RESUMEN DEL PRESUPUESTO

ITEM

ESPECIALIDAD

COSTO

01.00.00

OBRAS PRELIMINARES

S/. 9,270.00

03.00.00

ESTRUCTURAS

S/. 54,706.93

04.00.00

ARQUITECTURA

S/. 43,855.86

05.00.00

INSTALACIONES ELECTRICAS

S/. 7,840.00

06.00.00

INSTALACIONES SANITARIAS

S/. 5,880.00

10.00.00

ACABADOS

S/. 39,594.49

ADICIONAL POR AREA TECHADA

S/. 70,166.04

S/. 520.00
S/. 1,456.00

S/. 155,037.38

S/. 231,313.32
COSTO DIRECTO

S/. 231,313.32

GASTOS GENERALES 10.16%

S/. 23,500.00

UTILIDAD 13.65%

S/. 31,574.60

S/. 76,275.94

M2
196.70
1,176.00
420
COSTO POR M2 ESTIMADO
420.00
COSTO OBRA ESTIMADO
82,611.90
COSTO OBRA ESTIMADO
S/. 231,313.32 S/M2
$/M2
COSTO CONTRACTUAL
S/. 286,387.92
S/. 1,456.00
520.00
COSTO OBRA ESTIMADO
UTILIDAD ESPERADA
VCH
HA
S/. 231,313.32
S/. 55,074.60 S/. 23,500.00
S/. 31,574.60

8,392.86
SUB TOTAL

S/. 286,387.92

COSTO TOTAL OBRA S/. 286,387.92

AHORRO POR CADA 10 DOLARES X M2 DE AREA TECHADA


350.00
70.00
360.00
60.00
370.00
50.00
380.00
390.00
400.00
410.00

40.00
30.00
20.00
10.00

11,276.64

50%

50%

4,796.05
4,110.90
3,425.75

4,796.05
4,110.90
3,425.75

2,740.60
2,055.45
1,370.30
685.15

2,740.60
2,055.45
1,370.30
685.15

OBRAS PRELIMINARES
PARTIDA

DESCRIPCION

UND

METRADO

P.U.

PARCIAL

GLB

1.00

300.00

300.00

01.00.00
01.00.01

OBRAS PROVISIONALES
Almacen, Oficina y Caseta de Guardiana

01.00.02

Cerco provisional de Obra

GLB

1.00

Cliente

01.00.03
02.00.00
02.00.01

Seguridad de obra nocturna


INSTALACIONES PROVISIONALES
Agua para la Obra

MES

3.00

800.00

MES

3.00

Cliente

02.00.02

Energa elctrica para la Obra

MES

3.00

Cliente

02.00.03
03.00.00
03.00.01

Servicios Higienicos
TRABAJOS PRELIMINARES
Movilizacin y Desmovilizacion de equipos y herramientas

GLB

1.00

840.00

840.00

GLB

1.00

1,000.00

1,000.00

03.00.02

Transporte Vertical

SEM

8.00

300.00

2,400.00

03.00.03

Trazo y replanteo prelimiar de ejes y niveles

M2

60.00

3.00

180.00

04.00.00

SEGURIDAD EN OBRA

04.00.01

Implementacion de equipos de proteccin (EPP)

GLB

1.00

500.00

500.00

04.00.02

Seguro del personal (SCTR)

GLB

1.00

750.00

750.00

04.00.03

Sealizacion y seguridad contra riesgos en obra.

GLB

1.00

300.00

300.00

04.00.04

Prevencionista de obra

MES

3.00

200.00

600.00

TOTAL COSTO DIRECTO

2,400.00

S/. 9,270.00

MANO DE OBRA

ESTRUCTURAS
PARTIDA

DESCRIPCION

UND.

METRADO

P.U.

PARCIAL

01.00.00
01.01.00
01.01.03

MOVIMIENTO DE TIERRAS
Excavacion
Excavacin de Zanjas para Zapatas, Placas y Cimientos Corridos

M3

01.01.04

Relleno con Material propio


Eliminacion de material excedente

M3

31.26
12.90

35.00
20.00

1,093.93
258.03

01.01.12

M3

18.35

30.00

550.61

01.02.00

Perfilado y Nivelacion

01.02.02
02.00.00

Nivelacin interior y apisonado


OBRAS DE CONCRETO SIMPLE

M3

64.51

5.00

322.54

02.01.00

Solado

02.01.01

Solado 2" Concreto ciclopeo 1:10

02.02.00

Cimientos Corridos

02.02.01

Concreto Fc = 100 kg/cm2 +30% P.G. max 6"

