Está en la página 1de 28

DISEO DE ZAPATA AISLADA

ZAPATA Z-1
Area tributaria:

L=
B=
A=

3.85
3.43
13.21
0.30
0.30
3.30
0.25
0.35

Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado

2138.40
2425.50
144.20
19015.92

Kg
Kg
Kg
Kg

Pd =

23724.02 Kg

Pl =

396.17

Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto

m
m
m2
m
m
m
m
m

23724.02
396.17
100.00
1700.00
0.90
10000.00
2170000.00
210.00

Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2

Altura de relleno
Asumir H=
Ancho columna
Largo columna

0.40
0.60
0.30
0.30

m
m
m
m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


6450.00 kg/m2

A=(P+0.15P) / Tn
4.30 cm2
0.15
0.40
H

A=B x L
L2 - (l-a) - A = 0
L=
B=

2.07 m
2.07 m

Asumimos:
L =
B =

2.10 m
2.10 m

Pu = 1.5 x Wd + 1.8 x Wl
Pu =
36299.13 Kg
Tu=

8.23

Ton/m

CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =

0.45 m
0.50 m

CHEQUEO POR CORTANTE


d= h - rec. - /2
d=
X=

41.87 cm
0.48 cm

Vu = Tu x X x L
Vu=
X
0.55

8.32 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
57.40 Ton

Vc > Vu

En la otra direccin
X=
Vu = Tu x X x B
Vu=

0.48 cm

8.32 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
57.40 Ton

Vc > Vu

(OK)

X
0.55

CHEQUEO POR PUNZONAMIENTO


Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2
d/2
0.3

0.30+d

0.30

0.30+d

Az=
Ao = (a + d) * (b+d)

4.41 m2

Ao =

0.52 m2

Vup = Tu x (Az - Ao)


Vup =
32.05 Ton

Cortante tomado por el concreto


bo = 2(a + d) + 2(b + d)
bo=
2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp=

284.27 Ton

Vcp = 0.85 x Vcp


Vcp=
241.63 Ton
Vcp > Vup

(OK)

(OK)

ACERO DE REFUERZO
a=

As x Fy
0.85 x F'c x B

As =

Mu
0.9 x Fy (d - a/2)

Wu = Tu x B
Wu=

Mu =

17.29 Ton/m

Wu x X2
2

DIRECCION X-X
Mu =

7.00 Ton-m

As =

4.92 cm2

a=

0.86 cm

As =

4.47 cm2

a=

0.78 cm

As =

4.47 cm2

As min = 0.0018 x d x B
As min=
usamos

15.82 cm2
1/2"

S = 1/2" x B
As
1/2" @ 0.1712 m

S=

17.12 cm

USAR 1/2" @ 0.1712 m

DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=

40.60 cm
17.29 Ton/m
7.00 Ton-m

As =

6.42 cm2

a=

1.12 cm

As =

5.88 cm2

a=

1.03 cm

As =

5.87 cm2

As min = 0.0018 x d x L
As min=

15.34 cm2

1/2" @ 0.1765 m
usamos

1/2"

S = 1/2" x B
As
S=

17.65 cm

USAR 1/2" @ 0.1765 m

DISEO DE ZAPATA AISLADA


ZAPATA Z-1
Area tributaria:

L=
B=
A=

3.43
2.88
9.88
0.30
0.30
3.30
0.25
0.35

Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado

2138.40
2160.90
107.87
14224.90

Kg
Kg
Kg
Kg

Pd =

18632.07 Kg

Pl =

296.35

Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto

m
m
m2
m
m
m
m
m

18632.07
296.35
100.00
1700.00
0.90
10000.00
2170000.00
210.00

Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2

Altura de relleno
Asumir H=
Ancho columna
Largo columna

0.40
0.60
0.30
0.30

m
m
m
m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


6450.00 kg/m2

A=(P+0.15P) / Tn
3.37 cm2
0.15
0.40
H

A=B x L
L2 - (l-a) - A = 0
L=
B=

1.84 m
1.84 m

Asumimos:
L =
B =

1.85 m
1.85 m

Pu = 1.5 x Wd + 1.8 x Wl
Pu =
28481.54 Kg
Tu=

8.32

Ton/m

CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =

0.43 m
0.50 m

CHEQUEO POR CORTANTE


d= h - rec. - /2
d=
X=

41.87 cm
0.36 cm

Vu = Tu x X x L
Vu=
X
0.55

5.49 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
50.56 Ton

Vc > Vu

En la otra direccin
X=
Vu = Tu x X x B
Vu=

0.36 cm

5.49 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
50.56 Ton

Vc > Vu

(OK)

