Item
01
01.01
02
02.01
Descripcin
Costo al4/1/2011
Und.
Metrado
Precio (S/.)
TRABAJOS PRELIMINARES
CARTEL DE OBRA (1.80mX3.60m) Gigantografia
451.00
glb
1.00
451.00
4,338.23
TRABAJOS PRELIMINARES
16.20
02.01.01
LIMPIEZA DE TERRENO
m2
27.36
0.41
02.01.02
m2
17.16
0.29
02.02
MOVIMIENTO DE TIERRAS
132.31
02.02.01
EXCAVACION MANUAL
m3
3.58
20.65
02.02.02
m3
4.62
12.04
NIVELACION Y COMPACTACION
m2
1.92
1.44
02.02.03
02.03
CONCRETO SIMPLE
2,356.93
02.03.01
m3
0.69
280.03
02.03.02
m3
1.94
405.56
02.03.03
m2
5.60
73.11
ENCOFRADO Y DESENCOFRADO
m2
22.50
43.00
02.03.04
02.04
TARRAJEOS
380.91
02.04.01
m2
4.48
19.92
02.04.02
m2
4.48
18.38
02.04.03
m2
4.48
22.89
02.04.04
TARRAJEO DE EXTERIORES
m2
5.72
16.65
02.04.05
m2
0.84
13.74
02.05
VALVULAS Y ACCESORIOS
373.24
02.05.01
2.00
39.62
02.05.02
2.00
78.10
2.00
68.90
02.05.03
02.06
FILTROS
398.09
02.06.01
m3
0.46
157.97
02.06.02
m3
0.62
157.97
02.06.03
m3
1.44
157.97
EXCAVACION MANUAL
m3
0.04
20.65
02.07.02
14.00
12.13
02.07.03
ALAMBRES DE PUAS
110.00
2.13
02.07
02.07.01
02.08
CERCO PERIMETRICO
404.95
VARIOS
275.60
02.08.01
2.00
124.87
02.08.02
m2
5.76
4.49
03
03.01
21,897.26
TRABAJOS PRELIMINARES
50.96
03.01.01
LIMPIEZA DE TERRENO
m2
86.10
0.41
03.01.02
m2
54.00
0.29
03.02
03.02.01
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
Parcial (S/.)
1,395.60
m3
37.65
20.65
03.02.02
03.02.03
03.03
m3
48.57
12.04
NIVELACION Y COMPACTACION
m2
23.16
1.44
CONCRETO SIMPLE
12,583.93
03.03.01
m3
16.06
405.56
03.03.02
m3
1.62
390.14
03.03.03
m2
3.00
73.11
03.03.04
kg
138.24
4.74
03.03.05
ENCOFRADO Y DESENCOFRADO
m2
106.14
43.00
03.04
TARRAJEOS
2,036.12
03.04.01
m2
54.36
19.92
03.04.02
TARRAJEO DE EXTERIORES
m2
52.50
16.65
m2
5.76
13.74
03.04.03
03.05
VALVULAS Y ACCESORIOS
1,716.60
03.05.01
10.00
39.66
03.05.02
2.00
92.16
03.05.03
6.00
68.90
6.00
120.38
03.05.04
03.06
FILTROS
1,007.84
03.06.01
m3
1.31
157.97
03.06.02
m3
1.84
157.97
03.06.03
m3
3.23
157.97
EXCAVACION MANUAL
m3
0.12
20.65
03.07.02
42.00
12.13
03.07.03
ALAMBRES DE PUAS
450.00
2.13
03.07
03.07.01
03.08
CERCO PERIMETRICO
1,470.44
VARIOS
1,635.77
03.08.01
6.00
124.87
03.08.02
6.00
108.47
m2
52.50
4.49
03.08.03
04
04.01
1,230.15
CONCRETO SIMPLE
55.88
04.01.01
m3
0.01
900.11
04.01.02
m2
0.50
73.11
ENCOFRADO Y DESENCOFRADO
m2
0.24
43.00
04.01.03
04.02
VALVULAS Y ACCESORIOS
337.50
04.02.01
2.00
04.02.02
2.00
68.90
04.02.03
