Está en la página 1de 3

1ra ETAPA: PREDIMENSIONAMIENTO

TRAMO

P1 inicial
regualda
(Kg/cm2)

Caudal
(m3/h)

Dimetro
(mm)

Dimetro
Adoptado
(mm)

O-A
A-B
B-C
C-D
D-E
E-G
E-F
F-H

3.033
2.633
2.633
2.633
2.633
2.633
2.633
2.633

600
600
600
600
600
250
350
350

49.0868
52.6836
52.6836
52.6836
52.6836
34.0071
40.2378
40.2378

51
63
63
63
63
38
51
51

Longitud
Total (m)

Longitud
total (Km)

18.04
8.4
7.4
1.2
50.28
14.72
11.26
12.63

0.01804
0.0084
0.0074
0.0012
0.05028
0.01472
0.01126
0.01263

2da ETAPA: DE VERIFICACION


TRAMO

LONGITUD
(m)

Diametro
Adoptado
(mm)

Longitud
Equivalente
(m)

O-A
A-B
B-C
C-D
D-E
E-G
E-F
F-H

4.78
2.1
1.1
1.2
40.2
6
10
6

51
63
63
63
63
38
51
51

13.26
6.3
6.3
10.08
8.72
1.26
6.63

Caudal
(m3/h)

(P-P)

(P-P)

600
600
600
600
600
250
350
350

0.3815339476
0.064157
0.056519
0.009165
0.384024
0.261307
0.08929
0.100154

3.033
2.633
2.6208
2.6100
2.6082
2.5335
2.5335
2.5159

2.9694
2.6208
2.6100
2.6082
2.5335
2.4814
2.5159
2.4959

0.0635631759
0.012211569
0.0108050977
0.0017563493
0.0746871678
0.052105352
0.017683302
0.0199839213

TRAMO
O-A

E-G
F-H

Max. Caida de
Presion Admisible

También podría gustarte