Está en la página 1de 66

Generadores de Obra

CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PREELIMINARES
PRE-O1

PRE-02

PRE-03

LIMPIEZA: LIMPIEZA Y DESPALME


DEL TERRENO. INCLUYE: MANO DE
OBRA, HERRAMIENTRA, RETIRO DE
BASURA Y ACARREO DE MATERIAL.
1-7

A-L

16.00

12.00

1-7

A-L

16.00

12.00

A-L

16.00

0.60

TRAZO
Y
NIVELACIN
DEL
TERRENO: ESTABLECIENDO EJES Y
REFERENCIAS
POR
MEDIOS
MECNICOS CON TRNSITO Y NIVEL.
INCLUYE: HERRAMIENTA, MANO DE
OBRA, EQUIPO Y RETIRO.

EXCAVACIN
PARA
CIMENTACIN: A MANO PARA
ZANJA DE CIMENTACION EN SUELO
REGULAR CON PROFUNDIDAD NO
MAYOR A DOS METROS, INCLUYE:
TODO LO NECESARIO PARA SU
CORRECTA
ELABORACIO
(PICO,
PALA, CARRETILLA), AFINAMIENTO
DE TALUDES, AS COMO LA LIMPIEZA
DE EXCAVACIN. INCLUYE ACARREO
A PRIMERA ESTACION
1.25

PIEZAS

Generadores de Obra
CDIGO

PRE-04

CONCEPTO

RELLENO
DE
CEPAS:
CON
MATERIAL PRODUCTO DE OBRA
INCLUYE VOLTEO CON PALA, MANO
DE OBRA, HERRAMIENTA Y ACARREO.

EJE

TRAMO

LARGO

ANCHO

ALTO

B-J

11.05

0.60

1.25

F-H

1.85

0.60

1.25

G-J

3.25

0.60

1.25

B-J

11.05

0.60

1.25

G-J

3.25

0.60

1.25

A-L

16.00

0.60

1.25

1-7

12.00

0.60

1.25

2-5

4.82

0.60

1.25

5-7

4.33

0.60

1.25

2-5

4.82

0.60

1.25

2-7

9.15

0.60

1.25

2-7

9.15

0.60

1.25

3-5

1.35

0.60

1.25

5-6

1.40

0.60

1.25

2-6

6.22

0.60

1.25

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

A-L

16.00

0.46

B-J

11.05

0.46

F-H

1.85

0.46

G-J

3.25

0.46

B-J

11.05

0.46

G-J

3.25

0.46

A-L

16.00

0.46

1-7

12.00

0.46

2-5

4.82

0.46

5-7

4.33

0.46

2-5

4.82

0.46

2-7

9.15

0.46

2-7

9.15

0.46

3-5

1.35

0.46

5-6

1.40

0.46

2-6

6.22

0.46

CIMENTACIN

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

CIM-01

PLANTILLA DE CIMENTACIN:
SUMINISTRO Y FABRICACION DE
CONCRETO POBRE, F' C= 150 KG /
CM, DE 5 CM DE ESPESOR, INCLUYE
MANO DE OBRA, HERRAMIENTA Y
MATERIALES PARA SU CORRECTA
FABRICACION EN OBRA.

EJE

TRAMO

LARGO

ANCHO

A-L

16.00

0.60

B-J

11.05

0.60

F-H

1.85

0.60

G-J

3.25

0.60

B-J

11.05

0.60

G-J

3.25

0.60

A-L

16.00

0.60

1-7

12.00

0.60

2-5

4.82

0.60

5-7

4.33

0.60

2-5

4.82

0.60

2-7

9.15

0.60

2-7

9.15

0.60

3-5

1.35

0.60

5-6

1.40

0.60

ALTO

PIEZAS

Generadores de Obra
CDIGO

CIM-02

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

2-6

6.22

0.60

A-L

16.00

B-J

11.05

F-H

1.85

G-J

3.25

B-J

11.05

G-J

3.25

A-L

16.00

1-7

12.00

ZAPATA CORRIDA: FABRICACION


DE ZAPATA DE CONCRETO F'C= 150
KG/CM2 HECHO EN OBRA, DE 60.0
CMS DE ANCHO, 10 CMS DE
ESPESOR, ARMADA CON 4 VARILLAS
DEL No. 3
3/8" ;
INCLUYE
SUMINISTRO
Y
COLOCACION,
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTA, TRAZO, ARMADO,
CIMBRADO,
DESCIMBRADO,
COLADO, CURADO, RETIRO DE
SOBRANTES A PIE DE CAMIN,
LIMPIEZAS Y TODO LO NECESARIO
PARA LA CORRECTA EJECUCIN DE
LOS TRABAJOS.

ALTO

PIEZAS

Generadores de Obra
CDIGO

CIM-03

CONCEPTO

EJE

TRAMO

LARGO

2-5

4.82

5-7

4.33

2-5

4.82

2-7

9.15

2-7

9.15

3-5

1.35

5-6

1.40

2-6

6.22

A-L

16.00

B-J

11.05

F-H

1.85

DALA
DE
DESPLANTE:
FABRICACION
DE
DALA
DE
DESPLANTE, SECCION DE 0.15 x
0.20 CONCRETO FC 150 CM2
ARMADA CON 4 VARILLAS DE 3/8 Y
ESTRIBOS @20CM CADA UNO,
INCLUYE CIMBRA, DESCIMBRA, MANO
DE OBRA, HERRAMIENTAS Y TODO
LO NECESARIO PARA SU CORRECTA
FABRICACION.

ANCHO

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

G-J

3.25

B-J

11.05

G-J

3.25

A-L

16.00

1-7

12.00

2-5

4.82

5-7

4.33

2-5

4.82

2-7

9.15

2-7

9.15

3-5

1.35

5-6

1.40

2-6

6.22

ANCHO

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

CIM-04

DALA
DE
CORONACIN:
FABRICACIN
DE
DALA
DE
CERRAMIENTO SECCIN DE 0.15 X
0.20 CONCRETO FC 150 KG/CM2
ARMADA CON 4 VARILLAS DE 3/8 Y
ESTRIBOS @20CM CADA UNO,
INCLUYE CIMBRA, DESCIMBRA, MANO
DE OBRA, HERRAMIENTAS Y TODO
LO NECESARIO PARA SU CORRECTA
FABRICACIN.

EJE

TRAMO

LARGO

A-L

16.00

B-J

11.05

F-H

1.85

G-J

3.25

B-J

11.05

G-J

3.25

A-L

16.00

1-7

12.00

2-5

4.82

5-7

4.33

2-5

4.82

2-7

9.15

ANCHO

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

2-7

9.15

3-5

1.35

5-6

1.40

2-6

6.22

ANCHO

ALTO

PIEZAS

ESTRUCTURA

EST-01

CASTILLOS:
SUMINISTRO
Y
COLOCACION DE CASTILLOS DE
15X15 CMS ARMADO CON 4V#3 Y
E#2 @ 20 CMS, COLADO CON
CONCRETO DE FC=150 KG/CM2,
INCLUYE CIMBRA Y DESIMBRA, MANO
DE OBRA, HERRAMIENTA, VACIADO,
VIBRADO, Y TODO LO NECESARIO
PARA SU CORRECTA COLOCACION.

P/BARDA

P/CASA HABITACIN

A-L

3.70

A-L

3.70

2'-7'

3.70

B-G

3.00

D-G

3.00

Generadores de Obra
CDIGO

EST-02

EST-03

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

G-J

3.00

B-J

3.00

C-I

3.00

5'

3.00

2'

3.00

2''

3.00

3.00

3.00

COLUMNA
DE
CONCRETO
ARMADO C1: DE 40 X 40 CM CON
UN F'C =250 KG / CM2 ARMADA CON
OCHO VARILLAS DE 1/2" Y ANILLOS
DE 1/4 " A CADA 20 CM, INCLUYE
ANDAMIOS, CIMBRA, HABILITADO,
CONCRETO Y MANO DE OBRA.