1.00
120.38
04.03
39.66
FILTROS
169.02
04.03.01
m3
0.22
157.97
04.03.02
m3
0.31
157.97
04.03.03
m3
0.54
157.97
04.04
CERCO PERIMETRICO
245.07
04.04.01
EXCAVACION MANUAL
m3
0.02
20.65
04.04.02
7.00
12.13
ALAMBRES DE PUAS
75.00
2.13
04.04.03
04.05
VARIOS
422.68
04.05.01
m2
0.76
32.74
04.05.02
m2
0.34
32.74
04.05.03
LIJADO EN MUROS
m2
8.75
6.62
04.05.04
m2
8.75
4.49
04.05.05
04.05.06
05
05.01
05.01.01
05.02
m2
4.15
19.24
m3
10.15
20.65
LINEA DE CONDUCCION
11,453.55
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
121.80
m
435.00
0.28
MOVIMIENTO DE TIERRAS
10,078.95
05.02.01
435.00
7.23
05.02.02
435.00
7.23
05.02.03
435.00
1.21
05.02.04
435.00
7.50
05.03
TUBERIAS
1,252.80
05.03.01
435.00
2.37
05.03.02
435.00
0.51
06
06.01
06.01.01
06.01.02
06.02
5,573.45
TRABAJOS PRELIMINARES
5.53
LIMPIEZA DE TERRENO
m2
8.88
0.41
m2
6.50
0.29
MOVIMIENTO DE TIERRAS
232.94
06.02.01
EXCAVACION MANUAL
m3
6.18
20.65
06.02.02
m3
7.97
12.04
06.02.03
NIVELACION Y COMPACTACION
m2
6.50
1.44
06.03
CONCRETO SIMPLE
3,466.76
06.03.01
m3
0.68
280.03
06.03.02
m3
1.96
390.14
06.03.03
m3
1.38
428.10
06.03.04
m3
0.62
415.46
06.03.05
kg
151.20
4.74
06.03.06
m2
9.89
46.70
m2
16.03
30.24
06.03.07
06.04
TARRAJEOS
1,369.25
06.04.01
m2
15.36
19.92
06.04.02
m2
15.36
18.38
06.04.03
m2
15.36
22.89
06.04.04
TARRAJEO DE EXTERIORES
m2
18.93
16.65
06.04.05
m2
3.42
33.39
0.04
20.65
06.05
CERCO PERIMETRICO
289.10
06.05.01
EXCAVACION MANUAL
m3
06.05.02
12.00
12.13
ALAMBRES DE PUAS
67.00
2.13
06.05.03
06.06
VARIOS
209.87
06.06.01
06.06.02
m2
07
07.01
07.01.01
07.01.02
07.02
1.00
124.87
18.93
4.49
2,476.11
TRABAJOS PRELIMINARES
2.27
LIMPIEZA DE TERRENO
m2
4.60
0.41
m2
1.30
0.29
MOVIMIENTO DE TIERRAS
140.50
07.02.01
EXCAVACION MANUAL
m3
0.65
20.65
07.02.02
m3
0.84
12.04
07.02.03
NIVELACION Y COMPACTACION
m2
1.30
1.44
07.02.04
LECHO DE GRAVA
m2
0.90
127.89
07.03
CONCRETO
671.12
07.03.01
m3
0.54
405.56
07.03.02
m3
0.14
390.14
07.03.03
kg
6.75
4.74
ENCOFRADO Y DESENCOFRADO
m2
8.50
43.00
07.03.04
07.04
07.04.01
07.05
TARRAJEOS
TARRAJEO
141.53
m2
8.50
16.65
VALVULAS Y ACCESORIOS
1,095.82
07.05.01
3.00
07.05.02
1.00
76.13
07.05.03
1.00
198.87
1.00
120.38
07.05.04
07.06
233.48
VARIOS
424.87
07.06.01
1.00
07.06.02
m2
8.50
4.49
07.06.03
m2
2.24
50.82
08
08.01
08.01.01
08.02
272.86
LINEA DE DISTRIBUCION
251,363.70
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
