DATOS
f'c = 210.00 Kg/cm
fy = 4200.00 Kg/cm
S/C = 600.00 Kg/m
Acabados = 100.00 Kg/m
b=
1.20 m
CP =
0.18 m
P=
0.30 m
=
30.96
t=
0.20 m
Recub =
2.00 cm
C = 2400.00 Kg/m3
hm =
0.32 m
0.25 m
2.00 m
1. PREDIMENSIONADO
Espesor de la escalera
t = Ln/20
=
t = Ln/25
=
USAR t
=
2.40 m
hm h
0.25 m
0.22 m
0.18 m
0.20 m
2. METRADO DE CARGAS
Wu2
Wu1
2.125 m
2.525 m
X
CP
t
CP
2
cos
2
RB
Carga Viva
S/C = 720.00 Kg/m
720.00 Kg/m
WL1 = 1224.00 Kg/m
DISTRIBUCION DE ACERO
8
6
Carga Viva
S/C = 720.00 Kg/m
720.00 Kg/m
WL1 = 1224.00 Kg/m
3. CALCULO DE MOMENTO
Ra=
RB =
5451.927533
6025.29 Kg
6734.73 Kg-m
0.8
5387.78 Kg-m
4. DISEO EN ACERO
Para Momento Positivo:
Asumiendo varilla de acero:
b=
120.00 cm
d=
17.37 cm
a=
b=
c=
w1=
w2=
a=
As (+) =
As (+) =
# Varillas =
1.69 cm
8.63 cm
8.63 cm
8
5.39 T-m
5.39 T-m
=
As =
1/2
1.27 cm
A=
1.27 cm
0.59
-1
0.0787803
1.612087302
0.082827952
USAR =
8 1/2 @ 15
S = 15.00 cm
=
As =
3/8
0.71 cm
A=
0.95 cm
As (-) =
As min =
As (-) =
# Varillas =
2.88 cm
3.75 cm
3.75 cm
6
S=
S max =
S max =
S=
Para As de Temperatura:
As temp =
3.60 cm
As temp =
Dos capas
1.80 cm
Asumiendo varilla de acero:
S=
39.00 cm
S max =
100.00 cm
S max =
45.00 cm
S=
39.00 cm
6 3/8 @ 22
22.00 cm
60.00 cm
45.00 cm
22.00 cm
=
As =
3/8
0.71 cm
USAR =
3/8 @ 39
ISTRIBUCION DE ACERO
1/2
3/8
3/8
@ 15
@ 22
@ 39