Está en la página 1de 20

1.

- DATOS HIDROLOGICOS:

MESES

DEDUCCIONES
EVAPORACION
REQ. RIEGO
mm
M3
M3
5,480.32
58.7
5,729.48
57.6
5,350.40
52.1
4,974.94
47.5
4,637.30
43.8
2,150.45
139032.03
65.8
7,165.42
139032.03
71.4
5,809.00
139032.03
63.8
4,745.12
56.3
5,973.18
70.3
7,001.42
81.5
4,876.76
55.3
724.10
63,893.79
417,096.09

APORTE
M3

ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
TOTAL

96,620
79,920
49,742
31,486
19,857
1,252
986
1,879
18,350
29,280
51,630
88,980

469,982.0

REA (M2)
INICIO
FIN
M2
M2
93,361.42
99,470.08
99,470.08
102,694.84
102,694.84
104,735.48
104,735.48
105,874.36
105,874.36
32,681.65
32,681.65
100,356.02
100,356.02
91,050.17
91,050.17
84,282.82
84,282.82
84,967.05
84,967.05
85,906.97
85,906.97
88,187.43
88,187.43
93,361.42

NIVEL DE ALMACENAMIENTO MINIMO (NAM)


NIVEL DE ALMACENAMIENTO DE NORMAL ELEVACION (NANE)
NIVEL DE ALMACENAMIENTO DE MAXIMA ELEVACION (NAME) = NANE + H

2.- DATOS TOPOGRAFICOS:


CUADRO REA VOLUMEN - ALTURA
COTA
NAM

4359.4
4360
4361
4362
4363
4364
4365
4366
4367
4368
4369
4370
4371

REA
M2
84282.82
88631.01
93641.77
99114.58
104522.02
109289.57
114145.47
119156.64
160252.82
164133.87
164457.5997
164784.18
169131.86

VOLUMEN
M3
0.00
86,456.91
91,136.39
96,378.18
101,818.30
106,905.79
111,717.52
116,651.05
139,704.73
162,193.35
164,295.73
164,620.89
166,958.02

VOL. ACUM.
M3
0.00
86,456.91
177,593.30
273,971.48
375,789.78
482,695.57
594,413.09
711,064.15
850,768.88
1,012,962.22
1,177,257.96
1,341,878.84
1,508,836.87

3.- CALCULOS HIDRAULICOS:


CALCULO DEL NAME:

Q C .L .H

3/2

Clculo de la altura H:
donde:
Q
C
L

=
=
=

8.70 m3/seg
2.20
40.00 m

Q C .L .H

3/2

(caudal de descarga)

(asumido)

Reemplazando:
NAME

NANE + H

NAME =

4364.11 m

1.- DATOS HIDROLOGICOS:


DEDUCCIONES
EVAPORACION
REQ. RIEGO
mm
M3
M3
22,055.03
175
14,982.20
125
16,669.71
126
18,734.26
132
16,459.39
114
12,395.85
278829.32
85
18,836.47
139032.03
139
24,657.76
139032.03
187
15,567.02
165
17,792.72
174
16,628.07
152
21,659.86
183
1,757.00
216,438.36
556,893.38

APORTE
MESES
M3
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
TOTAL

208.243
199,425
135,825
99,850
89,652
65,421
50,325
65,325
92,754
85,235
118,874
175,213

1,178,107.2

REA (M2)
INICIO
FIN
M2
M2
126,028.74
119,857.59
119,857.59
132,299.28
132,299.28
141,926.20
141,926.20
144,380.63
144,380.63
145,833.58
145,833.58
135,514.17
135,514.17
131,859.70
131,859.70
94,345.61
94,345.61
102,257.02
102,257.02
109,395.23
109,395.23
118,359.89
118,359.89
126,028.74

NIVEL DE ALMACENAMIENTO MINIMO (NAM)


NIVEL DE ALMACENAMIENTO DE NORMAL ELEVACION (NANE)
NIVEL DE ALMACENAMIENTO DE MAXIMA ELEVACION (NAME) = NANE + H

2.- DATOS TOPOGRAFICOS:


CUADRO REA VOLUMEN - ALTURA
COTA
4400
4401
4402
4403
4404
4405
4406

REA
M2
94345.61
104538.07
116412.99
122711.42
128586.34
133873.28
143218.98

VOLUMEN
M3
0.00
99,441.84
110,475.53
119,562.20
125,648.88
131,229.81
138,546.13

VOL. ACUM.
M3
0.00
99,441.84
209,917.37
329,479.57
455,128.45
586,358.26
724,904.39

147619.13
155620.35
160252.82
164133.87
164457.5997
164784.18

4407
4408
4409
4410
4411
4412

145,419.06
151,619.74
157,936.59
162,193.35
164,295.73
164,620.89

870,323.44
1,021,943.18
1,179,879.77
1,342,073.11
1,506,368.85
1,670,989.73

3.- CALCULOS HIDRAULICOS:


CALCULO DEL NAME:
Clculo de la altura H:
donde:
Q
C
L

=
=
=

Q C .L .H

3/2

10.50 m3/seg (caudal de descarga)


2.20
40.00 m
(asumido)

Reemplazando:
NAME

NANE + H

NAME =

4407.02 m

1.- DATOS HIDROLOGICOS:

MESES

APORTE
M3

ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
TOTAL

208.243
199,425
135,825
99,850
89,652
65,421
50,325
65,325
92,754
85,235
118,874
175,213

1,178,107.2

DEDUCCIONES
EVAPORACION
REQ. RIEGO
mm
M3
M3
23,584.08
175
16,512.35
125
17,860.67
126
19,981.08
132
17,523.45
114
13,314.80
273058.88
85
20,062.94
139032.03
139
25,885.72
139032.03
187
19,208.14
165
20,929.99
174
18,782.11
152
23,477.71
183
1,757.00
237,123.06
551,122.94

REA (M2)
INICIO
FIN
M2
M2
134,766.20
132,098.79
132,098.79
141,751.39
141,751.39
151,371.82
151,371.82
153,714.48
153,714.48
156,644.74
156,644.74
144,337.68
144,337.68
138,426.31
138,426.31
116,412.99
116,412.99
120,287.32
120,287.32
123,566.53
123,566.53
128,293.52
128,293.52
134,766.20

NIVEL DE ALMACENAMIENTO MINIMO (NAM)


NIVEL DE ALMACENAMIENTO DE NORMAL ELEVACION (NANE)

NIVEL DE ALMACENAMIENTO DE MAXIMA ELEVACION (NAME) = NANE + H


NIVEL DE ALMACENAMIENTO MINIMO (NAM)

2.- DATOS TOPOGRAFICOS:


CUADRO REA VOLUMEN - ALTURA
REA
M2
116412.99
122711.42
128586.34
133873.28
143218.98
147619.13
155620.35
160252.82
164133.87
164457.5997
164784.18
169131.86
173214.59

COTA
4402
4403
4404
4405
4406
4407
4408
4409
4410
4411
4412
4413
4414

VOLUMEN
M3
0.00
119,562.20
125,648.88
131,229.81
138,546.13
145,419.06
151,619.74
157,936.59
162,193.35
164,295.73
164,620.89
166,958.02
171,173.23

VOL. ACUM.
M3
0.00
119,562.20
245,211.08
376,440.89
514,987.02
660,406.08
812,025.82
969,962.40
1,132,155.75
1,296,451.48
1,461,072.37
1,628,030.39
1,799,203.62

3.- CALCULOS HIDRAULICOS:


CALCULO DEL NAME:
Clculo de la altura H:
donde:
Q
C
L

=
=
=

10.50 m3/seg
2.20
40.00 m

Q C .L .H

3/2

(caudal de descarga)

(asumido)

Reemplazando:
NAME

NANE + H

Cotas
4401
4400
4402

Vol
1,738,505.92
1,670,989.73
1,799,203.62

NAME =

4408.31 m

Cota final
4,407.64
4,407.02
4,408.31

Alt. Presa
6.64
7.02
6.31

ok !

VOLUMEN (M3)
INICIO
FIN
M3
M3
165,643.51
256,783.20
256,783.20
330,973.72
330,973.72
375,365.32
375,365.32
401,876.38
401,876.38
417,096.09
417,096.09
277,165.60
277,165.60
131,954.16
131,954.16
0.00
0.00
13,604.88
13,604.88
36,911.69
36,911.69
81,540.28
81,540.28
165,643.51

COTAS (m.s.n.m.)
INICIO
FIN
m.s.n.m.
m.s.n.m.
4,360.94
4,361.98
4,361.98
4,362.64
4,362.64
4,363.12
4,363.12
4,363.35
4,363.35
4,363.90
4,363.90
4,362.16
4,362.16
4,360.53
4,360.53
4,359.40
4,359.40
4,359.49
4,359.49
4,359.46
4,359.46
4,360.00
4,360.00
4,360.94

4,359.40

m.s.n.m.