X
0.55

CHEQUEO POR PUNZONAMIENTO


Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2
d/2
0.3

0.30+d

0.30

0.30+d

Az=
3.4225 m2
Ao = (a + d) * (b+d)
Ao =

0.52 m2

Vup = Tu x (Az - Ao)


Vup =
24.18 Ton

Cortante tomado por el concreto


bo = 2(a + d) + 2(b + d)
bo=
2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp=

284.27 Ton

Vcp = 0.85 x Vcp


Vcp=
241.63 Ton
Vcp > Vup

(OK)

(OK)

ACERO DE REFUERZO
a=

As x Fy
0.85 x F'c x B

As =

Mu
0.9 x Fy (d - a/2)

Wu = Tu x B
Wu=

Mu =

15.40 Ton/m

Wu x X2
2

DIRECCION X-X
Mu =

4.62 Ton-m

As =

3.25 cm2

a=

0.57 cm

As =

2.94 cm2

a=

0.51 cm

As =

2.94 cm2

As min = 0.0018 x d x B
As min=
usamos

13.94 cm2
1/2"

S = 1/2" x B
As
1/2" @ 0.1712 m

S=

17.12 cm

USAR 1/2" @ 0.1712 m

DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=

40.60 cm
15.40 Ton/m
4.62 Ton-m

As =

5.62 cm2

a=

0.98 cm

As =

5.16 cm2

a=

0.90 cm

As =

5.15 cm2

As min = 0.0018 x d x L
As min=

13.52 cm2

1/2" @ 0.1765 m
usamos

1/2"

S = 1/2" x B
As
S=

17.65 cm

USAR 1/2" @ 0.1765 m

DISEO DE ZAPATA AISLADA


ZAPATA Z-1
Area tributaria:

L=
B=
A=

3.43
2.08
7.13
0.30
0.30
3.30
0.25
0.35

Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado

2138.40
2160.90
77.91
10273.54

Kg
Kg
Kg
Kg

Pd =

14650.74 Kg

Pl =

214.03

Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto

m
m
m2
m
m
m
m
m

14650.74
214.03
100.00
1700.00
0.90
10000.00
2170000.00
210.00

Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2

Altura de relleno
Asumir H=
Ancho columna
Largo columna

0.40
0.60
0.30
0.30

m
m
m
m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


6450.00 kg/m2

A=(P+0.15P) / Tn
2.65 cm2
0.15
0.40
H

A=B x L
L2 - (l-a) - A = 0
L=
B=

1.63 m
1.63 m

Asumimos:
L =
B =

1.65 m
1.65 m

Pu = 1.5 x Wd + 1.8 x Wl
Pu =
22361.37 Kg
Tu=

8.21

Ton/m

CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =

0.41 m
0.50 m

CHEQUEO POR CORTANTE


d= h - rec. - /2
d=
X=

41.87 cm
0.26 cm

Vu = Tu x X x L
Vu=
X
0.55

3.47 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton

Vc > Vu

En la otra direccin
X=
Vu = Tu x X x B
Vu=

0.26 cm

3.47 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton

Vc > Vu

(OK)

X
0.55

CHEQUEO POR PUNZONAMIENTO


Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2
d/2
0.3

0.30+d

0.30

0.30+d

Az=
2.7225 m2
Ao = (a + d) * (b+d)
Ao =

0.52 m2

Vup = Tu x (Az - Ao)


Vup =
18.12 Ton

Cortante tomado por el concreto


bo = 2(a + d) + 2(b + d)
bo=
2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp=

284.27 Ton

Vcp = 0.85 x Vcp


Vcp=
241.63 Ton
Vcp > Vup

(OK)

(OK)

ACERO DE REFUERZO
a=

As x Fy
0.85 x F'c x B

As =

Mu
0.9 x Fy (d - a/2)

Wu = Tu x B
Wu=

Mu =

13.55 Ton/m

Wu x X2
2

DIRECCION X-X
Mu =

3.09 Ton-m

As =

2.17 cm2

a=

0.38 cm

As =

1.96 cm2

a=

0.34 cm

As =

1.96 cm2

As min = 0.0018 x d x B
As min=
usamos

12.43 cm2
1/2"

S = 1/2" x B
As
1/2" @ 0.1712 m

S=

17.12 cm

USAR 1/2" @ 0.1712 m

DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=

40.60 cm
13.55 Ton/m
3.09 Ton-m

As =

5.01 cm2

a=

0.87 cm

As =

4.62 cm2

a=

0.81 cm

As =

4.61 cm2

As min = 0.0018 x d x L
As min=

12.06 cm2

1/2" @ 0.1765 m
usamos

1/2"

