01 - PUENTE PEATONAL ( L = 44 m )
O1
TRABAJOS PRELIMINARES
01.01
UNID.
ANCHO
ALTO
LARGO
VECES
PARCIAL
LIMPIEZA DE TERRENO
TOTAL
600.00
LADO IZQUIERDO
M2
15.00
20.00
300.00
LADO DERECHO
M2
15.00
20.00
300.00
01.02
TRAZO Y REPLANTEO
M2
5.00
60.00
300.00
01.03
GLB
1.00
1.00
1.00
1.00
01.04
ML
70.00
70.00
70.00
01.05
UND
1.00
1.00
01.06
UN
8.00
8.00
O2
MOVIMIENTO DE TIERRAS
DADO DE ANCLAJE IZQUIERDO
M3
8.30
25.11
1.00
208.41
M3
8.30
31.72
1.00
263.28
TORRE IZQUIERDA
M3
8.50
19.19
1.00
163.12
TORRE DERECHA
M3
8.50
9.51
1.00
80.84
M3
4.00
11.18
1.00
44.72
M3
4.00
11.18
1.00
44.72
TORRE IZQUIERDA
M3
4.00
8.40
1.00
33.60
TORRE DERECHA
M3
4.00
8.40
1.00
33.60
M3
1.20
1.00
5.00
6.00
M3
1.20
1.00
5.00
6.00
TORRE IZQUIERDA
M3
5.00
0.50
5.00
12.50
TORRE DERECHA
M3
5.00
0.50
5.00
12.50
M2
4.50
2.80
25.20
25.20
M3
4.30
4.30
96.15
88.43
02.01
02.03
02.04
O3
AREA
2.60
AREA
DADO IZQUIERDO
M3
-2
0.60
3.12
-3.74
DADO DERECHO
M3
-2
0.60
3.31
-3.97
M2
17.20
2.60
89.44
ENCOFRADO VENTANAS
M2
0.60
M2
M2
M2
M2
145.62
3.40
5.14
1.80
4.32
1.00
13.60
0.60
4.98
5.00
0.60
12.34
1.00
19.92
6.00
04.01
M3
4.50
0.70
04.02
M2
14.60
0.70
04.03
Kg
04.04
M3
0.30
8.70
0.50
2.61
TORRE DERECHA
M3
0.30
8.70
0.50
2.61
M2
1.60
8.70
27.84
TORRE DERECHA
M2
1.60
8.70
27.84
2.80
17.64
0.50
20.44
747.72
747.72
Kg
04.07
M3
0.30
04.08
M3
1.30
04.09
Kg
04.10
M3
0.70
0.10
4.14
0.58
M3
0.70
0.10
3.03
0.42
M3
0.70
4.14
5.80
M3
0.70
3.03
4.24
Kg
04.12
O5
17.64
20.44
04.06
04.11
25.00
04.05
168.64
03.02
O4
715.64
03.01
03.03
300.00
989.13
5.22
55.68
989.13
2.00
1.80
1.80
2.00
15.60
15.60
257.34
257.34
80.74
1.00
10.04
80.74
CARPINTERIA DE MADERA
05.01
UN
21
05.02
UN
21.00
2.00
05.03
UN
22
22.00
05.04
UN
22
22.00
05.05
UN
46
46.00
05.06
UN
44
44.00
05.07
SOLERA 3"X4"X7'
UN
44
44.00
05.08
DIAGONALES 2"X4"X5'
UN
88
88.00
HOJA DE METRADOS
PROYECTO : "CONSTRUCCION PUENTE PEATONAL CN CHAYUYACU, DISTRITO DE CAJARURO, PROVINCIA DE UTCUBAMBA - AMAZONAS"
FECHA
DESCRIPCION
UNID.
