1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
PERNOS
LADRILLO
YESO
PINTURA, IMPERM
TRIPLAY
CALAMINA
OTROS
UNIDAD
BL.
KG
P2
UN
UN
BL
GAL
KG
KG
KG
PESO TOTAL
PESO.TOTAL
23,162.50
3,392.17
5,434.71
72.00
7,705.91
300.00
297.00
197.80
1,468.40
300.00
42,330.49
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA Y GRAVA
M3
PIEDRA 1/2
M3
HORMIGN
M3
MADERA
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
36.43
23.39
41.33
5.00
101.16
6.00
16.86
16.86
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
No VIAJES
Tub de 3/4
5,040.00
U
0.00
0.00
0.00
Tub, 1"
3,360.00
U
0.00
0.00
0.00
Tub,1 1/2"
1,690.00
U
0.00
0.00
0.00
Tub 2:"
994.00
U
0.00
0.00
0.00
Tub, 3"
470.00
U
0.00
0.00
0.00
Tub 4":
259.00
U
0.00
0.00
0.00
Tub 6:" U-PVC
110.00
U
0.00
0.00
0.00
Tub 8" U-PVC
65.00
U
0.00
0.00
0.00
Tub 10" U-PVC
50.00
U
0.00
0.00
0.00
Tub 8'; CSN
80.00
U
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
UNIDAD QUE NO DA COMPROBANTE
6.00 CAPACIDAD DEL CAMION /M3
1,000.00 COSTO POR VIAJE S/.
10,000.00 CAPACIDAD DEL CAMION / KG
0.10
AFECTO IGV
4,233.05
SIN IGV
6.00
660.00
14,000.00
110.00
11,127.60
4,233.05
11,127.60
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Piedra
costo por m3
0.00
Unidades de
Carga
Peso total tubera de agua
2
Peso total tubera desague CSN
2
Peso total tubera desague PVC
2
Numero bolsas de cemento
545.00
1
Peso resto de materiales
19,167.99
1
Agregados Total en Kilos
202,320.00
1
Piedra zona aledaa
0.00
COSTO TOTAL DEL FLETE EN ACEMILA S/.
Capacidad de
Carga
80
80
80
1
50
61.782
AFECTO IGV
4,233.05
4,233.05
SIN IGV
TOTAL DE FLETE
11,127.60
1,260.93
12,388.53
16,621.58
Nmero de
Viajes
545.00
383.36
3,274.74
Flete no
Afecto a IGV
163.50
115.01
982.42
0.00
1,260.93
FONCODES / DEPI
:
:
:
:
PRISE HUATA
RESERVORIO Y CANAL MANDAHUAZ
HUARAZ
1320050214
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
ETERNIT
CALAMINA
YESO
PINTURA, ASFALTO
TEJA
OTROS
UNIDAD
BL.
KG
P2
UN
UN
BL
GAL
KG
KG
PESO TOTAL
PESO.TOTAL
13,812.50
34.32
834.96
46.98
0.00
300.00
15,028.76
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA Y GRAVA
M3
PIEDRA
M3
HORMIGN
M3
MADERA
P2
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
0.24
52.19
0.00
52.43
10.00
5.24
5.24
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
No VIAJES
Tub de 3/4
5,040.00
U
0.00
0.00
0.00
Tub, 1"
3,360.00
U
0.00
0.00
0.00
Tub,1 1/2"
1,690.00
U
0.00
0.00
0.00
Tub 2:"
994.00
U
0.00
0.00
0.00
Tub, 3"
470.00
U
0.00
0.00
0.00
Tub 4":
259.00
U
0.00
0.00
0.00
Tub 6:" U-PVC
110.00
U
0.00
0.00
0.00
Tub 8" U-PVC
65.00
U
0.00
0.00
0.00
Tub 6'; CSN
160.00
U
0.00
0.00
0.00
Tub 8'; CSN
80.00
U
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
2- FLETE TERRESTRE
HUARAZ - HUATA
AFECTO IGV
1,202.30
AGREGADOS
TUBERIA
COSTO TOTAL FLETE TERR.
