Project:
Alignment:

PUCAYACU TRAZO
1 lun
agosto
eje
de
carretera
PRISMOIDAL VOLUME
LISTING
WITH
CURVE
Cut
Fill
Cut
1 Fill
Station
Area
(m2)
Area
(m2)
----------------------------------------------------------------------------------------------------------------------0+000
0.8
0
8.35
4.74
8.35
4.74
3.62
0+020
0.13
0.71
0.86
18.19
9.22
22.93
-13.71
0+040
0
1.12
2.81
7.5
12.03
30.43
-18.39
0+060
0.42
0
25.93
0
37.96
30.43
7.54
0+080
2.45
0
54.51
0
92.47
30.43
62.04
0+100
3.01
0
20.06
8.52
112.53
38.95
73.58
0+120
0
1.28
4.09
4.34
116.62
43.29
73.33
0+130.180
1.21
0
6.18
0.19
122.8
43.48
79.32
0+140
0.2
0.06
9.23
0.2
132.03
43.68
88.35
0+150
1.96
0
13.2
0
145.23
43.68
101.55
0+156.567
2.07
0
6.8
0
152.03
43.68
108.35
0+160
1.89
0
29.63
0
181.65
43.68
137.98
0+180
1.11
0
15
4.98
196.65
48.65
148
0+200
0.44
0.75
14.78
4.98
211.43
53.63
157.8
0+220
1.08
0
11.19
1.14
222.62
54.76
167.86
0+240
0.17
0.17
2.16
1.57
224.78
56.33
168.45
0+260
0.06
0.01
1.5
0.1
226.28
56.43
169.85
0+280
0.09
0

4.49
0+300

_x000C_

Project:
Alignment:

5.29
0+319.391
0.1
0+320
0.88
0+329.315
0.26
0+340
0.06
0+360
0.23
0+380
0.84
0+400
0.34
0+420
0
0+440
page

0
0.39
0.29
0.17
0.03
0.16
0.81
0.04
2.24
0.01
14.52
0
10.55
0.03
1.42
0.05
13.45
0
20.79
0
2

230.76
0
236.05
0.05
236.15
0.05
237.04
0.13
237.3
0.31
237.36
1.25
237.59
0.06
238.43
0.08
238.77
1.57
238.77
0.59

56.43

174.34

56.72

179.33

56.75

179.4

57.56

179.48

59.79

177.5

74.32

163.04

84.86

152.72

86.28

152.15

99.73

139.03

120.52

118.25

PUCAYACU TRAZO
1 lun
agosto
eje
de
carretera
PRISMOIDAL VOLUME
LISTING
WITH
CURVE
Cut
Fill
Cut
1 Fill
Station
Area
(m2)
Area
(m2)
----------------------------------------------------------------------------------------------------------------------0
31.76
238.77
152.28
86.48
0+460
0
2.88
0
38.59
238.77
190.87
47.89
0+477.192
0
1.67
0
4.31
238.77
195.18
43.59
0+480
0
1.39
0
6.05
238.77
201.23
37.54
0+485.650
0
0.77
3.29
3.67
242.06
204.9
37.16
0+500
0.69
0
23.61
0
265.67
204.9
60.76
0+520
1.76
0
41.97
0
307.64
204.9
102.74
0+540
2.46
0
42.93
0
350.57
204.9
145.67

0+560

_x000C_

10.05
0+574.969
4.47
0+580
27.86
0+590
34.17
0+600
17.26
0+609.713
4.37
0+620
10.04
0+633.618
2.11
0+640
0
0+650
0.35
0+653.779
14.81
0+660
113.48
0+680
86.52
0+700
11.16
0+704.116
4.66
0+710
0
0+720
9.08
0+730
15.31
0+735.850
8.29
0+740
10.09
page

Project:

PUCAYACU

1.85
3.88
0.01
1.32
2.51
0
3.07
0
3.79
0.01
0.35
0.37
0.5
2.23
1
4.83
0
16.37
0
2.68
0.28
0.04
5.62
0
5.73
0
3.06
0
2.38
3.82
0
18.96
0
6.08
2.73
0
2.53
0
1.51
3.98
3

TRAZO

0
360.62
0.78
365.08
0
392.95
0
427.12
0
444.37
0
448.74
0.09
458.78
0.25
460.89
1.38
460.89
1.86
461.24
0.02
476.05
0
589.53
0
676.05
0
687.21
0
691.87
1.94
691.87
1.81
700.95
0
716.27
0
724.56
0
734.65