4,363.90

m.s.n.m.

4,364.11

m.s.n.m.

4359

84283

4360

88631

86457

86457

4361

93642

91136

177593

4362

99115

96378

273971

4363

104522

101818

375789

4364

109290

106906

482695

4365

114145

111718

594413

4366

119157

116651

711064

NANE

NAM

0.21 m

VOLUMEN (M3)
INICIO
FIN
M3
M3
400,428.32
378,581.53
378,581.53
563,024.33
563,024.33
682,179.62
682,179.62
763,295.37
763,295.37
836,487.97
836,487.97
610,683.80
610,683.80
503,140.30
503,140.30
0.00
0.00
77,186.98
77,186.98
144,629.25
144,629.25
246,875.18
246,875.18
400,428.32

COTAS (m.s.n.m.)
INICIO
FIN
m.s.n.m.
m.s.n.m.
4,403.56
4,403.50
4,403.50
4,404.83
4,404.83
4,405.71
4,405.71
4,406.26
4,406.26
4,406.78
4,406.78
4,405.18
4,405.18
4,404.45
4,404.45
4,400.00
4,400.00
4,400.78
4,400.78
4,401.41
4,401.41
4,402.31
4,402.31
4,403.56

4,400.00

m.s.n.m.

4,406.78

m.s.n.m.

4,407.02

m.s.n.m.

NANE

NAM

0.24 m

VOLUMEN (M3)
INICIO
FIN
M3
M3
389,678.04
366,302.20
366,302.20
549,214.85
549,214.85
667,179.17
667,179.17
747,048.09
747,048.09
819,176.64
819,176.64
598,223.96
598,223.96
489,453.99
489,453.99
0.00
0.00
73,545.86
73,545.86
137,850.86
137,850.86
237,942.75
237,942.75
389,678.04

COTAS (m.s.n.m.)
INICIO
FIN
m.s.n.m.
m.s.n.m.
4,405.10
4,405.06
4,405.06
4,406.27
4,406.27
4,407.08
4,407.08
4,407.59
4,407.59
4,408.07
4,408.07
4,406.59
4,406.59
4,405.86
4,405.86
4,402.00
4,402.00
4,402.62
4,402.62
4,403.15
4,403.15
4,403.94
4,403.94
4,405.10

4,402.00

m.s.n.m.

4,408.07

m.s.n.m.

NANE

NAM

4,408.31

m.s.n.m.

0.24 m

Elegido por Facilidad en el Proceso Constructivo

1) BALANCE HIDRICO MANCAN

MESES

APORTE
M3

ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
TOTAL

96,620
79,920
49,742
31,486
19,857
1,252
986
1,879
18,350
29,280
51,630
88,980

469,982.0

DEDUCCIONES
EVAPORACION
mm
M3
5,458.75
58.7
5,685.66
57.6
5,329.63
52.1
4,944.89
47.5
4,614.25
43.8
7,835.81
65.8
7,101.53
71.4
5,778.04
63.8
4,745.12
56.3
5,973.18
70.3
7,083.01
81.5
4,865.25
55.3
724.10
69,415.11

REQ. RIEGO
M3

139055.09
139055.09
139055.09

REA (M2)
INICIO
FIN
M2
M2
92,993.96
98,709.31
98,709.31
102,296.08
102,296.08
104,103.04
104,103.04
105,348.10
105,348.10
119,085.32
119,085.32
99,461.15
99,461.15
90,564.92
90,564.92
84,282.82
84,282.82
84,967.05
84,967.05
86,908.12
86,908.12
87,979.13
87,979.13
92,993.96

VOLUMEN (M3)
INICIO
M3
165,573.44
256,734.69
330,969.03
375,381.41
401,922.51
417,165.27
271,526.36
126,355.75
0.00
13,604.88
36,911.69
81,458.68

417,165.27

NIVEL DE ALMACENAMIENTO MINIMO (NAM)

