ZAPATA Z-1
Area tributaria:
L=
B=
A=
3.85
3.43
13.21
0.30
0.30
3.30
0.25
0.35
Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado
2138.40
2425.50
144.20
19015.92
Kg
Kg
Kg
Kg
Pd =
23724.02 Kg
Pl =
396.17
Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
m
m
m2
m
m
m
m
m
23724.02
396.17
100.00
1700.00
0.90
10000.00
2170000.00
210.00
Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2
Altura de relleno
Asumir H=
Ancho columna
Largo columna
0.40
0.60
0.30
0.30
m
m
m
m
A=(P+0.15P) / Tn
4.30 cm2
0.15
0.40
H
A=B x L
L2 - (l-a) - A = 0
L=
B=
2.07 m
2.07 m
Asumimos:
L =
B =
2.10 m
2.10 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu =
36299.13 Kg
Tu=
8.23
Ton/m
CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =
0.45 m
0.50 m
41.87 cm
0.48 cm
Vu = Tu x X x L
Vu=
X
0.55
8.32 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
57.40 Ton
Vc > Vu
En la otra direccin
X=
Vu = Tu x X x B
Vu=
0.48 cm
8.32 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
57.40 Ton
Vc > Vu
(OK)
X
0.55
0.30+d
0.30
0.30+d
Az=
Ao = (a + d) * (b+d)
4.41 m2
Ao =
0.52 m2
284.27 Ton
(OK)
(OK)
ACERO DE REFUERZO
a=
As x Fy
0.85 x F'c x B
As =
Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu=
Mu =
17.29 Ton/m
Wu x X2
2
DIRECCION X-X
Mu =
7.00 Ton-m
As =
4.92 cm2
a=
0.86 cm
As =
4.47 cm2
a=
0.78 cm
As =
4.47 cm2
As min = 0.0018 x d x B
As min=
usamos
15.82 cm2
1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m
S=
17.12 cm
DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=
40.60 cm
17.29 Ton/m
7.00 Ton-m
As =
6.42 cm2
a=
1.12 cm
As =
5.88 cm2
a=
1.03 cm
As =
5.87 cm2
As min = 0.0018 x d x L
As min=
15.34 cm2
1/2" @ 0.1765 m
usamos
1/2"
S = 1/2" x B
As
S=
17.65 cm
L=
B=
A=
3.43
2.88
9.88
0.30
0.30
3.30
0.25
0.35
Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado
2138.40
2160.90
107.87
14224.90
Kg
Kg
Kg
Kg
Pd =
18632.07 Kg
Pl =
296.35
Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
m
m
m2
m
m
m
m
m
18632.07
296.35
100.00
1700.00
0.90
10000.00
2170000.00
210.00
Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2
Altura de relleno
Asumir H=
Ancho columna
Largo columna
0.40
0.60
0.30
0.30
m
m
m
m
A=(P+0.15P) / Tn
3.37 cm2
0.15
0.40
H
A=B x L
L2 - (l-a) - A = 0
L=
B=
1.84 m
1.84 m
Asumimos:
L =
B =
1.85 m
1.85 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu =
28481.54 Kg
Tu=
8.32
Ton/m
CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =
0.43 m
0.50 m
41.87 cm
0.36 cm
Vu = Tu x X x L
Vu=
X
0.55
5.49 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
50.56 Ton
Vc > Vu
En la otra direccin
X=
Vu = Tu x X x B
Vu=
0.36 cm
5.49 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
50.56 Ton
Vc > Vu
(OK)
X
0.55
0.30+d
0.30
0.30+d
Az=
3.4225 m2
Ao = (a + d) * (b+d)
Ao =
0.52 m2
284.27 Ton
(OK)
(OK)
ACERO DE REFUERZO
a=
As x Fy
0.85 x F'c x B