COLUMNA
DE
CONCRETO
ARMADO C2: DE 20X 20 CM:CON
UN F'C =250 KG / CM2 ARMADA CON
OCHO VARILLAS DE 1/2" Y ANILLOS
DE 1/4 " A CADA 20 CM, INCLUYE
ANDAMIOS, CIMBRA, HABILITADO,
CONCRETO Y MANO DE OBRA.

Generadores de Obra
CDIGO

CONCEPTO

EST-04

TRABE: TRABE DE CONCRETO DE 20


X 30 CM FC=200 KG/CM2 CON
ACERO DE REFUERZO :2 VARILLAS
DE 1/2" Y 3 VARILLAS DE 1/2" CON
ESTRIBOS DEL #2 A CADA 10 Y 20
CM.
INCLUYE
:
CIMBRA
Y
DESCIMBRA, HABILITADO, CORTES,
AMARRES, COLADO, MATERIALES,
MANO DE OBRA, HERRAMIENTAS,
ACARREO, RETIRO DE SOBRANTES Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

EJE

TRAMO

LARGO

B-J

11.05

B-J

11.05

C-J

9.25

2-5

4.82

5-7

4.33

2-5

4.82

2-7

9.15

2-7

9.15

2-7

9.15

G-J

3.25

G-J

3.25

ANCHO

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EST-05

LOSA
DE
ENTREPISO:
DE
CONCRETO, CON ESPESOR DE 20
CM, INCLUYE ARMADO, CIMBRADO Y
DESCIMBRADO, COLADO Y TODO LO
NECESARIO PARA SU CORRECTA
FABRICACION.

EJE

LARGO

ANCHO

A1

7.83

4.82

A2

6.00

4.33

A3

3.22

6.22

A4

3.77

2.93

2.83

1.65

A1

7.83

4.82

A3

3.22

6.22

A4

3.77

2.93

67

EST-06

TRAMO

F-G

LOSA ALIGERADA: DE 20 CM DE
ESPESOR, CONCRETO COLADO EN
SITIO DE FC= 200Kg/cm2. ACERO
DE TEMPERATURA DEL #3 ARMADA
CON
MALLA
ELECTROSOLDADA
6X6,10X10. CASETN DE 40X40X15
CMS INCLUYE CIMBRADO, ACERREO
MATERIALES Y MANO DE OBRA.

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EST-07

LOSA INCLINADA MACIZA: FC


200 KG/CM2 DE 10 CM DE ESPESOR
ARMADO DE ACERO DEL #5 Y #4 A
CADA 15 CM, EN AMBOS SENTIDOS.
INCLUYE: CIMBRA Y DESCIMBRA,
HABILITADO, CORTES, AMARRES,
COLADO,
MANO
DE
OBRA,
HERRAMIENTAS
RETIRO
DE
SOBRANTES Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

EST-08

EJE

TRAMO

LARGO

ANCHO

5-7

G-F

5.98

4.15

6-7

F-G

2.93

1.85

ALTO

RAMPA PARA ESCALERA: DE


CONCRETO ARMADO; CONCRETO
HECHO EN OBRA F'C=150 KG/CM2
AGREGADO MXIMO DE 3/4", DE 10
CM DE ESPESOR; ARMADO CON
VARILLA DE 3/8. INCLUYE ARMADO,
CIMBRADO
Y
DESCIMBRADO,
COLADO, Y TODO LO NECESARIO
PARA SU CORRECTA FABRICACION.

ALBAILERIA GENERAL

ALB-01

FIRME:
FIRME
DE
CONCRETO
HECHO EN OBRA F'C=150 KG/CM2
AGREGADO MXIMO DE 3/4", DE 10
CM DE ESPESOR; INCLUYE TODO LO
NECESARIO PARA SU CORRECTA
EJECUCIN.

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

PARA INTERIOR E LA CASA

TRAMO

LARGO

ANCHO

A1

4.82

9.10

A2

4.33

4.15

A3

3.82

2.85

A4

2.87

1.85

A5

1.85

1.85

A6

1.85

4.33

A7

1.35

3.25

A8

1.40

2.25

ALTO

PIEZAS

PARA EXTERIOR DE LA CASA

1-7

A-G

8.63

10.05

1-2

H-L

3.30

0.30

4.00

5-6

K-L

1.20

0.30

4.00

HUELLAS DE AUTO

HUELLAS PEATONALES

Generadores de Obra
CDIGO

CONCEPTO

ALB-02

MUROS:
ESPESOR SOGA CON
BLOCK SLIDO 10 X 14 X 28,
ASENTADO
CON
MORTERO
(CEMENTO-ARENA) 1 A 3, JUNTA DE
1.5 CM DE ESPESOR HASTA UNA
ALTURA
DE
3
M,
INCLUYE
SUMINISTRO
Y
COLOCACION,
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTAS
Y
TODO
LO
NECESARIO PARA SU CORRECTA
EJECUCION.
MURO PARA BARDA

MURO PARA CASA EN PLANTA


BAJA

EJE

TRAMO

LARGO

ANCHO

ALTO

A-L

16.00

2.70

1-7

12.00

2.70

A-L

6.08

2.70

B-G

8.00

3.00

2-3

D-F

0.80

3.00

G-J

3.42

3.00

B-J

11.25

3.00

G-I

2.34

3.00

C-K

10.00

3.00

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

2-5

4.62

3.00

5-7

4.00

3.00

2-5

4.62

3.00

2-7

8.85

3.00

2-7

8.85

3.00

4-5

1.15

3.00

5-6

1.20

3.00

4-5

1.15

3.00

2-5

3.00

2.10

5-7

3.00

2.10

2-5

2.10

3.00

-VANOS EN PLANTA BAJA

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

2-6

2.10

3.00

2-5

0.40

0.60

5-6

1.20

3.00

4-5

0.65

2.10

5-6

1.20

2.10

B-G

0.70

2.10

B-G

1.20

1.20

B-G

0.90

2.10

G-J

1.00

0.60

B-C

1.20

1.20

C-D

1.10

3.00

PIEZAS

2.00

3.00

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

G-H

0.85

3.00

G-I

1.20

1.20

2-5

4.00

3.00

5-7

4.00

3.00

3-5

0.60

3.00

2-5

4.62

3.00

2-5

4.62

3.00

6-7

2.83

3.00

2-7

8.85

3.00

6-7

1.00

3.00

H-J

6-7

1.00

3.00

2-6

6.00

3.00

6-7

2.60

3.00

B-J

11.25

3.00

MURO PARA CASA EN PLANTA


ALTA

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

3-4

D-E

1.23

3.00

B-H

8.63

3.00

G-K

4.00

3.00

C-K

10.00

3.00

5-7

3.00

2.10

2-5

0.90

2.10

2-5

0.90

2.10

2-7

1.20

2.10

2-6

2.00

2.10

2-6

0.60

0.40

6-7

0.60

0.40

B-J

2.00

2.10

B-J

0.60

0.40

-VANOS EN PLANTA ALTA

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

ALB-03

FORJADO
DE
ESCALONES:
FORJADO DE ESCALONES DE 28 CM
DE HUELLA X 18CM DE PERALTE EN
RAMPA DE ESCALERA A BASE DE
TABIQUE
ROJO
RECOCIDO
DE
7X14X28 ASENTADO CON MORTERO
CEMENTO-ARENA 1:5.

ALB-04

REGISTRO SANITARIO: SECCION


DE 40 x 60 CM, PROFUNDIDAD
HASTA 1.00 M; CONSTRUIDO CON
LADRILLO ROJO 7x14x28 JUNTEADO
CON MORTERO (CEMENTO- ARENA)
PROPORCIN 1:5. APLANADO FINO
INTERIOR CON MORTERO (CEMENTOARENA)
1:5,
PLANTILLA
DE
CONCRETO
F'C=100.
TAPA
DE
REGISTRO DE CONCRETO. INCLUYE
EXCAVACIN.

