Está en la página 1de 38

: Diciembre 2011

CODIGO NOMBRE U.M. VALOR


001 ANLISIS AUXILIARES
001.1 ACTIVIDADES DE CONSERVACION
4,607
CONSTRUCCION DE CAMINO CON SUBBASE GRANULAR TIPO C
SBG-C e=0.30MT
M2 41,322.35
4,609
CONSTRUCCION DE CAMINO CON SUBBASE GRANULAR TIPO C
SBG-C e=0.30MTINCLUYE TRANSPORTE Y DISPOSICION DE
ESCOMBRO Y TRATAMIE
M2 74,393.10
4,603 CONSTRUCCION DE CAMINO EN GRAVA M2 681.87
4,604
DESCAPOTE A MAQUINA EN MATERIAL COMUN (e=0.1m. Incluye
Cargue). INCLUYE DISPOSICION FINAL DE ESCOMBROS
M2 2,786.49
4,610
MANTENIMIENTO CORRECTIVO DE CICLORUTAS
(SOBRECARPETA: RODADURA ASFLTICA e=0.04m)
M2 27,295.33
4,602 RECONSTRUCCION TRATAMIENTO SUPERFICIAL DOBLE M2 71,654.13
4,608
REHABILITACION DE CAMINO CON SUBBASE GRANULAR TIPO C
SBG-C e=0.30MT
M2 20,661.18
4,598 SELLO DE GRIETAS ML 6,818.54
4,601 SOBRECARPETA: RODADURA ASFLTICA e=0.05m M2 28,887.48
4,606 SUMINISTRO E INSTALACION DE TRITURADO 3/4" e=0.1M M2 13,405.68
4,600 TRATAMIENTO SUPERFICIAL DOBLE M2 62,116.58
4,599 TRATAMIENTO SUPERFICIAL SIMPLE M2 32,553.35
001.01 CUADRILLAS (INCLUYE FACTOR PRESTACI
4,478 CUADRILLA (2 AYUDANTES) J R 67,939.77
4,479 CUADRILLA (2 AYUDANTES) HR 8,492.47
4,286 CUADRILLA (3 OFICIALES +6 AYUDANTES) J R 351,294.49
4,393 CUADRILLA (3 OFICIALES +6 AYUDANTES) HR 43,911.84
4,274 CUADRILLA (OFICIAL +2 AYUDANTES) J R 117,098.16
4,279 CUADRILLA (OFICIAL +2 AYUDANTES) HR 14,637.28
4,287 CUADRILLA (OFICIAL +3 AYUDANTES) HR 18,883.52
4,288 CUADRILLA (OFICIAL +3 AYUDANTES) J R 151,068.05
4,284 CUADRILLA (OFICIAL +4 AYUDANTES) HR 23,129.75
4,285 CUADRILLA (OFICIAL +4 AYUDANTES) J R 185,037.94
3,770 CUADRILLA (OFICIAL +6 AYUDANTES) J R 252,977.71
4,392 CUADRILLA (OFICIAL +6 AYUDANTES) HR 31,622.23
4,273 CUADRILLA (OFICIAL +AYUDANTE) J R 83,128.28
4,278 CUADRILLA (OFICIAL +AYUDANTE) HR 10,391.05
LISTADO DE PRECIOS DE REFERENCIA DE ACTIVIDADES DE OBRA FEBRERO 2012
NOTA IMPORTANTE
Fecha Actualizacin: Febrero 2012
EL USO DE LA INFORMACIN PUBLICADA COMPROMETE NICAMENTE LA RESPONSABILIDAD DE QUIEN LA
CONSULTA. EL INTERESADO EST EN LA OBLIGACIN DE VERIFICARLA CASO POR CASO YA QUE EL ALCANCE
DE LA ACTIVIDAD PUEDE NO COINCIDIR CON SU NECESIDAD TCNICA PARTICULAR.
REFERENCIA DE ACTIVIDADES DE OBRA
CODIGO NOMBRE U.M. VALOR
4,283 CUADRILLA (TECNICO ELECTRICO +2 AYUDANTES) J R 124,689.58
4,277 CUADRILLA (TECNICO ELECTRICO +AYUDANTE) J R 90,719.70
4,282 CUADRILLA (TECNICO ELECTRICO +AYUDANTE) HR 11,339.97
4,276 CUADRILLA (TUBERO +2 AYUDANTES) J R 124,689.58
4,281 CUADRILLA (TUBERO +2 AYUDANTES) HR 15,586.20
4,275 CUADRILLA (TUBERO +AYUDANTE) J R 90,719.70
4,280 CUADRILLA (TUBERO +AYUDANTE) HR 11,339.97
001.02 CONCRETOS Y MORTEROS HECHOS EN OBRA
4,559
CONCRETO 1500 PSI (Hecho en Obra 1:3:5 con arena y gravilla de
ro)
M3 266,069.18
3,650
CONCRETO 1500 PSI (Hecho en Obra) 1:3:5 con arena de ro y
triturado de 3/4")
M3 260,733.18
3,468
CONCRETO 2000 PSI (Hecho en Obra 1:3:3 con arena de ro y
triturado de 3/4")
M3 299,337.53
4,564 CONCRETO 2000 PSI (Hecho en Obra 1:3:3 con material de ro) M3 303,484.53
3,649
CONCRETO 2500 PSI (Hecho en Obra con arena de ro y triturado de
3/4")
M3 288,274.47
4,560 CONCRETO 2500 PSI (Hecho en Obra con material de ro) M3 293,784.47
3,465
CONCRETO 3000 PSI (Hecho en Obra 1:2:2 con arena de ro y
triturado de 3/4")
M3 349,907.82
4,561 CONCRETO 3000 PSI (Hecho en Obra 1:2:2 con material de ro) M3 353,793.82
3,467
CONCRETO 3500 PSI (Hecho en Obra con arena de ro y triturado de
3/4")
M3 349,741.76
4,565 CONCRETO 3500 PSI (Hecho en Obra con material de ro) M3 353,627.76
3,466
CONCRETO 4000 PSI (Hecho en Obra con arena de ro y triturado de
3/4")
M3 361,741.76
4,566 CONCRETO 4000 PSI (Hecho en Obra con material de ro) M3 365,627.76
3,910 CONCRETO 4000 PSI IMPERMEABILIZADO (Hecho en Obra) M3 440,824.76
3,477 MORTERO 1:2 (Hecho en Obra) M3 361,749.57
3,476 MORTERO 1:3 (Hecho en Obra) M3 285,305.17
4,261 MORTERO 1:3 IMPERMEABILIZADO (Hecho en Obra) M3 422,382.37
3,475 MORTERO 1:4 (Hecho en Obra) M3 247,435.52
4,111 MORTERO 1:4 IMPERMEABILIZADO (Hecho en Obra) M3 358,151.72
3,874 MORTERO 1:5 (Hecho en Obra) M3 219,895.72
001.03 OTROS
4,431 PAETE LISO MURO 1:3 (No incluye andamio) M2 15,486.87
4,391
ARENA LAVADA DE PEA PARA EMBOQUILLADO (Incluye
Suministro, barrido para sellado de juntas y Compactacin)
M3 81,298.83
4,340 INSTALACIN DUCTO DE PVC TIPOS DB O TDP 4" A 6" ML 2,299.79
3,819
PINTURA EN ESMALTE URETANO GRIS (e=1mil. Inc. Sumin. y Aplic.
No Inc. Imprimante, Barrera, Esmalte Epxico o Similares)
ML 2,235.86
4,592 RETIRO DE ADOQUIN SOBRE ARENA M2 1,087.42
4,581 RETIRO DE ADOQUIN SOBRE MORTERO M2 1,576.31
4,703 RETIRO DE LOSETA A-50 SOBRE ARENA M2 2,209.31
4,704 RETIRO DE LOSETA A-50 SOBRE MORTERO M2 2,292.75
002 EXCAVACIONES
002.01 EXC. CONFORMACION DE SUBRASANTE
CODIGO NOMBRE U.M. VALOR
3,378
DESCAPOTE A MANO EN MATERIAL COMUN (e=0.1m. Incluye
Cargue)
M2 1,762.57
4,154
DESCAPOTE A MAQUINA EN MATERIAL COMUN (e=0.1m. Incluye
Cargue)
M2 578.89
3,464 EXCAVACION MANUAL EN MATERIAL COMUN M3 20,119.53
4,390
EXCAVACIN MANUAL EN MATERIAL COMN (INCL CARGUE,
TRANSPORTE Y DISPOSICION FINAL)
M3 42,195.57
3,710 EXCAVACION MECANICA EN MATERIAL COMUN (Incluye Cargue) M3 3,794.45
4,155 EXCAVACION MECANICA EN ROCA (Incluye Cargue) M3 56,475.01
3,007 REPLANTEO GENERAL M2 402.79
002.02 EXC. ESTRUCTURAS Y REDES
3,009
EXCAVACION MANUAL PARA REDES PROFUNDIDAD 0m - 2m
(Incluye Cargue)
M3 20,119.53
4,266
EXCAVACION MANUAL PARA REDES PROFUNDIDAD 2m - 3.50m
(Incluye Cargue)
M3 25,938.52
4,262
EXCAVACION MECANICA PARA REDES PROFUNDIDAD 0m - 3.5m
(Incluye Cargue)
M3 3,794.45
003 DEMOLICIONES
003.01 DEMOLICIONES
3,486 DEMOLICION CONCRETO ESTRUCTURAL (Incluye Cargue) M3 113,039.38
3,011 DEMOLICION MANUAL SARDINEL EXISTENTE (Incluye Cargue) ML 2,988.34
4,289 DEMOLICIN MUROS e=0.15m (Incluye cargue) M2 12,709.82
4,290 DEMOLICIN MUROS e=0.25m (Incluye cargue) M2 17,733.33
3,021
DEMOLICION PAVIMENTO ASFALTICO (Espesor Variable. Incluye
Cargue)
M2 4,204.24
3,010 DEMOLICION PAVIMENTO ASFALTICO (Incluye Cargue) M3 21,857.23
3,012
DEMOLICION PISOS DE CONCRETO (Espesor variable. Incluye
Cargue)
M2 4,417.83
3,022 DEMOLICION PISOS DE CONCRETO (incluye cargue) M3 33,371.30
004 RELLENOS Y CAPAS GRANULARES
004.01 CAPAS GRANULARES
3,006
BASE GRANULAR 14 IDU (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 26,320.68
3,674
BASE GRANULAR 14 IDU-Cal 10% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 162,182.08
3,672
BASE GRANULAR 14 IDU-Cal 5% (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 94,322.08
3,673
BASE GRANULAR 14 IDU-Cal 7% (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 121,466.08
3,701
BASE GRANULAR 14 IDU-Cemento 3% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 51,302.08
3,681
BASE GRANULAR 14 IDU-Cemento 5% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 67,862.08
3,682
BASE GRANULAR 14 IDU-Cemento 7% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 84,422.08
CODIGO NOMBRE U.M. VALOR
3,683
BASE GRANULAR 14 IDU-Cemento 9% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 100,982.08
3,677
BASE GRANULAR 14 IDU-Ceniza 10% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 55,262.08
3,675
BASE GRANULAR 14 IDU-Ceniza 5% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 40,862.08
3,676
BASE GRANULAR 14 IDU-Ceniza 7% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 46,622.08
3,441
BASE GRANULAR 14 IDU-Emulsin CRL-1 5% (Suministro,
Extendido, Nivelacin, Humedecimiento y Compactacin)
M3 192,922.08
3,689
BASE GRANULAR B-600 (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 62,570.68
4,140
BASE GRANULAR BG-1 INVIAS (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 117,670.68
4,487
BASE GRANULAR CLASE A (BG_A) (Suministro, Extendido Manual,
Humedecimiento y Compactacin)
M3 127,794.37
4,158
BASE GRANULAR CLASE A (BG_A) (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 122,020.68
4,488
BASE GRANULAR CLASE B (BG_B) (Suministro, Extendido Manual,
Humedecimiento y Compactacin)
M3 127,794.37
4,157
BASE GRANULAR CLASE B (BG_B) (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 122,020.68
4,513
BASE GRANULAR CLASE C (BG_C) (Suministro, Extendido Manual,
Humedecimiento y Compactacin)
M3 111,844.37
4,156
BASE GRANULAR CLASE C (BG_C) (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 106,070.68
3,454
ESTABILIZACIN DE SUBRASANTE CON RAJ ON (Suministro,
Extendido, Nivelacin y Compactacin)
M3 51,685.00
3,800 NIVELACION Y COMPACTACIN DE SUBRASANTE M2 681.87
3,005
SUBBASE GRANULAR 13A IDU (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 26,320.68
3,668
SUBBASE GRANULAR 13A IDU-Cal 3% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 67,178.08
3,666 SUBBASE GRANULAR 13A IDU-Cal 5% (Suministro, Extendido, Nive M3 94,322.08
3,398
SUBBASE GRANULAR 13A IDU-Cal 7% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 121,466.08
3,667
SUBBASE GRANULAR 13A IDU-Cal 9% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 148,610.08
3,678
SUBBASE GRANULAR 13A IDU-Cemento 3% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 51,302.08
3,399
SUBBASE GRANULAR 13A IDU-Cemento 5% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 67,862.08
3,679
SUBBASE GRANULAR 13A IDU-Cemento 7% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 84,422.08
3,680
SUBBASE GRANULAR 13A IDU-Cemento 9% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 100,982.08
3,669
SUBBASE GRANULAR 13A IDU-Ceniza 5% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 40,862.08
3,670
SUBBASE GRANULAR 13A IDU-Ceniza 7% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 46,622.08
3,671
SUBBASE GRANULAR 13A IDU-Ceniza 9% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 52,382.08
3,443
SUBBASE GRANULAR B-200 (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 40,820.68
4,477
SUBBASE GRANULAR B-400 (Suministro, Extendido, Nivelacin,
Humedecimiento y Compactacin)
M3 45,170.68
4,556
SUBBASE GRANULAR CLASE A (SBG_A) (Suministro, Extendido
Manual, Humedecimiento y Compactacin)
M3 121,994.37
4,161
SUBBASE GRANULAR CLASE A (SBG_A) (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 116,220.68
CODIGO NOMBRE U.M. VALOR
4,489
SUBBASE GRANULAR CLASE B (SBG_B) (Suministro, Extendido
Manual, Humedecimiento y Compactacin)
M3 121,994.37
4,160
SUBBASE GRANULAR CLASE B (SBG_B) (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 116,220.68
4,557
SUBBASE GRANULAR CLASE C (SBG_C) (Suministro, Extendido
Manual, Humedecimiento y Compactacin)
M3 117,644.37
4,159
SUBBASE GRANULAR CLASE C (SBG_C) (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 111,870.68
4,162
SUBBASE GRANULAR EN RECEBO-Cal 3% (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 74,428.08
4,142
SUBBASE GRANULAR SBG-1 INVIAS (Suministro, Extendido,
Nivelacin, Humedecimiento y Compactacin)
M3 111,870.68
004.02 RELLENOS PARA ANDENES Y REDES
4,476
RELLENO PARA ANDENES EN SUBBASE GRANULAR 13A IDU
(Suministro, Extendido, Humedecimiento y Compactacin)
M3 32,094.37
4,563
RELLENO PARA ANDENES EN SUBBASE GRANULAR B-200
(Suministro, Extendido, Humedecimiento y Compactacin)
M3 46,594.37
3,851
RELLENO PARA ANDENES EN SUBBASE GRANULAR B-400
(Suministro, Extendido, Humedecimiento y Compactacin)
M3 50,944.37
4,562
RELLENO PARA ANDENES EN SUBBASE GRANULAR B-600
(Suministro, Extendido, Humedecimiento y Compactacin)
M3 68,344.37
3,024
RELLENO PARA REDES EN ARENA DE PEA (Suministro,
Extendido, Humedecimiento y Compactacin)
M3 73,436.77
3,846
RELLENO PARA REDES EN BASE GRANULAR 14 IDU (Suministro,
Extendido, Humedecimiento y Compactacin)
M3 36,317.14
3,847
RELLENO PARA REDES EN BASE GRANULAR B-600 (Suministro,
Extendido, Humedecimiento y Compactacin)
M3 72,567.14
3,478
RELLENO PARA REDES EN GRAVILLA 1/2" (Suministro, Extendido
y Compactacin)
M3 84,707.67
3,050
RELLENO PARA REDES EN MATERIAL SELECCIONADO
PROVENIENTE DE LA EXCAVACIN (Extendido, Humedecimiento y
Compactacin)
M3 18,125.89
3,848
RELLENO PARA REDES EN SUBBASE GRANULAR 13A IDU
(Suministro, Extendido, Humedecimiento y Compactacin)
M3 36,317.14
3,052
RELLENO PARA REDES EN SUBBASE GRANULAR B-200
(Suministro, Extendido, Humedecimiento y Compactacin)
M3 50,817.14
3,436
RELLENO PARA REDES EN SUBBASE GRANULAR B-400
(Suministro, Extendido, Humedecimiento y Compactacin)
M3 55,167.14
004.03 RELLENOS EN TIERRA
3,018
RELLENO EN TIERRA NEGRA PARA EMPRADIZACION (Suministro
y Extendido)
M3 56,232.71
005 PAVIMENTOS
005.01 PAVIMENTOS EN CONCRETO ASFALTICO
4,195 AGREGADO PTREO DE PROTECCIN. (Suministro y Extendido) M2 334.23
3,754
FRESADO PAVIMENTO ASFALTICO Profundidad de Fresado 0 - 18
cm. (Incluye Cargue)
M2 2,725.67
3,864
IMPRIMACION CON EMULSION ASFALTICA CRL-0 (Suministro,
Barrido Superficie y Riego)
M2 2,429.97
4,486
MEZCLA ASFALTICA EN CALIENTE TIPO DENSO MD10 ASF
CONVENCIONAL (Suministro, Extendido y Nivelacin Manual y
Compactacin)
M3 505,098.61