SIN IGV
10.00
700.00
10,000.00
70.00
3,668.00
1,202.30
3,668.00
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Piedra
costo por m3
0.00
Unidades de
Carga
Peso total tubera de agua
2
Peso total tubera desague CSN
2
Peso total tubera desague PVC
2
Numero bolsas de cemento
325.00
1
Peso resto de materiales
1,216.26
1
Agregados Total en Kilos
104,860.00
1
Piedra zona aledaa
0.00
COSTO TOTAL DEL FLETE EN ACEMILA S/.
Capacidad de
Carga
Nmero de
Viajes
80
80
80
1
50
40
AFECTO IGV
1,202.30
1,202.30
SIN IGV
TOTAL DE FLETE
3,668.00
3,668.00
4,870.30
325.00
24.33
2,621.50
Flete no
Afecto a IGV
0.00
0.00
0.00
0.00
FONCODES / DEPI
:
:
:
:
PRISE HUATA
CANAL NAUYA
HUARAZ
1320050214
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
ETERNIT
CALAMINA
YESO
PINTURA, ASFALTO
PENDOLA
OTROS
UNIDAD
BL.
KG
P2
UN
UN
BL
GAL
UND
KG
PESO TOTAL
PESO.TOTAL
13,642.50
42.71
1,204.67
63.86
14.00
300.00
15,267.74
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA Y GRAVA
M3
PIEDRA
M3
HORMIGN
M3
MADERA
P2
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
0.44
51.35
0.00
51.79
10.00
5.18
5.18
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
No VIAJES
Tub de 3/4
5,040.00
U
0.00
0.00
0.00
Tub, 1"
3,360.00
U
0.00
0.00
0.00
Tub,1 1/2"
1,690.00
U
0.00
0.00
0.00
Tub 2:"
994.00
U
0.00
0.00
0.00
Tub, 3"
470.00
U
0.00
0.00
0.00
Tub 4":
259.00
U
0.00
0.00
0.00
Tub 6:" U-PVC
110.00
U
18.00
3.60
0.03
Tub 8" U-PVC
65.00
U
0.00
0.00
0.00
Tub 6'; CSN
160.00
U
0.00
0.00
0.00
Tub 8'; CSN
80.00
U
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
0.03
REDONDEO
0.00
TUBERIA EN VOLUMEN
1
2- FLETE TERRESTRE
HUARAZ - HUATA
AFECTO IGV
1,221.42
AGREGADOS
TUBERIA
COSTO TOTAL FLETE TERR.
SIN IGV
10.00
700.00
10,000.00
70.00
3,626.00
0.00
1,221.42
3,626.00
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Piedra
costo por m3
0.00
Unidades de
Carga
2
2
2
1
1
1
Capacidad de
Carga
Nmero de
Viajes
80
80
80
1
50
40
FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILA
FLETES TOTALES S/.
AFECTO IGV
1,221.42
1,221.42
SIN IGV
TOTAL DE FLETE
3,626.00
2,950.00
6,576.00
7,797.42
0.70
321.00
32.50
2,589.50
Flete no
Afecto a IGV
7.00
321.00
32.50
2,589.50
0.00
2,950.00
FONCODES / DEPI
:
:
:
:
PRISE HUATA
CANAL HUANQUEQUITA
HUARAZ
1320050214
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
ETERNIT
CALAMINA
YESO
PINTURA, ASFALTO
PENDOLA
OTROS
UNIDAD
BL.
KG
P2
UN
UN
BL
GAL
UND
KG
PESO TOTAL
PESO.TOTAL
9,222.50
28.19
806.61
40.68
300.00
10,397.98
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA Y GRAVA
M3
PIEDRA
M3
HORMIGN
M3
MADERA
P2
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
0.59
34.28
0.00
34.87
10.00
3.49
3.49
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
No VIAJES
Tub de 3/4
5,040.00
U
0.00
0.00
0.00
Tub, 1"
3,360.00
U
0.00
0.00
0.00
Tub,1 1/2"
1,690.00
U
0.00
0.00
0.00
Tub 2:"
994.00
U
0.00
0.00
0.00
Tub, 3"
470.00
U
0.00
0.00
0.00
Tub 4":
259.00
U
0.00
0.00
0.00
Tub 6:" U-PVC
110.00
U
0.00
0.00
0.00
Tub 8" U-PVC
65.00
U
0.00
0.00
0.00
Tub 6'; CSN
160.00
U
0.00
0.00
0.00
Tub 8'; CSN
80.00
U
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
2- FLETE TERRESTRE
HUARAZ - HUATA
AFECTO IGV
831.84
AGREGADOS
TUBERIA
COSTO TOTAL FLETE TERR.