S = 1/2" x B
As
S=

17.65 cm

USAR 1/2" @ 0.1765 m

DISEO DE ZAPATA AISLADA


ZAPATA Z-1
Area tributaria:

L=
B=
A=

3.85
1.83
7.05
0.30
0.30
3.30
0.25
0.35

Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado

2138.40
2425.50
76.94
10145.52

Kg
Kg
Kg
Kg

Pd =

14786.36 Kg

Pl =

211.37

Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto

m
m
m2
m
m
m
m
m

14786.36
211.37
100.00
1700.00
0.90
10000.00
2170000.00
210.00

Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2

Altura de relleno
Asumir H=
Ancho columna
Largo columna

0.40
0.60
0.30
0.30

m
m
m
m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


6450.00 kg/m2

A=(P+0.15P) / Tn
2.67 cm2
0.15
0.40
H

A=B x L
L2 - (l-a) - A = 0
L=
B=

1.64 m
1.64 m

Asumimos:
L =
B =

1.65 m
1.65 m

Pu = 1.5 x Wd + 1.8 x Wl
Pu =
22559.99 Kg
Tu=

8.29

Ton/m

CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =

0.41 m
0.50 m

CHEQUEO POR CORTANTE


d= h - rec. - /2
d=
X=

41.87 cm
0.26 cm

Vu = Tu x X x L
Vu=
X
0.55

3.51 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton

Vc > Vu

En la otra direccin
X=
Vu = Tu x X x B
Vu=

0.26 cm

3.51 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
45.10 Ton

Vc > Vu

(OK)

X
0.55

CHEQUEO POR PUNZONAMIENTO


Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2
d/2
0.3

0.30+d

0.30

0.30+d

Az=
2.7225 m2
Ao = (a + d) * (b+d)
Ao =

0.52 m2

Vup = Tu x (Az - Ao)


Vup =
18.28 Ton

Cortante tomado por el concreto


bo = 2(a + d) + 2(b + d)
bo=
2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp=

284.27 Ton

Vcp = 0.85 x Vcp


Vcp=
241.63 Ton
Vcp > Vup

(OK)

(OK)

ACERO DE REFUERZO
a=

As x Fy
0.85 x F'c x B

As =

Mu
0.9 x Fy (d - a/2)

Wu = Tu x B
Wu=

Mu =

13.67 Ton/m

Wu x X2
2

DIRECCION X-X
Mu =

3.11 Ton-m

As =

2.19 cm2

a=

0.38 cm

As =

1.98 cm2

a=

0.34 cm

As =

1.98 cm2

As min = 0.0018 x d x B
As min=
usamos

12.43 cm2
1/2"

S = 1/2" x B
As
1/2" @ 0.1712 m

S=

17.12 cm

USAR 1/2" @ 0.1712 m

DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=

40.60 cm
13.67 Ton/m
3.11 Ton-m

As =

5.01 cm2

a=

0.87 cm

As =

4.62 cm2

a=

0.80 cm

As =

4.61 cm2

As min = 0.0018 x d x L
As min=

12.06 cm2

1/2" @ 0.1765 m
usamos

1/2"

S = 1/2" x B
As
S=

17.65 cm

USAR 1/2" @ 0.1765 m

DISEO DE ZAPATA AISLADA


ZAPATA Z-1
Area tributaria:

L=
B=
A=

2.88
1.83
5.27
0.30
0.30
3.30
0.25
0.35

Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de viguetas
Peso de aligerado

2138.40
1814.40
57.55
7589.38

Kg
Kg
Kg
Kg

Pd =

11599.73 Kg

Pl =

158.11

Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto

m
m
m2
m
m
m
m
m

11599.73
158.11
100.00
1700.00
0.90
10000.00
2170000.00
210.00

Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2

Altura de relleno
Asumir H=
Ancho columna
Largo columna

0.40
0.60
0.30
0.30

m
m
m
m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


6450.00 kg/m2

A=(P+0.15P) / Tn
2.10 cm2
0.15
0.40
H

A=B x L
L2 - (l-a) - A = 0
L=
B=

1.45 m
1.45 m

Asumimos:
L =
B =

1.45 m
1.45 m

Pu = 1.5 x Wd + 1.8 x Wl
Pu =
17684.19 Kg
Tu=

8.41

Ton/m

CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =

0.40 m
0.50 m

CHEQUEO POR CORTANTE


d= h - rec. - /2
d=
X=

41.87 cm
0.16 cm

Vu = Tu x X x L
Vu=
X
0.55

1.91 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
39.63 Ton

Vc > Vu

En la otra direccin
X=
Vu = Tu x X x B
Vu=

0.16 cm

1.91 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
39.63 Ton

Vc > Vu

(OK)

