Está en la página 1de 4

ESTADO:

CALCULO DEL DIAMETRO ECONOMICO PARA LA LINEA A PRESION

MORELOS

LOCALIDAD:TEPALCINGO
MUNICIPIO: TEPALCINGO

76,000.00
274.00
1.00
110.00
2,100,000.00
1.71
Acero Rolado

GASTO =
CARGA ESTTICA TOTAL (He) =

OBRA:

" LINEA A PRESION (BOMBEO) "

LONGITUD DE LA LINEA=

TRAMO:

DEL km. 0+000 AL km 1+710

CONSTANTE HAZEN-WILLIAMS =

CALCULO:

ING. ANTONIO ALCNTAR

MODULO DE ELASTICIDAD DE TUBERIA=

FECHA:

10/24/2012

COSTO DE k W h =
TIPO DE TUBERIA =

INTERES ANUAL (r)

l.p.s

PERIODO (n)

m.

ANUALIDAD (a)

m.

$ EQUIPO

aos
kWh

CLASIFICACION DE GEOTECNICA
kg/cm

MATERIAL TIPO COMUN =

MATERIAL TIPO III

DIAM. PRELIM./ANAL. HIDR.

mm.

^
DIAMETRO NOMINAL
mm.

AREA

GASTO

VELOCIDAD

LONG. LINEA

D0.65

COEF. FRICC.

m/seg.

m./seg.

m.

H-W

pulg.

PERDIDA
FRICCION

PERD. MENORES
O SECUNDARIAS

TOTAL

AGUA

HT = Hf+HL

C.D.T.

Hf (m)

HL x 20% *

m.

m.

EFICIENCIA

POTABLE
W (kg/m3)

76 x N

N=

70%

HP= QxCDTxW/76*N

4013.2

158

12.6494

76.00000

6.01

1.00

2.4676

110

1.00

0.0058

0.00117

0.0070

275.85

1,000.00

N=

53.2

394,066.9495

8026.4

316

50.5978

76.00000

1.50

1.00

3.8720

110

1.00

0.0002

0.00004

0.0002

274.12

1,000.00

N=

53.2

391,593.1781

12700.0

500

126.6769

76.00000

0.60

1.00

5.2176

110

1.00

0.0000

0.00000

0.0000

274.02

1,000.00

N=

53.2

391,454.8146

145 V

23.2

G O
PRESION DE

DIAMETRO

ESPESOR

TRAB. TUBERIA

PARED

m/seg.

kg/cm

cm.

(e) cm.

200
200
200

401.32
802.64
1270.00

2.54
5.08
7.82

V = Velocidad inicial del agua

(m/seg)

D E

Ea d

A R I E

Et e

6.01
1.50
0.60

871.18
217.80
86.99

Ea = modulo de elasticidad del agua (

CONCEPTO

CANTIDAD

Limpia y Trazo

4.01

Instalacin

274.00

8190280.8
16380561.6
25927621.2

20,670

kg/cm. )

4013.2

5,334,000.00
10,668,000.00
16,422,000.00

200

Acero
Acero
Acero

SOBREPRESION

1+ Ea d

pulg.

2.54
2.54
2.58

DIAMETRO
CANTIDAD

m2

10.25

41.14

8.03

m2

1860.83

509,867.42

274.00

m3

32.97

H.P.
mm.

1.54
1.54
1.58

IMPORTE

DIAMETRO NOMINAL

TRABAJO TUB.

200

Ete

Acero Rolado

CLASE:

SOBREP. ABSOR.

h=145* V / 1+Ead/Ete

1.59
1.59
1.61

K.W.

8026.4

SOBREP. ABSOR.

POR LA VALVULA POR LA TUBERIA

CARGA NORMAL

PRESION TOTAL

DE OPERACIN

20% h +C.N.O.

m.

R.P.= 80% h

20 % h

m.

m.

547.116
136.779
54.172

437.69
109.42
43.34

109.42
27.36
10.83

275.85
274.12
274.02

385.27
301.47
284.85

Acero Rolado

DIAMETRO

P.U.

IMPORTE

CANTIDAD

m2

10.25

82.27

12.70

m2

10.25

130.18

m2

3974.29

1,088,955.46

274.00

m2

5868.79

1,608,048.46

m3

32.97

m3

32.97

mm.