EJE

TRAMO

LARGO

ANCHO

ALTO

B-J

1.50

2.10

D-E

0.75

2.10

B-H

1.20

3.00

G-K

0.80

2.10

6-7

F-G

0.85

0.28

PIEZAS

16.00

6.00

ALBAILERIA EN AZOTEA

Generadores de Obra
CDIGO

CONCEPTO

ALBA-01

PRETIL EN AZOTEA: POR MEDIO


DE TABIQUE ROJO RECOCIDO 6 x 10
x 25 CM DE 10 CM DE ESPESOR,
JUNTEADO
CON
MORTERO
(CEMENTO-ARENA) PROPORCION 1:6
JUNTA DE 1.5 CM.

ALBA-02

EJE

TRAMO

LARGO

ANCHO

A1+A3

36.14

0.40

A4

13.40

0.40

2-5

B-E

18.00

2-5

E-G

15.24

2-6

G-J

18.00

6-7

G-K

12.38

5-7

F-G

11.30

CHAFLN:
FABRICACIN
DE
CHAFLAN TRIANGULAR DE 10x10
CMS
A
BASE
DE
MORTERO
(CEMENTO-ARENA) 1: 4 , INCLUYE
SUMINISTRO Y COLOCACION DE
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTA,
FABRICACION
Y
HECHURA, RETIRO DE SOBRANTES,
LIMPIEZAS Y TODO LO NECESARIO
PARA LA CORRECTA EJECUCION DE
LOS TRABAJOS.

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

ALBA-03

TEJA: COLOCACION DE TEJA DE


BARRO TIPO VALLARTA ASENTADA
CON MORTERO CEMENTO-ARENA
PROPORCION
1:4.
INCLUYE
SUMINISTRO
DE
ELEVACION,
ACARREO,
MANO
DE
OBRA,
HERRAMIENTA
Y
TODO
LO
NECESARIO PARA SU CORRECTA
EJECUCION.

EJE

TRAMO

LARGO

ANCHO

5-7

G-F

5.98

4.15

ALTO

IMPERMEABILIZACIN

IMP-01

IMPERMEABILIZACIN:
IMPERMEABILIZACION EN AZOTEAS
CON PINTURA VINIMEX 700 COMEX
(COLOR BLANCO), EN TECHOS,
INCLUYE 1 MANO SELLADOR Y 2
MANOS DE VINILICA, PREPARACION
DE SUP. HASTA 3MTS, INCLUYE
ACARREO A 20 MTS Y MANIOBRAS
LOCALES. (DURACIN 5 AOS)
5-7

G-F

5.98

4.15

A1

7.83

4.82

A3

3.22

6.22

A4

3.77

2.93

INSTALACIN SANITARIA

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

INSTS-01

TUBERIA SANITARIA 2": TUBO DE


P.V.C. SANITARIO, DE 2"
DE
DIAMETRO,
INCLUYE:
INCLUYE
EXCAVACIN Y RELLENO PRODUCTO
DE EXCAVACION, Y TODO LO
NECESARIO PARA SU CORRECTA
COLOCACION.

INSTS-02

TUBERIA SANITARIA 4": TUBO DE


P.V.C. SANITARIO, DE 4"
DE
DIAMETRO,
INCLUYE:
INCLUYE
EXCAVACIN Y RELLENO PRODUCTO
DE EXCAVACION, Y TODO LO
NECESARIO PARA SU CORRECTA
COLOCACION.

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

13.12
21.66

INSTS-03

TUBERIA SANITARIA 6": TUBO DE


P.V.C. SANITARIO, DE 6"
DE
DIAMETRO,
INCLUYE:
INCLUYE
EXCAVACIN Y RELLENO PRODUCTO
DE EXCAVACION, Y TODO LO
NECESARIO PARA SU CORRECTA
COLOCACION.

INSTS-04

SALIDA SANITARIA PARA


MUEBLE INCLUYE: TUBO E PVC
SANITARIO 4", 1 CODO DE 2", TEE
DE 4", MATERIALES , MANO DE OBRA
Y EQUIPO.

12

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

INSTALACIN HIDRULICA

INSTH-01

TUBERIA DE COBRE 13 MM:


SUMINISTRO
Y COLOCACIN DE
TUBERIA DE COBRE DE 13 MM DE
DIAMETRO;
INCLUYE TODO
LO
NECESARIO PARA SU CORRECTA
COLOCACIN.

Planta Baja
Planta Alta 1
Planta alta 2

INSTH-02

11.18

2.67

12.32

SALIDA HIDRAULICA PARA


MUEBLE CON CODO DE 3MM
INCLUYE: CODOS, TEE, LLAVE,
MANGUERA, CONSUMIBLES, MANO E
OBRA Y HERRAMIENTA.

20

INSTALACIN ELCTRICA

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

INSTE-01

REGISTRO PARA ACOMETIDA:


CONSTRUCCIN DE REGISTRO PARA
ACOMETIDA ELECTRICA A LA CASA
HABITACION, DE 1.00 X 1.00 X 1.00
MTS MEDIDAS INTERIORES, A BASE
DE CONCRETO F'C=150 KG/CM2,
DESPLANTADO EN PLANTILLA DE
CONCRETO F'C=100 KG/CM2 DE 5.0
CMS DE ESPESOR, ARMADO CON
VARILLAS DEL NO. 3 A CADA 15 CMS.
EN AMBOS SENTIDOS, MUROS DE
0.10 MTS DE ESPESOR, INCLUYE
EXCAVACIN,
RELLENO,
RECIBIR
TUBERAS CON AVELLANAMIENTO,
ACARREOS DE MATERIALES HASTA
EL LUGAR DE SU UTILIZACIN,
MANO
DE
OBRA,
EQUIPO,
HERRAMIENTAS,
MATERIALES,
LIMPIEZA DEL REA DE TRABAJO Y
TODO LO NECESARIO PARA LA
CORRECTA EJECUCIN DE LOS
TRABAJOS.

INSTE-02

TABLERO
DE
DISTRIBUCIN:
SUMINISTRO Y COLOCACIN DE
TABLERO DE CONTROL PARA 4
CIRCUITOS MONOFSICOS.

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

INSTE-03

SUMINISTRO E INSTALACION DE
CENTRO
DE
CARGA
Q02
MONOFASICO DE 2 CIRCUITOS.
INCLUYE: 2 UNIDADES TERMICAS DE
130 AMPERES PARA LA DIVISION DE
LOS CIRCUITOS,MATERIAL,MANO DE
OBRA Y HERRAMIENTA.

INSTE-04

APAGADOR
SENCILLO:
INSTALACION
DE
APAGADOR
SENCILLO,
INCLUYE
TAQUETES,
TORNILLOS, HERRAMIENTAS, MANO
DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA INSTALACION.

17

INSTE-05

APAGADOR
EN
ESCALERA:
INSTALACION DE APAGADOR EN
ESCALERA,
INCLUYE
TAQUETES,
TORNILLOS, HERRAMIENTAS, MANO
DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA INSTALACION.

11

INSTE-06

CONTACTO DUPLEX: INSTALACION


DE CONTACTO DUPLEX, INCLUYE
TORNILLOS,
TAQUETES,
HERRAMIENTAS, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA INSTALACION.

42

MUEBLES SANITARIOS

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

MUS-01

INODORO:
SUMINISTRO
Y
COLOCACIN DE INODORO MARCA
VITROMEX, MODELO CORSICA ONE
PIECE, COLOR BLANCO; INCLUYE
TANQUE, JUNTA PROHEL, PIJAS,
MANGUERA DE ALIMENTACIN PARA
W.C. Y TODO LO NECESARIO PARA
SU CORRECTA INSTALACION.

MUS-02

LAVABO:
SUMINISTRO
Y
COLOCACIN DE LAVABO MARCA
VITROMEX, MODELO MARSELLA DE
PEDESTAL COLOR BLANCO; INCLUYE:
LLAVE AUTOMATICA DE AGUA,
CESPOL FLEXIBLE PARA LAVABO,
JUNTAS,
PIJAS,
MANGUERA
DE
ALIMENTACIN PARA LAVABO Y
TODO LO NECESARIO PARA SU
CORRECTA INSTALACION.