3,580.08
m
12,786.00
0.28
MOVIMIENTO DE TIERRAS
213,014.76
08.02.01
12,786.00
7.23
08.02.02
12,786.00
7.23
08.02.03
12,786.00
1.21
12,786.00
0.99
08.02.04
08.03
TUBERIAS
34,768.86
08.03.01
470.00
2.90
08.03.02
4,884.00
2.37
08.03.03
7,432.00
2.06
12,786.00
0.51
08.03.04
09
09.01
11,985.71
TRABAJOS PRELIMINARES
29.63
09.01.01
LIMPIEZA DE TERRENO
m2
54.87
0.41
09.01.02
m2
24.57
0.29
7.20
20.65
12.04
09.02
MOVIMIENTO DE TIERRAS
2,183.57
09.02.01
EXCAVACION MANUAL
m3
09.02.02
m3
9.29
09.02.03
NIVELACION Y COMPACTACION
m2
15.90
1.44
09.02.04
m3
5.40
33.70
PIEDRA COLOCADA
m2
24.00
71.59
09.02.05
09.03
CONCRETO ARMADO
5,285.42
09.03.01
m3
0.07
405.56
09.03.02
m3
0.55
415.46
09.03.03
m3
1.94
428.10
09.03.04
m3
1.51
390.14
09.03.05
m2
3.00
73.11
09.03.06
kg
272.16
4.74
09.03.07
m2
9.35
24.22
m2
43.56
43.00
09.03.08
09.04
TARRAJEOS
885.02
09.04.01
m2
20.64
19.92
09.04.02
TARRAJEO DE EXTERIORES
m2
25.49
16.65
09.04.03
m2
3.60
13.74
09.05
VALVULAS Y ACCESORIOS
1,628.46
09.05.01
6.00
120.40
09.05.02
6.00
41.56
09.05.03
6.00
68.90
6.00
40.55
09.05.04
09.06
CERCO PERIMETRICO
1,109.94
09.06.01
EXCAVACION MANUAL
m3
0.18
20.65
09.06.02
48.00
12.13
ALAMBRES DE PUAS
246.00
2.13
6.00
124.87
m2
25.49
4.49
09.06.03
09.07
09.07.01
09.07.02
10
10.01
VARIOS
863.67
822.10
TRABAJOS PRELIMINARES
3.46
10.01.01
LIMPIEZA DE TERRENO
m2
7.68
0.41
10.01.02
m2
1.08
0.29
10.02
MOVIMIENTO DE TIERRAS
22.89
10.02.01
EXCAVACION MANUAL
m3
0.59
20.65
10.02.02
m3
0.76
12.04
10.02.03
NIVELACION Y COMPACTACION
m2
1.08
1.44
10.03
CONCRETO SIMPLE
224.87
10.03.01
m3
0.30
405.56
10.03.02
ENCOFRADO Y DESENCOFRADO
m2
2.40
43.00
m2
2.40
16.65
3.00
66.36
10.04
10.04.01
10.05
10.05.01
10.06
TARRAJEOS
TARRAJEO
39.96
VALVULAS Y ACCESORIOS
ACCESORIOS DE CONTROL 3/4"
199.08
VARIOS
331.84
10.06.01
3.00
108.47
10.06.02
m3
0.04
160.68
11
11.01
11.01.01
11.01.02
11.02
46,694.74
TRABAJOS PRELIMINARES
172.03
LIMPIEZA DE TERRENO
m2
336.60
0.41
m2
117.30
0.29
MOVIMIENTO DE TIERRAS
3,736.96
11.02.01
EXCAVACION MANUAL
m3
80.94
20.65
11.02.02
m3
104.41
12.04
11.02.03
NIVELACION Y COMPACTACION
m2
70.89
1.44
11.02.04
m3
3.57
33.43
11.02.05
m2
4.59
127.89
m3
3.06
312.58
11.03.02
m3
12.31
405.56
11.03.03
kg
503.63
4.74
11.03.04
ENCOFRADO Y DESENCOFRADO
m2
224.16
43.00
11.03.05
m2
28.05
29.88
11.03.06
m2
27.54
22.41
m2
286.11
16.65
11.03
11.03.01
11.04
11.04.01
11.05
CONCRETO
