Está en la página 1de 5

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION PUENTE PEATONAL CN CHAYUYACU, DISTRITO DE CAJARURO, PROVINCIA DE UTCUBAMBA - AMAZONAS"
FECHA

: AGOSTO DEL 2,015

DESCRIPCION

**.**

01 - PUENTE PEATONAL ( L = 44 m )

O1

TRABAJOS PRELIMINARES

01.01

UNID.

ANCHO

ALTO

LARGO

VECES

PARCIAL

LIMPIEZA DE TERRENO

TOTAL

600.00

LADO IZQUIERDO

M2

15.00

20.00

300.00

LADO DERECHO

M2

15.00

20.00

300.00

01.02

TRAZO Y REPLANTEO

M2

5.00

60.00

300.00

01.03

MOVILIZACON Y DESMOVILIZACION DE EQUIPO LIVIANO

GLB

1.00

1.00

1.00

1.00

01.04

CABLE DE ACERO 5/8"

ML

70.00

70.00

70.00

01.05

SUMIN. E INST CARRO METALICO 0.50x1.00x1.00 M

UND

1.00

1.00

01.06

SUMIN. E INST. GRAPAS 5/8"

UN

8.00

8.00

O2

MOVIMIENTO DE TIERRAS
DADO DE ANCLAJE IZQUIERDO

M3

8.30

25.11

1.00

208.41

DADO DE ANCLAJE DERECHO

M3

8.30

31.72

1.00

263.28

TORRE IZQUIERDA

M3

8.50

19.19

1.00

163.12

TORRE DERECHA

M3

8.50

9.51

1.00

80.84

DADO DE ANCLAJE IZQUIERDO

M3

4.00

11.18

1.00

44.72

DADO DE ANCLAJE DERECHO

M3

4.00

11.18

1.00

44.72

TORRE IZQUIERDA

M3

4.00

8.40

1.00

33.60

TORRE DERECHA

M3

4.00

8.40

1.00

33.60

RELLENO ACCESO IZQUIERDO

M3

1.20

1.00

5.00

6.00

RELLENO ACCESO DERECHO

M3

1.20

1.00

5.00

6.00

TORRE IZQUIERDA

M3

5.00

0.50

5.00

12.50

TORRE DERECHA

M3

5.00

0.50

5.00

12.50

M2

4.50

2.80

25.20

25.20

M3

4.30

4.30

96.15

88.43

02.01

02.03

02.04

O3

EXCAVACIN EN ROCA SUELTA

AREA

CONCRETO CICLOPEO Fc = 175 Kg/cm2 + 30% P.G.


DADO DE ANCLAJE
DESCUENTO VENTANAS

2.60
AREA

DADO IZQUIERDO

M3

-2

0.60

3.12

-3.74

DADO DERECHO

M3

-2

0.60

3.31

-3.97

ENCOFRADO DADO DE ANCLAJE

M2

17.20

2.60

89.44

ENCOFRADO VENTANAS

M2

0.60

M2

M2

M2

M2

ENCOFRADO Y DESENCOFRADO DADO DE ANCLAJE

145.62

3.40
5.14

1.80

4.32

1.00

13.60

0.60
4.98

5.00

0.60

12.34
1.00

19.92
6.00

OBRAS DE CONCRETO ARMADO

04.01

ZAPATAS: CONCRETO F'c=210 Kg/cm2

M3

4.50

0.70

04.02

ZAPATAS : ENCOFRADO Y DESENCOFRADO

M2

14.60

0.70

04.03

ZAPATAS : ACERO Fy = 4200 kg/cm2

Kg

04.04

COLUMNAS: CONCRETO : TORRE IZQUIERDA

M3

0.30

8.70

0.50

2.61

TORRE DERECHA

M3

0.30

8.70

0.50

2.61

COLUMNAS ENCOFRADO : TORRE IZQUIERDA

M2

1.60

8.70

27.84

TORRE DERECHA

M2

1.60

8.70

27.84

2.80

17.64

0.50

20.44

747.72

747.72

COLUMNAS : ACERO Fy = 4200 kg/cm2

Kg

04.07

VIGAS CONCRETO Fc = 210 kg/cm2

M3

0.30

04.08

VIGAS: ENCOFRADO Y DESENC.

M3

1.30

04.09

VIGAS : ACERO Fy = 4200 kg/cm2

Kg

04.10

TAPAS DE INSPECCIN: CONCRETO Fc= 210 kg/cm2

M3

0.70

0.10

4.14

0.58

M3

0.70

0.10

3.03

0.42

M3

0.70

4.14

5.80

M3

0.70

3.03

4.24

Kg

04.12
O5

TAPAS DE INSPECCIN: ENCOFRADO Y DESENC.