MUS-03

REGADERA:
SUMINISTRO
Y
COLOCACIN DE REGADERA DE
HIDROMASAJE
MOD
KH-002;
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION.

MUEBLES DE SERVICIO

MUE-01

TARJA: SUMINISTRO Y COLOCACIN


DE TARJA EMPOTRADA EN MESA.
INCLUYE:
CONTRA
CANASTA,
CESPOL, MANIOBRA LOCAL Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCIN.

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

MUE-02

LAVADERO:
SUMINISTRO
Y
COLOCACIN
DE
LAVADERO.
INCLUYE:
CONTRA
CANASTA,
CESPOL, MANIOBRA LOCAL Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCIN.

MUE-03

BOILER:
SUMINISTRO
Y
COLOCACIN DE CALENTADOR DE
AGUA. INCLUYE: ACARREOS,
MANIOBRA LOCAL Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCIN.

MUE-04

TINACO:
SUMINISTRO
Y
COLOCACIN DE TINACO ROTOPLAS
CAP. 1100 LTS. INCLUYE ACARREOS,
MANIOBRA LOCAL, ACCESORIOS,
VLVULA DE COMPUERTA Y
VLVULA CHECK

CARPINTERA

CARP-01

PUERTA
P1:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 1.20 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

CARP-02

PUERTA
P2:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 0.90 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

CARP-03

PUERTA
P3:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 0.75 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

CARP-04

PUERTA
P4:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 0.65 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

CANCELERIA

VENT-01

VENTANA
V1:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 3.00 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

VENT-02

VENTANA
V2:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 0.60 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

VENT-03

VENTANA
V3:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 1.20 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

VENT-04

VENTANA
V4:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 0.40 X 0.60 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

VENT-05

VENTANA
V5:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 2.00 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

ACABADOS

ACAB-01

APLANADO FINO: SOBRE MUROS


DE BLOCK A BASE DE MORTERO
(CEMENTO-ARENA) 1: 4 DE 2.0 CMS
DE ESPESOR PROMEDIO A NIVEL,
PLOMO Y REGLA, HASTA UNA ALTURA
MAXIMA DE 3.00 M. INCLUYE,
SUMINISTRO
Y
COLOCACIN,
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTA Y ACARREOS DE
MATERIALES,
RETIRO
DE
SOBRANTES, LIMPIEZAS Y TODO LO
NECESARIO PARA LA CORRECTA
EJECUCIN DE LOS TRABAJOS.
IDEM ALB-02 X 2

446.49

Generadores de Obra
CDIGO

CONCEPTO

ACAB-02

PISO CERAMICO: DE 30 x 30 CMS,


MARCA
PORCELANATO,
COLOR
BEIGE,
INCLUYE SUMINISTRO Y
COLOCACION, MATERIALES, MANO
DE OBRA, HERRAMIENTA, TRAZO DEL
DESPIECE INDICADO EN PLANO
CORRESPONDIENTE,
RETIRO
DE
SOBRANTES, LIMPIEZAS Y TODO LO
NECESARIO PARA LA CORRECTA
EJECUCION DE LOS TRABAJOS.

EJE

TRAMO

LARGO

ANCHO

ALTO

IDEM EST-05 X 2

ACAB-03

PINTURA: PINTURA A BASE DE


AGUA, EN COLOR BLANCO Y BEIGE,
INCLUYE HERRAMIENTAS, MANO DE
OBRA,
LIMPIEZA
Y
TODO
LO
NECESARIO PARA SU CORRECTA
EJECUCION.
IDEM ACAB-01

ACAB-04

PIEZAS

446.49

AZULEJO PARA BAO: DE 20X30


MARCA LAMOSA ASENTADO CON
ADHESIVO PERDURA JUNTA DE 1CM.
INCLUYE: SELECCIN Y ACOPIO DE
PIEDRA,MANO
DE
OBRA,HERRAMIENTA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.
BAO 1

3.00

2.00

Generadores de Obra
CDIGO

CONCEPTO
BAO 2

EJE

TRAMO

LARGO

ANCHO

ALTO

5.47

2.00

JARDINERA

JARD-01

JARD-02

CAMA DE TIERRA: TENDIDO DE


CAMA DE TIERRA NEGRA A 10 CM DE
ESPESOR,
SECCION
SEGN
PROYECTO,
SOBRE
TERRENO
NATURAL, INCLUYE, PALAS, PICOS,
RASTRILLO, AGUA Y MANO DE OBRA.
12.00

16.00

12.00

16.00

PASTO
TIPO
ALFOMBRA:
SUMINISTRO Y COLOCACION DE
PASTO TIPO ALFOMBRA, INCLUYE
TODO LO NECESARIO PARA SU
CORRECTA COLOCACION: PALAS,
PICOS, RASTRILLO, MANO DE OBRA.

LIMPIEZA GENERAL

LIMPG-01

LIMPIEZA GENERAL: LIMPIEZA DEL


TERRENO. INCLUYE: MANO DE OBRA,
HERRAMIENTRA
Y
RETIRO
DE
BASURA.

12.00

16.00

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

LIMPG-02

LIMPIEZA FINAL: PARA ENTREGA


DE OBRA A BASE DE AGUA
DETERGENTE Y JABON, INCLUYE
ENCERES
COMO
ESCOBAS,
TRAPEADORES,
JALADORES,
RECOGEDORES, FIBRAS, JERGAS,
CEPILLOS ETC. MANO DE OBRA Y
HERRAMIENTA, ANDAMIOS Y TODO
LO NECESARIO PARA LA CORRECTA
EJECUCION DE LOS TRABAJOS. ESTE
CONCEPTO INCLUYE LA LIMPIEZA
DE: PISOS INTERIORES, MUROS,
CANCELES,
PUERTAS,
VIDRIOS,
MUEBLES DE BAO, Y TODO
ELEMENTO QUE SE ENCUENTRE
DETRO DEL AREA EN PLANTA, YA
SEA HORIZONTAL O VERTICAL Y SE
CONSIDERARA
PARA
FINES
DE
MEDICION, GENERACION Y PAGO
UNICAMENTE LA DIMENSION EN
PLANTA
DE
LOS
ESPACIOS
LIMPIADOS.

PLANTA BAJA
PLANTA ALTA

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

PREELIMINARES
PRE-O1

LIMPIEZA: LIMPIEZA Y DESPALME


DEL TERRENO. INCLUYE: MANO DE
OBRA, HERRAMIENTRA, RETIRO DE
BASURA Y ACARREO DE MATERIAL.

192

1-7

PRE-02

16.00

12.00

TRAZO
Y
NIVELACIN
DEL
TERRENO: ESTABLECIENDO EJES Y
REFERENCIAS
POR
MEDIOS
MECNICOS CON TRNSITO Y NIVEL.
INCLUYE: HERRAMIENTA, MANO DE
OBRA, EQUIPO Y RETIRO.

192

1-7

PRE-03

A-L

A-L

16.00

12.00

EXCAVACIN
PARA
CIMENTACIN: A MANO PARA
ZANJA DE CIMENTACION EN SUELO
REGULAR CON PROFUNDIDAD NO
MAYOR A DOS METROS, INCLUYE:
TODO LO NECESARIO PARA SU
CORRECTA
ELABORACIO
(PICO,
PALA, CARRETILLA), AFINAMIENTO
DE TALUDES, AS COMO LA LIMPIEZA
DE EXCAVACIN. INCLUYE ACARREO
A PRIMERA ESTACION

86.

A-L

16.00

0.60

1.25

12.00

Generadores de Obra
CDIGO

PRE-04

CONCEPTO

RELLENO
DE
CEPAS:
CON
MATERIAL PRODUCTO DE OBRA
INCLUYE VOLTEO CON PALA, MANO
DE OBRA, HERRAMIENTA Y ACARREO.