X
0.55

CHEQUEO POR PUNZONAMIENTO


Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2
d/2
0.3

0.30+d

0.30

0.30+d

Az=
2.1025 m2
Ao = (a + d) * (b+d)
Ao =

0.52 m2

Vup = Tu x (Az - Ao)


Vup =
13.34 Ton

Cortante tomado por el concreto


bo = 2(a + d) + 2(b + d)
bo=
2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp=

284.27 Ton

Vcp = 0.85 x Vcp


Vcp=
241.63 Ton
Vcp > Vup

(OK)

(OK)

ACERO DE REFUERZO
a=

As x Fy
0.85 x F'c x B

As =

Mu
0.9 x Fy (d - a/2)

Wu = Tu x B
Wu=

Mu =

12.20 Ton/m

Wu x X2
2

DIRECCION X-X
Mu =

2.02 Ton-m

As =

1.42 cm2

a=

0.25 cm

As =

1.28 cm2

a=

0.22 cm

As =

1.28 cm2

As min = 0.0018 x d x B
As min=
usamos

10.93 cm2
1/2"

S = 1/2" x B
As
1/2" @ 0.1712 m

S=

17.12 cm

USAR 1/2" @ 0.1712 m

DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=

40.60 cm
12.20 Ton/m
2.02 Ton-m

As =

4.44 cm2

a=

0.77 cm

As =

4.12 cm2

a=

0.72 cm

As =

4.11 cm2

As min = 0.0018 x d x L
As min=

10.60 cm2

1/2" @ 0.1765 m
usamos

1/2"

S = 1/2" x B
As
S=

17.65 cm

USAR 1/2" @ 0.1765 m

DISEO DE ZAPATA AISLADA


ZAPATA Z-2
Area tributaria:

L=
B=
A=

3.25
2.25
7.31
0.25
0.40
3.50
0.25
0.25

Ancho de columna =
Largo de columna =
Altura de columna =
Ancho de viga =
Peralte de viga =
Metrado de cargas
Peso de columna
Peso de Viga
Peso de tijeral
Peso de viguetas
Peso de cobertura

Pd =
Pl =

840.00
487.50
77.37
26.62
13.97

m
m
m2
m
m
m
m
m

Kg
Kg
Kg
Kg
Kg

1445.45 Kg
219.38

Datos:
Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto

1445.45
219.38
100.00
1700.00
0.79
10000.00
2170000.00
210.00

Kg
Kg
Kg/m2
Kg/m3
Kg/cm2
Ton/m3
Ton/m3
Kg/cm2

Altura de relleno
Asumir H=
Ancho columna
Largo columna

0.40
0.60
0.40
0.25

m
m
m
m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


5350.00 kg/m2

A=(P+0.15P) / Tn
0.36 cm2
0.15
0.40
H

A=B x L
L2 - (l-a) - A = 0
L=
B=

0.68 m
0.53 m

Asumimos:
L =
B =

1.30 m
1.10 m

Pu = 1.5 x Wd + 1.8 x Wl
Pu =
2563.05 Kg
Tu=

1.79

Ton/m

CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>=
h adoptado =

0.38 m
0.60 m

CHEQUEO POR CORTANTE


d= h - rec. - /2
d=
X=

51.87 cm
0.01 cm

Vu = Tu x X x L
Vu=
X
0.55

0.01 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
44.02 Ton

Vc > Vu

En la otra direccin
X=
Vu = Tu x X x B
Vu=

0.01 cm

0.01 Ton
1/2
Vc=0.85 x 0.53 x (210) x L x d
vc =
37.25 Ton

Vc > Vu

(OK)

X
0.55

CHEQUEO POR PUNZONAMIENTO


Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2
d/2
0.25

0.25+d

0.40

0.40+d

Az=
Ao = (a + d) * (b+d)

1.43 m2

Ao =

0.71 m2

Vup = Tu x (Az - Ao)


Vup =
1.30 Ton

Cortante tomado por el concreto


bo = 2(a + d) + 2(b + d)
bo=
3.37 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp=

308.80 Ton

Vcp = 0.85 x Vcp


Vcp=
262.48 Ton

(OK)

Vcp > Vup

(OK)

