Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Pgina :
1101001
Subpresupuesto
Fecha
001
01/11/2013
Lugar
Cdigo
150510
Recurso
Unidad
Cantidad
Precio S/.
Parcial S/.
18.63
14.90
13.07
11.82
14.90
14.90
9,500.00
14.90
20,118.79
32,931.33
34,261.21
166,060.33
196.67
123.73
9,500.00
2,740.80
MANO DE OBRA
0101010002
CAPATAZ
0101010003
OPERARIO
0101010004
OFICIAL
0101010005
PEON
01010100060001OPERADOR DE EQUIPO PESADO
01010100060002OPERADOR DE EQUIPO LIVIANO
0101010007
EDUCACION SANITARIA
0101030000
TOPOGRAFO
hh
hh
hh
hh
hh
hh
glb
hh
1,079.9135
2,210.1563
2,621.3627
14,049.0972
13.1994
8.3040
1.0000
183.9460
265,932.86
MATERIALES
02040100010001ALAMBRE NEGRO RECOCIDO N 8
02040100010002ALAMBRE NEGRO RECOCIDO N 16
0204010006
ALAMBRE DE PUAS
0204030001
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
02041200010005CLAVOS PARA MADERA CON CABEZA DE 3"
02041200010009CLAVOS PARA MADERA CON CABEZA DE 5"
0204120005
CLAVOS F N C/C 3/4"
02050700020024TUBERIA UPVC ISO 4435 S25 DN = 160mm (6")
02070100010002PIEDRA CHANCADA 1/2"
02070100010003PIEDRA CHANCADA 3/4"
0207010006
PIEDRA GRANDE DE 8"
02070200010001ARENA FINA
02070200010002ARENA GRUESA
0207030001
HORMIGON
02070400010007MATERIAL DE PRESTAMO SELLECIONADO - OBRA
02070400010008MATERIAL DE RELLENO PROPIO ZARANDEADO
02090100010004MARCO FF. Y TAPA DE CONCRETO REFORZADO
PARA BUZON D = 60 cm
0210030003
MALLA HDP COLOR ANARANJADO DE 1.00m DE
ALTURA
0213010001
CEMENTO PORTLAND TIPO I (42.5 kg)
0213030001
YESO
0213040002
TIZA
0218010002
PERNOS HEXAGONALES DE 3/4" x 3 1/2"
0222120002
LUBRICANTE PARA TUBERIA PVC ISO
0231000002
OFICINA Y ALMACEN
0231000003
MADERA NACIONAL P/ENCOFRADO CARP.
0231010002
MADERA TORNILLO PARA ENCOFRADOS INCLUYE
CORTE
0231010003
MADERA TORNILLO CEPILLADA
0231050002
TRIPLAY DE 6 MM
0231130002
MADERA CACHIMBO CEPILLADA
0240020016
PINTURA ESMALTE SINTETICO
0240020017
PINTURA ESMALTE PARA TRAFICO COLORES CPP
0246140002
ANILLO DE JEBE DESAGUE ISO 160 mm
02630600010002PALO DE EUCALIPTO DE 3" x 3.00 m
0267110022
CONO DE FIBRA DE VIDRIO (D = 0.31m, H = 0.67 m)
02683100010002GIGANTOGRAFIA 3.60 x 2.40 m
0272040054
MOVILIZACION Y DESMOVILIZACION DE
MAQUINARIA
0272040055
MOLDE METALICO PARA BUZON
0290020004
ARCILLA IMPERMEABILIZANTE
0290080006
MACROFITA
0290080007
TEODOLITO
0290130022
AGUA
0290130023
AGUA MAS TRANSPORTE
0290220009
PRUEBA DE CALIDAD DEL CONCRETO ROTURA
0290220010
PRUEBA PROCTOR MODIFICADO DE CAMPO
0291020003
AFIRMADO
0292010001
CORDEL
kg
kg
m
kg
kg
kg
kg
m
m3
m3
m3
m3
m3
m3
m3
m3
und
123.6450
53.5731
4,864.9230
1,840.4416
138.6200
6.0000
1.9000
934.3027
26.1388
21.3600
12.9750
7.6800
39.0314
22.9365
2,906.6080
497.0853
12.0000
3.00
3.00
0.50
3.48
5.00
5.00
1.50
20.00
55.00
55.00
25.00
35.00
35.00
25.00
30.00
30.00
265.00
370.94
160.72
2,432.46
6,404.74
693.10
30.00
2.85
18,686.05
1,437.63
1,174.80
324.38
268.80
1,366.10
573.41
87,198.24
14,912.56
3,180.00
2,081.3100
1.19
2,476.76
bol
kg
bol
pza
gal
glb
p2
p2
561.1968
20.8131
554.7300
9.0000
2.7213
1.0000
368.0593
873.7580
19.00
10.00
8.00
5.95
10.00
5,000.00
4.00
4.00
10,662.74
208.13
4,437.84
53.55
27.21
5,000.00
1,472.24
3,495.03
p2
m2
p2
gal
gal
und
und
und
m2
est
317.9362
1.4000
12.0000
0.4320
2.2414
158.7407
173.0000
10.0000
8.6400
1.0000
4.00
8.73
8.50
25.00
58.91
4.50
10.00
15.00
23.15
10,000.00
1,271.74
12.22
102.00
10.80
132.04
714.33
1,730.00
150.00
200.02
10,000.00
m2
m3
m2
da
m3
m3
und
und
m3
m
4.5600
248.4210
3,428.3400
13.9448
942.7098
90.7090
12.0000
30.0000
612.0940
395.4742
1.50
30.00
6.00
50.00
3.00
5.60
30.00
60.00
28.00
0.24
6.84
7,452.63
20,570.04
697.24
2,828.13
507.97
360.00
1,800.00
17,138.63
94.91
232,829.82
EQUIPOS
0301010006
0301100001
0301100007
0301100008
0301100009
HERRAMIENTAS MANUALES
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP
COMPACTADORA VIBRATORIA TIPO PLANCHA 4 HP
PLANCHA COMPACTADORA
COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP
%mo
hm
hm
hm
hm
81.9102
145.4094
1,055.2981
9.6944
Fecha :
20.00
25.00
20.00
20.00
11,274.24
1,638.20
3,635.24
21,105.96
193.89
23/12/2013 10:06:37a.m.
S10
Pgina :
1101001
Subpresupuesto
Fecha
001
01/11/2013
Lugar
Cdigo
150510
Recurso
Precio S/.
Parcial S/.
24.1708
123.10
2,975.43
90.7611
353.3807
5.5333
170.7274
16.8894
2.7408
52.4960
61.1996
190.00
220.00
220.00
290.00
150.00
150.00
12.00
20.00
17,244.61
77,743.75
1,217.33
49,510.95
2,533.41
411.12
629.95
1,223.99
Unidad
Cantidad
hm
hm
hm
hm
hm
hm
hm
hm
hm
191,338.07
Total
Fecha :
S/.
690,100.75