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

B-J

11.05

0.60

1.25

8.29

F-H

1.85

0.60

1.25

1.39

G-J

3.25

0.60

1.25

2.44

B-J

11.05

0.60

1.25

8.29

G-J

3.25

0.60

1.25

2.44

A-L

16.00

0.60

1.25

12.00

1-7

12.00

0.60

1.25

9.00

2-5

4.82

0.60

1.25

3.62

5-7

4.33

0.60

1.25

3.25

2-5

4.82

0.60

1.25

3.62

2-7

9.15

0.60

1.25

6.86

2-7

9.15

0.60

1.25

6.86

3-5

1.35

0.60

1.25

1.01

5-6

1.40

0.60

1.25

1.05

2-6

6.22

0.60

1.25

4.67

TOT

53.

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

A-L

16.00

0.46

7.38

B-J

11.05

0.46

5.10

F-H

1.85

0.46

0.85

G-J

3.25

0.46

1.50

B-J

11.05

0.46

5.10

G-J

3.25

0.46

1.50

A-L

16.00

0.46

7.38

1-7

12.00

0.46

5.53

2-5

4.82

0.46

2.22

5-7

4.33

0.46

2.00

2-5

4.82

0.46

2.22

2-7

9.15

0.46

4.22

2-7

9.15

0.46

4.22

3-5

1.35

0.46

0.62

5-6

1.40

0.46

0.65

2-6

6.22

0.46

2.87

CIMENTACIN

ALTO

PIEZAS

SUMA

TOT

Generadores de Obra
CDIGO

CONCEPTO

CIM-01

PLANTILLA DE CIMENTACIN:
SUMINISTRO Y FABRICACION DE
CONCRETO POBRE, F' C= 150 KG /
CM, DE 5 CM DE ESPESOR, INCLUYE
MANO DE OBRA, HERRAMIENTA Y
MATERIALES PARA SU CORRECTA
FABRICACION EN OBRA.

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

69.

A-L

16.00

0.60

9.60

B-J

11.05

0.60

6.63

F-H

1.85

0.60

1.11

G-J

3.25

0.60

1.95

B-J

11.05

0.60

6.63

G-J

3.25

0.60

1.95

A-L

16.00

0.60

9.60

1-7

12.00

0.60

7.20

2-5

4.82

0.60

2.89

5-7

4.33

0.60

2.60

2-5

4.82

0.60

2.89

2-7

9.15

0.60

5.49

2-7

9.15

0.60

5.49

3-5

1.35

0.60

0.81

5-6

1.40

0.60

0.84

Generadores de Obra
CDIGO

CIM-02

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

2-6

6.22

0.60

ZAPATA CORRIDA: FABRICACION


DE ZAPATA DE CONCRETO F'C= 150
KG/CM2 HECHO EN OBRA, DE 60.0
CMS DE ANCHO, 10 CMS DE
ESPESOR, ARMADA CON 4 VARILLAS
DEL No. 3
3/8" ;
INCLUYE
SUMINISTRO
Y
COLOCACION,
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTA, TRAZO, ARMADO,
CIMBRADO,
DESCIMBRADO,
COLADO, CURADO, RETIRO DE
SOBRANTES A PIE DE CAMIN,
LIMPIEZAS Y TODO LO NECESARIO
PARA LA CORRECTA EJECUCIN DE
LOS TRABAJOS.

ALTO

PIEZAS

SUMA

TOT

3.73

115

A-L

16.00

B-J

11.05

F-H

1.85

G-J

3.25

B-J

11.05

G-J

3.25

A-L

16.00

1-7

12.00

Generadores de Obra
CDIGO

CIM-03

CONCEPTO

EJE

TRAMO

LARGO

2-5

4.82

5-7

4.33

2-5

4.82

2-7

9.15

2-7

9.15

3-5

1.35

5-6

1.40

2-6

6.22

DALA
DE
DESPLANTE:
FABRICACION
DE
DALA
DE
DESPLANTE, SECCION DE 0.15 x
0.20 CONCRETO FC 150 CM2
ARMADA CON 4 VARILLAS DE 3/8 Y
ESTRIBOS @20CM CADA UNO,
INCLUYE CIMBRA, DESCIMBRA, MANO
DE OBRA, HERRAMIENTAS Y TODO
LO NECESARIO PARA SU CORRECTA
FABRICACION.

ANCHO

ALTO

PIEZAS

SUMA

TOT

115

A-L

16.00

B-J

11.05

F-H

1.85

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

G-J

3.25

B-J

11.05

G-J

3.25

A-L

16.00

1-7

12.00

2-5

4.82

5-7

4.33

2-5

4.82

2-7

9.15

2-7

9.15

3-5

1.35

5-6

1.40

2-6

6.22

ANCHO

ALTO

PIEZAS

SUMA

TOT

Generadores de Obra
CDIGO

CONCEPTO

CIM-04

DALA
DE
CORONACIN:
FABRICACIN
DE
DALA
DE
CERRAMIENTO SECCIN DE 0.15 X
0.20 CONCRETO FC 150 KG/CM2
ARMADA CON 4 VARILLAS DE 3/8 Y
ESTRIBOS @20CM CADA UNO,
INCLUYE CIMBRA, DESCIMBRA, MANO
DE OBRA, HERRAMIENTAS Y TODO
LO NECESARIO PARA SU CORRECTA
FABRICACIN.

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

115

A-L

16.00

B-J

11.05

F-H

1.85

G-J

3.25

B-J

11.05

G-J

3.25

A-L

16.00

1-7

12.00

2-5

4.82

5-7

4.33

2-5

4.82

2-7

9.15

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

2-7

9.15

3-5

1.35

5-6

1.40

2-6

6.22

ANCHO

ALTO

PIEZAS

SUMA

TOT

ESTRUCTURA

EST-01

CASTILLOS:
SUMINISTRO
Y
COLOCACION DE CASTILLOS DE
15X15 CMS ARMADO CON 4V#3 Y
E#2 @ 20 CMS, COLADO CON
CONCRETO DE FC=150 KG/CM2,
INCLUYE CIMBRA Y DESIMBRA, MANO
DE OBRA, HERRAMIENTA, VACIADO,
VIBRADO, Y TODO LO NECESARIO
PARA SU CORRECTA COLOCACION.

P/BARDA

P/CASA HABITACIN

137

A-L

3.70

22.2

A-L

3.70

29.6

2'-7'

3.70

11.1

B-G

3.00

15

D-G

3.00

62.

75.

Generadores de Obra
CDIGO

EST-02

CONCEPTO

EJE

TRAMO

ALTO

PIEZAS

SUMA

G-J

3.00

B-J

3.00

27

C-I

3.00

5'

3.00

2'

3.00

2''

3.00

ANCHO

COLUMNA
DE
CONCRETO
ARMADO C1: DE 40 X 40 CM CON
UN F'C =250 KG / CM2 ARMADA CON
OCHO VARILLAS DE 1/2" Y ANILLOS
DE 1/4 " A CADA 20 CM, INCLUYE
ANDAMIOS, CIMBRA, HABILITADO,
CONCRETO Y MANO DE OBRA.

TOT

EST-03

LARGO

3.00

COLUMNA
DE
CONCRETO
ARMADO C2: DE 20X 20 CM:CON
UN F'C =250 KG / CM2 ARMADA CON
OCHO VARILLAS DE 1/2" Y ANILLOS
DE 1/4 " A CADA 20 CM, INCLUYE
ANDAMIOS, CIMBRA, HABILITADO,
CONCRETO Y MANO DE OBRA.

