Calendario Final Petro Peru
Calendario Final Petro Peru
DESCRIPCION
ARQUITECTURA
ESTRUCTURAS
UND
MONTO S./
782,873.37
500,000.00
500,000.00
EQUIPAMIENTO
Costo Directo
03 MESES
PLAZO DE EJECUCION
MES 01
MES 02
MES 03
264,953.43
320,017.92
197,902.02
300,000.00
150,000.00
50,000.00
300,000.00
150,000.00
50,000.00
1,782,873.37
864,953.43
620,017.92
297,902.03
178,287.34
86,495.34
62,001.79
29,790.20
UTILIDAD (10.00%)
178,287.34
86,495.34
62,001.79
29,790.20
2,139,448.05
1,037,944.11
744,021.50
357,482.43
385,100.65
186,829.94
133,923.87
64,346.84
2,524,548.70
1,224,774.05
877,945.37
421,829.27
1,224,774.05
877,945.37
421,829.27
48.51%
34.78%
16.71%
48.51%
83.29%
100.00%
SUB-TOTAL
I.G.V (18%)
TOTAL OBRA
2,524,548.70
enero
febrero
marzo
abril
mayo
junio
"CONSTRUCCION DEL
PUENTE PETRO PERU- SAN
JERONIMO-CUSCO"
OBRAS PRELIMINARES
MOVILIZACION Y
DESMOVILIZACION
DE EQUIPOS
CAMPAMENTO DE
OBRA
S 17,361.36
LIMPIEZA Y
DESFROCE
S 4,255.57
TRAZO Y
REPLANTEO
S 4,679.31
CARTEL DE OBRA
2.40 x 3.60 m
S 1,303.71
CONSTRUCCION DE
PUENTE
PROVISIONAL
LIMPIEZA DE
CAUCE DE RIO
S 36,106.40
ELIMINACION DE
MATERIAL
EXCEDENTE
ACONDICIONAMIENTO
DE ESTRUCTURA
EXISTENTE
TARRAJEO
IMPERMABILIZADO
EN PUENTES R=8
SEALES
m2
INFORMATIVAS
BARANDA
METALICA
S 12,576.22
S 33,037.20
S 16,611.70
S 9,484.96
S 219.92
S 7,698.47
S 5,613.53
DADOS DE
CONCRETO
S 1,272.00
LIMPIEZA DE
CAUCE DE RIO
S 3,129.84
ELIMINACION DE
MATERIAL
EXCEDENTE
ESTRIBOS
EXCAVACION
P/ESTRUCTURAS EN
MATERIAL COMUN
EXCAVACION
BAJO AGUA
P/ESTRUCTURAS EN
MATERIAL COMUN
ENCOFRADO CARA
EN SECO
NO VISTA BAJO
AGUA
CONCRETO F'C=280
KG/CM2
S 1,573.74
S 20,151.97
S 2,553.98
S 923.78
S 28,702.38
S 218,528.22
ACERO DE
REFUERZO fy=4,200
kg/cm2
RELLENO DE
ESTRUCTURAS CON
MATERIAL DE
ELIMINACION DE
CANTERA
MATERIAL
EXCEDENTE
TRAZO Y
REPLANTEO DE
GAVIONES
GAVIONES
S 206,527.98
S 15,620.95
S 19,906.44
S 661.71
S 1,558.28
S 61,396.08
EXCAVACION PARA
GAVIONES
S 10,048.29
S 5,801.19
VIGAS METALICAS
FABRICACION DE
ESTRUCTURAS
METALICAS
PINTURA DE
ESTRUCTURA
METALICA
TRANSPORTE DE
ESTRUCTURA
METALICA
MONTAJE DE
ESTRUCTURA
METALICA INC.
LOSA Y VEREDAS DE
EMPLAME
CONCRETO
S 49,594.48
S 203,475.90
S 20,936.17
S 11,345.90
S 26,458.80
ENCOFRADO CARA
VISTA EN SECO
S 2,148.26
S 4,415.23
CONCRETO F'C=280
KG/CM2
S 22,870.84
ACERO DE
REFUERZO fy=4,200
kg/cm2
VARIOS
JUNTA DE
DILATACION
METALICA
APOYO NEOPRENO
TUBO DE DRENAJE
D=3" FF L=0.60 M
S 72,561.33
S 32,027.81
S 13,677.66
S 1,146.82
S 3,911.38
S 645.44
ACABADO DE
VEREDAS
S 1,297.73
BARANDA
METALICA
S 8,320.00
ACCESOS
EXCAVACION A
NIVEL DE SUB
RASANTE
CONFORMACION DE
TERRAPLENES
S 13,936.55
PERFILADO Y
COMPACTADO
S 8,808.10
ELIMINACION DE
MATERIAL
EXCEDENTE EN
LIGA
ACCESOS
S 1,135.29
ASFALTO
S 27,236.96
S 2,806.48
S 8,179.68
SEALIZACION
SEALES
INFORMATIVAS
S 1,759.36
MARCO DE CONCRETO
EXCAVACION PARA
MARCOS DE
CONCRETO
CONCRETO PARA
MARCOS DE
CONCRETO F'C=210
KG/CM2
S 280.90
ENCOFRADO Y
DESENCOFRADO
PARA MARCOS DE
ACERO DE
CONCRETO
REFUERZO fy=4,200
kg/cm2
IMPACTO AMBIENTAL
S 2,073.33
PROGRAMA DE
CONTINGENCIAS
REACONDICIONAMI
ENTO DEL AREA
AFECTADA POR
REFORESTACION
ABANDONO DE
MARGENES DEL RIO
OBRA
Total
REACONDICIONAMI
ENTO DE CANTERAS
Y ACCESOS
COMPACTACION DE
MATERIAL
EXCEDENTE Y
READECUACION
MORFOLOGICA DEL
AREA
S 143,334.82
S 83,889.54
S 680,902.96
S 112,619.89
S 122,552.24
S 145,056.13
julio
agosto
Total
S 17,361.36
S 12,576.22
S 4,255.57
S 4,679.31
S 1,303.71
S 36,106.40
S 33,037.20
S 16,611.70
S 9,484.96
S 219.92
S 13,312.00
S 1,272.00
S 3,129.84
S 1,573.74
S 20,151.97
S 3,477.76
S 28,702.38
S 218,528.22
S 206,527.98
S 15,620.95
S 19,906.44
S 2,219.99
S 71,444.37
S 5,801.19
S 253,070.38
S 20,936.17
S 11,345.90
S 26,458.80
S 6,563.49
S 22,870.84
S 104,589.14
S 13,677.66
S 5,058.20
S 645.44
S 1,297.73
S 8,320.00
S 13,936.55
S 2,806.48
S 8,808.10
S 1,135.29
S 8,179.68
S 27,236.96
S 1,759.36
S 280.90
S 5,882.39
S 5,882.39
S 2,829.69
S 4,903.02
S 16,377.85
S 16,377.85
S 10,000.00
S 10,000.00
S 3,604.85
S 3,604.85
S 3,548.25
S 3,548.25
S 2,973.50
S 2,973.50
S 5,856.00
S 51,072.53
S 5,856.00
S 1,339,428.11