19,430.32
TARRAJEOS
TARRAJEO DE EXTERIORES
4,763.73
VALVULAS Y ACCESORIOS
9,506.91
11.05.01
51.00
62.88
11.05.02
51.00
62.47
11.05.03
51.00
61.06
11.06
8,874.16
11.06.01
m3
17.85
124.29
11.06.02
m3
22.95
137.37
11.06.03
m3
25.50
137.37
m2
51.00
4.13
11.07
11.07.01
12
12.01
VARIOS
COLOCACION DE PLASTICO
210.63
28,683.89
TRABAJOS PRELIMINARES
72.47
12.01.01
LIMPIEZA DE TERRENO
m2
103.53
0.41
12.01.02
m2
103.53
0.29
12.02
MOVIMIENTO DE TIERRAS
275.04
12.02.01
m2
103.53
1.44
12.02.02
m3
13.08
9.63
jgo
51.00
101.01
51.00
323.94
355.73
4.38
12.03
CARPINTERIA DE MADERA
23,230.55
12.03.01
12.03.02
12.03.03
12.04
12.04.01
12.05
12.05.01
12.06
12.06.01
13
13.01
13.02
14
PINTURA
PINTURA ESMALTE EN CARPINTERIA DE MADERA
1,099.92
m2
198.90
5.53
51.00
15.29
m2
78.38
41.16
FLETE TERRESTRE
glb
1.00
8,791.75
FLETE RURAL
glb
1.00
1,595.83
4,200.00
INSTALACIONES SANITARIAS
SALIDA DE VENTILACION PARA LETRINAS PVC 4"
779.79
VARIOS
MALLA MOSQUITERO
3,226.12
FLETE
10,387.58
8,650.00
14.01
glb
1.00
14.02
glb
1.00
850.00
14.03
LETRINAS PROVISIONALES
glb
1.00
3,600.00
15
EDUCACIN SANITARIA
11,355.00
15.01
COSTO DIRECTO
FAM
51.00
210.00
15.02
glb
1.00
645.00
77.90
16
CAPACITACION EN A+O+M
6,949.48
16.01
glb
1.00
16.02
glb
1.00
70.90
16.03
glb
1.00
603.60
16.04
glb
1.00
2,136.00
16.05
glb
1.00
541.78
16.06
glb
1.00
3,519.30
glb
4.00
22.00
17
17.01
PRUEBAS DE LABORATORIO
ROTURA DE PROBETAS
88.00
COSTO DIRECTO
GASTOS GENERALES
GASTOS VARIABLES
GASTOS FIJOS
UTILIDAD
SUBTOTAL
IGV
424,399.95
15.7%
66,460.25
0.53%
2,250.00
###
64,210.25
5.00%
###
VALOR REFERENCIAL
GASTOS DE SUPERVISION :
INFRESTRUCTURA
21,220.00
512,080.20
92,174.44
604,254.63
42,170.19
4.00%
24,170.19
PROCESOS EDUCATIVOS
GASTOS LIQUIDACION
GASTOS DE EXPEDIENTE TECNICO
4.24%
18,000.00
2,000.00
5,572.71
653,997.53
1
1.1
1.2
1.3
1.4
2
Estimado
Estimado
Estimado
Estimado
S/.
4,500
3,000
2,200
2,500
2,000
Meses
3.5
3
3
3
3
1200
1200
Meses
3
3
210
650
Meses
3
1
Veces
0
500
500
500
Meses
3
3
3
4,000
1,500
2,500
Meses
3
3
3
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
500.00
1,000.00
500.00
250.00
2,250.00
S/.
S/.
S/.
S/.
S/.
S/.
15,750.00
9,000.00
6,600.00
3,750.00
3,000.00
38,100.00
S/.
S/.
S/.
3,600.00
3,600.00
7,200.00
S/.
S/.
S/.
9,450.00
650.00
10,100.00
Personas
0
S/.
S/.
0.00
S/.
S/.
S/.
S/.
S/.
1,500.00
1,500.00
1,500.00
4,500.00
2,250.00
S/.
S/.
S/.
S/.
S/.
