VOLUMEN VIGAS
SECCION
VE-3
VE-4
VE-1
VE-1',VE-2'
VE-2
VE-A,VE-B
VE-C
VE-B
RIOSTRA
LONGITUD
11.21
7.4
4.2
15.2
7.4
22.6
10.3
2.1
6.55
ALTURA
ANCHO
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.1
0.1
VOLUMEN
VOL+DESPERDICIO
1.01
1.06
0.67
0.70
0.38
0.40
1.37
1.44
0.67
0.70
2.03
2.14
0.93
0.97
0.06
0.07
0.20
0.21
VOLUMEN VIGUETAS
SECCION
VTA-1
VTA-2
VTA-3
VTA-4
VTA-5
CANTIDAD
2
5
3
5
2
LONGITUD
3.9
10.3
8.9
11.15
4.7
AREA 1
0.025
0.025
0.025
0.025
0.025
AREA 2
0.035
0.035
0.035
0.035
0.035
VOLUMEN
0.23
0.62
0.53
0.67
0.28
VOLUMEN
TOTAL VOLUMEN
18
0.027
0.49
PRODUCTO
AG
AF
CEMENTO
AGUA
DOCIFICACION
0.85
0.55
350
180
CANTIDAD
15.03
9.72
6188.43
3182.62
COSTO/UNIDAD
$
75,000
$
60,000
$
483
$
12
COSTO TOTAL
$
1,127,178
$
583,480
$
2,989,010
$
38,191
PERDICIO
TOTAL DE LA PLACA
17.68
4,737,860
18,951,439