3.00

Generadores de Obra
CDIGO

CONCEPTO

EST-04

TRABE: TRABE DE CONCRETO DE 20


X 30 CM FC=200 KG/CM2 CON
ACERO DE REFUERZO :2 VARILLAS
DE 1/2" Y 3 VARILLAS DE 1/2" CON
ESTRIBOS DEL #2 A CADA 10 Y 20
CM.
INCLUYE
:
CIMBRA
Y
DESCIMBRA, HABILITADO, CORTES,
AMARRES, COLADO, MATERIALES,
MANO DE OBRA, HERRAMIENTAS,
ACARREO, RETIRO DE SOBRANTES Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

79.

B-J

11.05

11.05

B-J

11.05

11.05

C-J

9.25

9.25

2-5

4.82

4.82

5-7

4.33

4.33

2-5

4.82

4.82

2-7

9.15

9.15

2-7

9.15

9.15

2-7

9.15

9.15

G-J

3.25

3.25

G-J

3.25

3.25

Generadores de Obra
CDIGO

CONCEPTO

EST-05

LOSA
DE
ENTREPISO:
DE
CONCRETO, CON ESPESOR DE 20
CM, INCLUYE ARMADO, CIMBRADO Y
DESCIMBRADO, COLADO Y TODO LO
NECESARIO PARA SU CORRECTA
FABRICACION.

EJE

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

90.

A1

7.83

4.82

37.74

A2

6.00

4.33

25.98

A3

3.22

6.22

20.03

A4

3.77

2.93

11.05

2.83

1.65

-4.67

67

EST-06

TRAMO

F-G

LOSA ALIGERADA: DE 20 CM DE
ESPESOR, CONCRETO COLADO EN
SITIO DE FC= 200Kg/cm2. ACERO
DE TEMPERATURA DEL #3 ARMADA
CON
MALLA
ELECTROSOLDADA
6X6,10X10. CASETN DE 40X40X15
CMS INCLUYE CIMBRADO, ACERREO
MATERIALES Y MANO DE OBRA.

68.

A1

7.83

4.82

A3

3.22

6.22

A4

3.77

2.93

37.74
20.03
11.05

Generadores de Obra
CDIGO

CONCEPTO

EST-07

LOSA INCLINADA MACIZA: FC


200 KG/CM2 DE 10 CM DE ESPESOR
ARMADO DE ACERO DEL #5 Y #4 A
CADA 15 CM, EN AMBOS SENTIDOS.
INCLUYE: CIMBRA Y DESCIMBRA,
HABILITADO, CORTES, AMARRES,
COLADO,
MANO
DE
OBRA,
HERRAMIENTAS
RETIRO
DE
SOBRANTES Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

EJE

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

24.

5-7

EST-08

TRAMO

G-F

5.98

4.15

24.82

RAMPA PARA ESCALERA: DE


CONCRETO ARMADO; CONCRETO
HECHO EN OBRA F'C=150 KG/CM2
AGREGADO MXIMO DE 3/4", DE 10
CM DE ESPESOR; ARMADO CON
VARILLA DE 3/8. INCLUYE ARMADO,
CIMBRADO
Y
DESCIMBRADO,
COLADO, Y TODO LO NECESARIO
PARA SU CORRECTA FABRICACION.

5.4

6-7

F-G

2.93

1.85

5.42

ALBAILERIA GENERAL

ALB-01

FIRME:
FIRME
DE
CONCRETO
HECHO EN OBRA F'C=150 KG/CM2
AGREGADO MXIMO DE 3/4", DE 10
CM DE ESPESOR; INCLUYE TODO LO
NECESARIO PARA SU CORRECTA
EJECUCIN.

123

Generadores de Obra
CDIGO

CONCEPTO

EJE

PARA INTERIOR E LA CASA

TRAMO

LARGO

ANCHO

A1

4.82

A2

ALTO

PIEZAS

SUMA

TOT

9.10

43.86

97.

4.33

4.15

17.97

A3

3.82

2.85

10.89

A4

2.87

1.85

5.31

A5

1.85

1.85

3.42

A6

1.85

4.33

8.01

A7

1.35

3.25

4.39

A8

1.40

2.25

3.15

PARA EXTERIOR DE LA CASA

21.

1-7

A-G

8.63

10.05

86.73

HUELLAS DE AUTO

3.9
1-2

H-L

3.30

0.30

4.00

3.96

HUELLAS PEATONALES

1.4
5-6

K-L

1.20

0.30

4.00

1.44

Generadores de Obra
CDIGO

CONCEPTO

ALB-02

MUROS:
ESPESOR SOGA CON
BLOCK SLIDO 10 X 14 X 28,
ASENTADO
CON
MORTERO
(CEMENTO-ARENA) 1 A 3, JUNTA DE
1.5 CM DE ESPESOR HASTA UNA
ALTURA
DE
3
M,
INCLUYE
SUMINISTRO
Y
COLOCACION,
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTAS
Y
TODO
LO
NECESARIO PARA SU CORRECTA
EJECUCION.
MURO PARA BARDA

MURO PARA CASA EN PLANTA


BAJA

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

446

A-L

16.00

2.70

43.20

1-7

12.00

2.70

32.40

A-L

6.08

2.70

16.42

B-G

8.00

3.00

24.00

2-3

D-F

0.80

3.00

2.40

G-J

3.42

3.00

10.26

B-J

11.25

3.00

33.75

G-I

2.34

3.00

7.02

C-K

10.00

3.00

30.00

92.

160

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

2-5

4.62

3.00

13.86

5-7

4.00

3.00

12.00

2-5

4.62

3.00

13.86

2-7

8.85

3.00

26.55

2-7

8.85

3.00

26.55

4-5

1.15

3.00

3.45

5-6

1.20

3.00

3.60

4-5

1.15

3.00

3.45

-VANOS EN PLANTA BAJA

TOT

50.
B

2-5

3.00

2.10

6.30

5-7

3.00

2.10

6.30

2-5

2.10

3.00

6.30

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

2-6

2.10

3.00

2-5

0.40

0.60

5-6

1.20

3.00

3.60

4-5

0.65

2.10

1.37

5-6

1.20

2.10

2.52

B-G

0.70

2.10

B-G

1.20

1.20

1.44

B-G

0.90

2.10

1.89

G-J

1.00

0.60

0.60

B-C

1.20

1.20

1.44

C-D

1.10

3.00

3.30

6.30

2.00

3.00

0.48

4.41

TOT

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

G-H

0.85

3.00

2.55

G-I

1.20

1.20

1.44

MURO PARA CASA EN PLANTA


ALTA

TOT

193
B

2-5

4.00

3.00

12.00

5-7

4.00

3.00

12.00

3-5

0.60

3.00

1.80

2-5

4.62

3.00

13.86

2-5

4.62

3.00

13.86

6-7

2.83

3.00

8.49

2-7

8.85

3.00

26.55

6-7

1.00

3.00

3.00

H-J

6-7

1.00

3.00

3.00

2-6

6.00

3.00

18.00

6-7

2.60

3.00

7.80

B-J

11.25

3.00

33.75

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

3-4

D-E

1.23

3.00

3.69

B-H

8.63

3.00

25.89

G-K

4.00

3.00

12.00

C-K

10.00

3.00

30.00

-VANOS EN PLANTA ALTA

TOT

31.
C

5-7

3.00

2.10

6.30

2-5

0.90

2.10

1.89

2-5

0.90

2.10

1.89

2-7

1.20

2.10

2.52

2-6

2.00

2.10

4.20

2-6

0.60

0.40

0.24

6-7

0.60

0.40

0.24

B-J

2.00

2.10

4.20

B-J

0.60

0.40

0.24

Generadores de Obra
CDIGO

CONCEPTO

ALB-03

FORJADO
DE
ESCALONES:
FORJADO DE ESCALONES DE 28 CM
DE HUELLA X 18CM DE PERALTE EN
RAMPA DE ESCALERA A BASE DE
TABIQUE
ROJO
RECOCIDO
DE
7X14X28 ASENTADO CON MORTERO
CEMENTO-ARENA 1:5.

