Está en la página 1de 12

datos

pf
df
cr
infiltracion
M conexiones
Area
Dp
n

N
1
2
3
4

N
1
2
3
4

De

De

360 hab
130 l/h/d
80 %
0.0005 l/s/m
10 %
0.732 Ha
491.80 Hab/ha
0.013

Tramo
A
1
2 2.1
2
3 3.1

Tramo
A
2

2.1
3
3.1

Long Propia Area Propia Area tributaria


(Ha)
(m)
(Ha)
2
100
0.25
0
80
0.25
0.25
3
70
0.25
0
80
0.5
0

1
2
2
3

Long Propia Area Propia Area tributaria


(Ha)
(m)
(Ha)
100
0
0.732
80
0.183
0
70
0.366
0.183
80
0.183
0

0.732

Area Acumulada (Ha)


0.25
0.5
0.25
0.5

Area Acumulada (Ha)


0.732
0.183
0.549
0.183

Poblacion Propia
Poblacion
Poblacion
(hab)
Tributaria (hab) futura (Ha)
122.9508196721
0
122.951
122.9508196721 122.9508196721
245.902
122.9508196721
0
122.951
245.9016393443
0
245.902

Poblacion Propia
(hab)
0
90
180
90

Poblacion
Poblacion
Tributaria (hab) futura (Ha)
360
360.000
0
90.000
90
270.000
0
90.000

C Punta
babid
7.604
6.619
7.604
6.619

C Punta
harmor
4.04347826
4.25581395
4.09760881
4.25581395

Q medio
Q maximo
diario (l/s) horario (l/s) Q infiltracion (l/s) Q conexiones erradas (l/s)
0.1480
1.1253
0.05
0.112532
0.2960
1.9593
0.04
0.195929
0.1480
1.1253
0.035
0.112532
0.2960
1.9593
0.04
0.195929

Q medio
diario (l/s)
0.43333333
0.10833333
0.325
0.10833333

Q maximo
horario (l/s) Q infiltracion (l/s) Q conexiones erradas (l/s)
1.75217391
0.05
0.1752173913
0.46104651
0.04
0.0461046512
1.33172286
0.035
0.1331722864
0.46104651
0.04
0.0461046512

Q diseo (l/s)
1.2878
2.1952
1.2728
2.1952

Q diseo
adoptado (l/s)
2.000
2.195
2.000
2.195

Cota terreno
Pendiente
minima (%) Inicio
Fin
0.00397081
2500
0.00380074
2498
0.00397081
2500
0.00380074
2498

2498
2497
2498
2497

Q diseo
adoptado
2.000
2.000
2.000
2.000

Cota terreno
Pendiente
minima (%) Inicio
Fin
0.00397081
204
0.00397081
207.5
0.00397081
206
0.00397081
213.5

200
204
204
206

6.9511348090

Q diseo (l/s)
1.9773913043
0.5471511628
1.4998951502
0.5471511628

4.5715887801

Dimetro (mm)
Pendiente
pendiente
terreno
de diseo Asumido
Diseo
0.02
0.02
100
0.0125
0.01
100
0.02857143
0.02
100
0.0125
0.01
100

Dimetro (mm)
Pendiente
pendiente
terreno
de diseo Asumido
Diseo
0.0400
0.04
100
0.0438
0.04
100
0.0286
0.03
100
0.0938
0.03
100

D comercial(pulg)
100
100
100
100

R (m)

4
4
4
4

D comercial(pulg)
100
100
100
100

Se

4
4
4
4

0.025
0.025
0.025
0.025

Se
R (m)
0.025
0.025
0.025
0.025

> 0,6
Seccin llena
V (m/s)
Verificacion V
0.9301
APTO
0.6577
APTO
0.9301
APTO
0.6577
APTO

tablas
Q (m3/s)
0.00731
0.00517
0.00731
0.00517

Seccin llena
V (m/s)
Verificacion V
1.3154
APTO
1.3154
APTO
1.1391
APTO
1.1391
APTO

