Está en la página 1de 3

Concepto

T.R. Y Acc's.
Cementos
Reg. Electricos
Barrenas
Fluidos B. Agua
Fluidos B. Aceite
Dia Equipo
Elim. Solidos
Direccional
Arbol Valv. yCab.
Transportes
Tub.Perf.
Eq. Bajo Balance
Varios

Costo
4,000,000
300,000
2,500,000
3,000,000
235,000
600,000
4,000,000
258,000
2,000,000
1,250,000
1,000,000
500,000
2,500,000
200,000

3,000,000
235,000
2,000,000
2,500,000
###
###
2,500,000
###
1,500,000
###
900,000
350,000
1,250,000
100,000

Costos de Perforacin
Pozo Fulano sin No.
4,000,000

T.R. Y Acc's.

3,000,000
300,000

Cem entos

235,000
2,500,000

Reg. Electricos

2,000,000
3,000,000

Barrenas

2,500,000
235,000

Fluidos B. Agua

235,000
600,000

Fluidos B. Aceite

600,000
4,000,000

Dia Equipo

2,500,000
258,000

Elim . Solidos

258,000
2,000,000

Direccional

1,500,000
1,250,000

Arbol Valv. yCab.

1,250,000
1,000,000

Trans portes

900,000
500,000

Tub.Perf.

350,000
2,500,000

Eq. Bajo Balance

1,250,000
200,000

Varios

4,500,000

4,000,000

3,500,000

3,000,000

2,500,000

2,000,000

1,500,000

1,000,000

500,000

100,000

4,500,000

4,000,000

3,500,000

3,000,000

2,500,000

2,000,000

1,500,000

1,000,000

Varios

500,000

Eq. Bajo Balance


1,250,000

200,000

100,000

También podría gustarte