ITEM
01
01.01
01.02
01.03
02
02.01
02.01.01
02.02
02.02.01
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
03
03.01
03.02
03.03
03.04
03.05
03.06
04
04.01
04.02
04.03
04.04
04.05
04.06
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.04
05.04.01
DESCRIPCION
OBRAS PROVISIONALES
CARTEL DE OBRA
CAMPAMENTO PROVISIONAL PARA LA OBRA
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
CAPTACIN TIPO BARRAJE
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
CONCRETO SIMPLE
CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P.G.
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS NORMAL
CONCRETO ARMADO
CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS NORMAL
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
CARPINTERIA METLICA
COMPUERTA TIPO VOLANTE 0.45x.25 M
ALCANTARILLAS DE TUBERIA HDPE 14"
TRAZO, NIVEL Y REPLANTEO DE OBRA
EXCAVACIN MANUAL EN TERRENO ROCA SUELTA (huayco)
CAMA DE APOYO
CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P.G.
TERMOFUSIN DE TUBERIA HDPE 14"
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS NORMAL
CANAL DE CONDUCCIN DE CONCRETO (EXISTENTE)
LIMPIEZA DE TUNEL ARENADO
MURO EMBOQUILLADO DE PIEDRA CON MORTERO C:H 1:8
CORTE EN ROCA FIJA C/ EQUIPO PARA PLATAFORMA DE CANAL
REPARACIN DE PAREDES LATERALES DEL CANAL
ENCOFRADO DE PAREDES LATERALES DEL CANAL EXISTENTE
DESARENADO DE CANAL DE CONCRETO EXISTENTE Hprom.= 0.20 M
CANAL DE CONDUCCIN DE CONCRETO L= 325.00 ML (NUEVO)
OBRAS PRELIMINARES
TRAZO, NIVEL Y REPLANTEO DE OBRA
DESQUINCHE Y REFINE DE TALUDES EN MAT. SUELTO H prom. =
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
REFINE Y NIVELACION EN TERRENO NORMAL
BASE DE AFIRMADO H=0.10 m
CONCRETO SIMPLE
CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL
JUNTAS
JUNTAS ASFALTICAS
UND
METRADO
PRECIO
S/.
und
glb
glb
1.00
1.00
1.00
1,196.32
1,723.88
2,686.50
m2
8.25
1.83
m3
6.60
33.15
m3
m2
9.21
7.70
236.82
44.47
m3
m2
kg
0.60
3.95
36.72
361.32
44.47
4.72
und
1.00
769.71
m2
m3
m
m3
pto
m2
50.00
75.00
50.00
25.52
6.00
80.00
2.23
33.15
7.80
236.82
175.88
44.47
m3
m3
m3
m3
m2
m3
44.00
18.40
89.50
28.40
296.30
25.65
56.23
131.08
96.64
361.32
30.21
33.15
m2
m
211.25
325.00
2.23
1.32
m3
m2
m2
48.75
568.75
211.25
33.15
3.98
11.67
m3
m2
47.13
585.00
361.32
30.21
94.25
4.67
PARCIAL S/.
5,606.70
1,196.32
1,723.88
2,686.50
4,092.90
15.10
218.79
2,181.11
342.42
216.79
175.66
173.32
769.71
13,644.28
111.50
2,486.25
390.00
6,043.65
1,055.28
3,557.60
33,598.28
2,474.12
2,411.87
8,649.28
10,261.49
8,951.22
850.30
42,387.08
471.09
429.00
1,616.06
2,263.63
2,465.29
17,029.01
17,672.85
440.15
CORRESPONDIENTE AL PERIDO
VALORIZ. ANTERIOR
METRADO
COSTO
VALORIZ. ACTUAL
%
DE:
12/23/2013
HASTA:
1/10/2014
VALORIZ. ACUMULADO
SALDO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
1.00
0.50
0.50
1,196.32
861.94
1,343.25
100.00%
50.00%
50.00%
1.00
0.50
0.50
1,196.32
861.94
1,343.25
100.00%
50.00%
50.00%
0.50
0.50
861.94
1,343.25
50.00%
50.00%
8.25
15.10
100.00%
6.60
218.79
100.00%
9.21
7.70
2,181.11
342.42
100.00%
100.00%
0.60
3.95
36.72
216.79
175.66
