND. REAJ.

May-09

Nov-09

Kr

Dec-09

Kr

Jan-10

47

MO

100.000%

0.169

397.23

413.41

30
49
48

DMyQ

7.588%

0.623

364.25

363.47

362.71

37.417%

251.25

247.72

247.22

54.995%

330.15

330.19

0.620

329.98

0.619

329.61

39

GGU

344.25

346.35

0.209

347.45

0.21

348.48

100.000%
K=

0.208
1.000

0.176

1.005

413.41

0.176

415.58
359.43
245.60

1.005

OBRA

#REF!

ENTIDAD
CONTRATISTA

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL


#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

CALCULO DE LOS REINTEGROS DEL PRESUPUESTO CONTRACTUAL


OBRAS DE PAVIMENTACION
Valorizacin
Avance Programado
N
Mes
Mensual (A)
Acumulado
1
2
3

Sep-09
Oct-09
Nov-09
TOTAL

57,259.27
143,148.20
85,888.92
286,296.39

57,259.27
200,407.47
286,296.39

Avance Real
Mensual (B) Acumulado
44,703.62
120,996.97
120,595.80
286,296.39

44,703.62
165,700.59
286,296.39

Coef
Reaj K
1.000
1.002
1.002

Reintegro Prog. Mensual Reintegro Real Mensual


C = A* (k-1) Acumulado C = B* (k-1) Acumulado
0.00
286.30
171.78
458.08

0.00
286.30
458.08

0.00
241.99
241.19

0.00
241.99
483.18

483.18

TOTAL REAJUSTE A RECONOCER S/.

Reintegro Reconocido
Mensual Acumulado
0.00
241.99
241.19
483.18

483.18

0.00
241.99
483.18

OBRA

#REF!

ENTIDAD
CONTRATISTA

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL


#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

CALCULO DE LOS REINTEGROS DEL PRESUPUESTO ADICIONAL N 01

Valorizacin
N
Mes
1
2
3
4
5

Nov-09
Dec-09

TOTAL

Avance Programado
Mensual (A) Programado
9,825.24
9,199.75

9,525.24
9,499.75

Avance Real
Mensual (B)
Acumulado
10,489.89
8,535.10

10,489.89
19,024.99

Coef
Reaj K
1.005
1.005

Reint. Progr. Mensual


C = A* (k-1)
49.13
46.00

19,024.99

TOTAL REAJUSTE A RECONOCER

S/.

NSPORTE NACIONAL

nt. Progr. Mensual


Acumulado

A RECONOCER

49.13
95.13

S/.

Reint. Real Mensual


C = B (K-1) Acumulado
52.45
42.68

52.45
95.13

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONTRATISTA

#REF!

CONTRATO

: N 382-2006 - MTC / 20

CALCULO DE INTERESES POR ATRASO EN EL PAGO

VALORIZACIONES CONTRACTUALES
CONCEPTO

Fecha de

Fecha de

DIAS

Monto

Pago Prevista

Pago Real

ATRASO

Base

Tasa Intereses Legal

Factor

Interes

#REF!

10/30/2009

#REF!

#REF!

#REF!

979.58547

981.07039

0.001515866

#REF!

#REF!

1/31/2010

#REF!

#REF!

#REF!

1026.12660

1027.16125

0.001008306

#REF!

#REF!

1/31/2010

#REF!

#REF!

#REF!

1026.12660

1027.16125

0.001008306

#REF!

#REF!

2/28/2010

#REF!

#REF!

#REF!

1040.61273

1047.84509

0.006950098
Total

#REF!
#REF!

VALORIZACIONES DE PRESUPUESTOS ADICIONALES


CONCEPTO

Fecha de

Fecha de

DIAS

Monto

Pago Prevista

Pago Real

ATRASO

Base

Tasa Intereses Legal

Factor

Interes

#REF!

1/30/2010

#REF!

#REF!

#REF!

1026.12660

1027.16125

0.001008306

#REF!

#REF!

1/31/2010

#REF!

#REF!

#REF!

1026.12660

1027.16125

0.001008306

#REF!

#REF!

2/28/2010

#REF!

#REF!

#REF!

1040.61273

1047.84509

0.006950098

#REF!

#REF!

1/30/2010

2/3/2010

4.00

#REF!

1026.12660

1027.16125

0.001008306

#REF!

#REF!

1/31/2010

2/3/2010

3.00

#REF!

1026.12660

1027.16125

0.001008306

#REF!

#REF!

2/28/2010

3/15/2010

15.00

#REF!

1040.61273

1047.84509

0.006950098

#REF!

#REF!

1/30/2010

#REF!

#REF!

#REF!

1026.12660

1027.16125

0.001008306

#REF!

#REF!

2/28/2010

#REF!

#REF!

#REF!

1040.61273

1047.84509

0.006950098

#REF!

#REF!

2/28/2010

#REF!

#REF!

#REF!

1040.61273

1047.84509

0.006950098
Total

#REF!
#REF!