ANCHO
ALTO
LARGO
VECES
PARCIAL
TOTAL
05.09
ARRIOSTRES 2"X4"X4'
UN
42
42.00
05.10
ENTABLADO 2"X8"X7'
UN
220
220.00
O6
06.01
ML
66.00
264.00
06.02
ML
4.10
8.20
06.03
ML
06.04
UN
52
42.00
06.05
UN
52
42.00
06.06
ABRAZADERA ANTIDESLIZANTE
UN
44
40.00
06.07
CARRO DE DILATACION
UN
4.00
06.08
UN
48
48.00
06.09
UN
8.00
114.00
264.00
8.20
114.00
O7
REVOQUES Y ENLUCIDOS
07.01
TORRES EN COLUMNAS
M2
1.60
5.20
33.28
33.28
07.02
TARRAJEO EN VIGAS
M2
1.60
2.00
12.80
12.80
O8
PINTURA
08.01
M2
46.08
46.08
08.02
PINTURA DE PENDOLAS
ML
114.00
114.00
08.03
M2
44.00
88.00
88.00
ML
13.00
26.00
26.00
1.00
1.00
O9
1.00
09.01
09.02
ACCESORIOS PVC
**.**
O1
GLB
01.01
PARANTES DE 3"x4"x8
UND
46.00
46.00
46.00
01.02
PARANTES DE 3"x4"x2
UND
23.00
23.00
23.00
01.03
VIGAS DE 3"x3"x7
UND
69.00
69.00
69.00
01.04
8.00
44.00
352.00
352.00
01.05
CHAPAS DE 1"x10"x1
UND
2.00
92.00
184.00
184.00
M2
2.00
2.10
184.80
184.80
O2
02.01
O3
03.01
**.**
O1.01
COBERTURA
COBERTURA CON CALAMINA GALVANIZADA
44.00
PINTURA
83.72
M2
POSTES 3X4"
M2
46.00
0.77
PARANTES DE 3"x4"x2
UND
23.00
0.21
4.83
VIGAS DE 3"x3"x7
UND
69.00
0.63
43.47
35.42
03 - MODULO DE CAPACITACION
MODULO DE CAPACITACIN
**.**
O1
UND
1.00
1.00
01.01
UN
6.00
6.00
01.02
UN
8.00
8.00
01.03
UN
8.00
8.00
**.**
O1
01.01
UN
1.00
1.00
01.02
UN
1.00
1.00
**.**
06 - FLETE
01.01
FLETE TERRESTRE
GLB
1.00
1.00
01.02
FLETE RURAL
GLB
1.00
1.00
UND
1.00
1.00
UN
1.00
1.00
**.**
01.01
07 - CARTEL DE OBRA
CARTEL DE IDENTIFICACION DE OBRA
**.**
08 - PLACA RECORDATORIA
O1
01.01
**.**
O1
01.01
EXCAVACIN MANUAL
M3
0.50
0.80
0.50
0.40
0.40
01.02
M3
0.30
1.20
0.30
0.22
0.22
01.03
ENCOFRADO Y DESENCOFRADO
M2
1.20
1.20
2.88
2.88
01.04
Kg
10.10
10.10
01.05
UN
2.00
2.00
DETALLE
VIGUETAS
VIGUETAS EXTREMA
LARGUERO CENT
LARGERO LATERAL
MONTANTE APOYO
MONTANTE CENTRAL
DIAGONAL
ARRIOSTRES
SOLERAS
TABLAS
TOTAL
N PIEZAS
21
2
22
22
46
44
88
42
44
220
PULG
6
6
5
5
4
4
4
4
4
8
LARGO
PIES
PARCIAL
10
7
15
15
5
5
5
4
7
7
P2
P2
420.00
28.00
550.00
550.00
230.00
220.00
293.33
112.00
308.00
2,053.33
4,764.67
METRADO DE ACERO
PROYECTO : "CONSTRUCCION PUENTE PEATONAL C. N. CHAYUYACU, DISTRITO DE CAJARURO, PROVINCIA DE UTCUBAMBA - AMAZONAS"
FECHA
: AGOSTO DEL 2,015
DESCRIPCION
N DE
N DE
(")
VECES
PIEZAS
1"
18
1"
11
3/8"
5/8"
3/4"
1"
PARCIAL
PARCIAL
MTS.
KGS.
OBSERV.
2.60
93.60
371.87
3.973 Kg/cm
4.30
94.60
375.85
3.973 Kg/cm
TOTAL
747.72
129.60
289.66
2.235 Kg/cm
43.20
67.05
1.552 Kg/cm
248.40
139.10
0.560 Kg/cm
129.60
289.66
2.235 Kg/cm
41.60
64.56
1.552 Kg/cm
248.40
139.10
0.560 Kg/cm
4.30
KG
10.5
L = 10.80
3/4"
5/8"
3/8"
54
3/4"
5/8"
3/8"
54
10.8
10.8
0.3
0.10
24
1.15
1.15
0.22
TORRE DERECHA
10.8
10.5
10.4
L =10.80
0.3
0.10
1.15
0.24
0.22
1.15
TOTAL
989.13
KG
0.30
3.10
3/4"
3/8"
3/8"
13
3.10
74.40
166.28
2.235 Kg/cm
2.5
30.00
16.80
0.560 Kg/cm
1.7
132.60
74.26
0.560 Kg/cm
TOTAL
257.34
0.10
0.52
0.22
1.7
KG
0.70
TOTAL
3/8"
24
0.50
72.00
41.76
0.58 Kg/cm
3/8"
24
0.70
67.20
38.98
0.58 Kg/cm
TOTAL
80.74
KG
2,074.92
KG