As =
Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu=
Mu =
15.40 Ton/m
Wu x X2
2
DIRECCION X-X
Mu =
4.62 Ton-m
As =
3.25 cm2
a=
0.57 cm
As =
2.94 cm2
a=
0.51 cm
As =
2.94 cm2
As min = 0.0018 x d x B
As min=
usamos
13.94 cm2
1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m
S=
17.12 cm
DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=
40.60 cm
15.40 Ton/m
4.62 Ton-m
As =
5.62 cm2
a=
0.98 cm
As =
5.16 cm2
a=
0.90 cm
As =
5.15 cm2
As min = 0.0018 x d x L
As min=
13.52 cm2
1/2" @ 0.1765 m
usamos
1/2"
S = 1/2" x B
As
S=
17.65 cm
L=
B=
A=
3.43
2.08
7.13
0.30
0.30
3.30
0.25
0.35
Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado
2138.40
2160.90
77.91
10273.54
Kg
Kg
Kg
Kg
Pd =
14650.74 Kg
Pl =
214.03
Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
m
m
m2
m
m
m
m
m
14650.74
214.03
100.00
1700.00
0.90
10000.00
2170000.00
210.00
Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2
Altura de relleno
Asumir H=
Ancho columna
Largo columna
0.40
0.60
0.30
0.30
m
m
m
m
A=(P+0.15P) / Tn
2.65 cm2
0.15
0.40
H
A=B x L
L2 - (l-a) - A = 0
L=
B=
1.63 m
1.63 m
Asumimos:
L =
B =
1.65 m
1.65 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu =
22361.37 Kg
Tu=
8.21
Ton/m
CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =
0.41 m
0.50 m
41.87 cm
0.26 cm
Vu = Tu x X x L
Vu=
X
0.55
3.47 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton
Vc > Vu
En la otra direccin
X=
Vu = Tu x X x B
Vu=
0.26 cm
3.47 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton
Vc > Vu
(OK)
X
0.55
0.30+d
0.30
0.30+d
Az=
2.7225 m2
Ao = (a + d) * (b+d)
Ao =
0.52 m2
284.27 Ton
(OK)
(OK)
ACERO DE REFUERZO
a=
As x Fy
0.85 x F'c x B
As =
Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu=
Mu =
13.55 Ton/m
Wu x X2
2
DIRECCION X-X
Mu =
3.09 Ton-m
As =
2.17 cm2
a=
0.38 cm
As =
1.96 cm2
a=
0.34 cm
As =
1.96 cm2
As min = 0.0018 x d x B
As min=
usamos
12.43 cm2
1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m
S=
17.12 cm
DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=
40.60 cm
13.55 Ton/m
3.09 Ton-m
As =
5.01 cm2
a=
0.87 cm
As =
4.62 cm2
a=
0.81 cm
As =
4.61 cm2
As min = 0.0018 x d x L
As min=
12.06 cm2
1/2" @ 0.1765 m
usamos
1/2"
S = 1/2" x B
As
S=
17.65 cm
L=
B=
A=
3.85
1.83
7.05
0.30
0.30
3.30
0.25
0.35
Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado
2138.40
2425.50
76.94
10145.52
Kg
Kg
Kg
Kg
Pd =
14786.36 Kg
Pl =
211.37
Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
m
m
m2
m
m
m
m
m
14786.36
211.37
100.00
1700.00
0.90
10000.00
2170000.00
210.00
Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2
Altura de relleno
Asumir H=
Ancho columna
Largo columna
0.40
0.60
0.30
0.30
m
m
m
m
A=(P+0.15P) / Tn
2.67 cm2
0.15
0.40
H
A=B x L
L2 - (l-a) - A = 0
L=
B=
1.64 m
1.64 m
Asumimos:
L =
B =
1.65 m
1.65 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu =
22559.99 Kg
Tu=
8.29
Ton/m
CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =
0.41 m
0.50 m
41.87 cm
0.26 cm
Vu = Tu x X x L
Vu=
X
0.55
3.51 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton
Vc > Vu
En la otra direccin
X=
Vu = Tu x X x B
Vu=
0.26 cm
3.51 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton
Vc > Vu
(OK)
X
0.55
0.30+d
0.30
0.30+d
Az=
2.7225 m2
Ao = (a + d) * (b+d)
Ao =
0.52 m2
284.27 Ton
(OK)
(OK)
ACERO DE REFUERZO
a=
As x Fy
0.85 x F'c x B
As =
Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu=
Mu =
13.67 Ton/m
Wu x X2
2
DIRECCION X-X
Mu =
3.11 Ton-m
As =
2.19 cm2
a=
0.38 cm
As =
1.98 cm2
a=
0.34 cm
As =
1.98 cm2
As min = 0.0018 x d x B
As min=
usamos
12.43 cm2
1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m
S=
17.12 cm
DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=
40.60 cm
13.67 Ton/m
3.11 Ton-m
As =
5.01 cm2
a=
0.87 cm
As =
4.62 cm2
a=
0.80 cm
As =
4.61 cm2
As min = 0.0018 x d x L
As min=
12.06 cm2
1/2" @ 0.1765 m
usamos
1/2"
S = 1/2" x B
As
S=
17.65 cm
L=
B=
A=
2.88
1.83
5.27
0.30
0.30
3.30
0.25
0.35
Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado
2138.40
1814.40
57.55
7589.38
Kg
Kg
Kg
Kg
Pd =
11599.73 Kg
Pl =
158.11
Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
m
m
m2
m
m
m
m
m
11599.73
158.11
100.00
1700.00
0.90
10000.00
2170000.00
210.00
Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2
Altura de relleno
Asumir H=
Ancho columna
Largo columna
0.40
0.60
0.30
0.30
m
m
m
m
A=(P+0.15P) / Tn
2.10 cm2
0.15
0.40
H
A=B x L
L2 - (l-a) - A = 0
L=
B=
1.45 m
1.45 m
Asumimos:
L =
B =
1.45 m
1.45 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu =
17684.19 Kg
Tu=
8.41
Ton/m
CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =
0.40 m
0.50 m
41.87 cm
0.16 cm
Vu = Tu x X x L
Vu=
X
0.55
1.91 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
39.63 Ton
Vc > Vu
En la otra direccin
X=
Vu = Tu x X x B
Vu=
0.16 cm
1.91 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
39.63 Ton
Vc > Vu
(OK)
X
0.55
0.30+d
0.30
0.30+d
Az=
2.1025 m2
Ao = (a + d) * (b+d)
Ao =
0.52 m2
284.27 Ton
(OK)
(OK)
ACERO DE REFUERZO
a=
As x Fy
0.85 x F'c x B
As =
Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu=
Mu =
12.20 Ton/m
Wu x X2
2
DIRECCION X-X
Mu =
2.02 Ton-m
As =
1.42 cm2
a=
0.25 cm
As =
1.28 cm2
a=
0.22 cm
As =
1.28 cm2
As min = 0.0018 x d x B
As min=
usamos
10.93 cm2
1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m
S=
17.12 cm
DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=
40.60 cm
12.20 Ton/m
2.02 Ton-m
As =
4.44 cm2
a=
0.77 cm
As =
4.12 cm2
a=
0.72 cm
As =
4.11 cm2
As min = 0.0018 x d x L
As min=
10.60 cm2
1/2" @ 0.1765 m
usamos
1/2"
S = 1/2" x B
As
S=
17.65 cm
L=
B=
A=
3.25
2.25
7.31
0.25
0.40
3.50
0.25
0.25
Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de tijeral