CODIGO NOMBRE U.M. VALOR
4,207
MEZCLA ASFALTICA EN CALIENTE TIPO DENSO MD10 ASFALTO
CONVENCIONAL (Suministro, Extendido, Nivelacin y Compactacin)
M3 496,562.23
4,567
MEZCLA ASFALTICA EN CALIENTE TIPO DENSO MD12 ASF
CONVENCIONAL (Suministro, Extendido y Nivelacin Manual y
Compactacin)
M3 569,973.30
4,203
MEZCLA ASFALTICA EN CALIENTE TIPO DENSO MD12 ASFALTO
CONVENCIONAL (Suministro, Extendido, Nivelacin y Compactacin)
M3 530,838.48
4,485
MEZCLA ASFALTICA EN CALIENTE TIPO DENSO MD20 ASF
CONVENCIONAL (Suministro, Extendido y Nivelacin Manual y
Compactacin)
M3 558,792.05
4,200
MEZCLA ASFALTICA EN CALIENTE TIPO DENSO MD20 ASFALTO
CONVENCIONAL (Suministro, Extendido, Nivelacin y Compactacin)
M3 519,657.23
4,480
MEZCLA DENSA EN CALIENTE MDC-1 AMP Tipo II (Suministro,
Extendido, Nivelacin y Compactacin)
M3 475,709.73
3,841
MEZCLA DENSA EN CALIENTE MDC-1 Asfalto 80-100 (Suministro,
Extendido, Nivelacin y Compactacin)
M3 509,367.23
3,856
MEZCLA DENSA EN CALIENTE MDC-2 AMP Tipo II (Suministro,
Extendido, Nivelacin y Compactacin)
M3 487,607.23
4,568
MEZCLA DENSA EN CALIENTE MDC-2 Asfalto 80-100 (Suministro,
Extendido y Nivelacin Manual y Compactacin)
M3 563,074.55
4,255
MEZCLA DENSA EN CALIENTE MDC-2 Asfalto 80-100 (Suministro,
Extendido, Nivelacin y Compactacin)
M3 523,939.73
3,859
MEZCLA DENSA EN CALIENTE MDC-3 AMP Tipo II (Suministro,
Extendido, Nivelacin y Compactacin)
M3 516,108.48
4,256
MEZCLA DENSA EN CALIENTE MDC-3 Asfalto 80-100 (Suministro,
Extendido, Nivelacin y Compactacin)
M3 551,260.98
4,194
PAVIMENTO ASF. RECICLADO-Cemento 3% (Inc. Sum, Recic,
Humed, Ext, Nivel y Compact. No Inc Agregados de Adicin)
M3 217,092.81
4,193
PAVIMENTO ASF. RECICLADO-Cemento 5% (Inc. Sum, Recic,
Humed, Ext, Nivel y Compact. No Inc Agregados de Adicin)
M3 233,652.81
4,191
PAVIMENTO ASF. RECICLADO-Emulsin CRL-1 3% (Inc. Sum,
Recic, Humed, Ext, Nivel y Compact. No Inc Agregados de Adicin)
M3 114,949.35
4,189
PAVIMENTO ASF. RECICLADO-Emulsin CRL-1 5% (Inc. Sum,
Recic, Humed, Ext, Nivel y Compact. No Inc Agregados de Adicin)
M3 191,520.95
4,552 PAVIMENTO CICLO-RUTA EN RODADURA ASFALTICA 5CM M2 48,777.19
3,866
RIEGO DE LIGA CON EMULSION ASFALTICA CRR-1 (Suministro,
Barrido Superficie y Riego)
M2 1,942.77
3,867
RIEGO DE LIGA CON EMULSION ASFALTICA CRR-2 (Suministro,
Barrido Superficie y Riego)
M2 2,175.93
4,197
RIEGO DE LIGA CON EMULSION MODIFICADA CON POLIMEROS
CRR-1m (Suministro, Barrido Superficie y Riego)
M2 2,130.69
4,198
RIEGO DE LIGA CON EMULSION MODIFICADA CON POLIMEROS
CRR-2m (Suministro, Barrido Superficie y Riego)
M2 2,175.93
005.02 PAVIMENTOS EN CONCRETO HIDRAULICO
3,806 CURADO DE LOSAS DE CONCRETO (Suministro y Aplicacin) M2 1,354.46
4,230
LOSA DE CONCRETO MR36 (Suministro, Formaleteado, Colocacin y
Acabado. No Incluye Acero, Curado, J untas)
M3 462,472.45
4,229
LOSA DE CONCRETO MR39 (Suministro, Formaleteado, Colocacin y
Acabado. No Incluye Acero, Curado, J untas)
M3 469,780.45
3,394
LOSA DE CONCRETO MR41 (Suministro, Formaleteado, Colocacin y
Acabado. No Incluye Acero, Curado, J untas)
M3 480,742.45
3,204
LOSA DE CONCRETO MR43 (Suministro, Formaleteado, Colocacin y
Acabado. No Incluye Acero, Curado, J untas)
M3 492,922.45
CODIGO NOMBRE U.M. VALOR
3,748
LOSA DE CONCRETO MR45 (Suministro, Formaleteado, Colocacin y
Acabado. No Incluye Acero, Curado, J untas)
M3 507,538.45
3,749
LOSA DE CONCRETO MR50 (Suministro, Formaleteado, Colocacin y
Acabado. No Incluye Acero, Curado, J untas)
M3 553,822.45
4,555
LOSA DE PAVIMENTO EN CONCRETO HIDRAULICO MR50 CON
FORMALETA FIJ A, HIERROS DE TRANSFERENCIA, HIERROS DE
AMARRE, ADITIVOS
M3 588,511.00
005.03 J UNTAS PARA PAVIMENTOS
3,811 CORTE DE PAVIMENTO ML 3,076.80
4,239
CORTE Y AMPLIACIN DE J UNTA EN PAVIMENTO DE CONCRETO
HIDRAULICO
ML 4,311.80
3,837
SELLADO DE J UNTAS EN PAVIMENTO DE CONCRETO
HIDRAULICO (Incluye Limpieza, Suministro e Instalacin de Fondo y
Sellante)
ML 7,011.95
4,525
SELLADO DE J UNTAS EN PAVIMENTO FLEXIBLE (Incluye Limpieza,
Suministro e Instalacin de Fondo y Emulsin Asfltica CRR-1)
ML 4,637.66
005.04 PAVIMENTOS ARTICULADOS
4,396
ADOQUIN DE ARCILLA TR. LIVIANO 20x10x6cm (Suministro e
Instalacin. Incluye Base 4cm Arena Nivelacion y Arena de Sello)
M2 37,045.06
4,593
ADOQUIN DE ARCILLA TR. LIVIANO 20x10x6cm (Suministro e
Instalacin. Incluye Base 4cm mortero 2000 y Arena de Sello)
M2 50,791.06
4,061
ADOQUIN DE ARCILLA TR. PESADO 20x10x8cm (Suministro e
Instalacin. Incluye Base 4cm Arena Nivelacin y Arena de Sello)
M2 43,285.06
4,678
ADOQUIN DE ARCILLA TR.PESADO 0.20x10x8cm (Suministro e
Instalacin. Incluye Base 4cm mortero 2000 y Arena de Sello)
M2 57,031.06
4,137
ADOQUIN DE CONCRETO COLOR 20x10x8cm (Suministro e
Instalacin. Incluye Base 4cm Arena Nivelacin y Arena de Sello)
M2 62,161.06
4,395
ADOQUIN DE CONCRETO TR. LIVIANO 20x10x6cm (Suministro e
Instalacin. Incluye Base 4cm Arena Nivelacin y Arena de Sello)
M2 47,289.06
4,394
ADOQUIN DE CONCRETO TR. PESADO 20x10x8cm (Suministro e
Instalacin. Incluye Base 4cm Arena Nivelacin y Arena de Sello)
M2 58,157.06
006 ACERO DE REFUERZO
006.01 ACERO DE REFUERZO
3,708 ACERO DE REFUERZO (Incluye Suministro, Figurado y Fijacin) KG 2,796.68
4,236
MALLA ELECTROSOLDADA 0.15x0.15m, D=4mm, 4mm (Incluye
Suministro, Fijacin e Instalacin)
KG 3,125.94
4,232
MALLA ELECTROSOLDADA 0.15x0.15m, D=5mm, 5mm (Incluye
Suministro, Fijacin e Instalacin)
KG 3,125.94
4,233
MALLA ELECTROSOLDADA 0.15x0.15m, D=6mm, 6mm (Incluye
Suministro, Fijacin e Instalacin)
KG 3,125.94
4,234
MALLA ELECTROSOLDADA 0.15x0.15m, D=7mm, 7mm (Incluye
Suministro, Fijacin e Instalacin)
KG 3,125.94
4,235
MALLA ELECTROSOLDADA 0.15x0.15m, D=8mm, 8mm (Incluye
Suministro, Fijacin e Instalacin)
KG 3,125.94
CODIGO NOMBRE U.M. VALOR
4,237
MALLA ELECTROSOLDADA 0.20x0.20m, D=4mm, 4mm (Incluye
Suministro, Fijacin e Instalacin)
KG 3,125.94
4,238
MALLA ELECTROSOLDADA 0.25x0.25m, D=4mm, 4mm (Incluye
Suministro, Fijacin e Instalacin)
KG 3,125.94
007 SEALIZACION DE VIAS
007.01 DEMARCACION DE PAVIMENTOS
3,179
DEMARCACION LINEA CONTINUA A=0.12m (e=15 mils, Acrlica
Base Agua. Inc. Sumin. y Aplic. con Equipo. Incl. Microesferas)
ML 2,676.88
4,240
DEMARCACION LINEA CONTINUA A=0.12m
(e=2.3mm,Termoplstica. Inc. Suministro y Aplicacin con Equipo.
Incl. Microesferas)
ML 5,220.00
4,242
DEMARCACION LINEA CONTINUA A=0.15m
(e=2.3mm,Termoplstica. Inc. Suministro y Aplicacin con Equipo.
Incl. Microesferas)
ML 5,800.00
3,872
DEMARCACION LINEA DISCONTINUA A=0.12m (e=15 mils, Acrlica
Base Agua. Inc. Sumin. y Aplic. con Equipo. Inc Microesferas)
ML 2,676.88
4,241
DEMARCACION LINEA DISCONTINUA A=0.12m
(e=2.3mm,Termoplstica. Inc. Suministro y Aplicacin con Equipo.
Incl. Microesfera
ML 5,220.00
4,243
DEMARCACION LINEA DISCONTINUA A=0.15m
(e=2.3mm,Termoplstica. Inc. Suministro y Aplicacin con Equipo. Inc
Microesferas)
ML 5,800.00
3,178
DEMARCACION PASO PEATONAL-CEBRA (e=15 mils, Acrlica Base
Agua. Inc. Sumin. y Aplic. con Equipo. Incl. Microesferas)
M2 22,307.33
4,248
DEMARCACION PASO PEATONAL-CEBRA (e=2.3mm,Termoplstica.
Inc. Suministro y Aplicacin con Equipo. Inc Microesferas)
M2 33,060.00
3,180
DEMARCACION PASO PEATONAL-LINEA CONT. A=0.15m (e=15
mils, Acrlica B. Agua. Inc. Sum y Aplic. con Equipo. Inc Microesf.)
ML 3,346.10
4,249
DEMARCACION PASO PEATONAL-LINEA CONT. A=0.15m
(e=2.3mm,Termoplstica. Inc. Sumin. y Aplic. con Equipo. Inc
Microesferas)
ML 5,800.00
3,490
FLECHA DIRECCIONAL "A LA DERECHA" (e=15 mils, Acrlica Base
Agua. Inc. Sumin. y Aplic. con Equipo. Incl. Microesferas)
UN 33,684.07
4,244
FLECHA DIRECCIONAL "A LA DERECHA" (e=2.3mm,Termoplstica.
Inc. Suministro y Aplicacin con Equipo. Inc Microesferas)
UN 49,920.60
3,492
FLECHA DIRECCIONAL "DE FRENTE A LA DERECHA" (e=15 mils,
Acrlica Base Agua. Inc. Sumin. y Aplic. con Equipo. Incl. Micr
UN 48,629.98
4,245
FLECHA DIRECCIONAL "DE FRENTE A LA DERECHA"
(e=2.3mm,Termoplstica. Inc. Sumin. y Aplic. con Equipo. Inc.
Microesferas)
UN 72,070.80
3,491
FLECHA DIRECCIONAL "DE FRENTE" (e=15 mils, Acrlica Base
Agua. Inc. Sumin. y Aplic. con Equipo. Incl. Microesferas)
UN 26,768.80
4,246
FLECHA DIRECCIONAL "DE FRENTE" (e=2.3mm,Termoplstica. Inc.
Suministro y Aplicacin con Equipo. Inc Microesferas)
UN 39,672.00
3,871
PINTURA ACRILICA BASE AGUA (e=15mils. Incluye Suministro y
Aplicacin con Equipo. Incluye Microesferas)
M2 22,307.33
4,247
PINTURA TERMOPLASTICA (e=2.3mm. Incluye Suministro y
Aplicacin con Equipo. Incluye Microesferas)
M2 33,060.00
3,433
TACHA REFLECTIVA UNIDIRECCIONAL (Incluye Suministro e
Instalacin)
UN 8,123.27
3,434
TACHON EN CONCRETO L=0.40m Hi=0.15m, Hs=0.08m (Incluye
Suminitro e Instalacin)
UN 46,848.58
CODIGO NOMBRE U.M. VALOR
007.02 SEALES DE TRANSITO
3,688
DESMONTE Y REINSTALACION DE SEALES VIALES (Incluye
Dado de Anclaje)
UN 27,892.64
3,429 SEAL DOBLE DE CICLORUTA (Incluye Suministro e Instalacin) UN 346,494.94
3,430
SEAL VERTICAL GRUPO I (60x60cm) (Incluye Suministro e
Instalacin)
UN 224,694.94
3,431
SEAL VERTICAL GRUPO I (75x75cm) (Incluye Suministro e
Instalacin)
UN 264,714.94
3,432
SEAL VERTICAL GRUPO I (90x90cm) (Incluye Suministro e
Instalacin)
UN 363,894.94
4,569
SUMINISTRO E INSTALACION DE ESTOPEROLES DE 10 cm x 2.5
cm
UN 9,765.07
008 ANDENES Y SARDINELES
008.01 SARDINELES Y BORDILLOS
3,209
BORDE SEPARADOR VERDE TIPO A170 (Suministro e Instalacin.
Incluye 3cm Mortero 1:5)
ML 175,932.23
4,044
BORDE SEPARADOR VERDE TIPO A170 (Suministro e Instalacin.
Incluye 3cm Mortero 2000 PSI)
ML 177,186.75
4,046
BORDE SEPARADOR VERDE TIPO A170 (Suministro e Instalacin.
No Incluye material de base)
ML 173,359.45
4,047
BORDILLO PREFABRICADO A80 (Suministro e Instalacin. Incluye
3cm Mortero de Nivelacin 1:5)
ML 40,458.52
3,210
BORDILLO PREFABRICADO A80 (Suministro e Instalacin. Incluye
3cm Mortero de Nivelacin 2000 PSI)
ML 41,166.20
4,048
BORDILLO PREFABRICADO A80 (Suministro e Instalacin. No
Incluye material de base)
ML 39,007.21
3,751
CAUELA TIPO A120 (Suministro e Instalacin. Incluye 3cm Mortero
1:5)
ML 46,249.03
4,049
CAUELA TIPO A120 (Suministro e Instalacin. Incluye 3cm Mortero
2000 PSI)
ML 47,310.55
4,050
CAUELA TIPO A120 (Suministro e Instalacin. No Incluye material
de base)
ML 44,072.06
4,087
PIEZA REMATE A105 PARA RAMPA TIPO A (Suministro e
Instalacin. Incluye 3cm Mortero 1:5)
UN 60,862.59
4,085
PIEZA REMATE A105 PARA RAMPA TIPO A (Suministro e
Instalacin. Incluye 3cm Mortero 2000 PSI)
UN 62,009.89
4,086
PIEZA REMATE A105 PARA RAMPA TIPO A (Suministro e
Instalacin. No Incluye material de base)
UN 58,509.71
4,091 RAMPA TIPO A (B10) (Base en Mortero 2000 PSI, Desarrollo: 1 m. UN 605,698.66
3,621 RAMPA TIPO A B10 incluye Base en Mortero 1:5, Desarrollo: 1m. UN 604,913.81
4,547
RAMPA TIPO B (B12) LONGITUD=3.00m, DESARROLLO=0.40m.
(incluye material de base mortero 1:5 psi
UN 178,652.46
4,401
RAMPA TIPO B (B12) LONGITUD=3.00m, DESARROLLO=0.40m.
(incluye material de base mortero 2000 psi
UN 182,898.54
4,548
RAMPA TIPO B (B12) LONGITUD=3.00m, DESARROLLO=0.40m.
(no incluye material de base
UN 169,944.60
4,543
SARDINEL PREFABRICADO ALTO RAMPAS A86 (Suministro e
Instalacin. Incluye 3cm Mortero de Nivelacin 1:5)
ML 47,308.32
4,089
SARDINEL BAJ O A85 PARA RAMPAS (Suministro e Instalacin.
Incluye 3cm Mortero 1:5)
ML 50,093.77
CODIGO NOMBRE U.M. VALOR
4,088
SARDINEL BAJ O A85 PARA RAMPAS (Suministro e Instalacin.
Incluye 3cm Mortero 2000 PSI)
ML 50,801.45
4,090
SARDINEL BAJ O A85 PARA RAMPAS (Suministro e Instalacin. No
Incluye material de base)
ML 48,642.46
3,207
SARDINEL ESPECIAL A100 PARA RAMPA TIPO A (Suministro e
Instalacin. Incluye 3cm Mortero 1:5)
UN 40,812.47
4,052
SARDINEL ESPECIAL A100 PARA RAMPA TIPO A (Suministro e
Instalacin. Incluye 3cm Mortero 2000 PSI)
UN 41,241.37
4,053
SARDINEL ESPECIAL A100 PARA RAMPA TIPO A (Suministro e
Instalacin. No Incluye material de base)
UN 39,932.89
4,093
SARDINEL ESPECIAL A110 PARA RAMPA TIPO B (Suministro e
Instalacin. Incluye 3cm Mortero 1:5)
ML 59,550.82
4,546
SARDINEL ESPECIAL A110 PARA RAMPA TIPO B (Suministro e
Instalacin. Incluye 3cm Mortero 2000 psi)
ML 60,966.18
4,094
SARDINEL ESPECIAL A110 PARA RAMPA TIPO B (Suministro e
Instalacin. No Incluye material de base)
ML 56,648.20
4,098
SARDINEL ESPECIAL A90 PARA SEPARADORES (Suministro e
Instalacin. Incluye 3cm Mortero 1:5)
UN 28,900.36
4,097
SARDINEL ESPECIAL A90 PARA SEPARADORES (Suministro e
Instalacin. Incluye 3cm Mortero 2000 PSI)
UN 29,468.65
4,099
SARDINEL ESPECIAL A90 PARA SEPARADORES (Suministro e
Instalacin. No Incluye material de base)
UN 27,734.91
3,753
SARDINEL H=0.20m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Hecho en Obra. Inc. Sumin, Formalet. y Const.)
ML 17,022.38
4,039
SARDINEL H=0.20m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Premezclado. Inc. Sumin, Formalet. y Const.)
ML 17,327.68
3,784
SARDINEL H=0.25m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Hecho en Obra. Inc. Sumin, Formalet. y Const.)