TAPAS DE INSPECCIN : ACERO Fy= 4,200 kg/cm2

17.64

20.44

04.06

04.11

25.00

OBRAS DE CONCRETO SIMPLE


SOLADO PARA ZAPATA E = 4"

04.05

168.64

RELLENO CON MATERIAL DE PRESTAMO

03.02

O4

715.64

RELLENO CON MATERIAL PROPIO

03.01

03.03

300.00

989.13

5.22
55.68
989.13

2.00

1.80

1.80

2.00

15.60

15.60

257.34

257.34

80.74

1.00
10.04
80.74

CARPINTERIA DE MADERA

05.01

VIGUETAS DE MADERA 4" x 6" x 10

UN

21

05.02

VIGUETA EXTERNA 4" x 6 x 7'

UN

21.00
2.00

05.03

LARGUERO CENTRAL 4" X5"X15'

UN

22

22.00

05.04

LARGUERO LATERAL 4"X5"X15'

UN

22

22.00

05.05

MONTANTE DE APOYO 3"X4"x5'

UN

46

46.00

05.06

MONTANTE CENTRAL 3"X4"x5'

UN

44

44.00

05.07

SOLERA 3"X4"X7'

UN

44

44.00

05.08

DIAGONALES 2"X4"X5'

UN

88

88.00

HOJA DE METRADOS
PROYECTO : "CONSTRUCCION PUENTE PEATONAL CN CHAYUYACU, DISTRITO DE CAJARURO, PROVINCIA DE UTCUBAMBA - AMAZONAS"
FECHA

: AGOSTO DEL 2,015

DESCRIPCION

UNID.

ANCHO

ALTO

LARGO

VECES

PARCIAL

TOTAL

05.09

ARRIOSTRES 2"X4"X4'

UN

42

42.00

05.10

ENTABLADO 2"X8"X7'

UN

220

220.00

O6

CABLES, PENDOLAS, Y ANCLAJE

06.01

CABLE DE ACERO TIPO BOA 11/8"

ML

66.00

264.00

06.02

VIGA METALICA H = 8"

ML

4.10

8.20

06.03

PENDOLAS DIAMETRO 1/2"

ML

06.04

ABRAZADERA PENDOLA - CABLE

UN

52

42.00

06.05

ABRAZADERA PENDOLA - VIGUETA

UN

52

42.00

06.06

ABRAZADERA ANTIDESLIZANTE

UN

44

40.00

06.07

CARRO DE DILATACION

UN

4.00

06.08

SUMINISTRO Y COLOC. DE GRAPAS 11/8"

UN

48

48.00

06.09

GUARDA CABLE 6"

UN

8.00

114.00

264.00
8.20
114.00

O7

REVOQUES Y ENLUCIDOS

07.01

TORRES EN COLUMNAS

M2

1.60

5.20

33.28

33.28

07.02

TARRAJEO EN VIGAS

M2

1.60

2.00

12.80

12.80

O8

PINTURA

08.01

PINTURA EN COLUMNAS Y VIGAS

M2

46.08

46.08

08.02

PINTURA DE PENDOLAS

ML

114.00

114.00

08.03

PINTURA EN MADERA DE PUENTE

M2

44.00

88.00

88.00

ML

13.00

26.00

26.00

1.00

1.00

O9

1.00

DRENAJE CAMARA DE ANCLAJE

09.01

TUBERIA PVC SAP C-7.5 D = 3"

09.02

ACCESORIOS PVC

**.**

02 - TECHO DE PUENTE CON CALAMINA

O1

TECHADO DEL PUENTE CON CALAMINA

GLB

01.01

PARANTES DE 3"x4"x8

UND

46.00

46.00

46.00

01.02

PARANTES DE 3"x4"x2

UND

23.00

23.00

23.00

01.03

VIGAS DE 3"x3"x7

UND

69.00

69.00

69.00

01.04

CORREAS Y TIURANTES DE MADERA 2"x3"

8.00

44.00

352.00

352.00

01.05

CHAPAS DE 1"x10"x1

UND

2.00

92.00

184.00

184.00

M2

2.00

2.10

184.80

184.80

O2
02.01
O3
03.01

**.**
O1.01

COBERTURA
COBERTURA CON CALAMINA GALVANIZADA

44.00

PINTURA
83.72

PINTURA ESMALTE EN CARPINTERIA DE MADERA

M2

POSTES 3X4"

