PLANILLA DE METRADOS DE OBRA

Obra
Formula
Fecha

ITEM

DESCRIPCION DE PARTIDA

03.04

PRIMER, SEGUNDO PISO Y AZOTEA

03.04.00

LOSA ALBAILERIA

03.04.01

concreto f'c = 210 kg/cm2

UND

UBICACIN / DETALLE

m3

PRIMER PISO

CANTIDAD

LARGO

ANCHO

ALTO

(M)

(M)

(M)

PARCIAL

C-1

13.00

0.25

0.25

3.20

2.60

C-2

4.00

0.25

0.15

3.20

0.48

13.00

0.25

0.25

2.80

2.28

12.00

0.25

0.25

2.80

2.10

SEGUNDO PISO
C-1
AZOTEA
C-1

03.04.02

encofrado y desencofrado

m2

PRIMER PISO
C-1 EJE A1 Y C1

2.00

0.70

3.20

4.48

C-1 EJE B1, A2 Y C5

3.00

0.55

3.20

5.28

C-1 EJE C2, B2, A3, C3, A4, C4 Y A5

7.00

0.70

3.20

15.68

C-1 EJE B5

1.00

0.85

3.20

2.72

C-2 EJE B4'

1.00

0.50

3.20

1.60

C-2 EJE A6, B6 Y C6

3.00

0.65

3.20

6.24

C-1 EJE C1

1.00

0.70

2.80

1.96

C-1 EJE C2, B2, A3, C3, C4, A5, B1, A2, B5, A1 Y C5

11.00

0.70

2.80

21.56

C-1 EJE A4

1.00

0.55

2.80

1.54

SEGUNDO PISO

AZOTEA

1 de 4

PLANILLA DE METRADOS DE OBRA


Obra
Formula
Fecha

ITEM

03.04.03

DESCRIPCION DE PARTIDA

acero f'y = 4200 kg/cm2

UND

UBICACIN / DETALLE

CANTIDAD

LARGO

ANCHO

ALTO

(M)

(M)

(M)

PARCIAL

C-1 EJE C1

1.00

0.70

2.80

1.96

C-1 EL RESTO

11.00

0.70

2.80

21.56

13.00

5.25

1.552

6.00

635.54

13.00

0.85

0.559

30.00

185.31

4.00

5.25

0.993

4.00

83.41

4.00

0.65

0.559

30.00

43.60

13.00

4.00

1.552

6.00

484.22

13.00

0.85

0.559

23.00

142.07

13.00

3.00

1.552

4.00

242.11

13.00

3.00

0.993

2.00

77.45

13.00

0.85

0.559

18.00

111.19

kg
(kg/ml)

PRIMER PISO
C-1
Estribos
C-2
Estribos

cantidad

SEGUNDO PISO
C-1
Estribos

AZOTEA
C-1

Estribos

2 de 4

METRADO

7.46

84.58

3 de 4

METRADO

2,004.91

4 de 4