1 lun

208.78

151.83

210.1

154.98

210.1

182.85

210.1

217.01

210.11

234.26

210.48

238.26

212.71

246.07

217.54

243.35

233.9

226.99

236.58

224.66

236.62

239.43

236.62

352.9

236.62

439.42

236.62

450.58

240.45

451.42

259.41

432.46

265.49

435.46

265.49

450.78

265.49

459.07

269.47

465.18

agosto

Alignment:

eje
de
carretera
PRISMOIDAL VOLUME
LISTING
WITH
CURVE
Cut
Fill
Cut
1 Fill
Station
Area
(m2)
Area
(m2)
----------------------------------------------------------------------------------------------------------------------0+760
0
0.6
10.47
3.98
745.12
273.46
471.66
0+780
1.57
0
25.27
0
770.39
273.46
496.93
0+793.741
2.12
0
12.64
0
783.03
273.46
509.58
0+800
1.92
0
12.83
0
795.87
273.46
522.41
0+810
0.74
0
2.46
3.79
798.32
277.25
521.07
0+820
0
1.14
0
1.22
798.32
278.47
519.85
0+820.985
0
1.35
0.08
14.97
798.41
293.44
504.97
0+840
0.01
0.33
10.65
2.23
809.05
295.66
513.39
0+860
1.44
0
29.16
0
838.21
295.66
542.55
0+880
1.47
0
19.09
0
857.3
295.66
561.64
0+900
0.52
0
19.83
0
877.12
295.66
581.46
0+920
1.56
0
23.83
0
900.95
295.66
605.29
0+940
0.86
0
13.55
0
914.5
295.66
618.84
0+951.473
1.53
0
20.21
0
934.72
295.66
639.05
0+960
3.31
0
25.58
0
960.29
295.66
664.63
0+970
1.87
0
14.44
0
974.73
295.66
679.07
0+980
1.06
0
15.67
0
990.41
295.66
694.75
0+990
2.13
0
2.81
0
993.22
295.66
697.56
0+991.254
2.32
0
28.42
0
1021.64
295.66
725.98
1+000
4.27
0
101.34
0
1122.98
295.66
827.32

_x000C_

Project:
Alignment:

1+020
101.71
1+040
142.67
1+059.617
4.14
1+060
89.97
1+070
93.48
1+080
117.74
1+090
117.63
1+100
page

5.91
0
4.31
0
10.72
0
10.71
0
7.3
0
11.54
0
11.99
0
11.43
4

0
1224.7
0
1367.37
0
1371.51
0
1461.48
0
1554.96
0
1672.7
0
1790.32
0

295.66

929.03

295.66

1071.71

295.66

1075.85

295.66

1165.82

295.66

1259.29

295.66

1377.03

295.66

1494.66

PUCAYACU TRAZO
1 lun
agosto
eje
de
carretera
PRISMOIDAL VOLUME
LISTING
WITH
CURVE
Cut
Fill
Cut
1 Fill
Station
Area
(m2)
Area
(m2)
----------------------------------------------------------------------------------------------------------------------41.32
0
1831.64
295.66
1535.98
1+105.363
4.39
0
69.33
0
1900.97
295.66
1605.31
1+120
5.1
0
20.31
0
1921.29
295.66
1625.63
1+123.728
5.81
0
37.7
0
1958.99
295.66
1663.33
1+130
6.07
0
28.48
10.61
1987.47
306.28
1681.19
1+140
0.5
3.31
1.34
27.99
1988.81
334.26
1654.55
1+147.941
0
4.07
0
67.81
1988.81
402.08
1586.74
1+160
0
7.33
29.99
48.87
2018.81
450.95
1567.86
1+180
4.5
0
32.9
0
2051.7
450.95
1600.75
1+190.748
1.82
0
7.58
1.24
2059.28
452.19
1607.09
1+200
0.11
0.41

4.25
1+210
22.12
1+220

_x000C_

Project:
Alignment:

25.64
1+224.962
101.31
1+240
19.74
1+242.920
51.45
1+250
71.13
1+260
25.37
1+270
0.51
1+272.138
2.33
1+280
19.52
1+300
34.39
1+320
17.7
1+326.710
12.26
1+330
50.76
1+340
31.56
1+344.849
109.29
1+360
180.19
page

10.54
0.8
9.53
3.84
0.48
6.33
0
7.16
0
6.38
0
8.82
0
5.77
0.37
0.47
0.73
0.09
1.51
0.57
0
1.45
0
2
0
3.33
0
4.17
0
6.04
0
6.94
0
7.49
0
5

2063.53
2.01
2085.65
0.3
2111.29
0
2212.6
0
2232.34
0
2283.79
0
2354.92
0
2380.29
0.11
2380.8
0.58
2383.13
0
2402.65
0
2437.05
0
2454.75
0
2467.01
0
2517.76
0
2549.32
0
2658.61
0
2838.8

462.72

1600.8

472.26

1613.39

472.74

1638.55

472.74

1739.87

472.74

1759.61

472.74

1811.06

472.74

1882.18

473.11

1907.19

473.84

1906.97

475.35

1907.78

475.35

1927.31

475.35

1961.7

475.35

1979.4

475.35

1991.66

475.35

2042.42

475.35

2073.98

475.35

2183.27

475.35

2363.45

PUCAYACU TRAZO
1 lun
agosto
eje
de
carretera
PRISMOIDAL VOLUME
LISTING
WITH
CURVE
Cut
Fill
Cut
1 Fill
Station
Area
(m2)
Area
(m2)
-----------------------------------------------------------------------------------------------------------------------