SIN IGV
10.00
700.00
10,000.00
70.00
2,443.00
831.84
2,443.00
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Piedra
costo por m3
0.00
Unidades de
Carga
Peso total tubera de agua
2
Peso total tubera desague CSN
2
Peso total tubera desague PVC
2
Numero bolsas de cemento
217.00
1
Peso resto de materiales
1,175.48
1
Agregados Total en Kilos
69,740.00
1
Piedra zona aledaa
0.00
COSTO TOTAL DEL FLETE EN ACEMILA S/.
Capacidad de
Carga
Nmero de
Viajes
80
80
80
1
50
40
FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILA
FLETES TOTALES S/.
AFECTO IGV
831.84
831.84
SIN IGV
TOTAL DE FLETE
2,443.00
2,976.02
5,419.02
6,250.86
217.00
23.51
1,743.50
Flete no
Afecto a IGV
325.50
35.27
2,615.25
0.00
2,976.02
FONCODES / DEPI
:
:
:
:
PRISE HUATA
CANAL HUINCHUS URAN
HUARAZ
1320050214
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
ETERNIT
CALAMINA
YESO
PINTURA, ASFALTO
PENDOLA
OTROS
UNIDAD
BL.
KG
P2
UN
UN
BL
GAL
UND
KG
PESO TOTAL
PESO.TOTAL
11,135.00
35.13
991.56
51.89
300.00
12,513.58
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA Y GRAVA
M3
PIEDRA
M3
HORMIGN
M3
MADERA
P2
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
0.37
41.85
0.00
42.22
10.00
4.22
4.22
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
No VIAJES
Tub de 3/4
5,040.00
U
0.00
0.00
0.00
Tub, 1"
3,360.00
U
0.00
0.00
0.00
Tub,1 1/2"
1,690.00
U
0.00
0.00
0.00
Tub 2:"
994.00
U
0.00
0.00
0.00
Tub, 3"
470.00
U
0.00
0.00
0.00
Tub 4":
259.00
U
0.00
0.00
0.00
Tub 6:" U-PVC
110.00
U
0.00
0.00
0.00
Tub 8" U-PVC
65.00
U
0.00
0.00
0.00
Tub 6'; CSN
160.00
U
0.00
0.00
0.00
Tub 8'; CSN
80.00
U
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
2- FLETE TERRESTRE
HUARAZ - HUATA
AFECTO IGV
1,001.09
AGREGADOS
TUBERIA
COSTO TOTAL FLETE TERR.
SIN IGV
10.00
700.00
10,000.00
70.00
2,954.00
1,001.09
2,954.00
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Piedra
costo por m3
0.00
Unidades de
Carga
Peso total tubera de agua
2
Peso total tubera desague CSN
2
Peso total tubera desague PVC
2
Numero bolsas de cemento
262.00
1
Peso resto de materiales
1,378.58
1
Agregados Total en Kilos
84,440.00
1
Piedra zona aledaa
0.00
COSTO TOTAL DEL FLETE EN ACEMILA S/.
Capacidad de
Carga
Nmero de
Viajes
80
80
80
1
50
40
FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILA
FLETES TOTALES S/.
AFECTO IGV
1,001.09
1,001.09
SIN IGV
TOTAL DE FLETE
2,954.00
2,400.57
5,354.57
6,355.66
262.00
27.57
2,111.00
Flete no
Afecto a IGV
262.00
27.57
2,111.00
0.00
2,400.57
FONCODES / DEPI
:
:
:
:
PRISE HUATA
RESERVORIO Y CANAL COTOPUIN
HUARAZ
1320050214
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
ETERNIT
CALAMINA
YESO
PINTURA, ASFALTO
PENDOLA
OTROS
UNIDAD
BL.