173.32
100.00%
100.00%
100.00%
1.00
769.71
100.00%
50.00
75.00
50.00
25.52
6.00
80.00
111.50
2,486.25
390.00
6,043.65
1,055.28
3,557.60
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
44.00
2,474.12
100.00%
89.50
4.41
59.00
25.65
8,649.28
1,593.42
1,782.39
850.30
100.00%
15.53%
19.91%
100.00%
30.45
378.00
11,002.19
11,419.38
64.61%
64.62%
94.25
440.15
100.00%
18.40
2,411.87
100.00%
18.40
2,411.87
100.00%
23.99
237.30
8,668.07
7,168.83
84.47%
80.09%
23.99
237.30
8,668.07
7,168.83
84.47%
80.09%
211.25
325.00
471.09
429.00
100.00%
100.00%
211.25
325.00
471.09
429.00
100.00%
100.00%
48.75
568.75
211.25
1,616.06
2,263.63
2,465.29
100.00%
100.00%
100.00%
48.75
568.75
211.25
1,616.06
2,263.63
2,465.29
100.00%
100.00%
100.00%
16.68
207.00
6,026.82
6,253.47
35.39%
35.38%
16.68
207.00
6,026.82
6,253.47
35.39%
35.38%
VALORIZACIN DE OBRA N 01
(DEL 23 DE DICIEMBRE DEL 2013 AL 10 DE ENERO DEL 2014)
: "MEJORAMIENTO Y REHABILITACIN DEL SISTEMA DE RIEGO DEL CANAL SAN JUAN, DISTRITO DE TAMBO - HUAYTAR - HUANCAVELICA"
: HUANCAVELICA - HUAYTARA - TAMBO.
MODALIDAD : SUMA ALZADA
EJECUTA
: ING. TOROBIO ARMANDO CACERES GUTIERREZ
SUPERVISOR : ING. RONALD CHAUCA HUAMAN
MONTO
: S/. 239,000.00
OBRA
UBICACIN
06
ITEM
06.01
06.02
06.03
06.04
07
07.01
07.01.01
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.03
07.03.01
07.04
07.04.01
08
08.01
08.02
09
09.01
09.02
09.03
09.04
09.05
UND
und
und
m
und
METRADO
128.00
185.00
90.00
4.00
PRECIO
95.99
S/.
112.29
8.17
209.30
m3
8.78
93.47
m3
m3
m2
m2
20.19
6.40
11.75
6.40
361.32
361.32
44.47
44.47
m2
45.98
23.13
und
41.00
52.35
glb
glb
1.00
1.00
13,992.29
22,861.65
m2
glb
glb
m2
und
36.00
1.00
1.00
150.00
1.00
25.00
845.37
1,500.00
13.81
150.00
COSTO DIRECTO
34,632.87
12,286.72
20,773.65
735.30
837.20
14,445.17
820.67
7,295.05
2,312.45
522.52
284.61
1,063.52
2,146.35
36,853.94
13,992.29
22,861.65
5,466.87
900.00
845.37
1,500.00
2,071.50
150.00
PARCIAL S/.
CORRESPONDIENTE AL PERIDO
VALORIZ. ANTERIOR
75.00
75.00
0.50
0.25
VALORIZ. ACTUAL
58.59%
7,199.25
40.54%
8,421.75
6,996.15
5,715.41
50.00%
25.00%
12/23/2013
HASTA:
1/10/2014
VALORIZ. ACUMULADO
58.59%
75.00
7,199.25
40.54%
75.00
8,421.75
0.50
0.25
6,996.15
5,715.41
50.00%
25.00%
SALDO
5,087.47
12,351.90
735.30
837.20
41.41%
59.46%
100.00%
100.00%
8.78
820.67
100.00%
20.19
6.40
11.75
6.40
7,295.05
2,312.45
522.52
284.61
100.00%
100.00%
100.00%
100.00%
45.98
1,063.52
100.00%
41.00
2,146.35
100.00%
0.50
0.75
6,996.15
17,146.24
50.00%
75.00%
36.00
1.00
1.00
150.00
1.00
900.00
845.37
1,500.00
2,071.50
150.00
100.00%
100.00%
100.00%
100.00%
100.00%
63.56%
190,728.09
69,508.20
69,508.20
121,219.90
9%
17,165.53
6,255.74
6,255.74
10,909.79
UTILIDADES (5.00%)
5%
9,536.40
3,475.41
3,475.41
6,061.00
217,430.02
79,239.35
79,239.35
138,190.69
87,100.23
87,100.23
151,899.79
36.44%
53.00
110.00
90.00
4.00
36.44%
DE:
1.09920
239,000.00
___________________________________________
36.44%
____________________________________
ING. RONALD CHAUCA HUAMAN
INGENIERO CIVIL
CIP. N 88663
SUPERVISOR DE OBRA
36.44%
63.56%
12/16/2013
1/30/2014
45