NIVEL DE ALMACENAMIENTO DE NORMAL ELEVACION (NANE)

NIVEL DE ALMACENAMIENTO DE MAXIMA ELEVACION (NAME) = NANE + H

2 ) DATOS TOPOGRAFICOS

CUADRO REA VOLUMEN - ALTURA


COTA
4359.4
4360
4361
4362
4363
4364
4365
4366

REA
M2
84282.82
88631.01
93641.77
99114.58
104522.02
109289.57
114145.47
119156.64

VOLUMEN
M3
0.00
86,456.91
91,136.39
96,378.18
101,818.30
106,905.79
111,717.52
116,651.05

VOL. ACUM.
M3
0.00
86,456.91
177,593.30
273,971.48
375,789.78
482,695.57
594,413.09
711,064.15

3 ) CALCULOS HIDRAULICOS
CALC

Clculo de la altura H:
donde:
Q
C

=
=

8.70 m3/seg
2.20

3.- CALCULOS HIDRAULICOS:

Q C .L .H

3/2

(caudal de descarga)

CALCULO DEL NAME:

0.26 m

(asumido)

30.00 m

Reemplazando:
NAME

NANE + H

NAME =

4363.65 m

CALCULO DEL BORDE LIBRE

SEGN: "Manual para proyectos de pequeas obras hidraulicas para riego y abrevado" universidad de Chaping

H HV H D H O H L
Donde:
H = Altura mxima de diseo (m)
Hv = Distancia vertical entre elevaciones de la seccin de control y el fondo
del cauce del arroyo (m)
Hd = Carga hidraulica sobre el vertedero
Ho = Altura mxima de olas (m)
HL = Altura libre
Hcauce = Para 5 000 m3 (volumene muerto)-asumido para pequeas presas
la altura equivalente sera de 0,05 m; que es insignificante para el diseo.
Hcauce = H (NAM)
Resolviendo:

Hv = NANE - NAM =
Hd = H

4363.39 - 4359.4
Hd =

Hv =

3.99 m

0.26 m

Calculo de Ho:

H O (0.005.V 0.068). F
V
F

= 100.00 km/h = 31,07 millas/h


=
0.583 km

(velocidad del viento)


(fetch)

Calculamos el HL:
HL =

1.00 m

(asumido)

Entonces:
H =

3.99 + 0.26 + 0.33 + 1

Calculo del borde libre:


BL = Ho + HL (altura de olas + seguridad)

H =

5.60 m

BL

1.33 m

4.- COTA DE CORANA:


NIVEL DE ALMACENAMIENTO MINIMO (NAM) =
COTA DE CORONA

4,359.40
4,365.00

ELEVACIN DE LA CORONA
Elevacion NANE =
Hd =
BL =

4363.39 m.s.n.m.
0.26 m
1.33 m

Elevacin de la Corona =

4364.98 m.s.n.m.

B. SEGN: "Memorias del seminario diseo de presas de tierra" . UNI - FIC - CISMID

HBL Hv Hr AH Hs
Donde:
HBL =
Hv =
Hr =
H =
Hs =

Dist. vert. entre la corona del terraplen y la sup. de agua del vaso en (NAME)
Amplitud del oleage generado por el viento
Altura de rodamiento de las olas sobre el talud aguas arriba
Asentamiento mximo de la corona
Margen de seguridad

Datos:
V = 100.00 km/h (velocidad del viento)
F =
0.583 km
(fetch)
Calculo de Hv:

Hv 3.22 VF 76 26.94 F

Hv =

77.09 cm

Calculo de Hr:

Hr 0.4Hv

Hr =

30.83 cm

Calculo de H:
H KH

K =
H =

NOTA:
Braja M. Das, "FUNDAMENTOS DE INGENIERIA GEOTECNICA", pag. 84 - Tabla 4.1
-1
0.000001 cm
560.00 cm

(para material CL de plasticidad media)


Altura de la presa

Calculo de Hs

Hs
=
Hv
=
Hs(min) =

(NAME - NANE)/3
77.09 cm
60.00 cm

Entonces:
HBL =

77.09 + 30.83 + 0.31 + 0.09

Hs =

0.09 cm

HBL =

108.32 cm

ELEVACIN DE LA CORONA
Elevacin NAME =
HBL =
Elevacin de la Corona =

4363.65 m
1.08 m
4364.73 m.s.n.m.