KG
P2
UN
UN
BL
GAL
UND
KG
PESO TOTAL
PESO.TOTAL
13,897.50
30.21
719.25
30.42
300.00
14,977.38
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA Y GRAVA
M3
PIEDRA
M3
HORMIGN
M3
MADERA
P2
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
0.18
52.47
0.00
52.65
10.00
5.27
5.27
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
No VIAJES
Tub de 3/4
5,040.00
U
0.00
0.00
0.00
Tub, 1"
3,360.00
U
0.00
0.00
0.00
Tub,1 1/2"
1,690.00
U
0.00
0.00
0.00
Tub 2:"
994.00
U
0.00
0.00
0.00
Tub, 3"
470.00
U
0.00
0.00
0.00
Tub 4":
259.00
U
0.00
0.00
0.00
Tub 6:" U-PVC
110.00
U
0.00
0.00
0.00
Tub 8" U-PVC
65.00
U
0.00
0.00
0.00
Tub 6'; CSN
160.00
U
0.00
0.00
0.00
Tub 8'; CSN
80.00
U
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
2- FLETE TERRESTRE
HUARAZ - HUATA
AFECTO IGV
898.64
AGREGADOS
TUBERIA
COSTO TOTAL FLETE TERR.
SIN IGV
10.00
600.00
10,000.00
60.00
3,162.00
898.64
3,162.00
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Piedra
costo por m3
0.00
Unidades de
Carga
Peso total tubera de agua
2
Peso total tubera desague CSN
2
Peso total tubera desague PVC
2
Numero bolsas de cemento
327.00
1
Peso resto de materiales
1,079.88
1
Agregados Total en Kilos
105,300.00
1
Piedra zona aledaa
0.00
COSTO TOTAL DEL FLETE EN ACEMILA S/.
Capacidad de
Carga
Nmero de
Viajes
80
80
80
1
50
40
FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILA
FLETES TOTALES S/.
AFECTO IGV
898.64
898.64
SIN IGV
TOTAL DE FLETE
3,162.00
3,162.00
4,060.64
327.00
21.60
2,632.50
Flete no
Afecto a IGV
0.00
0.00
0.00
0.00
FONCODES / DEPI
:
:
:
:
PRISE HUATA
CANAL LUCMA
HUARAZ
1320050214
1- DATOS GENERALES
A-POR PESO
MATERIALES
CEMENTO
FIERRO, CLAV. ETC
MADERA
ETERNIT
CALAMINA
YESO
PINTURA, ASFALTO
PENDOLA
OTROS
UNIDAD
BL.
KG
P2
UN
UN
BL
GAL
UND
KG
PESO TOTAL
PESO.TOTAL
8,840.00
23.76
665.28
42.12
300.00
9,871.16
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA Y GRAVA
M3
PIEDRA
M3
HORMIGN
M3
MADERA
P2
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTOS IGV
SIN IGV
0.14
33.53
0.00
33.67
10.00
3.37
3.37
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
No VIAJES
Tub de 3/4
5,040.00
U
0.00
0.00
0.00
Tub, 1"
3,360.00
U
0.00
0.00
0.00
Tub,1 1/2"
1,690.00
U
0.00
0.00
0.00
Tub 2:"
994.00
U
0.00
0.00
0.00
Tub, 3"
470.00
U
0.00
0.00
0.00
Tub 4":
259.00
U
0.00
0.00
0.00
Tub 6:" U-PVC
110.00
U
0.00
0.00
0.00
Tub 8" U-PVC
65.00
U
0.00
0.00
0.00
Tub 6'; CSN
160.00
U
0.00
0.00
0.00
Tub 8'; CSN
80.00
U
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
2- FLETE TERRESTRE
HUARAZ - HUATA
AFECTO IGV
592.27
AGREGADOS
TUBERIA
COSTO TOTAL FLETE TERR.
SIN IGV
10.00
500.00
10,000.00
50.00
1,685.00
592.27
1,685.00
4- FLETE EN ACEMILA
La tubera ser transportada por peones
Piedra
costo por m3
0.00
Unidades de
Carga
Peso total tubera de agua
2
Peso total tubera desague CSN
2
Peso total tubera desague PVC
2
Numero bolsas de cemento
208.00
1
Peso resto de materiales
1,031.16
1
Agregados Total en Kilos
67,340.00
1
Piedra zona aledaa
0.00
COSTO TOTAL DEL FLETE EN ACEMILA S/.
Capacidad de
Carga
Nmero de
Viajes
80
80
80
1
50
40
FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILA
FLETES TOTALES S/.
AFECTO IGV
592.27
592.27
SIN IGV
TOTAL DE FLETE
1,685.00
2,868.18
4,553.18
5,145.45
208.00
20.62
1,683.50
Flete no
Afecto a IGV
312.00
30.93
2,525.25
0.00
2,868.18