ML 19,786.65
4,040
SARDINEL H=0.25m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Premezclado. Inc. Sumin, Formalet. y Const.)
ML 20,168.52
4,042
SARDINEL H=0.30m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Hecho en Obra. Inc. Sumin, Formalet. y Const.)
ML 22,550.92
4,043
SARDINEL H=0.30m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Premezclado. Inc. Sumin, Formalet. y Const.)
ML 23,009.36
3,426
SARDINEL H=0.40m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Hecho en Obra. Inc. Sumin, Formalet. y Const.)
ML 28,044.47
4,041
SARDINEL H=0.40m, e=0.15m CONCRETO 3000 PSI (Fundido en
Sitio, Concreto Premezclado. Inc. Sumin, Formalet. y Const.)
ML 28,655.08
4,544
SARDINEL PREFABRICADO ALTO RAMPAS A86 (Suministro e
Instalacin. Incluye 3cm Mortero de Nivelacin 2000 PSI)
ML 48,016.00
4,545
SARDINEL PREFABRICADO ALTO RAMPAS A86 (Suministro e
Instalacin. sin material de base)
ML 45,857.01
3,027
SARDINEL TIPO A10 (Suministro e Instalacin. Incluye 3cm Mortero
1:5)
ML 56,028.24
4,054
SARDINEL TIPO A10 (Suministro e Instalacin. Incluye 3cm Mortero
2000 PSI)
ML 56,735.92
4,055
SARDINEL TIPO A10 (Suministro e Instalacin. No Incluye material de
base)
ML 54,576.93
3,163
SEPARADOR 'NEW J ERSEY' BIDIRECCIONAL 1.5m x 0.6m x 1.1m
(Prefabricado. Incluye Sum. e Inst. No Inc. material de base)
ML 238,413.10
4,045
SEPARADOR 'NEW J ERSEY' MONODIRECCIONAL 1.5m x 0.6m x
1.1m (Prefabricado. Incluye Sum. e Inst. No Inc. material de base)
ML 181,224.25
008.02 PISOS EN ADOQUINES Y EN LOSETAS
3,727
CENEFA EN ADOQUIN DE ARCILLA a=6cm (Suministro e
Instalacin. No Incluye Material de Base)
ML 3,739.11
3,403
CONTENEDOR DE RAICES TIPO B20 (TIPO A) (1.2x1.2x1m. Inc.
Suministro, Construccin y filtro en gravilla. No Inc. Tierra)
UN 431,607.02
CODIGO NOMBRE U.M. VALOR
4,084
CONTENEDOR DE RAICES TIPO B25 (TIPO A) (1.6x1.6x1.1m. Inc.
Suministro, Construccin y filtro en gravilla. No Inc.Tierra)
UN 574,519.18
4,064
PISO EN ADOQUIN DE ARCILLA 20x10x6cm (Suministro e
Instalacin. Incluye Base 3cm Arena Nivelacion y Arena de Sello)
M2 36,481.93
3,696
PISO EN ADOQUIN DE ARCILLA 26x6x6cm (Suministro e Instalacin.
Incluye Base 3cm Arena Nivelacin y Arena de Sello)
M2 42,443.93
3,745
PISO EN ADOQUIN DE CONCRETO A25 20x10x6cm (Suministro e
Instalacin. Incluye Base 3cm Arena Nivelacin y Arena de Sello)
M2 46,725.93
3,062
PISO EN LOSETA PREFABRICADA A30 (Suministro e Instalacin.
Incluye Base 4cm Arena Nivelacin y Arena de Sello)
M2 32,145.03
4,068
PISO EN LOSETA PREFABRICADA A30 (Suministro e Instalacin.
Incluye Base 4cm Mortero 1:5 y Arena de Sello)
M2 38,883.31
4,069
PISO EN LOSETA PREFABRICADA A30 (Suministro e Instalacin.
Incluye Base 4cm Mortero 2000 PSI y Arena de Sello)
M2 43,601.18
4,070
PISO EN LOSETA PREFABRICADA A40 (Suministro e Instalacin.
Incluye Base 4cm Arena Nivelacion y Arena de Sello)
M2 32,145.03
4,071
PISO EN LOSETA PREFABRICADA A40 (Suministro e Instalacin.
Incluye Base 4cm Mortero 1:5 y Arena de Sello)
M2 46,200.20
4,076
PISO EN LOSETA PREFABRICADA A40 (Suministro e Instalacin.
Incluye Base 4cm Mortero 2000 PSI y Arena de Sello)
M2 43,601.18
4,074
PISO EN LOSETA PREFABRICADA A50 (Suministro e Instalacin.
Incluye Base 4cm Arena Nivelacion y Arena de Sello)
M2 51,047.23
4,075
PISO EN LOSETA PREFABRICADA A50 (Suministro e Instalacin.
Incluye Base 4cm Mortero 1:5 y Arena de Sello)
M2 57,785.51
4,073
PISO EN LOSETA PREFABRICADA A50 (Suministro e Instalacin.
Incluye Base 4cm Mortero 2000 PSI y Arena de Sello)
M2 61,849.14
4,077
PISO EN LOSETA PREFABRICADA A60 (Suministro e Instalacin.
Incluye Base 4cm Arena Nivelacion y Arena de Sello)
M2 52,372.53
4,078
PISO EN LOSETA PREFABRICADA A60 (Suministro e Instalacin.
Incluye Base 4cm Mortero 1:5 y Arena de Sello)
M2 59,110.81
4,079
PISO EN LOSETA PREFABRICADA A60 (Suministro e Instalacin.
Incluye Base 4cm Mortero 2000 PSI y Arena de Sello)
M2 63,828.68
3,028
PISO EN TABLETA PREFABRICADA A20 (Suministro e Instalacin.
Incluye Base 1.5cm Mortero 1:5 y Arena de Sello)
M2 32,682.25
4,067
PISO EN TABLETA PREFABRICADA A20 (Suministro e Instalacion.
Incluye Base 1.5cm Mortero 2000 PSI y Arena de Sello)
M2 34,376.40
008.03 ANDENES EN CONCRETO
4,051
ANDEN CONCRETO 3000 PSI (210 Kg/cm2) HECHO EN OBRA
e=0.10m (Incluye Mezcla, Formaleteo, Fundida y Curado)
M2 46,546.52
3,425
ANDEN CONCRETO 3000 PSI (210 Kg/cm2) PREMEZCLADO
e=0.10m (Incluye Suministro, Formaleteo, Fundida y Curado)
M2 47,564.20
009 MOBILIARIO URBANO
009.01 MOBILIARIO URBANO
3,396
BANCA EN CONCRETO TIPO M30 (Suministro e Instalacin. No
Incluye material de base)
UN 425,859.42
3,401 BANCA EN CONCRETO TIPO M31 (Suministro e Instalacin) UN 240,259.42
3,400 BANCA EN CONCRETO TIPO M40 (Suministro e Instalacin) UN 89,809.71
3,550 BANCA EN MADERA TIPO M50 (Suministro e Instalacin) UN 329,958.15
CODIGO NOMBRE U.M. VALOR
4,080
BOLARDO EN CONCRETO TIPO M60 (Suministro e Instalacin.
Incluye base en Concreto 1500 PSI, Hecho en Obra)
UN 94,138.01
3,549
BOLARDO EN CONCRETO TIPO M60 (Suministro e Instalacin.
Incluye base en Concreto 1500 PSI, Premezclado)
UN 99,244.55
4,689
BOLARDO EN CONCRETO TIPO M60 (Suministro e Instalacin.
Incluye base en Concreto 3000 PSI, Hecho en Obra)
UN 101,173.39
4,690
BOLARDO EN CONCRETO TIPO M60 (Suministro e Instalacin.
Incluye base en Concreto 3000 PSI, Premezclado)
UN 101,612.34
4,691
BOLARDO EN CONCRETO TIPO M60 (Suministro e Instalacin. No
incluye base en Concreto)
UN 71,309.26
4,081
BOLARDO EN CONCRETO TIPO M61 (Suministro e Instalacin.
Incluye base en Concreto 1500 PSI, Hecho en Obra)
UN 94,138.01
3,560
BOLARDO EN CONCRETO TIPO M61 (Suministro e Instalacin.
Incluye base en Concreto 1500 PSI, Premezclado)
UN 94,138.01
4,692
BOLARDO EN CONCRETO TIPO M61 (Suministro e Instalacin.
Incluye base en Concreto 3000 PSI, Hecho en Obra)
UN 101,173.39
4,693
BOLARDO EN CONCRETO TIPO M61 (Suministro e Instalacin.
Incluye base en Concreto 3000 PSI, Premezclado)
UN 101,612.34
4,694
BOLARDO EN CONCRETO TIPO M61 (Suministro e Instalacin. No
incluye base en Concreto 3000)
UN 74,426.58
4,082
BOLARDO EN HIERRO TIPO M62 (Suministro e Instalacin. Incluye
base en Concreto 1500 PSI, Hecho en Obra)
UN 122,886.90
3,561
BOLARDO EN HIERRO TIPO M62 (Suministro e Instalacin. Incluye
base en Concreto 1500 PSI, Premezclado)
UN 124,021.68
4,698
BOLARDO EN HIERRO TIPO M62 (Suministro e Instalacin. Incluye
base en Concreto 3000 PSI, hecho en obra)
UN 124,385.03
4,697
BOLARDO EN HIERRO TIPO M62 (Suministro e Instalacin. Incluye
base en Concreto 3000 PSI, Premezclado)
UN 124,547.86
4,083
BOLARDO EN HIERRO TIPO M63 (Suministro e Instalacin. Incluye
base en Concreto 1500 PSI premezclado)
UN 124,711.07
3,548
BOLARDO EN HIERRO TIPO M63 (Suministro e Instalacin. Incluye
base en Concreto 1500 PSI, hecho en obra)
UN 123,434.44
4,699
BOLARDO EN HIERRO TIPO M63 (Suministro e Instalacin. Incluye
base en Concreto 3000 PSI premezclado)
UN 478,106.58
4,700
BOLARDO EN HIERRO TIPO M63 (Suministro e Instalacin. Incluye
base en Concreto 3000 PSI, hecho en obra)
UN 125,193.28
3,397
CANECA TIPO M120 (En malla metlica. Incluye Suministro e
Instalacin. Incluye base en Concreto 1500 PSI, Hecho en Obra)
UN 218,285.19
4,675
CANECA TIPO M120 (En malla metlica. Incluye Suministro e
Instalacin. Incluye base en Concreto 3000 PSI, premezclado
UN 219,382.61
3,554
CICLO-PARQUEADERO TIPO M100 (TIPO 1) (H=1m, L=2m. Incluye
Suministro e Instalacin. No Incluye bases)
UN 356,591.05
3,555
CICLO-PARQUEADERO TIPO M101 (TIPO 2) (H=0.6m, L=2m,
A=0.6m. Incluye Suministro e Instalacin. No Incluye bases)
UN 460,386.58
3,557
PARADERO TIPO M10 (Inc. Sum. e Inst. Inc. bases en Concreto 3000
PSI, Hecho en Obra. No incluye losas de Concreto)
UN 11,366,610.10
3,559
POSTE LUMINARIA HISTORICA TIPO M131 H=5m (Inc. Suministro e
Instalacin. No Inc.: Luminarias, Cableado y Base Pedestal)
UN 3,826,679.94
3,552
PROTECTOR DE ARBOL DE DOS TUBOS TIPO M91 (Incluye
Suministro e Instalacin. No Incluye bases)
UN 139,386.58
3,551
PROTECTOR DE ARBOL TIPO M90 (Incluye Suministro e Instalacin.
No Incluye bases)
UN 388,786.58
4,686
REPOSICION BOLARDO M63 INCLUYE EXCAVACION CARGUE Y
DISPOSICION FINAL DE ESCOMBROS Y BASE EN CONCRETO DE
1500PSI
UN 133,765.74
4,688
REPOSICION DE PROTECTOR DE ARBOL DE UN TUBO M91.
INCLUYE EXCAVACION. TRANSPORTE Y DISPOSICION FINAL,
INSTALA. NUEVO PROT
UN 139,770.36
3,556
TELEFONO PUBLICO DE PEDESTAL TIPO M20 (Incluye Suministro
e Instalacin. No Incluye base)
UN 5,552,822.06
CODIGO NOMBRE U.M. VALOR
009.02 SIEMBRA DE ARBOLES Y GRAMA
3,721
SIEMBRA DE GRAMA (incluye Suministro e Instalacin. Incluye 10cm
de Tierra Negra)
M2 11,767.89
3,172
SIEMBRA DE GRAMA (Incluye Suministro e Instalacin. No Incluye
Tierra Negra)
M2 6,236.42
3,699
TALA DE ARBOLES CLASE I (H<5m. Incluye Desenrace, Retiro y
Disposicin Final)
UN 96,008.52
4,101
TALA DE ARBOLES CLASE II (5m<H<10m. Incluye Desenrace,
Retiro y Disposicin Final)
UN 161,101.72
3,698
TALA DE ARBOLES CLASE III (10m<H<20m. Incluye Desenrace,
Retiro y Disposicin Final)
UN 167,904.97
3,695
TALA DE ARBOLES CLASE IV (20m<H<30m. Incluye Desenrace,
Retiro y Disposicin Final)
UN 359,240.79
4,100
TALA DE ARBOLES CLASE V (H>30m. Incluye Desenrace, Cargue,
Transporte y Disposicin Final)
UN 463,564.22
010 GEOSINTETICOS
010.01 GEOTEXTILES
4,668
GEOTEXTIL NT 1600 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 5,192.05
4,672
GEOTEXTIL NT 1600 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 5,192.05
4,669
GEOTEXTIL NT 1800 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 6,139.19
4,673
GEOTEXTIL NT 1800 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 6,139.19
4,670
GEOTEXTIL NT 2000 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 6,276.71
4,674
GEOTEXTIL NT 2000 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 6,990.28
4,671
GEOTEXTIL NT 2500 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 7,257.08
4,676
GEOTEXTIL NT 2500 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 7,257.08
4,014
GEOTEXTIL NT 3000 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 8,728.49
4,009
GEOTEXTIL NT 3000 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 8,728.49
4,021
GEOTEXTIL NT 4000 PARA ESTABILIZACION
SUBRASANTE/CAPAS GRANULARES (Inc. Suministro e Instalacin)
M2 10,844.21
4,015
GEOTEXTIL NT 4000 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 10,844.21
4,010
GEOTEXTIL NT 4000 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 10,844.21
4,022
GEOTEXTIL NT 5000 PARA ESTABILIZACION
SUBRASANTE/CAPAS GRANULARES (Inc. Suministro e Instalacin)
M2 13,093.33
4,016
GEOTEXTIL NT 5000 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 13,093.33
4,011
GEOTEXTIL NT 5000 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 13,093.33
4,023
GEOTEXTIL NT 6000 PARA ESTABILIZACION
SUBRASANTE/CAPAS GRANULARES (Inc. Suministro e Instalacin)
M2 14,755.50
CODIGO NOMBRE U.M. VALOR
4,017
GEOTEXTIL NT 6000 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 14,755.50
4,012
GEOTEXTIL NT 6000 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 14,755.50
4,024
GEOTEXTIL NT 7000 PARA ESTABILIZACION
SUBRASANTE/CAPAS GRANULARES (Inc. Suministro e Instalacin)
M2 18,049.14
4,013
GEOTEXTIL NT 7000 PARA SEPARACION SUBRASANTE/CAPAS
GRANULARES (Incluye Suministro e Instalacin)
M2 18,049.14
4,018
GEOTEXTIL NT 7000 PARA SUBDRENES/FILTROS (Incluye
Suministro e Instalacin)
M2 18,049.14
4,019
GEOTEXTIL REPAV 400 PARA PAVIMENTACION Y
REPAVIMENTACION (Incluye Suministro e Instalacin)
M2 5,481.53
4,020
GEOTEXTIL REPAV 450 PARA PAVIMENTACION Y
REPAVIMENTACION (Incluye Suministro e Instalacin)
M2 6,224.57
4,030
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=30 kN/m PARA
SEPARACION SUBRASANTE/CAPAS GRANULARES (Inc. Sumin. e
Instalacin)
M2 6,635.90
4,026
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=30 kN/m PARA
SUBDRENES/FILTROS (Incluye Suministro e Instalacin)
M2 6,635.90
4,036
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=40 kN/m PARA
ESTABILIZACION SUBRASANTE/CAPAS GRANULARES (Inc.
Sumin. e Inst.)
M2 6,982.05
4,032
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=40 kN/m PARA
SEPARACION SUBRASANTE/CAPAS GRANULARES (Inc. Sumin. e
Instalacin)
M2 6,982.05
4,027
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=40 kN/m PARA
SUBDRENES/FILTROS (Incluye Suministro e Instalacin)
M2 6,982.05
4,037
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=60 kN/m PARA
ESTABILIZACION SUBRASANTE/CAPAS GRANULARES (Inc.
Sumin. e Inst.)
M2 10,364.20
4,033
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=60 kN/m PARA
SEPARACION SUBRASANTE/CAPAS GRANULARES (Inc. Sumin. e
Instalacin)
M2 10,364.20
4,028
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=60 kN/m PARA
SUBDRENES/FILTROS (Incluye Suministro e Instalacin)
M2 10,364.20
4,038
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=90 kN/m PARA
ESTABILIZACION SUBRASANTE/CAPAS GRANULARES (Inc.
Sumin. e Inst.)
