Diseñ Pav CBR Antacocha
Diseñ Pav CBR Antacocha
1
2
3
4
5
6
7
8
9
10
11
12
Calicata
C-01
C-02
C-03
C-04
C-06
C-07
C-08
C-09
C-10
C-11
C-12
C-13
Tipo de suelo
Profundidad
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
Progresiva
SUCS
AASHTO
CL
GM
SM
GM
GM-GC
GM
SM
ML
SM
ROCA
ROCA
CL
A-4 (7)
A-4 (0)
A-1-b (0)
A-2-4 (0)
A-2-4 (0)
A-4 (1)
A-4 (1)
A-4 (5)
A-4 (1)
ROCA
ROCA
A-6 (6)
0+000
0+500
1+000
2+000
2+500
3+000
3+500
4+000
4+500
5+000
5+500
5+720
mpa
CBR 95% MDS
5.500
23.500
22.140
14.300
18.275
22.250
25.060
10.450
22.195
7.880
N
1
2
3
4
5
6
7
8
9
10
CBR 95%
MDS
5.500
23.500
22.140
14.300
18.275
22.250
25.060
10.450
22.195
7.880
CBR 95%
MDS
PERCENTIL
(Ordenado)
(%)
25.060
100.000
23.500
90.000
22.250
80.000
22.195
70.000
22.140
60.000
18.275
50.000
14.300
40.000
10.450
30.000
7.880
20.000
5.500
10.000
CBR = 18.95
%
MUESTRA
C-01
C-02
C-03
C-04
C-06
C-07
C-08
C-09
C-10
C-13
TIPO DE SUELO
SUCS
AASHTO
CL
GM
SM
GM
GM-GC
GM
SM
ML
SM
CL
A-4 (7)
A-4 (0)
A-1-b (0)
A-2-4 (0)
A-2-4 (0)
A-4 (1)
A-4 (1)
A-4 (5)
A-4 (1)
A-6 (6)
CBR 95%
MDS
5.5
23.5
22.14
14.3
18.275
22.25
25.06
10.45
22.195
7.88
CBR 95%
MDS
Frecuencia
(Ordenado)
25.060
23.500
22.250
22.195
22.140
18.275
14.300
10.450
7.880
5.500
TOTAL
1
1
1
1
1
1
1
1
1
1
10
NTIL
klepampa
%Reparticion PERCENTIL
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
100%
100.00
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
segn usace
valor de 5-10
16.86
X
71
5
Xpulg
Xcm
=
=
segn manual
CBR =
18.95
EAL = 18011
e =
TIPO DE
VEHICULO
TRAFICO
TOTAL
2025
Ligeros
Camin 2 E
22
11
NOMBRE
UBICACIN
LADO
CANTERA
Antes del
inicio del
tramo
07+300
Derecho
3.81267606
9.68419718
95.971112
VEH/AO
FCXFPR
EAL
8,030
4,015
0.2451
3.9958
EAL
1968.153
16043.137
18,011.29
ACCESO
TIPO DE MATERIAL
A EXTRAER
USO DEL
MATERIAL
30 m
Material granular
equivalente 97%
Afirmados y
concreto
VOLUMEN VOLUMEN A
POTENCIAL
EXTRAER
10000 m3
750 m3
SUPERFICIE
A SER
AFECTADA
375 m2