12,000.00
2,250.00
5,625.00
19,875.00
4,968.75
Coef. Part.
1
1
1
0.5
0.5
0.5
1
0.5
0.75
20
%
1,061.00
10
%
530.50
S/.
GASTOS GENERALES
S/.
424,399.95
S/.
% Costo Directo
I. GASTOS GENERALES
1. GASTO FIJOS
2. GASTO VARIABLES
2,250.00
64,210.25
0.53
15.13
%
%
TOTAL
66,460.25
15.66
64,210.25
Construccin del servicio de agua potable y letrinizacin del casero de la Extrema, distrito de la Encaada.Cajamarca.Cajamarca.
CALENDARIO VALORIZADO DE AVANCE DE OBRA
N
FRMULAS
MONTO
MES N 1
MES N 2
MES N 3
MES N 4
MES N 5
MES N 6
MES N 7
MES N 8
MES N 9
MES N 10
MES N 11
MES N 12
100%
01.00 TRABAJOS PRELIMINARES
451.00
451.00
100%
4,338.23
4,338.23
100%
21,897.26
1,230.15
21,897.26
100%
1,230.15
100%
11,453.55
11,453.55
100%
5,573.45
2,476.11
5,573.45
100%
2,476.11
251,363.70
50%
50%
125,681.85
125,681.85
100%
11,985.71
11,985.71
100%
10
11
822.10
822.10
100%
46,694.74
###
50%
50%
14,341.95
12
28,683.89
14,341.95
50%
50%
13
FLETE
10,387.58
5,193.79
5,193.79
14
15
EDUCACIN SANITARIA
16
CAPACITACION EN A+O+M
6,949.48 S/.
17
PRUEBAS DE LABORATORIO
88.00
100%
8,650.00
S/. 8,650.0
10%
11,355.00 S/.
1,135.50
9%
S/.
20%
1,389.90
1,021.95
9%
S/.
20%
S/.
1,389.90
8%
1,021.95
S/.
1,389.90
S/.
20%
S/.
8%
908.40
S/.
20%
1,389.90
8%
908.40
S/.
8%
908.40
S/.
8%
908.40
S/.
908.40
8%
S/.
908.40
8%
S/.
908.40
8%
S/.
908.40
8%
S/.
908.40
20%
S/.
1,389.90
100%
COSTO DIRECTO
424,399.95
S/.
2,525.40 192,573.07
88.00
218,346.09
2,298.30
2,298.30
908.40
908.40
908.40
908.40
908.40
908.40
908.40
0.60
45.38
51.45
0.54
0.54
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.60
45.97
97.42
97.96
98.50
98.72
98.93
99.14
99.36
99.57
99.79
100.00
Construccin del servicio de agua potable y letrinizacin del casero de la Extrema, distrito de la Encaada.Cajamarca.Cajamarca.
COMPONENTE
ACTIVIDAD
1. FASE INTENSIVA
Aprendiendo a vivir mejor
1.1 Lnea de base
1.2 Motivando a la comunidad
EDUCACION 1.3 Mejorando nuestra cocina
SANITARIA
1.4 Mejorando alred. de la casa
(270 Das)
1.5 Cuidndonos para vivir mejor
2. FASE SEGUIMIENTO
Participan
Visitas a las familias
madres de
familia, nios 3. REFORZAMIENTO
y paps de la Reforzamiento a las familias
comunidad
Evaluacin a Contratista
LETRINAS
MEJ. CONDUCCIN
INFRAESTR. RED DE DISTRIBUCIN
CRP- 7
VLVULAS (Control )
PILETAS
PROMOCION ANTES
CAPACITACION EN PROMOCION DURANTE
ADMINISTRACION,
OPERACIN Y
MANTENIMIENTO
CURSO DE ADMINISTRACION,
OPERACIN Y MANTENIM.
SEGUIMIENTO
MES 1
DURACION
das
MES 2
4
MES 3
8
10 11 12 13
MES 4
14
MES 5
MES 6
MES 7
210
90
60
32
15
30
15
15
35
min 3
min 3
8
8
MES 8
MES 9
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
MES 10
38
39 40 41
MES 11
42 43 44 45
MES 12
46
47
48