M2 14,699.70
4,034
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=90 kN/m PARA
SEPARACION SUBRASANTE/CAPAS GRANULARES (Inc. Sumin. e
Instalacin)
M2 14,699.70
4,029
GEOTEXTIL T, RESIST. ULTIMA (TIRA ANCHA)=90 kN/m PARA
SUBDRENES/FILTROS (Incluye Suministro e Instalacin)
M2 14,699.70
011 REDES ACUEDUCTO
011.01 REDES ACUEDUCTO
3,254 TEE HD EXTREMO LISO 6"x6" (Suministro e Instalacin) UN 363,162.14
4,425
ACOPLE UNIVERSAL, UNION ALFA O MULTIUSOS D=10"
(Suministro e Instalacin)
UN 376,513.10
4,426
ACOPLE UNIVERSAL, UNION ALFA O MULTIUSOS D=12"
(Suministro e Instalacin)
UN 470,343.20
4,421
ACOPLE UNIVERSAL, UNION ALFA O MULTIUSOS D=3" (Suministro
e Instalacin)
UN 70,170.37
4,422
ACOPLE UNIVERSAL, UNION ALFA O MULTIUSOS D=4" (Suministro
e Instalacin)
UN 84,467.99
CODIGO NOMBRE U.M. VALOR
4,423
ACOPLE UNIVERSAL, UNION ALFA O MULTIUSOS D=6" (Suministro
e Instalacin)
UN 143,034.99
4,424
ACOPLE UNIVERSAL, UNION ALFA O MULTIUSOS D=8" (Suministro
e Instalacin)
UN 190,379.61
3,546
ADAPTADOR AC-PVC TIPO U.S. D=2" (Suministro e Instalacin)
REVISAR SOLDADURA LIMPIADOR
UN 8,225.40
3,544
ADAPTADOR AC-PVC TIPO U.S. D=3" (Suministro e Instalacin)
REVISAR LIMPIADOR SOLDADURA
UN 20,072.93
3,545
ADAPTADOR AC-PVC TIPO U.S. D=4" (Suministro e Instalacin)
REVISAR SOLDADURA LIMPIADOR
UN 33,728.36
3,687 CAJ A PARA VALVULA 0.4x0.4m H=0.8m (Incluye Marco y Tapa) UN 132,873.35
4,292
CARCAMO DE PROTECCIN DE TUBERA 10" NORMA EAAB NS-
090 V. 1.2
ML 351,145.65
4,293
CARCAMO DE PROTECCIN DE TUBERA 12" NORMA EAAB NS-
090 V. 1.2
ML 372,748.33
4,294
CARCAMO DE PROTECCIN DE TUBERA 16" NORMA EAAB NS-
090 V. 1.2
ML 428,587.70
4,295
CARCAMO DE PROTECCIN DE TUBERA 18" NORMA EAAB NS-
090 V. 1.2
ML 444,651.37
4,296
CARCAMO DE PROTECCIN DE TUBERA 20" NORMA EAAB NS-
090 V. 1.2
ML 466,318.08
4,297
CARCAMO DE PROTECCIN DE TUBERA 24" NORMA EAAB NS-
090 V. 1.2
ML 634,746.91
4,298
CARCAMO DE PROTECCIN DE TUBERA 27" NORMA EAAB NS-
090 V. 1.2
ML 839,050.51
4,299
CARCAMO DE PROTECCIN DE TUBERA 30" NORMA EAAB NS-
090 V. 1.2
ML 937,126.66
4,291
CARCAMO PROTECCIN DE TUBERA 8" NORMA EAAB NS-090
. 3v.2
ML 335,776.81
4,612
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 10"
NORMA EAAB NS-090 . 3v.2
ML 105,804.79
4,614
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 12"
NORMA EAAB NS-090 . 3v.2
ML 106,109.38
4,615
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 16"
NORMA EAAB NS-090 . 3v.2
ML 138,339.26
4,616
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 18"
NORMA EAAB NS-090 . 3v.2
ML 138,647.30
4,617
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 20"
NORMA EAAB NS-090 . 3v.2
ML 166,052.92
4,618
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 24"
NORMA EAAB NS-090 . 3v.2
ML 173,137.62
4,619
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 27"
NORMA EAAB NS-090 . 3v.2
ML 189,943.75
4,620
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 30"
NORMA EAAB NS-090 . 3v.2
ML 206,643.94
4,621
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 32"
NORMA EAAB NS-090 . 3v.2
ML 229,198.90
4,622
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 36"
NORMA EAAB NS-090 . 3v.2
ML 242,069.04
4,611
CARCAMO TIPO PLACA DE PROTECCIN PARA TUBERA 8"
NORMA EAAB NS-090 . 3v.2
ML 105,496.59
3,542
CODO G.RAD. PVC 11.25 TIPO U.M. D=10" (Suministro e
Instalacin)
UN 472,499.63
3,543
CODO G.RAD. PVC 11.25 TIPO U.M. D=12" (Suministro e
Instalacin)
UN 623,762.81
3,537
CODO G.RAD. PVC 11.25 TIPO U.M. D=2 1/2" (Suministro e
Instalacin)
UN 20,370.69
3,536 CODO G.RAD. PVC 11.25 TIPO U.M. D=2" (Suministro e Instalacin) UN 18,096.19
CODIGO NOMBRE U.M. VALOR
3,538 CODO G.RAD. PVC 11.25 TIPO U.M. D=3" (Suministro e Instalacin) UN 27,310.42
3,539 CODO G.RAD. PVC 11.25 TIPO U.M. D=4" (Suministro e Instalacin) UN 50,451.39
3,540 CODO G.RAD. PVC 11.25 TIPO U.M. D=6" (Suministro e Instalacin) UN 112,630.33
3,541 CODO G.RAD. PVC 11.25 TIPO U.M. D=8" (Suministro e Instalacin) UN 224,120.18
3,532 CODO G.RAD. PVC 22.5 TIPO U.M D=6" (Suministro e Instalacin) UN 125,269.69
3,534 CODO G.RAD. PVC 22.5 TIPO U.M. D=10" (Suministro e Instalacin) UN 575,516.91
3,535 CODO G.RAD. PVC 22.5 TIPO U.M. D=12" (Suministro e Instalacin) UN 773,131.37
3,529
CODO G.RAD. PVC 22.5 TIPO U.M. D=2 1/2" (Suministro e
Instalacin)
UN 21,372.93
3,528 CODO G.RAD. PVC 22.5 TIPO U.M. D=2" (Suministro e Instalacin) UN 16,049.95
3,530 CODO G.RAD. PVC 22.5 TIPO U.M. D=3" (Suministro e Instalacin) UN 29,658.26
3,531 CODO G.RAD. PVC 22.5 TIPO U.M. D=4" (Suministro e Instalacin) UN 52,576.95
3,533 CODO G.RAD. PVC 22.5 TIPO U.M. D=8" (Suministro e Instalacin) UN 259,834.26
3,526 CODO G.RAD. PVC 45 TIPO U.M. D=10" (Suministro e Instalacin) UN 704,706.11
3,527 CODO G.RAD. PVC 45 TIPO U.M. D=12" (Suministro e Instalacin) UN 986,798.73
3,521 CODO G.RAD. PVC 45 TIPO U.M. D=2 1/2" (Suministro e Instalacin) UN 19,958.89
3,520 CODO G.RAD. PVC 45 TIPO U.M. D=2" (Suministro e Instalacin) UN 17,842.15
3,522 CODO G.RAD. PVC 45 TIPO U.M. D=3" (Suministro e Instalacin) UN 30,028.30
3,523 CODO G.RAD. PVC 45 TIPO U.M. D=4" (Suministro e Instalacin) UN 58,497.59
3,524 CODO G.RAD. PVC 45 TIPO U.M. D=6" (Suministro e Instalacin) UN 155,391.41
3,525 CODO G.RAD. PVC 45 TIPO U.M. D=8" (Suministro e Instalacin) UN 331,859.82
3,518 CODO G.RAD. PVC 90 TIPO U.M. D=10" (Suministro e Instalacin) UN 1,072,343.75
3,519 CODO G.RAD. PVC 90 TIPO U.M. D=12" (Suministro e Instalacin) UN 1,453,393.65
3,513 CODO G.RAD. PVC 90 TIPO U.M. D=2 1/2" (Suministro e Instalacin) UN 25,094.21
3,512 CODO G.RAD. PVC 90 TIPO U.M. D=2" (Suministro e Instalacin) UN 10,765.97
3,514 CODO G.RAD. PVC 90 TIPO U.M. D=3" (Suministro e Instalacin) UN 43,237.22
3,515 CODO G.RAD. PVC 90 TIPO U.M. D=4" (Suministro e Instalacin) UN 80,947.07
3,516 CODO G.RAD. PVC 90 TIPO U.M. D=6" (Suministro e Instalacin) UN 211,378.81
3,517 CODO G.RAD. PVC 90 TIPO U.M. D=8" (Suministro e Instalacin) UN 495,911.66
3,318
CODO HD 11.25 EXTREMO LISO PARA PVC D=12" (Suministro e
Instalacin)
UN 884,270.34
3,619
CODO HD 11.25 EXTREMO LISO PARA PVC D=2" (Suministro e
Instalacin)
UN 61,485.47
3,618
CODO HD 11.25 EXTREMO LISO PARA PVC D=3" (Suministro e
Instalacin)
UN 85,862.50
3,620
CODO HD 11.25 EXTREMO LISO PARA PVC D=4" (Suministro e
Instalacin)
UN 115,940.96
3,317
CODO HD 11.25 EXTREMO LISO PARA PVC D=6" (Suministro e
Instalacin)
UN 208,900.78
3,685
CODO HD 11.25 EXTREMO LISO PARA PVC D=8" (Suministro e
Instalacin)
UN 342,316.17
CODIGO NOMBRE U.M. VALOR
4,404
CODO HD 11.25 J UNTA HIDRAULICA PARA PVC D=2" (Suministro
e Instalacin)
UN 67,285.47
4,405
CODO HD 11.25 J UNTA HIDRAULICA PARA PVC D=3" (Suministro
e Instalacin)
UN 100,942.50
4,407
CODO HD 11.25 J UNTA HIDRAULICA PARA PVC D=4" (Suministro
e Instalacin)
UN 135,660.96
4,406
CODO HD 11.25 J UNTA HIDRAULICA PARA PVC D=6" (Suministro
e Instalacin)
UN 264,580.78
4,408
CODO HD 11.25 J UNTA HIDRAULICA PARA PVC D=8" (Suministro
e Instalacin)
UN 409,596.17
3,316
CODO HD 22.5 EXTREMO LISO PARA PVC D=12" (Suministro e
Instalacin)
UN 1,011,870.34
3,684
CODO HD 22.5 EXTREMO LISO PARA PVC D=3" (Suministro e
Instalacin)
UN 91,662.50
3,391
CODO HD 22.5 EXTREMO LISO PARA PVC D=4" (Suministro e
Instalacin)
UN 141,460.96
3,315
CODO HD 22.5 EXTREMO LISO PARA PVC D=6" (Suministro e
Instalacin)
UN 208,900.78
3,308
CODO HD 45 EXTREMO LISO PARA PVC D=10" (Suministro e
Instalacin)
UN 865,694.93
3,309
CODO HD 45 EXTREMO LISO PARA PVC D=12" (Suministro e
Instalacin)
UN 948,070.34
3,310
CODO HD 45 EXTREMO LISO PARA PVC D=14" (Suministro e
Instalacin)
UN 1,348,357.78
3,311
CODO HD 45 EXTREMO LISO PARA PVC D=16" (Suministro e
Instalacin)
UN 1,983,522.06
3,312
CODO HD 45 EXTREMO LISO PARA PVC D=18" (Suministro e
Instalacin)
UN 2,645,049.56
3,303
CODO HD 45 EXTREMO LISO PARA PVC D=2" (Suministro e
Instalacin)
UN 82,365.47
3,313
CODO HD 45 EXTREMO LISO PARA PVC D=20" (Suministro e
Instalacin)
UN 3,789,886.96
3,304
CODO HD 45 EXTREMO LISO PARA PVC D=3" (Suministro e
Instalacin)
UN 98,622.50
3,305
CODO HD 45 EXTREMO LISO PARA PVC D=4" (Suministro e
Instalacin)
UN 115,940.96
3,306
CODO HD 45 EXTREMO LISO PARA PVC D=6" (Suministro e
Instalacin)
UN 234,420.78
3,307
CODO HD 45 EXTREMO LISO PARA PVC D=8" (Suministro e
Instalacin)
UN 533,716.17
3,296
CODO HD 90 EXTREMO LISO PARA PVC D=10" (Suministro e
Instalacin)
UN 1,018,914.93
3,297
CODO HD 90 EXTREMO LISO PARA PVC D=12" (Suministro e
Instalacin)
UN 1,216,030.34
3,298
CODO HD 90 EXTREMO LISO PARA PVC D=14" (Suministro e
Instalacin)
UN 1,675,607.80
3,299
CODO HD 90 EXTREMO LISO PARA PVC D=16" (Suministro e
Instalacin)
UN 2,621,522.06
3,300
CODO HD 90 EXTREMO LISO PARA PVC D=18" (Suministro e
Instalacin)
UN 3,004,649.56
3,291
CODO HD 90 EXTREMO LISO PARA PVC D=2" (Suministro e
Instalacin)
UN 69,605.47
3,301
CODO HD 90 EXTREMO LISO PARA PVC D=20" (Suministro e
Instalacin)
UN 3,920,966.96
3,292
CODO HD 90 EXTREMO LISO PARA PVC D=3" (Suministro e
Instalacin)
UN 96,302.50
3,293
CODO HD 90 EXTREMO LISO PARA PVC D=4" (Suministro e
Instalacin)
UN 126,380.96
3,294
CODO HD 90 EXTREMO LISO PARA PVC D=6" (Suministro e
Instalacin)
UN 300,540.78
CODIGO NOMBRE U.M. VALOR
3,295
CODO HD 90 EXTREMO LISO PARA PVC D=8" (Suministro e
Instalacin)
UN 559,236.17
3,327
HIDRANTE EXTREMO BRIDA D=3" (Suministro e Instalacin. No
incluye kit de nivelacin)
UN 1,732,578.60
3,328
HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE (Suministro e
Instalacin. No incluye kit de nivelacin)
UN 2,191,611.70
3,330
HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO (Suministro e
Instalacin. No incluye kit de nivelacin)
UN 2,582,531.70
3,329
HIDRANTE EXTREMO BRIDA D=6" TIPO POSTE (Suministro e
Instalacin. No incluye kit de nivelacin)
UN 2,344,404.80
3,331
HIDRANTE EXTREMO BRIDA D=6" TIPO TRAFICO (Suministro e
Instalacin. No incluye kit de nivelacin)
UN 3,151,764.80
4,623
PRUEBA DE PRESION TUBERIA DE ACUEDUCTO HASTA
DIAMETRO DE 12"
UN 556,800.00
4,413 REDUCCION CONCENTRICA HD 12"x6" (Suministro e Instalacin) UN 827,430.34
4,414 REDUCCION CONCENTRICA HD 12"x8" (Suministro e Instalacin) UN 1,037,390.34
4,412 REDUCCION CONCENTRICA HD 6"x3" (Suministro e Instalacin) UN 143,940.78
4,409 REDUCCION PVC TIPO U.M. 4"x2" (Suministro e Instalacin) UN 75,147.47
4,410 REDUCCION PVC TIPO U.M. 4"x3" (Suministro e Instalacin) UN 86,404.11
4,411 REDUCCION PVC TIPO U.M. 6"x4" (Suministro e Instalacin) UN 240,032.37
4,649 SUMINISTRO E INSTALACION DE ACOPLE GRP 1000mm UN 598,686.59
4,650 SUMINISTRO E INSTALACION DE ACOPLE GRP 1100mm UN 639,406.05
4,651 SUMINISTRO E INSTALACION DE ACOPLE GRP 1200mm UN 681,591.73
4,652 SUMINISTRO E INSTALACION DE ACOPLE GRP 1300mm UN 738,933.11
4,653 SUMINISTRO E INSTALACION DE ACOPLE GRP 1400mm UN 796,592.62
4,654 SUMINISTRO E INSTALACION DE ACOPLE GRP 1500mm UN 868,199.06
4,655 SUMINISTRO E INSTALACION DE ACOPLE GRP 1600mm UN 1,047,393.54
4,656 SUMINISTRO E INSTALACION DE ACOPLE GRP 1700mm UN 1,156,774.55
4,657 SUMINISTRO E INSTALACION DE ACOPLE GRP 1800mm UN 1,422,087.98
4,658 SUMINISTRO E INSTALACION DE ACOPLE GRP 2000mm UN 1,555,155.02
4,662 SUMINISTRO E INSTALACION DE ACOPLE GRP 2400mm UN 1,934,750.14
4,641 SUMINISTRO E INSTALACION DE ACOPLE GRP 300mm UN 218,740.95
4,642 SUMINISTRO E INSTALACION DE ACOPLE GRP 350mm UN 222,088.68
4,643 SUMINISTRO E INSTALACION DE ACOPLE GRP 400mm UN 244,452.58
4,644 SUMINISTRO E INSTALACION DE ACOPLE GRP 500mm UN 272,632.42
4,645 SUMINISTRO E INSTALACION DE ACOPLE GRP 600mm UN 375,365.46
4,646 SUMINISTRO E INSTALACION DE ACOPLE GRP 700mm UN 463,606.66
4,647 SUMINISTRO E INSTALACION DE ACOPLE GRP 800mm UN 506,107.02
4,648 SUMINISTRO E INSTALACION DE ACOPLE GRP 900mm UN 565,369.38
4,631
SUMINISTRO E INSTALACION DE TUBERIA GRP 1000mm
(INCLUYE TRANSPORTE)
ML 650,469.04
4,632
SUMINISTRO E INSTALACION DE TUBERIA GRP 1100mm
(INCLUYE TRANSPORTE)
ML 728,351.13
4,633
SUMINISTRO E INSTALACION DE TUBERIA GRP 1200mm
(INCLUYE TRANSPORTE)
ML 852,306.78
4,634
SUMINISTRO E INSTALACION DE TUBERIA GRP 1300mm
(INCLUYE TRANSPORTE)
ML 944,004.80
4,635
SUMINISTRO E INSTALACION DE TUBERIA GRP 1400mm
(INCLUYE TRANSPORTE)
ML 1,047,337.33
4,636
SUMINISTRO E INSTALACION DE TUBERIA GRP 1500mm
(INCLUYE TRANSPORTE)
ML 1,171,124.95
4,637
SUMINISTRO E INSTALACION DE TUBERIA GRP 1600mm
(INCLUYE TRANSPORTE)
ML 1,333,474.66
4,638
SUMINISTRO E INSTALACION DE TUBERIA GRP 1700mm
(INCLUYE TRANSPORTE)