Q (m3/s)
0.01033086
0.01033086
0.00894679
0.00894679

q/Q
0.2738
0.4250
0.2738
0.4250

q/Q
0.1936
0.1936
0.2235
0.2235

r/R

v/V

0.78259
0.93942
0.78259
0.93942

0.84923
0.91051
0.84923
0.91051

r/R

v/V

0.68376
0.68376
0.72070
0.72070

0.77614
0.77614
0.80384
0.80384

tablas

0,262<X<0,75
y/D
0.35500
0.43500
0.35500
0.43500

y/D
0.30000
0.30000
0.32000
0.32000

Verificacion y/D
apto
apto
apto
apto

Verificacion y/D
apto
apto
apto
apto

r (m)
0.01956
0.02349
0.01956
0.02349

r (m)
0.01709
0.01709
0.01802
0.01802

v (m/s)
0.7899
0.5988
0.7899
0.5988

v (m/s)
1.0209
1.0209
0.9157
0.9157

y (m)
0.0355
0.0435
0.0355
0.0435

y (m)
0.03
0.03
0.032
0.032

(Pa)
3.83
2.30
3.83
2.30

(Pa)
6.701
6.701
5.297
5.297

Verificacion
(Pa)
apto
apto
apto
apto

Verificacion
(Pa)
apto
apto
apto
apto

cota terreno
Profundidad exc
Cota solera
inicio
fin
Inicio
Fin
Inicio
2500
2498
1.000
1.020
2499.000
2498
2497
1.020
1.030
2496.980
2500
2498
1.030
1.050
2498.970
2498
2497
1.050
1.060
2496.950

cota terreno
inicio
fin
204
207.5
206
213.5

Profundidad
Inicio
Fin
200
1.000
204
1.040
204
1.080
206
1.110

Cota solera
Inicio
1.040
203.000
1.080
206.460
1.110
204.920
1.140
212.390

Cota solera
Fin
2496.980
2495.970
2496.950
2495.940

ancho
zanja

Vol (m3)
0.6
0.6
0.6
0.6

60.6
49.2
43.68
50.64

204.12

Cota solera
Fin
198.960
202.920
202.890
204.860

ancho
zanja

Vol (m3)
0.6
0.6
0.6
0.6

61.20
50.88
45.99
54.00

212.07

EJERCICIO 2
tramo
de
2
2.1
3
3.1

a
1
2
2
3

Long Propia (m) Area Propia


100
0
80
0.183
70
0.366
80
0.183

Q medio
diario (l/s)
0.433333333
0.108333333
0.325
0.108333333

Q maximo
horario (l/s)
1.752173913
0.461046512
1.331722864
0.461046512

Q infiltracion
Q conexiones
(l/s)
erradas (l/s)
Q diseo (l/s)
0.05 0.1752173913 1.9773913043
0.04 0.0461046512 0.5471511628
0.035 0.1331722864 1.4998951502
0.04 0.0461046512 0.5471511628

Dimetro (mm)
pendiente de
diseo
Asumido
Diseo
0.04
100
0.04
100
0.03
100
0.03
100

v/V
0.776135294
0.776135294
0.803842205
0.803842205

y/D

Area tributaria
Area
Poblacion
(Ha)
Acumulada
(Ha) Propia (hab)
(Ha)
0.732
0.732
0
0
0.183
90
0.183
0.549
180
0
0.183
90

100
100
100
100

Verificacion y/D
0.3 apto
0.3 apto
0.32 apto
0.32 apto

D
comercial(pulg) R (m)
4
4
4
4

r (m)
0.0170940968
0.0170940968
0.0180175699
0.0180175699

Q diseo
adoptado
2
2
2
2

Poblacion
Tributaria
(hab)
360
0
90
0

Pendiente
minima (%) Inicio
0.003970805
0.003970805
0.003970805
0.003970805

Cota terreno
204
207.5
206
213.5

Seccin llena
V (m/s)
Verificacion V Q (m3/s)
0.025 1.3153661128 APTO
0.010330861
0.025 1.3153661128 APTO
0.010330861
0.025
1.139140469 APTO
0.008946788
0.025
1.139140469 APTO
0.008946788

v (m/s)
1.0209020647
1.0209020647
0.9156891863
0.9156891863

y (m)
0.03
0.03
0.032
0.032

Verificacion
(Pa)
6.700885934 apto
6.700885934 apto
5.297165551 apto
5.297165551 apto
(Pa)

Poblacion
futura (Ha)
360
90
270
90

Cota terreno
Fin
200
204
204
206

q/Q
0.193594701
0.193594701
0.223543905
0.223543905

C Punta
harmor
4.043478261
4.255813953
4.097608812
4.255813953

Pendiente
terreno
0.04
0.04375
0.028571429
0.09375

r/R
0.68376
0.68376
0.72070
0.72070

cota terreno
inicio
fin
204
207.5
206
213.5

200
204
204
206

Inicio

Profundidad
Fin
1
1.04
1.08
1.11

Cota solera
Inicio
Fin
1.04
203
1.08
206.46
1.11
204.92
1.14
212.39

198.96
202.92
202.89
204.86

ancho
zanja

Vol (m3)
0.6
0.6
0.6
0.6

61.2
50.88
45.99
54

También podría gustarte