ALB-04

REGISTRO SANITARIO: SECCION


DE 40 x 60 CM, PROFUNDIDAD
HASTA 1.00 M; CONSTRUIDO CON
LADRILLO ROJO 7x14x28 JUNTEADO
CON MORTERO (CEMENTO- ARENA)
PROPORCIN 1:5. APLANADO FINO
INTERIOR CON MORTERO (CEMENTOARENA)
1:5,
PLANTILLA
DE
CONCRETO
F'C=100.
TAPA
DE
REGISTRO DE CONCRETO. INCLUYE
EXCAVACIN.

EJE

TRAMO

LARGO

ANCHO

ALTO

B-J

1.50

2.10

3.15

D-E

0.75

2.10

1.58

B-H

1.20

3.00

3.60

G-K

0.80

2.10

1.68

6-7

F-G

0.85

0.28

PIEZAS

16.00

6.00

ALBAILERIA EN AZOTEA

SUMA

TOT

Generadores de Obra
CDIGO

CONCEPTO

ALBA-01

PRETIL EN AZOTEA: POR MEDIO


DE TABIQUE ROJO RECOCIDO 6 x 10
x 25 CM DE 10 CM DE ESPESOR,
JUNTEADO
CON
MORTERO
(CEMENTO-ARENA) PROPORCION 1:6
JUNTA DE 1.5 CM.

ALBA-02

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

19.

A1+A3

36.14

0.40

14.46

A4

13.40

0.40

5.36

CHAFLN:
FABRICACIN
DE
CHAFLAN TRIANGULAR DE 10x10
CMS
A
BASE
DE
MORTERO
(CEMENTO-ARENA) 1: 4 , INCLUYE
SUMINISTRO Y COLOCACION DE
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTA,
FABRICACION
Y
HECHURA, RETIRO DE SOBRANTES,
LIMPIEZAS Y TODO LO NECESARIO
PARA LA CORRECTA EJECUCION DE
LOS TRABAJOS.

74.

2-5

B-E

18.00

2-5

E-G

15.24

2-6

G-J

18.00

6-7

G-K

12.38

5-7

F-G

11.30

Generadores de Obra
CDIGO

CONCEPTO

ALBA-03

TEJA: COLOCACION DE TEJA DE


BARRO TIPO VALLARTA ASENTADA
CON MORTERO CEMENTO-ARENA
PROPORCION
1:4.
INCLUYE
SUMINISTRO
DE
ELEVACION,
ACARREO,
MANO
DE
OBRA,
HERRAMIENTA
Y
TODO
LO
NECESARIO PARA SU CORRECTA
EJECUCION.

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

24.

5-7

G-F

5.98

4.15

24.82

IMPERMEABILIZACIN

IMP-01

IMPERMEABILIZACIN:
IMPERMEABILIZACION EN AZOTEAS
CON PINTURA VINIMEX 700 COMEX
(COLOR BLANCO), EN TECHOS,
INCLUYE 1 MANO SELLADOR Y 2
MANOS DE VINILICA, PREPARACION
DE SUP. HASTA 3MTS, INCLUYE
ACARREO A 20 MTS Y MANIOBRAS
LOCALES. (DURACIN 5 AOS)

93.

5-7

G-F

5.98

4.15

A1

7.83

4.82

A3

3.22

6.22

A4

3.77

2.93

INSTALACIN SANITARIA

24.82
37.74
20.03
11.05

Generadores de Obra
CDIGO

CONCEPTO

INSTS-01

TUBERIA SANITARIA 2": TUBO DE


P.V.C. SANITARIO, DE 2"
DE
DIAMETRO,
INCLUYE:
INCLUYE
EXCAVACIN Y RELLENO PRODUCTO
DE EXCAVACION, Y TODO LO
NECESARIO PARA SU CORRECTA
COLOCACION.

INSTS-02

TUBERIA SANITARIA 4": TUBO DE


P.V.C. SANITARIO, DE 4"
DE
DIAMETRO,
INCLUYE:
INCLUYE
EXCAVACIN Y RELLENO PRODUCTO
DE EXCAVACION, Y TODO LO
NECESARIO PARA SU CORRECTA
COLOCACION.

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

7.7

34.

13.12
21.66

INSTS-03

TUBERIA SANITARIA 6": TUBO DE


P.V.C. SANITARIO, DE 6"
DE
DIAMETRO,
INCLUYE:
INCLUYE
EXCAVACIN Y RELLENO PRODUCTO
DE EXCAVACION, Y TODO LO
NECESARIO PARA SU CORRECTA
COLOCACION.

INSTS-04

SALIDA SANITARIA PARA


MUEBLE INCLUYE: TUBO E PVC
SANITARIO 4", 1 CODO DE 2", TEE
DE 4", MATERIALES , MANO DE OBRA
Y EQUIPO.

9.1

12

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

INSTALACIN HIDRULICA

INSTH-01

TUBERIA DE COBRE 13 MM:


SUMINISTRO
Y COLOCACIN DE
TUBERIA DE COBRE DE 13 MM DE
DIAMETRO;
INCLUYE TODO
LO
NECESARIO PARA SU CORRECTA
COLOCACIN.

52.

Planta Baja
Planta Alta 1
Planta alta 2

INSTH-02

11.18

22.36

2.67

5.34

12.32

24.64

SALIDA HIDRAULICA PARA


MUEBLE CON CODO DE 3MM
INCLUYE: CODOS, TEE, LLAVE,
MANGUERA, CONSUMIBLES, MANO E
OBRA Y HERRAMIENTA.

20

INSTALACIN ELCTRICA

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

INSTE-01

REGISTRO PARA ACOMETIDA:


CONSTRUCCIN DE REGISTRO PARA
ACOMETIDA ELECTRICA A LA CASA
HABITACION, DE 1.00 X 1.00 X 1.00
MTS MEDIDAS INTERIORES, A BASE
DE CONCRETO F'C=150 KG/CM2,
DESPLANTADO EN PLANTILLA DE
CONCRETO F'C=100 KG/CM2 DE 5.0
CMS DE ESPESOR, ARMADO CON
VARILLAS DEL NO. 3 A CADA 15 CMS.
EN AMBOS SENTIDOS, MUROS DE
0.10 MTS DE ESPESOR, INCLUYE
EXCAVACIN,
RELLENO,
RECIBIR
TUBERAS CON AVELLANAMIENTO,
ACARREOS DE MATERIALES HASTA
EL LUGAR DE SU UTILIZACIN,
MANO
DE
OBRA,
EQUIPO,
HERRAMIENTAS,
MATERIALES,
LIMPIEZA DEL REA DE TRABAJO Y
TODO LO NECESARIO PARA LA
CORRECTA EJECUCIN DE LOS
TRABAJOS.

INSTE-02

TABLERO
DE
DISTRIBUCIN:
SUMINISTRO Y COLOCACIN DE
TABLERO DE CONTROL PARA 4
CIRCUITOS MONOFSICOS.

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

INSTE-03

SUMINISTRO E INSTALACION DE
CENTRO
DE
CARGA
Q02
MONOFASICO DE 2 CIRCUITOS.
INCLUYE: 2 UNIDADES TERMICAS DE
130 AMPERES PARA LA DIVISION DE
LOS CIRCUITOS,MATERIAL,MANO DE
OBRA Y HERRAMIENTA.

INSTE-04

APAGADOR
SENCILLO:
INSTALACION
DE
APAGADOR
SENCILLO,
INCLUYE
TAQUETES,
TORNILLOS, HERRAMIENTAS, MANO
DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA INSTALACION.

17

INSTE-05

APAGADOR
EN
ESCALERA:
INSTALACION DE APAGADOR EN
ESCALERA,
INCLUYE
TAQUETES,
TORNILLOS, HERRAMIENTAS, MANO
DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA INSTALACION.

11

INSTE-06

CONTACTO DUPLEX: INSTALACION


DE CONTACTO DUPLEX, INCLUYE
TORNILLOS,
TAQUETES,
HERRAMIENTAS, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA INSTALACION.