ML 1,519,061.18
4,659
SUMINISTRO E INSTALACION DE TUBERIA GRP 1800mm
(INCLUYE TRANSPORTE)
ML 1,711,986.41
CODIGO NOMBRE U.M. VALOR
4,660
SUMINISTRO E INSTALACION DE TUBERIA GRP 2000mm
(INCLUYE TRANSPORTE)
ML 2,152,680.13
4,661
SUMINISTRO E INSTALACION DE TUBERIA GRP 2400mm
(INCLUYE TRANSPORTE)
ML 3,133,821.67
4,624
SUMINISTRO E INSTALACION DE TUBERIA GRP 300mm
(INCLUYE TRANSPORTE)
ML 145,485.38
4,625
SUMINISTRO E INSTALACION DE TUBERIA GRP 400mm
(INCLUYE TRANSPORTE)
ML 212,959.28
4,626
SUMINISTRO E INSTALACION DE TUBERIA GRP 500mm
(INCLUYE TRANSPORTE)
ML 269,892.85
4,627
SUMINISTRO E INSTALACION DE TUBERIA GRP 600mm
(INCLUYE TRANSPORTE)
ML 335,330.10
4,628
SUMINISTRO E INSTALACION DE TUBERIA GRP 700mm
(INCLUYE TRANSPORTE)
ML 429,897.35
4,629
SUMINISTRO E INSTALACION DE TUBERIA GRP 800mm
(INCLUYE TRANSPORTE)
ML 492,905.05
4,630
SUMINISTRO E INSTALACION DE TUBERIA GRP 900mm
(INCLUYE TRANSPORTE)
ML 598,042.56
3,321 TAPON HD EXTREMO LISO D=12" (Suministro e Instalacin) UN 652,445.91
3,404 TAPON HD EXTREMO LISO D=4" (Suministro e Instalacin) UN 88,100.96
3,320 TAPON HD EXTREMO LISO D=6" (Suministro e Instalacin) UN 203,100.78
3,589 TAPON HD EXTREMO LISO D=8" (Suministro e Instalacin) UN 363,196.17
4,415 TAPON PVC TIPO U.M. D=3" (Suministro e Instalacin) UN 70,231.58
4,416 TAPON PVC TIPO U.M. D=4" (Suministro e Instalacin) UN 80,992.31
4,417 TAPON PVC TIPO U.M. D=6" (Suministro e Instalacin) UN 221,997.45
3,265 TEE HD EXTREMO LISO 10"x10" (Suministro e Instalacin) UN 1,116,727.39
3,260 TEE HD EXTREMO LISO 10"x2" (Suministro e Instalacin) UN 670,127.39
3,261 TEE HD EXTREMO LISO 10"x3" (Suministro e Instalacin) UN 804,687.39
3,262 TEE HD EXTREMO LISO 10"x4" (Suministro e Instalacin) UN 832,527.39
3,263 TEE HD EXTREMO LISO 10"x6" (Suministro e Instalacin) UN 874,287.39
3,264 TEE HD EXTREMO LISO 10"x8" (Suministro e Instalacin) UN 1,014,647.39
3,271 TEE HD EXTREMO LISO 12"x10" (Suministro e Instalacin) UN 1,890,265.91
3,272 TEE HD EXTREMO LISO 12"x12" (Suministro e Instalacin) UN 2,170,985.91
3,267 TEE HD EXTREMO LISO 12"x3" (Suministro e Instalacin) UN 1,188,465.91
3,268 TEE HD EXTREMO LISO 12"x4" (Suministro e Instalacin) UN 1,216,305.91
3,269 TEE HD EXTREMO LISO 12"x6" (Suministro e Instalacin) UN 1,469,185.91
3,270 TEE HD EXTREMO LISO 12"x8" (Suministro e Instalacin) UN 1,609,545.91
3,274 TEE HD EXTREMO LISO 24"x10" (Suministro e Instalacin) UN 6,706,515.11
3,275 TEE HD EXTREMO LISO 24"x12" (Suministro e Instalacin) UN 6,866,595.11
3,276 TEE HD EXTREMO LISO 24"x14" (Suministro e Instalacin) UN 7,141,515.11
3,277 TEE HD EXTREMO LISO 24"x16" (Suministro e Instalacin) UN 8,125,195.11
3,278 TEE HD EXTREMO LISO 24"x18" (Suministro e Instalacin) UN 9,082,195.11
3,279 TEE HD EXTREMO LISO 24"x20" (Suministro e Instalacin) UN 10,125,035.11
3,280 TEE HD EXTREMO LISO 24"x24" (Suministro e Instalacin) UN 11,095,955.11
3,273 TEE HD EXTREMO LISO 24"x8" (Suministro e Instalacin) UN 6,140,435.11
3,281 TEE HD EXTREMO LISO 4"x3" (Suministro e Instalacin) UN 164,660.96
3,282 TEE HD EXTREMO LISO 4"x4" (Suministro e Instalacin) UN 171,620.96
3,251 TEE HD EXTREMO LISO 6"x2" (Suministro e Instalacin) UN 253,650.12
3,252 TEE HD EXTREMO LISO 6"x3" (Suministro e Instalacin) UN 258,943.92
3,253 TEE HD EXTREMO LISO 6"x4" (Suministro e Instalacin) UN 306,322.14
3,255 TEE HD EXTREMO LISO 8"x2" (Suministro e Instalacin) UN 438,429.33
3,256 TEE HD EXTREMO LISO 8"x3" (Suministro e Instalacin) UN 501,069.33
3,257 TEE HD EXTREMO LISO 8"x4" (Suministro e Instalacin) UN 570,669.33
3,258 TEE HD EXTREMO LISO 8"x6" (Suministro e Instalacin) UN 598,509.33
3,259 TEE HD EXTREMO LISO 8"x8" (Suministro e Instalacin) UN 641,429.33
CODIGO NOMBRE U.M. VALOR
3,735
TUBERIA PF D=1/2" PARA ACOMETIDA DOMICILIARIA (Suministro
e Instalacin)
ML 1,567.98
3,229 TUBERIA PVC D=10" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 140,989.84
3,237 TUBERIA PVC D=10" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 116,275.80
3,243 TUBERIA PVC D=10" TIPO U.M. RDE 32.5 (Suministro e Instalacin) ML 96,839.59
3,249 TUBERIA PVC D=10" TIPO U.M. RDE 41 (Suministro e Instalacin) ML 79,227.24
3,230 TUBERIA PVC D=12" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 192,909.73
3,238 TUBERIA PVC D=12" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 159,457.32
3,245 TUBERIA PVC D=12" TIPO U.M. RDE 32.5 (Suministro e Instalacin) ML 131,978.32
3,250 TUBERIA PVC D=12" TIPO U.M. RDE 41 (Suministro e Instalacin) ML 107,697.39
3,224 TUBERIA PVC D=2 1/2" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 12,043.74
3,232 TUBERIA PVC D=2 1/2" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 10,520.78
3,223 TUBERIA PVC D=2" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 9,095.29
3,231 TUBERIA PVC D=2" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 8,022.95
3,225 TUBERIA PVC D=3" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 16,754.43
3,233 TUBERIA PVC D=3" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 14,466.60
3,239 TUBERIA PVC D=3" TIPO U.M. RDE 32.5 (Suministro e Instalacin) ML 12,206.03
3,226 TUBERIA PVC D=4" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 26,469.99
3,234 TUBERIA PVC D=4" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 22,714.33
3,240 TUBERIA PVC D=4" TIPO U.M. RDE 32.5 (Suministro e Instalacin) ML 18,951.90
3,246 TUBERIA PVC D=4" TIPO U.M. RDE 41 (Suministro e Instalacin) ML 16,345.25
3,227 TUBERIA PVC D=6" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 55,102.73
3,235 TUBERIA PVC D=6" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 46,117.23
3,241 TUBERIA PVC D=6" TIPO U.M. RDE 32.5 (Suministro e Instalacin) ML 38,629.23
3,247 TUBERIA PVC D=6" TIPO U.M. RDE 41 (Suministro e Instalacin) ML 32,193.84
3,228 TUBERIA PVC D=8" TIPO U.M. RDE 21 (Suministro e Instalacin) ML 90,742.29
3,236 TUBERIA PVC D=8" TIPO U.M. RDE 26 (Suministro e Instalacin) ML 75,820.04
3,242 TUBERIA PVC D=8" TIPO U.M. RDE 32.5 (Suministro e Instalacin) ML 63,093.03
3,248 TUBERIA PVC D=8" TIPO U.M. RDE 41 (Suministro e Instalacin) ML 51,808.15
3,500 UNION DE REPARACION HD EL D=10" (Suministro e Instalacin) UN 508,427.39
3,501 UNION DE REPARACION HD EL D=12" (Suministro e Instalacin) UN 738,985.91
3,502 UNION DE REPARACION HD EL D=14" (Suministro e Instalacin) UN 1,000,203.37
3,503 UNION DE REPARACION HD EL D=16" (Suministro e Instalacin) UN 1,556,060.75
4,138 UNION DE REPARACION HD EL D=3" (Suministro e Instalacin) UN 102,902.50
3,405 UNION DE REPARACION HD EL D=6" (Suministro e Instalacin) UN 229,420.78
3,499 UNION DE REPARACION HD EL D=8" (Suministro e Instalacin) UN 325,716.17
3,393
UNION DE REPARACION PVC TIPO U.M. D=12" (Suministro e
Instalacin)
UN 578,143.49
4,418
UNION DE REPARACION PVC TIPO U.M. D=2" (Suministro e
Instalacin)
UN 17,966.27
4,419
UNION DE REPARACION PVC TIPO U.M. D=3" (Suministro e
Instalacin)
UN 28,009.90
4,420
UNION DE REPARACION PVC TIPO U.M. D=4" (Suministro e
Instalacin)
UN 46,604.11
3,463
UNION DE REPARACION PVC TIPO U.M. D=6" (Suministro e
Instalacin)
UN 104,561.37
3,412
UNION DE REPARACION PVC TIPO U.M. D=8" (Suministro e
Instalacin)
UN 188,646.22
4,388 UNION DRESSER D=10" (Suministro e Instalacin) UN 275,593.10
4,389 UNION DRESSER D=12" (Suministro e Instalacin) UN 505,412.15
4,384 UNION DRESSER D=3" (Suministro e Instalacin) UN 72,659.97
4,385 UNION DRESSER D=4" (Suministro e Instalacin) UN 79,619.97
CODIGO NOMBRE U.M. VALOR
4,386 UNION DRESSER D=6" (Suministro e Instalacin) UN 178,089.96
4,387 UNION DRESSER D=8" (Suministro e Instalacin) UN 191,879.94
3,200 UNION GIBAULT D=10" (Suministro e Instalacin) UN 338,412.40
3,201 UNION GIBAULT D=12" (Suministro e Instalacin) UN 406,352.15
3,196 UNION GIBAULT D=3" (Suministro e Instalacin) UN 64,539.97
3,197 UNION GIBAULT D=4" (Suministro e Instalacin) UN 89,929.96
3,198 UNION GIBAULT D=6" (Suministro e Instalacin) UN 134,009.96
3,199 UNION GIBAULT D=8" (Suministro e Instalacin) UN 209,279.94
4,136 UNION PVC D=1/2" TIPO U.S. (Suministro e Instalacin) UN 3,287.14
3,605 UNION PVC TIPO U.M. D=10" (Suministro e Instalacin) UN 299,743.15
3,606 UNION PVC TIPO U.M. D=12" (Suministro e Instalacin) UN 460,787.45
3,607 UNION PVC TIPO U.M. D=12" (Suministro e Instalacin) UN 20,703.61
3,600 UNION PVC TIPO U.M. D=2" (Suministro e Instalacin) UN 15,768.47
3,601 UNION PVC TIPO U.M. D=3" (Suministro e Instalacin) UN 25,492.38
3,602 UNION PVC TIPO U.M. D=4" (Suministro e Instalacin) UN 40,503.15
3,603 UNION PVC TIPO U.M. D=6" (Suministro e Instalacin) UN 91,263.33
3,604 UNION PVC TIPO U.M. D=8" (Suministro e Instalacin) UN 166,077.70
4,403
VALVULA COMPUERTA ELASTICA VASTAGO NO ASCENDENTE
EXTREMO LISO D=12" (Suministro e Instalacin)
UN 3,744,206.41
3,322
VALVULA COMPUERTA ELASTICA VASTAGO NO ASCENDENTE
EXTREMO LISO D=2" (Suministro e Instalacin)
UN 285,859.61
3,323
VALVULA COMPUERTA ELASTICA VASTAGO NO ASCENDENTE
EXTREMO LISO D=3" (Suministro e Instalacin)
UN 417,573.10
4,402
VALVULA COMPUERTA ELASTICA VASTAGO NO ASCENDENTE
EXTREMO LISO D=4" (Suministro e Instalacin)
UN 560,823.20
3,324
VALVULA COMPUERTA ELASTICA VASTAGO NO ASCENDENTE
EXTREMO LISO D=6" (Suministro e Instalacin)
UN 987,703.20
3,325
VALVULA COMPUERTA ELASTICA VASTAGO NO ASCENDENTE
EXTREMO LISO D=8" (Suministro e Instalacin)
UN 1,456,907.04
012 REDES ALCANTARILLADO / DRENAJE
012.01 REDES ALCANTARILLADO / DRENAJ E
3,779
CAJ A DE INSPECCIN DE 0.6x0.6m (H=0.6m. Incluye Suministro y
Construccin. Incluye Marco y Tapa. No Inc. Base y Cauela)
UN 267,953.90
3,471
CILINDRO POZO INSP. EN MAMPOSTERIA e=0.25m (Inc. Sumin. y
Const, Acero para Escaleras, Geotextil y Paete Impermeab.)
ML 386,985.47
3,470
CILINDRO POZO INSP. EN MAMPOSTERIA e=0.37m (Inc. Sumin. y
Const, Acero para Escaleras, Geotextil y Paete Impermeab.)
ML 566,238.21
3,881
CILINDRO POZO INSPECCION PREFABRICADO D=1.2m, H=0.25m,
e=0.10m (Incluye Suministro e Instalacin. No inc. Aro de Ajuste)
UN 243,443.45
3,880
CILINDRO POZO INSPECCION PREFABRICADO D=1.2m, H=0.5m,
e=0.10m (Incluye Suministro e Instalacin. No inc. Aro de Ajuste)
UN 335,419.85
3,716
CILINDRO POZO INSPECCION PREFABRICADO D=1.2m, H=1m,
e=0.10m (Incluye Suministro e Instalacin. No inc. Aro de Ajuste)
UN 616,182.79
4,139
CONO POZO INSPECCION PREFABRICADO H=0.75m, e=0.10m
(Inc. Suministro e Inst. No Inc. Aro de Ajuste, Aro-Tapa y Tapa)
UN 83,833.25
4,254
CONO PREFABRICADO POZO INSPECCION. (Suministro e
Instalacin. Incluye Tapa en Concreto.)
UN 197,310.25
3,155 DEMOLICION SUMIDERO EXISTENTE (Incluye Cargue) UN 73,773.20
3,776
ENTIBADO TIPO ED1, DISCONTINUO EN MADERA (Incluye
Suministro e Instalacin)
M2 23,033.89
3,723
LIMPIEZA DE POZOS (Incluye Cargue, Retiro y Disposicin Final de
Sobrantes)
UN 43,261.04
CODIGO NOMBRE U.M. VALOR
3,724
LIMPIEZA DE SUMIDEROS (Incluye Cargue, Retiro y Disposicin
Final de Sobrantes)
UN 43,261.04
3,722
NIVELACIN DE POZO (Hasta rasante en Concreto 3000 PSI Hecho
en Obra, h=0.15m. Incluye Suministro y Construccin)
UN 72,879.41
4,252
PLACA CUBIERTA D=1.70m POZO INSPEC. (Fundida en Sitio. Inc.
Sum, Formalet., Refuerzo e Inst. Incl.Tapa en Polipropileno)
UN 661,322.77
4,253
PLACA CUBIERTA D=1.70m POZO INSPEC. (Fundida en Sitio. Inc.
Sumin, Formalet., Refuerzo e Inst. Inc. Tapa en Concreto)
UN 467,979.77
3,472
PLACA CUBIERTA D=1.70m POZO INSPEC. (Fundida en Sitio. Inc.
Suministro, Formaleteo, Refuerzo e Instalacin. No Inc.Tapa)
UN 354,502.77
3,878
PLACA CUBIERTA D=1.70m POZO INSPEC. (Prefabricada. Incluye
Suministro e Instalacin. Incluye Tapa)
UN 815,020.73
3,473
PLACA FONDO D=1.70m POZO INSPEC. (Fundida en Sitio. Incl.
Sumin, Formalet, Ref, Inst. Incl. Concreto 2000 PSI de base)
UN 480,658.20
3,879
PLACA FONDO D=1.80m POZO INSPEC. (Prefabricada. Incl. Sumin,
Inst.)
UN 666,888.73
3,474
PLACA FONDO D=1.95m POZO INSPEC. (Fundida en Sitio. Incl.
Sumin, Formalet, Ref, Inst. Incl. Concreto 2000 PSI de base)
UN 604,428.76
4,553
POZO DE INSPECCION D=1.7 M (INCL. SUMINISTRO E
INSTALACION)
UN 1,810,444.87
3,876
SUBDREN EN GRAVILLA 1/2", 0.4x0.8m (Inc. Sumin. y Compact. Inc.
Geotextil NT CR=700N y Tubera PVC Corrug.-Filtro D=4")
ML 103,907.83
3,877
SUBDREN EN GRAVILLA 1/2", 0.5x1m (Inc. Sumin. y Compact. Inc.
Geotextil NT CR=700N y Tubera PVC Corrug.-Filtro D=6")
ML 168,298.93
3,704
SUBDREN EN GRAVILLA 3/4", 0.5x1m (Inc. Sumin. y Compact. Inc.