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

REINTEGRO POR PAGO POR COMPESACIN DE TIEMPO SE SERVICIOS - FACTOR "F"

Valorizacin
N
Mes
1
2
3
4
5
6
7
8
9

Monto
Valorizado
Sep-09
Oct-09
Nov-09
Dec-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

TOTAL

44,703.62
120,996.97
120,595.80
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

i
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086

INDICES
Io
397.23
397.23
397.23
397.23
397.23
397.23
397.23
397.23
397.23

R= i x (F/Io) x Vc
F
1.060
1.060
1.060
1.060
1.060
1.060
1.060
1.060
1.060

10.26
27.77
27.68
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

REINTEGRO POR PAGO POR COMPESACIN DE TIEMPO SE SERVICIOS - FACTOR "V"

Valorizacin
N
Mes
1
2
3
4
5
6
7
8
9

Sep-09
Oct-09
Nov-09
Dec-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

TOTAL

Monto
Valorizado
44,703.62
120,996.97
120,595.80
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

i
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086

INDICES
Io
397.23
397.23
397.23
397.23
397.23
397.23
397.23
397.23
397.23

R= i x (V/Io) x Vc
V
0.790
0.790
0.790
0.790
0.790
0.790
0.790
0.790
0.790

7.65
20.69
20.63
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

OBRA
ENTIDAD

#REF!
: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

CLCULO DE LA VALORIZACION DE MAYORES GASTOS GENERALES


Gastos Generales Variables
Plazo Contractual (das)

Ampliacin de
Plazo

S/.
=

Resolucin
Aprobacin
6 3231-2007-MTC/20

Gasto
=
General Diario

1,323,739.28
150.00

Fecha

8/2/2007

N
dias

Gasto General
diario
3

8,824.93

Mes de
Ocurrencia
Mar-10

Io
IU=39
May-09
347.88

1,323,739.28
150.00

IP
IU=39
350.59

TOTAL MAYORES GASTOS GENERALES S/.

S/. 8,824.93

Valoriz.
May. G.G.
26,681.03

26,681.03

Adelanto por Materiales Otorgado


Monto Adelanto
Monto Contrato

Material

Indice

OBRAS DE PAVIMENTACION
Acero Corrugado
3
Dinamita
28
Dlar
30
Madera Nacional
43
OBRAS DE SANEAMIENTO
Cemento Portland
21
Dlar
30
Tubera de Acero
65

Factor

Incidencia

0.27
0.12
0.12
0.27

10.370%
10.000%
90.000%
7.778%

0.117
0.117
0.282

72.650%
15.385%
10.638%

Total Adelanto

286,296.39

Adelanto x Material

8,016.01
3,435.56
30,920.01
6,012.40
24,335.34
5,153.46
8,588.65
86,461.43

5,315.24 sin IGV


286,296.39 sin IGV

nto x Material

227,295.46
98,218.11
791,037.08
178,022.29
77,122.23
17,550.04
29,428.77
1,418,673.98

6012.39597

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL

CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

DEDUCCION DE REAJUSTE QUE NO CORRESPONDE POR ADELANTO EN EFECTIVO


Monto Adelanto
Monto Contrato
OBRAS DE PAVIMENTACION
Valorizacin
Monto
N
Mes
Valorizado
1
2
3

Sep-09
Oct-09
Nov-09

44,703.62
120,996.97
120,595.80

TOTAL

Amortizaciones

INDICES
Ka

4,470.36
12,099.70
12,059.58

28,629.64
286,296.39

1.005
1.005
1.005

Deduccin
S/.

Kr
1.000
1.002
1.002

28,629.64

-22.24
-36.12
-36.00

-94.36

TOTAL DEDUCCIN S/.

-94.36

OBRA

#REF!

ENTIDAD

: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL

CONTRATISTA

#REF!

CONTRATO

: N 086-2009 - MTC / 20

LUGAR

: DEPARTAMENTO: AYACUCHO; PROVINCIA: LUCANAS; DISTRITOS: PUQUIO

DEDUCCION DE REAJUSTE QUE NO CORRESPONDE POR ADELANTO DE MATERIALES


OBRAS DE PAVIMENTACION

Monto Contrato
Adelanto Otorgado

286,296.39
4,294.45

MADERA NACIONAL PARA ENCOFRADOS Y CARPINTERIA


Valorizacin
Mes
Valorizado

(1)
1
2
3

Sep-09
Oct-09
Nov-09

44,703.62
120,996.97
120,595.80

Adelanto Otorgado
Monto
Fecha
(2)

4,294.45

Coef. Incid x
% Particip
(3)

9/5/2009

0.0210006
0.0210006
0.0210006

INDICES UNIFICADOS
Ir
Ia
Io
(4)

680.35
668.44
665.00

(5)

668.44
668.44
668.44

(6)

670.87
670.87
670.87

Monto
Deflatado

Adelanto
Utilizado

(7)=(2) x (6)/(5) (8)=(1) x (3)

4,310.06
4,310.06
4,310.06

TOTAL

938.80
2,541.01
830.25

4,310.06

Deuda

Saldo por
Utilizar

Deduccin
D

(9)

(9)-(8)

(8)x[(4-5)/ 6]

4,310.06
3,371.26
830.25

3,371.26
830.25
0.00

16.67
0.00
-4.26

12.41