02.03.00

Sobrecimientos

02.03.01

Concreto Fc = 100 kg/cm2 + 25% P.M. max 3"

02.03.02

Encofrado y desencofrado

02.05.00

Falso Piso

02.05.01

Falso Piso 4" : Concreto f'c = 100kg/cm2

03.00.00

OBRAS DE CONCRETO ARMADO

03.01.00

Zapatas

03.01.01

Concreto Fc = 175 kg/cm2

03.01.02

Encofrado y desencofrado

03.06.00

Columnas

03.06.01

Concreto Fc = 175 kg/cm2

03.06.04

Encofrado y desencofrado

03.08.00

Vigas

03.08.01

Concreto Fc = 175 kg/cm2

03.08.03

Encofrado y desencofrado

03.09.00

Losa Aligerada

03.09.01

Losas Aligeradas.-Concreto Fc = 175 kg/cm2

03.09.03

Losas Aligeradas.-Encofrado y desencofrado

03.09.05
03.11.00
03.11.01
03.11.03

Ladrillo de techo 0.30x0.30x0.15 m


Escalera
Concreto Fc = 175 kg/cm2 Piso 02 @ ultimo Piso
Encofrado y desencofrado

03.14.00
03.14.01
03.14.02

Dinteles
Concreto Fc = 175 kg/cm2
Encofrado y desencofrado
Acero Fy = 4,200 kg/cm2
Acero Fy = 4,200 kg/cm2
TOTAL COSTO DIRECTO

03.14.03

P.U.

MATERIALES

PARCIAL

P.U.

PARCIAL

35.00
20.00

1093.932
258.03

0.00
0.00
30.00

0
0
550.611

322.5375

0.00

M2

6.00

20.00

120.00

10

60

10.00

60

M3

20.84

250.00

5,209.20

100

2083.68

150.00

3125.52

M3

3.47

250.00

868.20

M3

17.36

30.00

520.92

100
25

347.28
434.1

150.00
5.00

520.92
86.82

M2

64.51

25.00

1,612.69

10

645.075

15.00

967.6125

M3

4.20

280.00

1,176.00

M2

16.80

30.00

504.00

100.00
28.00

420
470.4

180.00
2.00

756
33.6

M3

8.51

280.00

2,381.40

M2

170.10

30.00

5,103.00

M3

6.30

280.00

1,764.00

M2

24.50

30.00

735.00

100
28

850.5
4762.8

180.00
2.00

1530.9
340.2

100.00
28

630
686

180.00
2.00

1134
49

11.42

280.00

3,197.88

M2

64.51

30.00

1,935.23

UNID

580.57

3.00

1,741.70

100.00
28
0.5

1142.1
1806.21
290.28375

180.00
2.00
2.50

2055.78
129.015
1451.41875

M3
M2

3.00
9.60

280.00
30.00

840.00
288.00

100.00
28

300
268.8

180.00
2.00

540
19.2

M3
M2

0.95
42.00

280.00
30.00

264.60
1,260.00

100.00
28

94.5
1176

180.00
2.00

170.1
84

KG

5600.00

4.10

22,960.00
S/. 54,706.93

0.7

3920

3.40

19040

M3

S/. 22,062.23

S/. 32,644.70

ARQUITECTURA
PARTIDA

DESCRIPCION

MANO DE OBRA

02.01.00
02.01.01
02.04.00
02.04.01
03.00.00
03.01.00
03.01.01
03.01.03
04.00.00
04.01.00
04.01.01
04.03.00
04.03.02

ALBAILERIA
Muros de Alabailera
Muro de Ladrillo KK Soga C:A 1:4 E=0.15 m
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES
Tarrajeo
Tarrajeo en Muros Interiores
TARRAJEO EN EXTERIORES
Tarrajeo
Tarrajeo en Muros Exteriores
CIELORASOS
Cielorasos
Tarrajeo de Cieloraso y v igas
Vestidura de Fondo de Escalera
PISOS Y CONTRAPISOS: ACABADO CEMENTO
Contrapisos
Contrapiso 2"
Revestimiento
Rev estimiento pasos/contrapiso con Cemento
Pulido 2" max.

METRADO

P.U.