M2

46.00

0.77

PARANTES DE 3"x4"x2

UND

23.00

0.21

4.83

VIGAS DE 3"x3"x7

UND

69.00

0.63

43.47

35.42

03 - MODULO DE CAPACITACION
MODULO DE CAPACITACIN

**.**

04 - CONTROL DE CALIDAD DE OBRA

O1

CONTROL DE CALIDAD DE OBRA PTE. PEATONAL

UND

1.00

1.00

01.01

ROTURA PROBETAS CONCRETO : DADO DE ANCLAJE

UN

6.00

6.00

01.02

ROTURA PROBETAS CONCRETO : ZAPATAS

UN

8.00

8.00

01.03

ROTURA PROBETAS CONCRETO : COLUMNAS- VIGAS

UN

8.00

8.00

**.**

05 - DISEO DE MEZCLAS DE CONCRETO

O1

DISEO DE MEZCLAS DE CONCRETO PTE. PEATONAL

01.01

DISEO DE MEZCLAS DE CONCRETO Fc = 175 kg/cm2

UN

1.00

1.00

01.02

DISEO DE MEZCLAS DE CONCRETO fC = 210 kg/cm2

UN

1.00

1.00

**.**

06 - FLETE

01.01

FLETE TERRESTRE

GLB

1.00

1.00

01.02

FLETE RURAL

GLB

1.00

1.00

UND

1.00

1.00

UN

1.00

1.00

**.**
01.01

07 - CARTEL DE OBRA
CARTEL DE IDENTIFICACION DE OBRA

**.**

08 - PLACA RECORDATORIA

O1

PLACA RECORDATORIA + MURETE

01.01

PLACA RECORDATORIA + MURETE

**.**

09 - SEALIZACIN INFORMATIVA (02)

O1

SEAL INFORMATIVA 0.9x1.20 m.

01.01

EXCAVACIN MANUAL

M3

0.50

0.80

0.50

0.40

0.40

01.02

CONCRETO Fc = 175 kg/cm2

M3

0.30

1.20

0.30

0.22

0.22

01.03

ENCOFRADO Y DESENCOFRADO

M2

1.20

1.20

2.88

2.88

01.04

ACERO Fy = 4200 Kg/cm2

Kg

10.10

10.10

01.05

LETRERO PARA PUENTE PEATONAL

UN

2.00

2.00

MADERA PARA PLATAFORMA DE PUENTE PEATONAL

PROYECTO : "CONST. PUENTE PEATONAL CN CHAYUYACU, DISTRITO DE CAJARURO, PROV. UTCUBAMB


FECHA

: AGOSTO DEL 2,015

DETALLE
VIGUETAS
VIGUETAS EXTREMA
LARGUERO CENT
LARGERO LATERAL
MONTANTE APOYO
MONTANTE CENTRAL
DIAGONAL
ARRIOSTRES
SOLERAS
TABLAS
TOTAL

N PIEZAS
21
2
22
22
46
44
88
42
44
220

ANCHO PULG ALTO


4
4
4
4
3
3
2
2
3
2

PULG
6
6
5
5
4
4
4
4
4
8

PLATAFORMA DE PUENTE PEATONAL

YUYACU, DISTRITO DE CAJARURO, PROV. UTCUBAMBA - AMAZONAS"

LARGO
PIES

PARCIAL
10
7
15
15
5
5
5
4
7
7

P2

P2

420.00
28.00
550.00
550.00
230.00
220.00
293.33
112.00
308.00
2,053.33
4,764.67

METRADO DE ACERO
PROYECTO : "CONSTRUCCION PUENTE PEATONAL C. N. CHAYUYACU, DISTRITO DE CAJARURO, PROVINCIA DE UTCUBAMBA - AMAZONAS"
FECHA
: AGOSTO DEL 2,015
DESCRIPCION

N DE

N DE

(")

VECES

PIEZAS

1"

18

1"

11

3/8"

5/8"

3/4"

1"

PARCIAL

PARCIAL

MTS.

KGS.

OBSERV.

2.60

93.60

371.87

3.973 Kg/cm

4.30

94.60

375.85

3.973 Kg/cm

TOTAL

747.72

129.60

289.66

2.235 Kg/cm

43.20

67.05

1.552 Kg/cm

248.40

139.10

0.560 Kg/cm

129.60

289.66

2.235 Kg/cm

41.60

64.56

1.552 Kg/cm

248.40

139.10

0.560 Kg/cm

4.03 .- ACERO ZAPATAS


2.60

4.30

KG

4.06 .- ACERO COLUMNAS


TORRE IZQUIERDA

10.5

L = 10.80

3/4"

5/8"

3/8"

54

3/4"

5/8"

3/8"

54

10.8

10.8

0.3

0.10
24

1.15

1.15
0.22
TORRE DERECHA

10.8

10.5
10.4

L =10.80
0.3

0.10

1.15

0.24

0.22
1.15

TOTAL

989.13

KG

4.09 .- ACERO VIGAS


2.50
0.30

0.30
3.10

3/4"

3/8"

3/8"

13

3.10

74.40

166.28

2.235 Kg/cm

2.5

30.00

16.80

0.560 Kg/cm

1.7

132.60

74.26

0.560 Kg/cm

TOTAL

257.34

0.10
0.52

0.22
1.7

KG

4.12 .- ACERO TAPAS DE INSPECCION


0.50

0.70

TOTAL

3/8"

24

0.50

72.00

41.76

0.58 Kg/cm

3/8"

24

0.70

67.20

38.98

0.58 Kg/cm

TOTAL

80.74

KG

2,074.92

KG