Geotextil NT CR=700N y Tubera PVC Corrug.-Filtro D=6")
ML 165,108.93
4,549
SUMIDERO ALCANTARILLADO COMBINADO EN ANDEN NS-047-
1V4 EAAB
UN 3,806,121.86
4,550
SUMIDERO ALCANTARILLADO COMBINADO EN VIA NS-047-1V4
EAAB
UN 2,722,235.22
4,551
SUMIDERO ALCANTARILLADO PLUVIAL EN ANDEN NS-047-1V4
EAAB
UN 2,882,980.67
4,558 SUMIDERO ALCANTARILLADO PLUVIAL EN VIA NS-047-1V4 EAAB UN 3,942,419.86
3,908
SUMIDERO ESPECIAL TIPO 1, H=1.65m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sum, Form, Ref. y Const. Incl. Reja)
UN 1,819,186.41
3,909
SUMIDERO ESPECIAL TIPO 1, H=1.65m (Fundido en Sitio, Concreto
Premezclado. Incl. Sum, Form, Ref. y Const. Incl. Reja)
UN 1,709,503.31
3,712
SUMIDERO LATERAL SL-100, H=0.85m (Prefabricado. Incluye
Suministro e Instalacin. Incluye Sobretapa y Tapa)
UN 1,105,021.83
3,882
SUMIDERO LATERAL SL-100, H=1.25m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sumin, Form, Ref. y Const. Incl. Tapa)
UN 1,488,188.32
3,151
SUMIDERO LATERAL SL-100, H=1.25m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 1,507,088.07
3,889
SUMIDERO LATERAL SL-100A, H=1.7m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sum, Form, Ref. y Const. Incl. Tapa)
UN 1,552,023.89
3,890
SUMIDERO LATERAL SL-100A, H=1.7m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 1,571,892.86
3,897
SUMIDERO LATERAL SL-150, H=0.85m (Prefabricado. Incluye
Suministro e Instalacin. Incluye Sobretapa y Tapa)
UN 1,560,844.65
3,884
SUMIDERO LATERAL SL-150, H=1.25m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sumin, Form, Ref. y Const. Incl. Tapa)
UN 1,900,653.64
3,896
SUMIDERO LATERAL SL-150, H=1.25m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 1,927,016.37
CODIGO NOMBRE U.M. VALOR
3,891
SUMIDERO LATERAL SL-150A, H=1.7m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sum, Form, Ref. y Const. Incl. Tapa)
UN 2,094,058.34
3,883
SUMIDERO LATERAL SL-150A, H=1.7m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 2,125,267.16
3,898
SUMIDERO LATERAL SL-200, H=0.85m (Prefabricado. Incluye
Suministro e Instalacin. Incluye Sobretapa y Tapa)
UN 1,807,438.97
3,886
SUMIDERO LATERAL SL-200, H=1.25m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sumin, Form, Ref. y Const. Incl. Tapa)
UN 2,381,968.42
3,885
SUMIDERO LATERAL SL-200, H=1.25m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 2,414,534.14
3,892
SUMIDERO LATERAL SL-200A, H=1.7m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sum, Form, Ref. y Const. Incl. Tapa)
UN 2,598,569.95
3,893
SUMIDERO LATERAL SL-200A, H=1.7m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 2,635,981.76
3,899
SUMIDERO LATERAL SL-250, H=0.85m (Prefabricado. Incluye
Suministro e Instalacin. Incluye Sobretapa y Tapa)
UN 2,287,879.65
3,887
SUMIDERO LATERAL SL-250, H=1.25m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sumin, Form, Ref. y Const. Incl. Tapa)
UN 2,629,540.68
3,888
SUMIDERO LATERAL SL-250, H=1.25m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 2,666,952.49
3,894
SUMIDERO LATERAL SL-250A, H=1.7m (Fundido en Sitio, Concreto
Hecho en Obra. Incl. Sum, Form, Ref. y Const. Incl. Tapa)
UN 2,887,015.71
3,895
SUMIDERO LATERAL SL-250A, H=1.7m (Fundido en Sitio, Concreto
Premezclado. Incl. Sumin, Form, Ref. y Constr. Incl. Tapa)
UN 2,929,273.61
3,733
SUMIDERO TRANSVERSAL ST-1, H=1.9m (Fundido en Sitio,
Concreto Hecho en Obra. Incl. Sum, Form, Ref. y Const. Incl. Reja)
ML 1,069,263.76
3,900
SUMIDERO TRANSVERSAL ST-1, H=1.9m (Fundido en Sitio,
Concreto Premezclado. Incl. Sumin, Form, Ref. y Const. Incl. Reja)
ML 1,085,515.07
3,906
SUMIDERO TRANSVERSAL ST-2, H=1.77m (Fundido en Sitio,
Concreto Hecho en Obra. Incl. Sum, Form, Ref. y Const. Incl. Reja)
ML 840,290.47
3,907
SUMIDERO TRANSVERSAL ST-2, H=1.77m (Fundido en Sitio,
Concreto Premezclado. Incl. Sumin, Form, Ref. y Const. Incl. Reja)
ML 852,705.39
3,065
TUBERIA CONCRETO D=10" CL. I SIN REFUERZO (Incluye
Suministr
ML 40,756.04
4,265
TUBERIA CONCRETO D=10" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 43,368.30
3,066
TUBERIA CONCRETO D=12" CL. I SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 61,144.33
3,934
TUBERIA CONCRETO D=12" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 67,280.49
3,067
TUBERIA CONCRETO D=14" CL. I SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 71,231.22
3,935
TUBERIA CONCRETO D=14" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 81,792.79
3,068
TUBERIA CONCRETO D=16" CL. I SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 90,226.87
CODIGO NOMBRE U.M. VALOR
3,936
TUBERIA CONCRETO D=16" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 103,418.15
3,069
TUBERIA CONCRETO D=18" CL. I SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 112,100.96
3,937
TUBERIA CONCRETO D=18" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 132,855.21
3,070
TUBERIA CONCRETO D=20" CL. I SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 142,694.95
3,938
TUBERIA CONCRETO D=20" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 159,420.99
3,944
TUBERIA CONCRETO D=24" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 264,647.38
3,071
TUBERIA CONCRETO D=24" CL. I SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 203,924.49
3,960
TUBERIA CONCRETO D=24" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 264,647.38
3,939
TUBERIA CONCRETO D=24" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 223,932.17
3,975
TUBERIA CONCRETO D=24" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 264,647.38
3,992
TUBERIA CONCRETO D=24" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 293,795.86
3,945
TUBERIA CONCRETO D=27" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 319,783.68
3,961
TUBERIA CONCRETO D=27" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 327,513.92
3,976
TUBERIA CONCRETO D=27" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 343,577.60
3,993
TUBERIA CONCRETO D=27" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 383,435.20
3,940
TUBERIA CONCRETO D=27" CL. UNICA (Incluye Suministro e
Instalacin)
ML 262,594.89
3,946
TUBERIA CONCRETO D=30" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 405,103.25
3,962
TUBERIA CONCRETO D=30" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 414,619.89
3,977
TUBERIA CONCRETO D=30" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 434,256.37
3,994
TUBERIA CONCRETO D=30" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 486,006.29
3,941
TUBERIA CONCRETO D=30" CL. UNICA (Incluye Suministro e
Instalacin)
ML 366,820.60
3,947
TUBERIA CONCRETO D=36" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 508,261.32
3,963
TUBERIA CONCRETO D=36" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 518,965.80
3,978
TUBERIA CONCRETO D=36" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 543,358.28
3,995
TUBERIA CONCRETO D=36" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 608,197.64
3,942
TUBERIA CONCRETO D=36" CL. UNICA (Incluye Suministro e
Instalacin)
ML 418,613.83
3,948
TUBERIA CONCRETO D=40" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 620,706.33
3,964
TUBERIA CONCRETO D=40" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 634,385.05
3,979
TUBERIA CONCRETO D=40" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 665,913.85
3,996
TUBERIA CONCRETO D=40" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 746,222.97
CODIGO NOMBRE U.M. VALOR
3,943
TUBERIA CONCRETO D=40" CL. UNICA (Incluye Suministro e
Instalacin)
ML 508,580.54
3,949
TUBERIA CONCRETO D=44" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 708,975.76
3,965
TUBERIA CONCRETO D=44" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 721,475.92
3,980
TUBERIA CONCRETO D=44" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 755,974.32
3,997
TUBERIA CONCRETO D=44" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 846,398.64
3,950
TUBERIA CONCRETO D=48" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 862,276.89
3,966
TUBERIA CONCRETO D=48" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 880,122.33
3,981
TUBERIA CONCRETO D=48" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 921,167.77
3,998
TUBERIA CONCRETO D=48" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 1,027,057.21
3,951
TUBERIA CONCRETO D=52" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 990,301.51
3,967
TUBERIA CONCRETO D=52" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 1,011,715.11
3,982
TUBERIA CONCRETO D=52" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 1,056,927.27
3,999
TUBERIA CONCRETO D=52" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 1,181,854.63
3,952
TUBERIA CONCRETO D=56" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 1,134,258.31
3,968
TUBERIA CONCRETO D=56" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 1,146,749.19
3,983
TUBERIA CONCRETO D=56" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 1,195,529.51
4,000
TUBERIA CONCRETO D=56" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 1,289,517.35
3,932
TUBERIA CONCRETO D=6" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 24,138.17
4,264
TUBERIA CONCRETO D=6" CL.I SIN REFUERZO (Incluye Suministro
e Instalacin)
ML 23,769.29
3,953
TUBERIA CONCRETO D=60" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 1,283,624.93
3,984
TUBERIA CONCRETO D=60" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 1,303,252.13
3,969
TUBERIA CONCRETO D=60" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 1,426,393.09
4,001
TUBERIA CONCRETO D=60" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 1,491,237.09
3,954
TUBERIA CONCRETO D=64" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 1,414,317.21
3,970
TUBERIA CONCRETO D=64" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 1,441,683.93
3,985
TUBERIA CONCRETO D=64" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 1,491,058.17
4,002
TUBERIA CONCRETO D=64" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 1,655,838.49
3,955
TUBERIA CONCRETO D=68" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 1,558,501.86
3,987
TUBERIA CONCRETO D=68" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 1,589,436.74
3,971
TUBERIA CONCRETO D=68" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 1,645,951.94
CODIGO NOMBRE U.M. VALOR
4,004
TUBERIA CONCRETO D=68" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 1,833,333.70
3,956
TUBERIA CONCRETO D=72" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 1,720,236.76
3,972
TUBERIA CONCRETO D=72" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 1,726,779.16
3,986
TUBERIA CONCRETO D=72" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 1,870,141.24
4,005
TUBERIA CONCRETO D=72" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 2,015,289.72
3,064
TUBERIA CONCRETO D=8" CL. I SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 34,677.00
3,933
TUBERIA CONCRETO D=8" CL. II SIN REFUERZO (Incluye
Suministro e Instalacin)
ML 35,414.76
3,957
TUBERIA CONCRETO D=80" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 2,081,181.61
3,973
TUBERIA CONCRETO D=80" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 2,089,515.05
3,988
TUBERIA CONCRETO D=80" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 2,165,058.89
4,006
TUBERIA CONCRETO D=80" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 2,423,237.77
3,958
TUBERIA CONCRETO D=86" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 2,315,194.61
3,974
TUBERIA CONCRETO D=86" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 2,347,321.97
3,989
TUBERIA CONCRETO D=86" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 2,399,071.89
4,007
TUBERIA CONCRETO D=86" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 2,846,418.93
3,959
TUBERIA CONCRETO D=92" CL. I REFORZADO (Incluye Suministro
e Instalacin)
ML 2,569,935.89
3,990
TUBERIA CONCRETO D=92" CL. II REFORZADO (Incluye Suministro
e Instalacin)
ML 2,605,626.77
3,991
TUBERIA CONCRETO D=92" CL. III REFORZADO (Incluye
Suministro e Instalacin)
ML 2,644,296.53
4,008
TUBERIA CONCRETO D=92" CL. IV REFORZADO (Incluye
Suministro e Instalacin)
ML 3,086,878.29
3,044
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=10" (Incluye Suministro e Instalacin)
ML 49,754.99
3,045
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=12" (Incluye Suministro e Instalacin)
ML 71,155.96
3,046
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=16" (Incluye Suministro e Instalacin)
ML 107,471.72
3,047
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=18" (Incluye Suministro e Instalacin)
ML 139,640.02
3,048
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=20" (Incluye Suministro e Instalacin)
ML 172,008.39
3,041
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=4" (Incluye Suministro e Instalacin)
ML 15,652.21
3,042
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=6" (Incluye Suministro e Instalacin)
ML 25,298.93
3,043
TUBERIA PVC EXT. CORRUGADO/INT. LISO TIPO NOVAFORT
D=8" (Incluye Suministro e Instalacin)
ML 35,528.32
3,919
TUBERIA PVC EXT./INT. LISO TIPO NOVALOC D=24" (Incluye
Suministro e Instalacin)
ML 253,409.03
3,920
TUBERIA PVC EXT./INT. LISO TIPO NOVALOC D=27" (Incluye
Suministro e Instalacin)
ML 318,373.92
3,921
TUBERIA PVC EXT./INT. LISO TIPO NOVALOC D=30" (Incluye
Suministro e Instalacin)
ML 371,451.75
CODIGO NOMBRE U.M. VALOR
3,922
TUBERIA PVC EXT./INT. LISO TIPO NOVALOC D=33" (Incluye
Suministro e Instalacin)
ML 419,979.79
3,923
TUBERIA PVC EXT./INT. LISO TIPO NOVALOC D=36" (Incluye
Suministro e Instalacin)
ML 572,855.64
3,924
TUBERIA PVC EXT./INT. LISO TIPO NOVALOC D=39" (Incluye
Suministro e Instalacin)
ML 829,952.74
3,925
TUBERIA PVC EXT./INT. LISO TIPO NOVALOC D=42" (Incluye
Suministro e Instalacin)
ML 888,030.77
3,787
TUBERIA PVC PARA DRENAJ E D=2 1/2" CON FILTRO (Incluye
Suministro e Instalacin)
ML 20,230.49
3,901
TUBERIA PVC PARA DRENAJ E D=2 1/2" SIN FILTRO (Incluye
Suministro e Instalacin)
ML 16,330.45
3,902
TUBERIA PVC PARA DRENAJ E D=4" CON FILTRO (Incluye
Suministro e Instalacin)
ML 32,872.11
3,904
TUBERIA PVC PARA DRENAJ E D=4" SIN FILTRO (Incluye
Suministro e Instalacin)
ML 25,874.70
3,905
TUBERIA PVC PARA DRENAJ E D=6" CON FILTRO (Incluye
Suministro e Instalacin)
ML 72,781.16
3,903
TUBERIA PVC PARA DRENAJ E D=6" SIN FILTRO (Incluye
Suministro e Instalacin)
ML 60,641.35
4,145
TUBERIA PVC PARA DRENAJ E D=8" CON FILTRO (Incluye
Suministro e Instalacin)
ML 97,169.17
4,146
TUBERIA PVC PARA DRENAJ E D=8" SIN FILTRO (Incluye
Suministro e Instalacin)
ML 78,529.83
4,143
TUBERIA PVC SANITARIA D=4" TIPO U.S. (Incluye Suministro e
Instalacin)
ML 21,505.90
4,144
TUBERIA PVC SANITARIA D=6" TIPO U.S. (Incluye Suministro e
Instalacin)
ML 43,464.45
3,505
YEE EN CONCRETO 10" x 6" x 1.25m (Incluye Suministro e
Instalacin)
UN 106,904.66
3,506
YEE EN CONCRETO 12" x 6" x 1.25 m (Incluye Suministro e
Instalacin)
UN 138,492.30
3,507
YEE EN CONCRETO 14" x 6" x 1.25m (Incluye Suministro e
Instalacin)
UN 165,185.96
3,508
YEE EN CONCRETO 16" x 6" x 1.25 m (Incluye Suministro e
Instalacin)
UN 206,278.84
3,509
YEE EN CONCRETO 18" x 6" x 1.25m (Incluye Suministro e
Instalacin)
UN 238,038.03
3,510
YEE EN CONCRETO 20" x 6" x 1.25m (Incluye Suministro e
Instalacin)
UN 294,384.59
3,511
YEE EN CONCRETO 24" x 6" x 1.25m (Incluye Suministro e
Instalacin)
UN 455,995.54
3,504
YEE EN CONCRETO 8" x 6" x 0.60m (Incluye Suministro e
Instalacin)
UN 50,417.18
013 REDES ELECTRICAS
013.01 RED ELECTRICA CODENSA
3,413
ADAPTADOR TERMINAL CAMPANA PVC D=3" (Suministro e
Instalacin)
UN 5,161.05
3,414
ADAPTADOR TERMINAL CAMPANA PVC D=4" (Suministro e
Instalacin)
UN 8,486.80
4,108
CAJ A DE INSPECCIN DOBLE PARA CANALIZACIN NORMA
CODENSA CS 276 (Anden. Incluye Base, Muros, Paete, Marco y
Tapas)
UN 891,268.09
4,107
CAJ A DE INSPECCIN DOBLE PARA CANALIZACIN NORMA
CODENSA CS 276 (ZVerde. Incluye Base, Muros, Paete, Marco y
Tapas)
UN 951,114.40
CODIGO NOMBRE U.M. VALOR
4,104
CAJ A DE INSPECCIN PARA ALUMBRADO PBLICO NORMA
CODENSA CS 274 (Anden. Incluye Base, Muros, Paete, Marco y
Tapa)
UN 363,258.67
3,221
CAJ A DE INSPECCIN PARA ALUMBRADO PBLICO NORMA
CODENSA CS 274 (ZVerde. Incluye Base, Muros, Paete, Marco y
Tapa)
UN 370,153.50
4,106
CAJ A DE INSPECCIN SENCILLA PARA CANALIZACIN NORMA
CODENSA CS 275 (Anden. Incluye Base, Muros, Paete, Marco y
Tapa)
UN 629,485.20
4,105
CAJ A DE INSPECCIN SENCILLA PARA CANALIZACIN NORMA
CODENSA CS 275 (ZVerde. Incluye Base, Muros, Paete, Marco y
Tapa)
UN 650,298.62
3,652
CAJ A DE INSPECCIN TIPO VEHICULAR NORMA CODENSA CS
280 (Incluye Base, Muros, Pasos, Paete, Cubierta, Aro y Tapa)
UN 2,443,096.26
4,110
CAJ A DE INSPECCIN TRIPLE PARA CANALIZACIN NORMA
CODENSA CS 277 (Incluye Base, Muros, Paete, Marcos y Tapas)
UN 1,645,932.25
3,452
LUMINARIA DE SODIO 150W PARA AP (Inc.Suministro e Instalacin.
Inc. Bombillo y Fotocelda con Base. No Inc Brazo Soporte)
UN 639,133.01
3,451
LUMINARIA DE SODIO 250W PARA AP (Inc.Suministro e Instalacin.
Inc. Bombillo y Fotocelda con Base. No Inc Brazo Soporte)
UN 796,429.01
3,487
LUMINARIA DE SODIO 400W PARA AP (Inc.Suministro e Instalacin.
Inc. Bombillo y Fotocelda con Base. No Inc Brazo Soporte)
UN 1,315,645.01
3,450
LUMINARIA DE SODIO 70W PARA AP (Inc. Suministro e Instalacin.
Inc. Bombillo y Fotocelda con Base. No Inc Brazo Soporte)
UN 430,217.01
4,125
NORMA AP802. BASE EN CONCRETO 3000 PSI PARA POSTE
METALICO H=12m (Incluye Suministro y Construccin. Incluye
Refuerzo)
UN 190,406.27
4,127
NORMA AP802. BASE EN CONCRETO 3000 PSI PARA POSTE
METALICO H=14m (Incluye Suministro y Construccin. Incluye
Refuerzo)
UN 258,373.28
4,126
NORMA AP802. BASE EN CONCRETO 3000 PSI PARA POSTE
METALICO H=8, 9 y 10m (Inc. Suministro y Construccin. Inc.
