Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Analitico Achirayo - Segunda Etapa
Analitico Achirayo - Segunda Etapa
TT GG SG1 SG2 E1 E2
2.
2.
2.
2.
6.
6.
6.
6.
2
2 2.
2 2.
TT GG SG1 SG2 E1 E2
2.
6.
2 2.
"ESCUELA PRIMARIA"
MES
CANTIDAD
C. POR MES
PARCIAL
TOTAL
14173.83
hh
326.40
15.12
4,935.17
OFICIAL
hh
196.28
13.14
2,579.15
PEON
hh
562.46
11.84
DESCRIPCCION
TT GG SG1 SG2 E1 E2
2.
6.
2 2.
UND
CANTIDAD
C.UNITARIO
6,659.51
PARCIAL
603.74
kg
29.14
4.50
131.12
kg
21.56
4.50
97.00
ALAMBRE NEGRO N 16
kg
18.18
4.50
81.83
und
3.00
90.00
270.00
kg
8.35
2.85
23.79
ARENA FINA
m3
3.53
130.00
458.68
ARENA GRUESA
m3
8.28
45.00
372.76
TIERRA AGRICOLA
m3
22.40
30.00
672.00
m3
8.44
50.00
421.80
m3
1.93
45.00
86.94
m3
26.54
40.00
1,061.76
m2
9.22
36.00
331.88
HORMIGON
m3
12.54
60.00
752.11
und
3,479.66
0.70
2,435.76
650.00
1.80
1,170.00
bls
230.17
20.00
4,603.42
und
1.00
45.00
45.00
pza
20.00
6.20
124.00
und
4.00
10.00
40.00
und
5.00
60.00
300.00
ASTA DE BANDERA
ACERO DE REFUERZO FY=4200 GRADO 60
Agregados y afines
4,157.93
3,605.76
Cemento
CEMENTO PORTLAND TIPO I (42.5 kg)
4,603.42
TOTAL
17,291.13
4,320.28
und
1.00
50.00
50.00
YESO EN BOLSAS DE 25 KG
BOL
13.47
12.00
161.66
CINTA ASILANTE
al
21.80
3.00
65.41
CINTA TEFLON
roll
1.00
1.50
1.50
und
3.00
9.20
27.60
pza
1.00
160.00
160.00
OCRE
kg
3.05
12.00
36.64
THINNER CORRIENTE
gln
1.27
12.00
15.18
IMPERMEABILIZANTE
gln
2.44
28.00
68.40
und
3.00
140.00
420.00
und
10.00
4.24
42.40
und
10.00
1.37
13.70
GRASS NATURAL
kg
2.70
25.42
68.63
ESTACA DE MADERA
p2
10.78
2.50
26.94
p2
583.52
2.50
1,458.81
ML
25.30
45.00
1,138.50
LIJA DE FIERRO N 80
pza
14.74
1.00
14.74
PINTURA ANTICORROSIVA
qln
1.01
40.68
41.17
DESCRIPCCION
TT GG SG1 SG2 E1 E2
2.
6.
2 2.
UND
CANTIDAD
C.UNITARIO
PARCIAL
HERRAMIENTAS MANUALES
585.06
%MO
hm
5.74
20.00
WINCHA DE 30 METROS
pza
1.89
30.00
56.58
VOLQUETE DE 8 M3
hm
24.88
150.00
3,731.25
CIZALLA
hm
0.12
7.00
0.87
hm
20.87
10.00
208.68
RETROEXCAVADOR S/LLANTAS 56 HP 1 Y D3
hm
24.88
200.00
4,975.70
hm
0.38
8.00
3.01
ESTACION TOTAL
hm
13.93
25.00
348.25
hm
DESCRIPCCION
UND
TOTAL
10,024.21
30.46
CANTIDAD
220.00
C.UNITARIO
114.81
6,700.32
PARCIAL
TOTAL
PROYECTO
ENTIDAD
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
JUNIN
HUANCAYO
SANTO DOMINGO DE ACOBAMBA
ACHIRAYO
TT GG SG1 SG2 E1 E2
2. 6.
2.
2.
2.
2.
RESIDENTE
INSPECTOR
6.
6.
6.
6.
2
2 2.
2 2.
2 2.
EDIFICIOS ADMINISTRATIVOS
2
1 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL
2. 6.
2. 6.
2. 6.
2 2.
2 2.
2 2.
17,291.13
10,024.21
0.00
0.00
2. 6.
2 2.
0.00
8,238.00
2.
2.
2.
2.
2
2
2
2
4
4
4
4
0
0
0
0
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
41,489.17
16,237.00
6.
6.
6.
6.
2.
2.
2.
2.
0
0
0
0
41,489.17
7,999.00
49,488.17
14,173.83
8,238.00
57,726.18
DESCRIPCCION
TT GG SG1 SG2 E1 E2
2. 6.
2 2.
UND
CANTIDAD
C.UNITARIO
PARCIAL
1.00
4,800.00
4,800.00
1.00
1,125.00
1,125.00
UND
2.00
15.00
30.00
Mllr
1.00
29.00
29.00
UND
2.00
7.00
14.00
UND
2.00
8.00
16.00
CNTO
0.50
10.00
5.00
PERFORADOR
UND
1.00
20.00
20.00
UND
1.00
20.00
20.00
USV DE 4GB
UND
1.00
25.00
25.00
DOC
0.50
30.00
15.00
ESCALIMETRO
UND
1.00
20.00
20.00
UND
1.00
80.00
80.00
COORDINACION - MOVILIZACION
GBL
1.00
300.00
300.00
MES
3.00
500.00
1,500.00
MATERIALES DE ESCRITORIO
OTROS
DESCRIPCCION
TT GG SG1 SG2 E1 E2
2. 6.
2 2.
UND
CANTIDAD
C.UNITARIO
PARCIAL
1.00
4,800.00
4,800.00
1.00
1,125.00
1,125.00
UND
5.00
15.00
75.00
Mllr
1.00
29.00
29.00
UND
2.00
7.00
14.00
16.00
MATERIALES DE ESCRITORIO
UND
2.00
8.00
CNTO
0.50
10.00
5.00
PERFORADOR
UND
1.00
20.00
20.00
UND
1.00
20.00
20.00
USV DE 4GB
UND
1.00
25.00
25.00
DOC
0.50
30.00
15.00
ESCALIMETRO
UND
1.00
20.00
20.00
LIBRETA DE CAMPO
UND
3.00
8.00
24.00
UND
1.00
80.00
80.00
CASCOS DE PROTECCION
UND
2.00
15.00
30.00
UND
2.00
70.00
140.00
COORDINACION - MOVILIZACION
GBL
1.00
300.00
300.00
MES
3.00
500.00
1,500.00
INDUMENTARIA - VESTUARIO
OTROS
TOTAL
7,999.00
TOTAL
8,238.00