Peso de viguetas
Peso de cobertura
Pd =
Pl =
840.00
487.50
77.37
26.62
13.97
m
m
m2
m
m
m
m
m
Kg
Kg
Kg
Kg
Kg
1445.45 Kg
219.38
Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
1445.45
219.38
100.00
1700.00
0.79
10000.00
2170000.00
210.00
Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2
Altura de relleno
Asumir H=
Ancho columna
Largo columna
0.40
0.60
0.40
0.25
m
m
m
m
A=(P+0.15P) / Tn
0.36 cm2
0.15
0.40
H
A=B x L
L2 - (l-a) - A = 0
L=
B=
0.68 m
0.53 m
Asumimos:
L =
B =
1.30 m
1.10 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu =
2563.05 Kg
Tu=
1.79
Ton/m
CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =
0.38 m
0.60 m
51.87 cm
0.01 cm
Vu = Tu x X x L
Vu=
X
0.55
0.01 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
44.02 Ton
Vc > Vu
En la otra direccin
X=
Vu = Tu x X x B
Vu=
0.01 cm
0.01 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
37.25 Ton
Vc > Vu
(OK)
X
0.55
0.25+d
0.40
0.40+d
Az=
Ao = (a + d) * (b+d)
1.43 m2
Ao =
0.71 m2
308.80 Ton
(OK)
(OK)
ACERO DE REFUERZO
a=
As x Fy
0.85 x F'c x B
As =
Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu=
Mu =
1.97 Ton/m
Wu x X2
2
DIRECCION X-X
Mu =
0.18 Ton-m
As =
0.10 cm2
a=
0.02 cm
As =
0.09 cm2
a=
0.02 cm
As =
0.09 cm2
As min = 0.0018 x d x B
As min=
usamos
10.27 cm2
1/2"
S = 1/2" x B
As
1/2" @ 0.125 m
S=
16.33 cm
DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=
50.60 cm
2.33 Ton/m
0.24 Ton-m
As =
5.34 cm2
a=
0.93 cm
As =
7.50 cm2
a=
1.31 cm
As =
9.70 cm2
As min = 0.0018 x d x L
As min=
11.84 cm2
1/2" @ 0.125 m
usamos
1/2"
S = 1/2" x B
As
S=
11.99 cm
0.15
2.85
0.015
0.15
0.45
Metrado de cargas
Peso de muro
Peso de tarrajeo
Peso de sobrecimiento
769.5 Kg / m
188.1 Kg / m
162 Kg / m
Pd=
m
m
m
m
m
1119.6 Kg / m
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
Espesor de muro
1119.60 Kg
300.00 Kg
300.00 Kg/m2
1800.00 Kg/m3
0.79 Kg/cm2
10000.00 Ton/m3
2170000.00 Ton/m3
100.00 Kg/cm2
0.15 m
Altura de relleno
Asumir H=
0.20 m
0.50 m
1.00 m
b=
0.24 m
Asuminos b =
0.60 m
Fc
T <= f r
T=
6M
hxh
Fr =
84.50
Ton/m
Carga ltima
e/2
Tu = 1.5xPd + 1.8xPv
Lxb
Tu =
3.70 Ton/m2
X=
0.26 m
2
Mu = (Tu x X) / 2
Mu =
0.13 Ton-m
6M
b x fr
H=
0.45 m
USAMOS H = 0.80 m
0.15
3
0.015
0.15
0.4
Metrado de cargas
Peso de muro
Peso de tarrajeo
Peso de sobrecimiento
m
m
m
m
m
810 Kg / m
198 Kg / m
144 Kg / m
Pd=
1152 Kg / m
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
Espesor de muro
1152.00 Kg
300.00 Kg
300.00 Kg/m2
1800.00 Kg/m3
0.55 Kg/cm2
10000.00 Ton/m3
2170000.00 Ton/m3
140.00 Kg/cm2
0.15 m
Altura de relleno
Asumir H=
0.20 m
0.60 m
1.00 m
b=
0.43 m
Asuminos b =
0.50 m
Fc
T <= f r
T=
6M
hxh
Fr =
99.98
Ton/m
Carga ltima
e/2
Tu = 1.5xPd + 1.8xPv
Lxb
Tu =
4.54 Ton/m2
X=
0.21 m
2
Mu = (Tu x X) / 2
Mu =
0.10 Ton-m
6M
b x fr
H=
0.31 m
USAMOS H = 0.60 m