PARCIAL

m2

321.10

55.00

17,660.50

25.00

8027.5

30.00

9633

m2

642.20

20.00

12,844.00

15.00

9633

5.00

3211

M2

72.00

30.00

2,160.00

25.00

1800

5.00

360

m2
m2

120.00
42.00

24.00
24.00

2,880.00
1,008.00

15.00
20.00

1800
840

9.00
4.00

1080
168

m2

140.00

24.00

3,360.00

10.00

1400

14.00

1960

m2

14.11

30.00

20.00

282.24

10.00

141.12

80

5.00

05.00.00
05.01.00

CONTRAZOCALOS A 10cms DE ALTURA : ACABADO CEMENTO


Contrazcalos h=0.10m
Escaleras

05.01.04

Contrazcalo Escaleras cemento pulido


h=0.10m

06.00.00
06.01.00

COBERTURAS Y OTROS
Cobertura de Ladrillo Pastelero 25 x 25 cm

m2

06.01.01

REPOSICION DE VEREDA

M2

ml

8.00

423.36

15.00

120.00

60.00

50.00

3,000.00

4.00

100.00

10.00
11.00

S/. 43,855.86

PARCIAL

P.U.

PARCIAL

10.00

400.00

TOTAL COSTO DIRECTO

MATERIALES

UND.

P.U.
01.00.00
01.01.00
01.01.02
02.00.00

600

40.00

44

89.00

##########

40
2400
356

##########

ARQUITECTURA
PARTIDA
07.00.00
07.01.00
07.01.01
07.01.01

DESCRIPCION
PISOS Y ENCHAPES
PISOS Y ENCHAPES
CERAMICO
LAMINADO

UND.

METRADO

M2
M2

119.60
36.00

P.U.

PARCIAL

40.00
35.00

4,784.00
1,260.00

07.00.00

CARPINTERIA DE MADERA

07.01.00
07.01.01

Puertas contraplacasdas en mdf con marco de 2 1/2"x 1/2"


Puerta Tipo P-1 (0.90 x 2.10)
und

1.00

600.00

600.00

07.01.01

Puerta Tipo P-1 (0.90 x 2.10)

und

7.00

300.00

2,100.00

07.04.00
07.04.01
07.04.02
07.04.03

Varios
ml
ml
UNID

6.00
6.00
3.00

800.00
500.00
300.00

4,800.00
3,000.00
900.00

100.00

1,000.00

08.00.00

Mueble de Cocina
Mueble de Closet
Mueble de Bao
CARPINTERIA METALICA

08.02.00
08.02.01

Escaleras y Barandas
Baranda Metlica Escalera de Cto. de Bombas

ml

10.00

08.03.00
08.03.03

Varios
Escalera de gato

und

1.00

und
und

5.00
3.00

und

1.00

m2

120.00

8.00

960.00

m2

642.20

8.50

5,458.70

m2

72.00

11.59

834.48

09.00.00

VIDRIOS

09.01.00
09.01.01
09.01.02
09.02.00
09.02.01

Ventanas segn detalle de arquitectura


Ventana fachadas
Ventana Baos
Mamparas cristal templado
Mampara terraza

10.00.00
10.01.00
10.01.01
10.02.00
10.02.01
10.03.00
10.03.01

PINTURA (Pintura vencelatex)


Cielorasos
Pintura en Cielorasos
Muros Interiores
Pintura en Muros interiores
Muros Exteriores
Pintura en Muros Exteriores Empastado y Pintado

12.00.00
12.01.00
12.01.01

APARATOS SANITARIOS Y ACCESORIOS


APARATOS SANITARIOS
Lavatorio Ovalin

12.01.08
12.01.18
12.01.19
12.01.22

Inodoro
Lavadero Acero Inoxidable 1 poza - Record boston
75 cm (Sauna)
Lavadero amazonas
Colocacin de aparatos sanitarios

12.02.00
12.02.01
12.02.02
12.02.03
12.02.05
12.02.06

GRIFERIAS
Grifera para Lavatorio
Mezcladora para Ducha
Mezcladora para Lavadero de Cocina
Grifos para Lavadero
Colocacin de griferas

12.00.00
12.01.00
12.01.01
12.01.02

ARTEFACTOS ELECTRICOS
ARTEFACTOS ELECTRICOS
ARTEFACTOS ELECTRICOS
TERMA ELECTRICA
TOTAL COSTO DIRECTO

800.00

800.00

250.00
100.00

1,250.00
300.00

3,000.00

3,000.00

und

3.00

100.00

300.00

und

3.00

250.00

750.00

und

1.00

200.00

200.00

und
und

1.00
8.00

200.00
50.00

200.00
400.00

und
und
und
und
und

3.00
3.00
1.00
1.00
8.00

200.00
200.00
200.00
100.00
50.00

600.00
600.00
200.00
100.00
400.00

und
und

20.00
3.00

164.87
500.00

3,297.31
1,500.00
S/. 39,594.49

También podría gustarte