C. SEGN: "PredimenSionamiento y estimacin de costos de obras de presas a nivel preliminar" CIDIAT

BL HL BLA
Datos:
V = 100.00 km/h
F = 0.583 km
Calculo de HL:
HL (0.005V 0.068) F

HL =

0.33 cm

Calculo de BLA:

BLA 1.5HL

BLA

Por lo tanto:
0.33 + 0.49

0.49 cm

BL =

0.82 m

ELEVACIN DE LA CORONA.
Elevacin de NAME =
BL =
Elevacin de la Corona =

4363.65 m
0.82 m
4364.47 m.s.n.m.

CONCLUSIN:
Altura de Elevacin de la Corona =

DIMENSIONES DEL ANCHO DE CORONA

8.11 m

Elevacin de la Corona =

A. De acuerdo a la referencia N 1:
W

Z
10 12
5

W = Ancho de la cresta (pies)


Z = Altura de la presa (pies)

Z=

8.11 m

=
=

26.61 pies

15.32 pies

4.67 m

B. Segn referencias N 5: (para anchos mnimos de corona)


Hasta 12 m de altura, una altura mnima =

3.00 m

Asumimos : 4.00

C. Segn G. Post - P. Lande :

B 1.65. H

B =
H =

B =

Ancho de la corona (m)


Altura de la presa (m) =

8.11 m

4.70 m

Finalmente tomamos:
ANCHO DE CORONA =

3.00 m

CONCLUSIONES
ELEVACIN DE LA CORONA:
ELEVACION DE LA CORONA

ANCHO DE LA CORONA:
ANCHO DE CORONA =

3.00 m

4367.51 m.s.n.m.

VOLUMEN (M3)
FIN
M3
256,734.69
330,969.03
375,381.41
401,922.51
417,165.27
271,526.36
126,355.75
0.00
13,604.88
36,911.69
81,458.68
165,573.44

COTAS (m.s.n.m.)
INICIO
FIN
m.s.n.m.
m.s.n.m.
4,360.87
4,361.82
4,361.82
4,362.56
4,362.56
4,363.00
4,363.00
4,363.24
4,363.24
4,363.39
4,363.39
4,361.98
4,361.98
4,360.44
4,360.44
4,359.40
4,359.40
4,359.49
4,359.49
4,359.66
4,359.66
4,359.97
4,359.97
4,360.87

4,359.40

m.s.n.m.

4,363.39

m.s.n.m.

4,363.65

m.s.n.m.

NANE

NAM

" universidad de Chapingo Mexico

Ho =

0.33 m

EESTE ES LA ALTURA DE LA PRESA

g. 84 - Tabla 4.1
H

0.31 cm

4367.51 m.s.n.m.

TRAMO 1
TRAMO 2
TRAMO 3
TRAMO 4
TRAMO 5
TRAMO 6
TRAMO 7
TRAMO 8
TRAMO 9
TRAMO 10

SECCION
1.50
1.72
1.94
2.17
2.39
2.61
2.83
3.06
3.28
3.50

0.22222222
CAUDAL
1.05
2.1
3.15
4.2
5.25
6.3
7.35
8.4
9.45
10.5

SECCION
TRAMO 1
TRAMO 2
TRAMO 3
TRAMO 4
TRAMO 5
TRAMO 6
TRAMO 7
TRAMO 8
TRAMO 9
TRAMO 10

2.50
2.72
2.94
3.17
3.39
3.61
3.83
4.06
4.28
4.50

0.22222222
CAUDAL
1.05
2.1
3.15
4.2
5.25
6.3
7.35
8.4
9.45
10.5

NORMAL
CRITICO
TIRANTE
VELOCIDAD TIRANTE
VELOCIDAD
0.1366
3.0748
0.262
1.6031
0.1995
3.8709
0.3931
1.9638
0.2439
4.3787
0.4891
2.1905
0.2786
4.7564
0.5635
2.3512
0.3064
5.0541
0.6253
2.4767
0.3294
5.2984
0.6771
2.5773
0.3486
5.5044
0.7214
2.6602
0.3644
5.6774
0.7585
2.7278
0.3786
5.8321
0.7921
2.7875
0.3909
5.9688
0.8218
2.8393

También podría gustarte