42

MUEBLES SANITARIOS

PIEZAS

SUMA

TOT

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

MUS-01

INODORO:
SUMINISTRO
Y
COLOCACIN DE INODORO MARCA
VITROMEX, MODELO CORSICA ONE
PIECE, COLOR BLANCO; INCLUYE
TANQUE, JUNTA PROHEL, PIJAS,
MANGUERA DE ALIMENTACIN PARA
W.C. Y TODO LO NECESARIO PARA
SU CORRECTA INSTALACION.

MUS-02

LAVABO:
SUMINISTRO
Y
COLOCACIN DE LAVABO MARCA
VITROMEX, MODELO MARSELLA DE
PEDESTAL COLOR BLANCO; INCLUYE:
LLAVE AUTOMATICA DE AGUA,
CESPOL FLEXIBLE PARA LAVABO,
JUNTAS,
PIJAS,
MANGUERA
DE
ALIMENTACIN PARA LAVABO Y
TODO LO NECESARIO PARA SU
CORRECTA INSTALACION.

MUS-03

REGADERA:
SUMINISTRO
Y
COLOCACIN DE REGADERA DE
HIDROMASAJE
MOD
KH-002;
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION.

MUEBLES DE SERVICIO

MUE-01

TARJA: SUMINISTRO Y COLOCACIN


DE TARJA EMPOTRADA EN MESA.
INCLUYE:
CONTRA
CANASTA,
CESPOL, MANIOBRA LOCAL Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCIN.

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

MUE-02

LAVADERO:
SUMINISTRO
Y
COLOCACIN
DE
LAVADERO.
INCLUYE:
CONTRA
CANASTA,
CESPOL, MANIOBRA LOCAL Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCIN.

MUE-03

BOILER:
SUMINISTRO
Y
COLOCACIN DE CALENTADOR DE
AGUA. INCLUYE: ACARREOS,
MANIOBRA LOCAL Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCIN.

MUE-04

TINACO:
SUMINISTRO
Y
COLOCACIN DE TINACO ROTOPLAS
CAP. 1100 LTS. INCLUYE ACARREOS,
MANIOBRA LOCAL, ACCESORIOS,
VLVULA DE COMPUERTA Y
VLVULA CHECK

CARPINTERA

CARP-01

PUERTA
P1:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 1.20 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

CARP-02

PUERTA
P2:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 0.90 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

CARP-03

PUERTA
P3:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 0.75 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

CARP-04

PUERTA
P4:
SUMINISTRO
Y
COLOCACION
DE
PUERTA
DE
MADERA TIPO DE 2.10 X 0.65 M,
INCLUYE TAQUETES, TORNILLOS Y
FIJO PARA PUERTA CON ORIFICIO
PARA CHAPA.

VENT-01

VENTANA
V1:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 3.00 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

VENT-02

VENTANA
V2:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 0.60 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

CANCELERIA

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

VENT-03

VENTANA
V3:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 1.20 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

VENT-04

VENTANA
V4:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 0.40 X 0.60 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

VENT-05

VENTANA
V5:
SUMINISTRO
Y
COLOCACION DE VENTANA DE
ALUMINIO TIPO 2.00 X 2.10 M,
INCLUYE TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

ACABADOS

ACAB-01

APLANADO FINO: SOBRE MUROS


DE BLOCK A BASE DE MORTERO
(CEMENTO-ARENA) 1: 4 DE 2.0 CMS
DE ESPESOR PROMEDIO A NIVEL,
PLOMO Y REGLA, HASTA UNA ALTURA
MAXIMA DE 3.00 M. INCLUYE,
SUMINISTRO
Y
COLOCACIN,
MATERIALES,
MANO
DE
OBRA,
HERRAMIENTA Y ACARREOS DE
MATERIALES,
RETIRO
DE
SOBRANTES, LIMPIEZAS Y TODO LO
NECESARIO PARA LA CORRECTA
EJECUCIN DE LOS TRABAJOS.
IDEM ALB-02 X 2

892

446.49

892

Generadores de Obra
CDIGO

CONCEPTO

ACAB-02

PISO CERAMICO: DE 30 x 30 CMS,


MARCA
PORCELANATO,
COLOR
BEIGE,
INCLUYE SUMINISTRO Y
COLOCACION, MATERIALES, MANO
DE OBRA, HERRAMIENTA, TRAZO DEL
DESPIECE INDICADO EN PLANO
CORRESPONDIENTE,
RETIRO
DE
SOBRANTES, LIMPIEZAS Y TODO LO
NECESARIO PARA LA CORRECTA
EJECUCION DE LOS TRABAJOS.

EJE

TRAMO

LARGO

ANCHO

ALTO

ACAB-04

PINTURA: PINTURA A BASE DE


AGUA, EN COLOR BLANCO Y BEIGE,
INCLUYE HERRAMIENTAS, MANO DE
OBRA,
LIMPIEZA
Y
TODO
LO
NECESARIO PARA SU CORRECTA
EJECUCION.
IDEM ACAB-01

TOT

94.80

178

892

446.49

AZULEJO PARA BAO: DE 20X30


MARCA LAMOSA ASENTADO CON
ADHESIVO PERDURA JUNTA DE 1CM.
INCLUYE: SELECCIN Y ACOPIO DE
PIEDRA,MANO
DE
OBRA,HERRAMIENTA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.
BAO 1

SUMA

178

IDEM EST-05 X 2

ACAB-03

PIEZAS

892

15.

3.00

2.00

5.0

Generadores de Obra
CDIGO

CONCEPTO
BAO 2

EJE

TRAMO

LARGO

ANCHO

ALTO

5.47

PIEZAS

SUMA

2.00

TOT

10.

JARDINERA

JARD-01

CAMA DE TIERRA: TENDIDO DE


CAMA DE TIERRA NEGRA A 10 CM DE
ESPESOR,
SECCION
SEGN
PROYECTO,
SOBRE
TERRENO
NATURAL, INCLUYE, PALAS, PICOS,
RASTRILLO, AGUA Y MANO DE OBRA.

72.

12.00

JARD-02

16.00

192.00

PASTO
TIPO
ALFOMBRA:
SUMINISTRO Y COLOCACION DE
PASTO TIPO ALFOMBRA, INCLUYE
TODO LO NECESARIO PARA SU
CORRECTA COLOCACION: PALAS,
PICOS, RASTRILLO, MANO DE OBRA.

72.

72.

12.00

16.00

192.00

72.

LIMPIEZA GENERAL

LIMPG-01

LIMPIEZA GENERAL: LIMPIEZA DEL


TERRENO. INCLUYE: MANO DE OBRA,
HERRAMIENTRA
Y
RETIRO
DE
BASURA.

12.00

16.00

192

Generadores de Obra
CDIGO

CONCEPTO

EJE

TRAMO

LARGO

ANCHO

ALTO

PIEZAS

SUMA

TOT

LIMPG-02

LIMPIEZA FINAL: PARA ENTREGA


DE OBRA A BASE DE AGUA
DETERGENTE Y JABON, INCLUYE
ENCERES
COMO
ESCOBAS,
TRAPEADORES,
JALADORES,
RECOGEDORES, FIBRAS, JERGAS,
CEPILLOS ETC. MANO DE OBRA Y
HERRAMIENTA, ANDAMIOS Y TODO
LO NECESARIO PARA LA CORRECTA
EJECUCION DE LOS TRABAJOS. ESTE
CONCEPTO INCLUYE LA LIMPIEZA
DE: PISOS INTERIORES, MUROS,
CANCELES,
PUERTAS,
VIDRIOS,
MUEBLES DE BAO, Y TODO
ELEMENTO QUE SE ENCUENTRE
DETRO DEL AREA EN PLANTA, YA
SEA HORIZONTAL O VERTICAL Y SE
CONSIDERARA
PARA
FINES
DE
MEDICION, GENERACION Y PAGO
UNICAMENTE LA DIMENSION EN
PLANTA
DE
LOS
ESPACIOS
LIMPIADOS.

184

PLANTA BAJA

86.

PLANTA ALTA

97.