ACERO DE REFUERZO
a=

As x Fy
0.85 x F'c x B

As =

Mu
0.9 x Fy (d - a/2)

Wu = Tu x B
Wu=

Mu =

1.97 Ton/m

Wu x X2
2

DIRECCION X-X
Mu =

0.18 Ton-m

As =

0.10 cm2

a=

0.02 cm

As =

0.09 cm2

a=

0.02 cm

As =

0.09 cm2

As min = 0.0018 x d x B
As min=
usamos

10.27 cm2
1/2"

S = 1/2" x B
As
1/2" @ 0.125 m

S=

16.33 cm

USAR 1/2" @ 0.125 m

DIRECCION Y-Y
d' = d - 1/2"
d'=
Wu =
Mu=

50.60 cm
2.33 Ton/m
0.24 Ton-m

As =

5.34 cm2

a=

0.93 cm

As =

7.50 cm2

a=

1.31 cm

As =

9.70 cm2

As min = 0.0018 x d x L
As min=

11.84 cm2

1/2" @ 0.125 m
usamos

1/2"

S = 1/2" x B
As
S=

11.99 cm

USAR 1/2" @ 0.125 m

DISEO DE CIMIENTO CORRIDO


EJE 1-1 = EJE 2-2
Datos
Espesor de muro
Altura de muro
Espesor de tarrajeo
Ancho de sobrecimiento
Altura de sobrecimiento

0.15
2.85
0.015
0.15
0.45

Metrado de cargas
Peso de muro
Peso de tarrajeo
Peso de sobrecimiento

769.5 Kg / m
188.1 Kg / m
162 Kg / m

Pd=

m
m
m
m
m

1119.6 Kg / m

Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
Espesor de muro

1119.60 Kg
300.00 Kg
300.00 Kg/m2
1800.00 Kg/m3
0.79 Kg/cm2
10000.00 Ton/m3
2170000.00 Ton/m3
100.00 Kg/cm2
0.15 m
Altura de relleno
Asumir H=

0.20 m
0.50 m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


5940.00 kg/m2
A=(P+0.15P) / Tn
0.24 cm2
Para L =

1.00 m

b=

0.24 m

Asuminos b =

0.60 m

DETERMINACIN DEL PERALTE


Fr = 1.3 x

Fc
T <= f r

T=

6M
hxh

Fr =

84.50

Ton/m
Carga ltima

e/2

Tu = 1.5xPd + 1.8xPv
Lxb
Tu =

3.70 Ton/m2

Determinacin del momento ltimo


X = (b - e)/2 + e/4

X=

0.26 m
2
Mu = (Tu x X) / 2

Mu =

0.13 Ton-m

DETERMINACIN DEL PERALTE "H"


H=

6M
b x fr

H=

0.45 m

USAMOS H = 0.80 m

DISEO DE CIMIENTO CORRIDO


EJE A = EJE C
Datos
Espesor de muro
Altura de muro
Espesor de tarrajeo
Ancho de sobrecimiento
Altura de sobrecimiento

0.15
3
0.015
0.15
0.4

Metrado de cargas
Peso de muro
Peso de tarrajeo
Peso de sobrecimiento

m
m
m
m
m

810 Kg / m
198 Kg / m
144 Kg / m

Pd=

1152 Kg / m

Carga Muerta
Carga viva
Sobrecarga
Peso especifico del suelo
Capacidad portante del suelo
Coeficiente de Balasto
Modulo de elasticidad
Resistencia del concreto
Espesor de muro

1152.00 Kg
300.00 Kg
300.00 Kg/m2
1800.00 Kg/m3
0.55 Kg/cm2
10000.00 Ton/m3
2170000.00 Ton/m3
140.00 Kg/cm2
0.15 m
Altura de relleno
Asumir H=

0.20 m
0.60 m

Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15


3340.00 kg/m2
A=(P+0.15P) / Tn
0.43 cm2
Para L =

1.00 m

b=

0.43 m

Asuminos b =

0.50 m

DETERMINACIN DEL PERALTE


Fr = 1.3 x

Fc
T <= f r

T=

6M
hxh

Fr =

99.98

Ton/m
Carga ltima

e/2

Tu = 1.5xPd + 1.8xPv
Lxb
Tu =

4.54 Ton/m2

Determinacin del momento ltimo


X = (b - e)/2 + e/4

X=

0.21 m
2
Mu = (Tu x X) / 2

Mu =

0.10 Ton-m

DETERMINACIN DEL PERALTE "H"


H=

6M
b x fr

H=

0.31 m

USAMOS H = 0.60 m