CLASE:

UNIDAD

509,908.56

R E

200

Ete

Et=mdulo de elasticidad de las paredes del tubo(asbesto cemento=240,000 kg/cm, acero=2,100,00 kg/cm, PVC= 28,124/29,300 kg/cm, PAD=28,100 kg/cm, Cobre= 1,130,00 kg/cm, Bronce=1,050,000 kg/cm.)

COSTO TOTAL DE CONDUCCION

kg/cm

E
1 + Ea d

P.U.

mm.

UNIDAD

Excavacin

PRESION DE

Ea d

Et e

DIAMETRO

CLAVE

12700

mm.

UNIDAD

Acero Rolado

CLASE:
P.U.

IMPORTE

$ 1,089,037.73

S U M

$ 1,608,178.6

COSTO POR

CARGO ANUAL

COSTO TOTAL

CARGO ANUAL

HORA DE BOMBEO

DE BOMBEO

DE CONDUC.

DE AMORTIZACION

kW / h

COSTO ANUAL DE

BOMBEO PARA

OPERACION 365 DIAS ( $ )

4,013.200

158

394,066.95

293,855.724

502,493.288

$4,401,841,206.84

509,908.56

25,495.43

4,401,866,702.27

8,026.400

316

391,593.18

292,011.033

499,338.866

$4,374,208,468.15

1,089,037.73

54,451.89

4,374,262,920.04

12,700.000

500

391,454.81

291,907.855

499,162.432

$4,372,662,908.24

1,608,178.64

80,408.93

4,372,743,317.17

= 1

x 0.7457

= 2

1.71

= 3
8,760
x
8,760 = 24 hrs. x 365 das

= 5 x Anualidad
7
a = r + ( r / (1 + r) - 1))

OBSERVACIONES

NOTAS:

* Se considera como perdidas menores (Pm) el 5 % de Hf.


El dimetro ms econmico esta dado por el menor costo determinado en la columna

ANCHO DE

ALTURA

MM.

DIAMETRO
M.

PULG.

ZANJA (M)

(M)

M3

M3

M3

TUBO

M3

25

0.025

0.55

0.75

0.413

0.034

0.178

0.000

0.200

32

0.032

1.25

0.6

0.75

0.450

0.037

0.198

0.001

0.214

38

0.038

1.5

0.6

0.75

0.450

0.037

0.202

0.001

0.210

50

0.05

0.60

0.75

0.450

0.038

0.208

0.002

0.202

63

0.063

2.5

0.60

1.05

0.630

0.039

0.215

0.003

0.373

75

0.075

0.60

1.05

0.630

0.040

0.221

0.004

0.366

100

0.1

0.60

1.05

0.630

0.041

0.232

0.008

0.349

150

0.15

0.70

1.15

0.805

0.051

0.297

0.018

0.440

200
250

0.2
0.25

8
10

0.75
0.80

1.20
1.25

0.900
1.000

0.058
0.065

0.344
0.391

0.031
0.049

0.468
0.495

300
350
400

0.3
0.35
0.4

12
14
16

0.85
0.90
0.95

1.30
1.35
1.45

1.105
1.215
1.378

0.073
0.082
0.091

0.439
0.489
0.539

0.071
0.096
0.126

0.522
0.549
0.622

394,066.9495

450

0.45

18

1.10

1.50

1.650

0.110

0.666

0.159

0.716

391,593.1781

500

0.5

20

1.15

1.55

1.783

0.120

0.724

0.196

0.743

391,454.8146

600

0.6

24

1.30

1.70

2.210

0.148

0.887

0.283

0.892

750
900
1000

0.75
0.9
1

30
36
40

1.50
1.70
1.85

1.90
2.25
2.30

2.850
3.825
4.255

0.193
0.243
0.283

1.133
1.404
1.620

0.442
0.636
0.785

1.083
1.542
1.568

HP= QxCDTxW/76*N

PRESION TOTAL
20% h +C.N.O.
m.

385.27
301.47
284.85

OBSERVACIONES

EXCAVACION PLANTILLA COMPACTADO

AREA

VOLTEO