1+380
220.08
1+400
259.18
1+420
302.82
1+440
324.52
1+460
224.98
1+480
101.89
1+500
37.73
1+520
35.89
1+540
198.31
1+560
210.29
1+575.315
48.38
1+580
137.7
1+590
140.62
1+600
14.72
1+601.283
104.18
1+620
8.58
1+640
0
1+642.215
0
1+650
4.08
1+660
14.19
1+664.918
2.95
1+665.563
38.64
1+670

10.62
0
11.39
0
14.59
0
15.7
0
16.76
0
6.53
0
3.78
24.04
0.5
24.04
3.55
0
18.16
0
9.73
0
10.96
0
16.82
0
11.62
0
11.56
36.2
1.29
129.97
0
15.68
0
58.91
0
47.41
1.15
3.09
4.45
0
4.7
0
14.19

0
3058.88
0
3318.06
0
3620.89
0
3945.41
0
4170.39
0
4272.27
0
4310.01
3.61
4345.9
0
4544.21
0
4754.5
0
4802.88
0
4940.59
0
5081.2
0
5095.92
0
5200.1
5.8
5208.68
7.22
5208.68
6.94
5208.68
10.13
5212.76
2.13
5226.95
0
5229.9
0
5268.54
0

475.35

2583.54

475.35

2842.72

475.35

3145.54

475.35

3470.06

475.35

3695.04

475.35

3796.93

499.39

3810.62

523.44

3822.46

523.44

4020.77

523.44

4231.06

523.44

4279.45

523.44

4417.15

523.44

4557.77

523.44

4572.48

559.63

4640.47

689.6

4519.08

705.28

4503.4

764.19

4444.48

811.61

4401.15

814.69

4412.25

814.69

4415.2

814.69

4453.85

_x000C_

Project:
Alignment:

95.73
1+677.231
31.5
1+680
173.05
1+700
72.05
1+709.823
1.37
1+710
page

0
12.48
0
10.3
0
7.1
0
7.57
0
7.59
6

5364.26
0
5395.76
0
5568.81
0
5640.86
0
5642.23
0

814.69

4549.57

814.69

4581.07

814.69

4754.12

814.69

4826.17

814.69

4827.54

PUCAYACU TRAZO
1 lun
agosto
eje
de
carretera
PRISMOIDAL VOLUME
LISTING
WITH
CURVE
Cut
Fill
Cut
1 Fill
Station
Area
(m2)
Area
(m2)
----------------------------------------------------------------------------------------------------------------------67.14
0
5709.37
814.69
4894.68
1+720
5.75
0
18.85
0
5728.22
814.69
4913.53
1+724.461
2.89
0
12.03
1.81
5740.25
816.5
4923.75
1+736.937
0
0.44
_x000C_

26

12:01:51

CORRECTION
1 Cut
Volume
(m3)
---------------------

2013

Volume

1 Fill
(m3)

1
Tot

Vol

26

12:01:51

CORRECTION
1 Cut
Volume
(m3)
---------------------

2013

Volume

1 Fill
(m3)

1
Tot

Vol

26

12:01:51

2013

CORRECTION
1 Cut
Volume
(m3)
---------------------

Volume

1 Fill
(m3)

1
Tot

Vol

26

12:01:51

CORRECTION
1 Cut
Volume
(m3)
---------------------

2013

Volume

1 Fill
(m3)

1
Tot

Vol

26

12:01:51

CORRECTION
1 Cut
Volume
(m3)
---------------------

2013

Volume

1 Fill
(m3)

1
Tot

Vol

26

12:01:51

CORRECTION
1 Cut
Volume
(m3)
---------------------

2013

Volume

1 Fill
(m3)

1
Tot

Vol

(m3)

Tot

Vol

(m3)

Mass

Ordinate

(m3)

Tot

Vol

(m3)

Mass

Ordinate

(m3)

Tot

Vol

(m3)

Mass

Ordinate

(m3)

Tot

Vol

(m3)

Mass

Ordinate

(m3)

Tot

Vol

(m3)

Mass

Ordinate

(m3)

Tot

Vol

(m3)

Mass

Ordinate

PROGRESIVA DISTANCIA

0+000.00
0+005.00
0+010.00
0+015.00
0+020.00
0+025.00
0+030.00
0+033.21

5.00
5.00
5.00
5.00
5.00
5.00
3.21

TERRENO
SIN CONSTRUIR
CONSTRUIDO

A.C.

A.R.

110.18
125.51
123.99
131.66
137.89
141.76
145.81
147.79

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

AREA (M2)
758.02
417.4

PERIMETRO (ML)
112.5
96.97

VOL. DE
CORTE

VOL. DE
RELLENO

589.23
623.75
639.13
673.88
699.13
718.93
470.64

0.00
0.00
0.00
0.00
0.00
0.00
0.00

VOL. DE CORTE
ACUMULADO

VOL. DE RLLENO
ACUMULADO

589.23
1212.98
1852.10
2525.98
3225.10
3944.03
4414.67

0.00
0.00
0.00
0.00
0.00
0.00
0.00