Refuerzo)
UN 169,146.04
3,159
NORMA CS207. 2 DUCTOS D=3" PVC-EB (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 15,075.50
3,591
NORMA CS208. 2 DUCTOS D=4" PVC-TDP (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 18,664.68
3,380
NORMA CS209. 4 DUCTOS D=4" PVC-TDP (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 35,082.42
4,103
NORMA CS210. 6 DUCTOS D=4" PVC-TDP (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 51,500.17
3,562 NORMA CS211. 9 DUCTOS D=4" PVC-TDP (Incluye Suministro e Ins ML 76,126.79
3,408
NORMA CS212. 6 DUCTOS D=6" PVC-TDP (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 113,781.53
3,388
NORMA CS213. 9 DUCTOS D=6" PVC-TDP (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 169,548.83
4,102
NORMA CS214. 3 DUCTOS D=4" Y 3 DUCTOS D=3" PVC-TDP
(Incluye Suministro e Instalacin. No Incluye Rellenos)
ML 82,640.85
3,189
NORMA CS215. 6 DUCTOS D=4" Y 3 DUCTOS D=6" PVC-TDP
(Incluye Suministro e Instalacin. No Incluye Rellenos)
ML 107,267.47
3,379
NORMA CS217. 4 DUCTOS D=6" PVC-TDP (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 76,603.33
3,382
NORMA CS220. 1 DUCTO D=3" PVC-TDP (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 8,163.38
CODIGO NOMBRE U.M. VALOR
3,377
NORMA CS336. TERMINAL TIPO CODO, 15KV 600A (Incluye
Suministro e Instalacin)
J GO 1,113,082.61
4,112
NORMA CS336. TERMINAL TIPO T, 15KV 600A (Incluye Suministro e
Instalacin)
J GO 1,294,833.73
4,250
NORMA CS339. EMPALME TIPO RECTO/DERIVACION EN RESINA
PARA B.T. 1KV (Incluye Suministro e Instalacin)
J GOX2 198,013.13
4,251
NORMA CS339. EMPALME TIPO RECTO/DERIVACION EN RESINA
PARA B.T. 1KV (Incluye Suministro e Instalacin)
J GOX4 323,511.21
4,113
NORMA LA009. CIMENTACION DE POSTES H=10m, CR=1050Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 220,644.09
4,122
NORMA LA009. CIMENTACION DE POSTES H=10m, CR=510Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 177,449.52
4,121
NORMA LA009. CIMENTACION DE POSTES H=10m, CR=750Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 190,661.98
4,116
NORMA LA009. CIMENTACION DE POSTES H=12m, CR=1050Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 228,266.66
4,117
NORMA LA009. CIMENTACION DE POSTES H=12m, CR=1350Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 244,528.14
4,114
NORMA LA009. CIMENTACION DE POSTES H=12m, CR=510Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 179,990.38
4,115
NORMA LA009. CIMENTACION DE POSTES H=12m, CR=750Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 195,743.69
4,119
NORMA LA009. CIMENTACION DE POSTES H=14m, CR=1050Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 236,397.40
4,120
NORMA LA009. CIMENTACION DE POSTES H=14m, CR=1350Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 254,183.40
4,118
NORMA LA009. CIMENTACION DE POSTES H=14m, CR=750Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 199,809.06
4,124
NORMA LA009. CIMENTACION DE POSTES H=8m, CR=1050Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 212,513.35
3,777
NORMA LA009. CIMENTACION DE POSTES H=8m, CR=510Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 174,400.49
4,123
NORMA LA009. CIMENTACION DE POSTES H=8m, CR=750Kg
(Incluye Izaje, Aplomado e Hincado. Incluye Rellenos)
UN 186,088.43
3,352
POSTE EN CONCRETO AP, H=10m, CR=1050 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 740,894.09
3,350
POSTE EN CONCRETO AP, H=10m, CR=510 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 578,650.49
3,351
POSTE EN CONCRETO AP, H=10m, CR=750 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 652,911.98
3,354
POSTE EN CONCRETO AP, H=12m, CR=1050 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 980,516.66
3,353
POSTE EN CONCRETO AP, H=12m, CR=510 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 700,240.38
3,356
POSTE EN CONCRETO AP, H=14m, CR=1050 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 1,243,847.40
3,357
POSTE EN CONCRETO AP, H=14m, CR=1350 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 1,377,633.40
3,355
POSTE EN CONCRETO AP, H=14m, CR=750 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 1,091,259.06
3,347
POSTE EN CONCRETO AP, H=8m, CR=510 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 462,650.49
3,348
POSTE EN CONCRETO AP, H=8m, CR=750 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 520,738.43
3,370
POSTE EN CONCRETO LA, H=10m, CR=1050 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 740,894.09
3,368
POSTE EN CONCRETO LA, H=10m, CR=510 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 581,699.52
3,369
POSTE EN CONCRETO LA, H=10m, CR=750 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 652,911.98
CODIGO NOMBRE U.M. VALOR
3,373
POSTE EN CONCRETO LA, H=12m, CR=1050 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 980,516.66
3,371
POSTE EN CONCRETO LA, H=12m, CR=510 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 700,240.38
3,372
POSTE EN CONCRETO LA, H=12m, CR=750 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 762,393.69
3,375
POSTE EN CONCRETO LA, H=14m, CR=1050 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 1,243,847.40
3,376
POSTE EN CONCRETO LA, H=14m, CR=1350 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 1,377,633.40
3,374
POSTE EN CONCRETO LA, H=14m, CR=750 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 1,091,259.06
3,366
POSTE EN CONCRETO LA, H=8m, CR=1050 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 616,763.35
3,364
POSTE EN CONCRETO LA, H=8m, CR=510 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 462,650.49
3,365
POSTE EN CONCRETO LA, H=8m, CR=750 Kg (Inc. Suministro,
Izaje, Hincado, Aplomado y Cimentacin segn Norma LA009)
UN 520,738.43
3,363
POSTE METALICO AP, H=10m (Inc. Suministro, Izaje, Aplomado e
Instalacin. Inc. Brazo Doble y Base segn Norma AP802)
UN 1,929,868.21
3,569
POSTE METALICO AP, H=10m (Inc. Suministro, Izaje, Aplomado e
Instalacin. Inc. Brazo Sencillo y Base segn Norma AP802)
UN 1,644,270.98
3,361
POSTE METALICO AP, H=10m (Inc. Suministro, Izaje, Aplomado e
Instalacin. Incluye Brazo Doble y Base segn Norma AP802)
UN 1,720,134.98
3,362
POSTE METALICO AP, H=12m (Inc. Suministro, Izaje, Aplomado e
Instalacin. Inc. Brazo Sencillo y Base segn Norma AP802)
UN 1,854,004.21
3,359
POSTE METALICO AP, H=6m TIPO M130 DOBLE (Inc. Sumin., Izaje,
Aplomado, Inst., Base segn Norma AP330 y Luminarias 70W)
UN 1,800,787.98
3,358
POSTE METALICO AP, H=6m TIPO M130 SENCILLO (Inc. Sumin.,
Izaje, Aplomado, Inst., Base segn Norma AP330 y Luminaria 70W)
UN 1,311,294.97
3,360
POSTE METALICO AP, H=9m (Inc. Suministro, Izaje, Aplomado e
Instalacin. Inc. Brazo Sencillo y Base segn Norma AP802)
UN 1,547,153.98
3,015 RETIRO DE POSTES DE AP/LA (Incluye Traslado a Sitio de Acopio) UN 151,129.30
3,287
TUBERIA CONDUIT METALICO D=1 1/2" TIPO RMC (Incluye
Suministro e Instalacin)
ML 35,382.27
3,288
TUBERIA CONDUIT METALICO D=1" TIPO RMC (Incluye Suministro
e Instalacin)
ML 22,418.27
3,284 TUBERIA CONDUIT PVC D=1 1/2" (Incluye Suministro e Instalacin) ML 7,452.39
3,285 TUBERIA CONDUIT PVC D=1 1/4" (Incluye Suministro e Instalacin) ML 6,197.85
3,283 TUBERIA CONDUIT PVC D=1" (Incluye Suministro e Instalacin) ML 4,587.65
3,286 TUBERIA CONDUIT PVC D=2" (Incluye Suministro e Instalacin) ML 10,582.65
013.02 RED ELECTRICA EPM
4,434
CANALIZACION VIA PUBLICA CINCO (5) DUCTOS PVC TIPO DB-60
4" MAS CUATRO (4) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-025
ML 418,879.55
4,441
CANALIZACION VIA PUBLICA CINCO (5) DUCTOS PVC TIPO DB-60
4" MAS DOCE (12) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-032
ML 774,634.99
4,438
CANALIZACION VIA PUBLICA CINCO (5) DUCTOS PVC TIPO DB-60
4" MAS OCHO (8) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-029
ML 597,136.00
4,352
CANALIZACION VIA PUBLICA CUATRO (4) DUCTOS PVC TIPO DB-
60 4" EPM NORMA RS1-012
ML 160,590.56
CODIGO NOMBRE U.M. VALOR
4,442
CANALIZACION VIA PUBLICA CUATRO (4) DUCTOS PVC TIPO DB-
60 4" EPM NORMA RS1-033
ML 188,767.60
4,440
CANALIZACION VIA PUBLICA CUATRO (4) DUCTOS PVC TIPO DB-
60 4" MAS NUEVE (9) DUCTOS PVC TIPO DB-60 6" EPM
NORMA RS1-031
ML 600,039.45
4,436
CANALIZACION VIA PUBLICA CUATRO (4) DUCTOS PVC TIPO DB-
60 4" MAS SEIS (6) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-027
ML 465,074.35
4,361
CANALIZACION VIA PUBLICA CUATRO (4) DUCTOS PVC TIPO DB-
60 4" MAS TRES (3) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-021
ML 329,534.31
4,344
CANALIZACION VIA PUBLICA CUATRO (4) DUCTOS PVC TIPO DB-
60 6" DISPOSICIN CUADRADA EPM NORMA RS1-004
ML 255,272.04
4,345
CANALIZACION VIA PUBLICA CUATRO (4) DUCTOS PVC TIPO DB-
60 6" DISPOSICIN LINEAL EPM NORMA RS1-005
ML 265,762.03
4,350
CANALIZACION VIA PUBLICA DIECISEIS (16) DUCTOS PVC TIPO
DB-60 6" EPM NORMA RS1-010
ML 833,797.35
4,435
CANALIZACION VIA PUBLICA DIEZ (10) DUCTOS PVC TIPO DB-60
4" MAS CUATRO (4) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-026
ML 536,624.29
4,439
CANALIZACION VIA PUBLICA DIEZ (10) DUCTOS PVC TIPO DB-60
4" MAS OCHO (8) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-030
ML 721,046.19
4,356
CANALIZACION VIA PUBLICA DOCE (12) DUCTOS PVC TIPO DB-60
4" EPM NORMA RS1-016
ML 370,943.87
4,349
CANALIZACION VIA PUBLICA DOCE (12) DUCTOS PVC TIPO DB-60
6" EPM NORMA RS1-009
ML 576,159.42
4,342
CANALIZACION VIA PUBLICA DOS (2) DUCTOS PVC TIPO DB-60
6" EPM NORMA RS1-002
ML 138,366.61
4,354
CANALIZACION VIA PUBLICA NUEVE (9) DUCTOS PVC TIPO DB-60
4" EPM NORMA RS1-014
ML 294,296.82
4,348
CANALIZACION VIA PUBLICA NUEVE (9) DUCTOS PVC TIPO DB-60
6" EPM NORMA RS1-008
ML 498,725.88
4,355
CANALIZACION VIA PUBLICA OCHO (8) DUCTOS PVC TIPO DB-60
4" EPM NORMA RS1-015
ML 282,044.81
4,437
CANALIZACION VIA PUBLICA OCHO (8) DUCTOS PVC TIPO DB-60
4" MAS SEIS (6) DUCTOS PVC TIPO DB-60 6" EPM NORMA RS1-
028
ML 564,522.87
4,362
CANALIZACION VIA PUBLICA OCHO (8) DUCTOS PVC TIPO DB-60
4" MAS TRES (3) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-022
ML 424,216.67
4,347
CANALIZACION VIA PUBLICA OCHO (8) DUCTOS PVC TIPO DB-60
6" EPM NORMA RS1-007
ML 471,494.15
4,353
CANALIZACION VIA PUBLICA SEIS (6) DUCTOS PVC TIPO DB-60
4" EPM NORMA RS1-013
ML 221,901.38
4,433
CANALIZACION VIA PUBLICA SEIS (6) DUCTOS PVC TIPO DB-60
4" MAS CUATRO (4) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-024
ML 417,907.50
4,360
CANALIZACION VIA PUBLICA SEIS (6) DUCTOS PVC TIPO DB-60
4" MAS DOS (2) DUCTOS PVC TIPO DB-60 6" EPM NORMA RS1-
020
ML 319,805.22
4,358
CANALIZACION VIA PUBLICA SEIS (6) DUCTOS PVC TIPO DB-60
4" MAS UN (1) DUCTO PVC TIPO DB-60 6" EPM NORMA RS1-
018
ML 282,879.33
4,346
CANALIZACION VIA PUBLICA SEIS (6) DUCTOS PVC TIPO DB-60
6" EPM NORMA RS1-006
ML 361,153.25
4,351
CANALIZACION VIA PUBLICA TRES (3) DUCTOS PVC TIPO DB-60
4" EPM NORMA RS1-011
ML 150,072.00
4,363
CANALIZACION VIA PUBLICA TRES (3) DUCTOS PVC TIPO DB-60
4" MAS CUATRO (4) DUCTOS PVC TIPO DB-60 6" EPM NORMA
RS1-023
ML 341,575.25
CODIGO NOMBRE U.M. VALOR
4,359
CANALIZACION VIA PUBLICA TRES (3) DUCTOS PVC TIPO DB-60
4" MAS DOS (2) DUCTOS PVC TIPO DB-60 6" EPM NORMA RS1-
019
ML 218,980.71
4,357
CANALIZACION VIA PUBLICA TRES (3) DUCTOS PVC TIPO DB-60
4" MAS UN (1) DUCTO PVC TIPO DB-60 6" EPM NORMA RS1-
017
ML 210,535.28
4,343
CANALIZACION VIA PUBLICA TRES (3) DUCTOS PVC TIPO DB-60
6" EPM NORMA RS1-003
ML 228,919.21
4,341
CANALIZACION VIA PUBLICA UN (1) DUCTO PVC TIPO DB-60 6"
EPM NORMA RS1-001
ML 111,791.98
4,447
CANALIZACION ZONA VERDE CUATRO (4) DUCTOS PVC TIPO DB-
60 6" DISPOSICIN LINEAL EPM NORMA RS1-005
ML 264,957.11
4,461
CANALIZACION ZONA VERDE TRES (3) DUCTOS PVC TIPO DB-60
4" MAS DOS (2) DUCTOS PVC TIPO DB-60 6" EPM NORMA RS1-
019
ML 223,209.39
014 REDES TELEFONICAS / DATOS
014.01 RED TELEFONICA ETB
3,796 12 DUCTOS D=4" PVC-EB (LIVIANO) (Incluye Suministro e instal ML 137,060.94
3,055
12 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 101,702.07
3,797
16 DUCTOS D=4" PVC-EB (LIVIANO) (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 181,682.72
3,056
16 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 134,537.56
3,415
2 DUCTOS D=3" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 14,079.84
3,195
2 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 18,664.68
3,798
24 DUCTOS D=4" PVC-EB (LIVIANO) (Incluye Suministro e
Instalacin. No Incluye Rellenos)
ML 271,658.16
3,780
3 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 26,873.55
3,599
36 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 303,838.08
4,128
4 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 35,082.42
3,194
6 DUCTOS D=3" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 37,745.65
3,385
6 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin. No
Incluye Rellenos)
ML 51,500.17
3,795
8 DUCTOS D=4" PVC-EB (Incluye Suministro e Instalacin. No Incluye
Rellenos)
ML 91,490.50
4,129 8 DUCTOS D=4" PVC-TDP (Incluye Suministro e Instalacin) ML 70,827.41
3,419
CAJ A DE PASO ANDEN CONCRETO 0.30x0.30m ETB (Incluye Base,
Muros, Paete, Bordillo Perimetral, Marco y Tapa)
UN 205,539.28
4,131
CAJ A DE PASO DOBLE ANDEN CONCRETO ETB (Incluye Base,
Muros, Paete, Bordillo Perimetral, Marco y Tapa)
UN 600,506.34
4,133
CAJ A DE PASO DOBLE EN CALZADA ETB (Incluye Base, Muros,
Paete, Bordillo Perimetral, Marco y Tapa)
UN 941,653.47
4,130
CAJ A DE PASO SENCILLA ANDEN CONCRETO ETB (Incluye Base,
Muros, Paete, Bordillo Perimetral, Marco y Tapa)
UN 358,673.41
4,132
CAJ A DE PASO SENCILLA EN CALZADA ETB (Incluye Base, Muros,
Paete, Bordillo Perimetral, Marco y Tapa)
UN 681,147.63
3,057
CAMARA DE INSPECCIN T-13 ETB (H=2.3m. Incluye Base, Muros,
Cubierta, Aro-Base y Aro-Tapa)
UN 2,719,611.64
CODIGO NOMBRE U.M. VALOR
3,058
CAMARA DE INSPECCIN T-13A ETB (H=2.3m. Incluye Base,
Muros, Cubierta, Aro-Base y Aro-Tapa)
UN 4,665,105.40
3,059
CAMARA DE INSPECCIN T-14 ETB (H=2.3m. Incluye Base, Muros,
Cubierta, Aro-Base y Aro-Tapa)
UN 2,621,366.16
3,410
CAMARA DE INSPECCIN T-14A ETB (H=2.3m. Incluye Base,
Muros, Cubierta, Aro-Base y Aro-Tapa)
UN 4,615,600.57
3,653
CAMARA DE INSPECCIN T-16 ETB (H=2.3m. Incluye Base, Muros,
Cubierta, Aro-Base y Aro-Tapa)
UN 3,519,018.97
3,655
CAMARA DE INSPECCIN T-16A ETB (H=2.3m. Incluye Base,
Muros, Cubierta, Aro-Base y Aro-Tapa)
UN 4,364,707.05
3,654
CAMARA DE INSPECCIN T-18 ETB (H=2.3m. Incluye Base, Muros,
Cubierta, Aro-Base y Aro-Tapa)
UN 2,350,786.10
3,411
CAMARA DE INSPECCIN T-18A ETB (H=2.3m. Incluye Base,
Muros, Cubierta, Aro-Base y Aro-Tapa)
UN 4,763,072.78
4,481 CARCAMO DOCE DUCTOS ETB ML 158,901.72
014.03 RED TELEFONICA COLOMBIA TELECOMUNIC
4,331
CAMARA DOBLE TIPO "2Fs" COLOMBIA TELECOMUNICACIONES
ESQUEMA CT-055
UN 617,866.28
4,330
CAMARA DOBLE TIPO "F1" COLOMBIA TELECOMUNICACIONES
ESQUEMA CT-049
UN 597,628.28
4,305
CAMARA DOBLE TIPO "Fs" COLOMBIA TELECOMUNICACIONES
ESQUEMA CT-018
UN 228,809.18
4,306
CAMARA TIPO "2Fr" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-019
UN 528,516.12
4,327
CAMARA TIPO "2TA" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-041
UN 4,422,695.02
4,326
CAMARA TIPO "2XA" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-040
UN 4,425,961.42
4,308
CAMARA TIPO "A" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-022
UN 3,519,295.40
4,314
CAMARA TIPO "B" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-028
UN 3,179,735.40
4,320
CAMARA TIPO "C" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-034
UN 2,653,365.52
4,328
CAMARA TIPO "D" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-042
UN 2,411,717.68
4,336
CAMARA TIPO "D/2" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-048
UN 1,330,362.58
4,329
CAMARA TIPO "F1" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-050
UN 324,310.82
4,337
CAMARA TIPO "F2" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-051
UN 150,155.06
4,307
CAMARA TIPO "Fr" COLOMBIA TELECOMUNICACIONES
ESQUEMA CT-021
UN 324,715.66
4,311
CAMARA TIPO "J A" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-025
UN 3,507,868.20
4,317
CAMARA TIPO "J B" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-031
UN 3,164,324.20
4,323
CAMARA TIPO "J C" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-037
UN 2,634,358.32
4,332
CAMARA TIPO "J D" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-045
UN 2,272,240.72
4,309
CAMARA TIPO "LA" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-023
UN 3,519,295.40
4,315
CAMARA TIPO "LB" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-029
UN 3,179,735.40
4,321
CAMARA TIPO "LC" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-035
UN 2,653,365.52
CODIGO NOMBRE U.M. VALOR
4,333
CAMARA TIPO "LD" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-043
UN 2,262,867.92
4,312
CAMARA TIPO "TA" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-026
UN 3,507,868.20
4,318
CAMARA TIPO "TB" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-032
UN 3,164,324.20
4,324
CAMARA TIPO "TC" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-038
UN 2,634,358.32
4,335
CAMARA TIPO "TD" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-046
UN 2,261,840.72
4,313
CAMARA TIPO "XA" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-027
UN 3,496,441.00
4,319
CAMARA TIPO "XB" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-033
UN 3,154,852.20
4,325
CAMARA TIPO "XC" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-039
UN 2,624,886.32
4,334
CAMARA TIPO "XD" COLOMBIA TELECOMUNICACIONES
ESQUEMA CT-047
UN 2,263,156.72
4,310
CAMARA TIPO "ZA" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-024
UN 3,683,899.40
4,316
CAMARA TIPO "ZB" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-030
UN 3,370,509.00
4,322
CAMARA TIPO "ZC" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-036
UN 2,653,365.52
4,338
CAMARA TIPO "ZD" COLOMBIA TELECOMUNICACIONES DIBUJ O
CT-044
UN 2,262,867.92
4,302 CARCAMO 12 A 20 VIAS COLOMBIA TELECOMUNICACIONES ML 268,291.22
4,300 CARCAMO 2 A 4 VIAS COLOMBIA TELECOMUNICACIONES ML 207,565.74
4,303 CARCAMO 20 A 24 VIAS COLOMBIA TELECOMUNICACIONES ML 305,296.02
4,304 CARCAMO 24 A 36 VIAS COLOMBIA TELECOMUNICACIONES ML 319,262.42
4,301 CARCAMO 6 A 9 VIAS COLOMBIA TELECOMUNICACIONES ML 230,751.34
016 CONCRETO Y ACERO PARA ESTRUCTURAS
016.01 CONCRETO PARA ESTRUCTURAS
4,432
COLUMNA EN CONCRETO DE 3000 PSI SECCION 20x12 andamio
tubular
ML 25,060.00
4,429
COLUMNA EN CONCRETO DE 3000 PSI SECCION 20x20 revisar
paral telescopico, andamio tubular
ML 31,101.28
3,729
CONCRETO 1500 PSI PARA SOLADOS (Premezclado. Incluye
Suministro y Colocacin)
M3 375,317.36
3,442 CONCRETO 2000 PSI PARA REDES (Suministro y Colocacin) M3 354,622.50
3,647
CONCRETO 2000 PSI PARA SUB-BASE PUENTE (Premezclado.
Incluye Sumin., Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 428,801.18
3,875
CONCRETO 2500 PSI PARA ANCLAJ E TUBERIA (Hecho en Obra.
Incluye Suministro, Formaleteo y Colocacin)
M3 311,056.54
3,611
CONCRETO 2500 PSI PARA ANCLAJ E TUBERIA (Premezclado.
Incluye Suministro, Formaleteo y Colocacin)
M3 390,171.47
3,203 CONCRETO 2500 PSI PARA REDES (Suministro y Colocacin) M3 339,151.44
3,646
CONCRETO 3000 PSI PARA ALETA VIGA SOLERA (Premezclado.
Incl. Sumin., Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 598,720.25
3,645
CONCRETO 3000 PSI PARA BOX CULVERT (Premezclado. Incluye
Sumin., Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 557,710.66
CODIGO NOMBRE U.M. VALOR
3,641
CONCRETO 3000 PSI PARA ESTR. DE TRANSICION (Premezclado.
Incl. Sumin, Formalet. y Colocacin. No incl. Refuerzo, Curado)
M3 530,755.37
3,642
CONCRETO 3000 PSI PARA ESTRIBOS (Premezclado. Incluye
Suministro, Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 530,755.37
3,644
CONCRETO 3000 PSI PARA MURO DE CONTENCIN
(Premezclado. Incl. Sumin, Formaleteo y Colocacin. No incl.
Refuerzo, Curado)
M3 557,710.66
3,643
CONCRETO 3000 PSI PARA PUENTE CAJ ON (Premezclado. Incluye
Sumin., Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 529,954.97
3,202 CONCRETO 3000 PSI PARA REDES (Suministro y Colocacin) M3 400,784.79
3,639
CONCRETO 3500 PSI PARA VIGA (Premezclado. Incluye Sumin.,
Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 620,107.54
3,640
CONCRETO 3500 PSI PARA ZAPATAS (Premezclado. Incluye
Sumin., Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 503,389.18
3,637
CONCRETO 4000 PSI PARA PILAS (Premezclado. Incluye Sumin.,
Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 516,845.18
3,636
CONCRETO 5000 PSI PARA SUPER ESTRUCTURA (Premezclado.
Incluye Sumin, Formaleteo y Colocacin. No incl. Refuerzo, Curado)
M3 617,626.46
3,873
CONCRETO CICLOPEO (60%-40%) (Concreto hecho en Obra.
Incluye Suministro y Colocacin)
M3 207,374.69
3,665
CONCRETO CICLOPEO (60%-40%) (Concreto premezclado. Incluye
Suministro y Colocacin)
M3 243,906.01
3,730 GROUTING 1500 PSI (Incluye Suministro y Colocacin) M3 399,598.98
4,134 GROUTING 2000 PSI (Incluye Suministro y Colocacin) M3 406,297.98
4,135 GROUTING 2500 PSI (Incluye Suministro y Colocacin) M3 414,823.98
3,567
MURO EN BLOQUE ESTRUCTURAL TIPO PIEDRA GRIS
(Referencia: PI-16. Incluye Suministro y Construccin)
M2 43,842.28
3,758
PILOTE D=40 CM (Incl. Excavacin, Cargue y Retiro de Sobrantes,
Movilizacin, montaje y desmontaje equipo, y concreto)
ML 147,209.93
3,760
PILOTE D=50 CM (Incl. Excavacin, concreto,cargue y Retiro de
Sobrantes, desmovilizacion montaje y desmontaje de equipo
ML 190,437.20
3,761
PILOTE D=60 CM (Incl. Excavacin, concreto, cargue y Retiro de
Sobrantes, Movilizacin, montaje y desmontaje equipo.
ML 245,551.23
4,430
VIGA DE AMARRE AEREA EN CONCRETO DE 3000 PSI SECCION
20x12 REVISAR FORMALETA
ML 22,062.56
4,428 VIGA DE AMARRE EN CONCRETO DE 3000 PSI SECCION 20x20 ML 26,932.86
4,427 ZAPATA EN CONCRETO DE 3000 PSI M3 487,848.35
017 TRANSPORTES Y ACARREOS
017.01 TRANSPORTES Y ACARREOS
3,017
TRANSPORTE Y DISPOSICION FINAL DE ESCOMBROS EN SITIO
AUTORIZADO (distancia de transporte 21 Km)
M3 16,981.57
4,613
TRANSPORTE Y DISPOSICION FINAL DE ESCOMBROS EN SITIO
AUTORIZADO (distancia de transporte 28 Km)
M3 21,832.57
018 MANTENIMIENTO Y REHABILITACION DE V
018.01 MALLA VIAL INTERMEDIA
4,490 BACHEO EN PAVIMENTO FLEXIBLE e=0.12m M2 125,345.98
CODIGO NOMBRE U.M. VALOR
4,664
CONSTRUCCIN DE PAVIMENTO FLEXIBLE e=0.15m (no incluye
sardinel)
M2 203,351.56
4,605
CONSTRUCCIN DE PAVIMENTO FLEXIBLE e=0.16m (no incluye
sardinel)
M2 163,012.03
4,504
CONSTRUCCIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-45 e=0.18m
M2 213,833.60
4,502
DEMOLICIN Y RECONSTRUCCIN DE LOSAS EN CONCRETO
HIDRAULICO MR-45 e=0.18m
M2 160,146.53
4,501 FRESADO Y REPOSICIN DE PAVIMENTO FLEXIBLE e=0.12m M2 71,585.39
4,663 PARCHEO EN PAVIMENTO FLEXIBLE e=0.12m M2 88,843.39
4,541 PARCHEO EN PAVIMENTO FLEXIBLE M3 CON MD12 M3 670,366.68
4,542 PARCHEO EN PAVIMENTO FLEXIBLE M3 CON MDC-2 M3 663,467.93
4,491 REHABILITACIN DE PAVIMENTO FLEXIBLE e=0.12m M2 163,636.90
4,503
REHABILITACIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-45 e=0.18m
M2 181,357.54
018.02 MALLA VIAL LOCAL
4,506 BACHEO EN PAVIMENTO FLEXIBLE e=0.10m M2 114,632.21
4,511 CONSTRUCCIN DE PAVIMENTO FLEXIBLE e=0.10m M2 178,265.22
4,512
CONSTRUCCIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-41 e=0.18m
M2 213,050.18
4,507
DEMOLICIN Y RECONSTRUCCIN DE LOSAS EN CONCRETO
HIDRAULICO MR-41 e=0.18m
M2 155,323.25
4,510 FRESADO Y REPOSICIN DE PAVIMENTO FLEXIBLE e=0.10m M2 60,750.72
4,505 PARCHEO EN PAVIMENTO FLEXIBLE e=0.10m M2 77,226.03
4,709 PARCHEO EN PAVIMENTO FLEXIBLE e=0.10m con MD12 M2 78,549.13
4,508 REHABILITACIN DE PAVIMENTO FLEXIBLE e=0.10m M2 141,347.68
4,509
REHABILITACIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-41 e=0.18m
M2 190,874.52
018.03 MALLA VIAL ARTERIAL
4,515 BACHEO EN PAVIMENTO FLEXIBLE e=0.14m M2 134,458.75
4,640
CONSTRUCCIN DE PAVIMENTO FLEXIBLE MD10 E=0.06m Y
MD20 e=0.18m (no incluye sardinel)
M2 172,634.83
4,639
CONSTRUCCIN DE PAVIMENTO FLEXIBLE MD10 E=0.08m Y
MD20 e=0.18m (no incluye sardinel)
M2 225,989.21
4,667
CONSTRUCCIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-45 e=0.20m (no incluye sardinel)
M2 224,501.78
4,517
DEMOLICIN Y RECONSTRUCCIN DE LOSAS EN CONCRETO
HIDRAULICO MR-45 e=0.20m
M2 172,999.61
4,516 FRESADO Y REPOSICIN DE PAVIMENTO FLEXIBLE e=0.14m M2 82,420.06
4,514 PARCHEO EN PAVIMENTO FLEXIBLE e=0.14m M2 100,460.77
4,665 REHABILITACIN DE PAVIMENTO FLEXIBLE e=0.18m M2 210,109.21
4,707
REHABILITACIN DE PAVIMENTO FLEXIBLE ESPESOR DE
MEZCLA ASFALTICA e=0.21m PARA TRONCAL
M2 333,501.29
4,666
REHABILITACIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-45 e=0.20m
M2 185,981.59
4,708
REHABILITACIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-45 e=0.27m PARA TRONCAL
M2 283,455.10
018.04 ACTIVIDADES ADICIONALES
4,522
BACHEO EN PAVIMENTO FLEXIBLE e=30mm (ESTABILIZACIN
DE BASE GRANULAR CON EMULSIN +CEMENTO 5% e=0.20m
M2 125,627.51
CODIGO NOMBRE U.M. VALOR
4,523
CONSTRUCCIN PAVIMENTO ARTICULADO EN ADOQUIN DE
ARCILLA - TRAFICO LIVIANO
M2 139,524.45
4,524
CONSTRUCCIN PAVIMENTO ARTICULADO EN ADOQUIN DE
ARCILLA - TRAFICO PESADO
M2 145,840.34
4,521
ESTABILIZACIN DE BASE GRANULAR CON EMULSIN +
CEMENTO 5% e=0.20m
M2 11,346.00
4,586
REHABILITACION PAVIMENTO ARTICULADO EN ADOQUIN DE
ARCILLA - TRAFICO PESADO
M2 66,062.57
4,518 SOBRECARPETA: RODADURA ASFLTICA e=0.04m M2 22,208.05
4,519 SOBRECARPETA: RODADURA ASFLTICA e=0.06m M2 34,195.87
4,520 SOBRECARPETA: RODADURA ASFLTICA e=0.08m M2 43,918.14
1100-01 CONSTRUCCION DE ANDENES
4,575
CONSTRUCCION DE ANDEN EN ADOQUIN DE ARCILLA SOBRE
ARENA. NO INCLUYE BORDILLO
M2 113,359.61
4,576
CONSTRUCCION DE ANDEN EN LOSA DE CONCRETO DE 3000
PSI. NO INCLUYE BORDILLO
M2 122,861.07
4,578 CONSTRUCCION DE BORDILLO PREFABRICADO A80 ML 57,176.29
4,595
MANTENIMIENTO CORRECTIVO DE ESPACIO PUBLICO ADOQUIN
DE ARCILLA LIV SOBRE MORTER. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 54,065.53
4,677
MANTENIMIENTO CORRECTIVO DE ESPACIO PUBLICO ADOQUIN
DE ARCILLA PES SOBRE MORTER. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 60,305.53
4,705
MANTENIMIENTO CORRECTIVO DE ESPACIO PUBLICO LOSETA A-
50 SOBRE ARENA. INCL. RETIRO LOSETA E INSTALAR NUEVA
M2 54,954.70
4,706
MANTENIMIENTO CORRECTIVO DE ESPACIO PUBLICO LOSETA A-
50 SOBRE MORTERO. INCL. RETIRO LOSETA E INSTALAR
NUEVA
M2 55,038.14
4,596
MANTENIMIENTO CORRECTIVO ESPACIO PUBLICO EN ADOQUIN
DE ARCILLA LIV SOBRE ARENA. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 39,830.64
4,679
MANTENIMIENTO CORRECTIVO ESPACIO PUBLICO EN ADOQUIN
DE ARCILLA PES SOBRE ARENA. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 46,070.64
4,680
MANTENIMIENTO CORRECTIVO ESPACIO PUBLICO EN ADOQUIN
DE CONCRETO LIV SOBRE ARENA. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 50,074.64
4,681
MANTENIMIENTO CORRECTIVO ESPACIO PUBLICO EN ADOQUIN
DE CONCRETO PES SOBRE ARENA. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 60,942.64
4,589
MANTENIMIENTO PREVENTIVO ESPACIO PUBLICO EN ADOQUIN
INCLUYE SELLO DE J UNTAS, BARRIDO, Y RETIRO MANUAL DE
CAPA VEGETAL
M2 1,023.92
4,682
REHABILITACION DE ANDEN EN ADOQUIN DE ARCILLA SOBRE
ARENA. NO INCL BORDILLO. INCL. DEMOLICION ADOQUIN E
INSTALAR NUEVO
M2 79,068.12
4,594
REHABILITACION DE ANDEN EN ADOQUIN DE ARCILLA SOBRE
ARENA. NO INCL BORDILLO. INCL. DEMOLICION ADOQUIN E
INSTALAR NUEVO
M2 72,828.12
4,579
REHABILITACION DE ANDEN EN ADOQUIN DE ARCILLA SOBRE
MORTER. NO INCL BORDILLO. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 85,738.45
4,683
REHABILITACION DE ANDEN EN ADOQUIN DE ARCILLA SOBRE
MORTER. NO INCL BORDILLO. INCL. RETIRO ADOQUIN E
INSTALAR NUEVO
M2 91,978.45
CODIGO NOMBRE U.M. VALOR
4,685
REHABILITACION DE ANDEN EN ADOQUIN DE CONCRETO L
BASE ARENA. NO INCL BORDILLO. INCL. DEMOLICION ADOQUIN
E INSTALAR NUEVO
M2 83,072.12
4,684
REHABILITACION DE ANDEN EN ADOQUIN DE CONCRETO P
BASE ARENA. NO INCL BORDILLO. INCL. DEMOLICION ADOQUIN
E INSTALAR NUEVO
M2 93,940.12
4,582
REHABILITACION DE ANDEN EN LOSA DE CONCRETO DE 3000
PSI. NO INCLUYE BORDILLO
M2 84,855.21
4,583
REHABILITACION ZONA VERDE e=10 cm. INCLUYE DESCAPOTE,
SIEMBRA DE GRAMA, TIERRA NEGRA Y RETIRO DE MATERIAL
ORGANICO
M2 15,738.06
4,687
REPOSICION BOLARDO M61 INCLUYE EXCAVACION CARGUE Y
DISPOSICION FINAL DE ESCOMBROS Y BASE EN CONCRETO DE
1500PSI
UN 144,511.89
1100-02 CONSTRUCCION DE VIAS
4,588 CONSTRUCCION DE ESCALERAS EN CONCRETO M2 243,178.23
4,585
REHABILITACIN DE PAVIMENTO RGIDO: LOSAS EN CONCRETO
HIDRAULICO MR-41 e=0.18m
M2 143,508.93
1100-03 CONSTRUCCION DE CICLORUTAS
4,577 CONSTRUCCION DE CICLORUTA. M2 98,490.54
4,597 MANTENIMIENTO PREVENTIVO PARA CICLORUTAS M2 9,282.25
4,584 REHABILITACION DE CICLORUTA. M2 61,512.24
EL USO DE LA INFORMACIN PUBLICADA COMPROMETE NICAMENTE LA RESPONSABILIDAD DE QUIEN LA
CONSULTA. EL INTERESADO EST EN LA OBLIGACIN DE VERIFICARLA CASO POR CASO YA QUE EL ALCANCE
DE LA ACTIVIDAD PUEDE NO COINCIDIR CON SU NECESIDAD TCNICA PARTICULAR.

También podría gustarte