Está en la página 1de 18

166.

24
DIAMETRO NOMINAL AREA GASTO VELOCIDAD LONG.LINEA COEF.FRIC. CONSTANTE PERDIDA FRIC. 5% hf hft = hf + 5%hf Q x Hd 76 n HP = (Q)(Hd)
mm. Pulg. (A) m (Q) m/s (V) m/s (L) m (Q) MANNING n MANNING (K) hf = KLQ, m OTRAS PERD. (Q en l.p.s.) n = 75% 76 n ( 1 )
152.4 6 0.0182 0.05342 2.93 1,050.00 0.002853696 0.011 28.36 84.98 4.25 89.23 13,647.39 57.00 239.43
203.2 8 0.0324 0.05342 1.65 1,050.00 0.002853696 0.011 6.12 18.32 0.92 19.24 9,908.30 57.00 173.83
254 10 0.0507 0.05342 1.05 890.00 0.002853696 0.009 1.25 3.16 0.16 3.32 9,057.93 57.00 158.91
254 10 0.0507 0.05342 1.05 160.00 0.002853696 0.011 1.86 0.85 0.04 0.89 8,928.18 57.00 156.63
PRESION DE DIAME. ESPESOR VELOCI- 145V Ea d Et e Ea d Ea d Ea d SOBREPRES. SOBREPRES. SOBREPRES. CARGA PRESION TOTAL
TRABAJO DE NOM.(d) PARED DAD 1 + 1 + h = 145 v ABSORVIDA ABSORVIDA NORMAL DE 20%h +
LA TUBERIA cm. TUBO m/s Et e Et e Et e 1+ Ea d POR VALVULA POR TUBERIA OPERACIN CARGA NORMAL
Kg/cm (e) cm Et e R.P.=80%h 20%h m DE OPERACIN
72.00 15.24 0.48 2.93 424.63 315,468.00 1,003,800.00 0.31 1.31 1.15 370.40 296.32 74.08 192.23 266.31
55.00 20.32 0.48 1.65 238.86 420,624.00 1,003,800.00 0.42 1.42 1.19 200.51 160.41 40.10 122.24 162.34
9.80 25.4 0.93 1.05 152.87 525,780.00 26,133.00 20.12 21.12 4.60 33.26 26.61 6.65 106.32 112.97
44.00 25.4 0.48 1.05 152.87 525,780.00 1,003,800.00 0.52 1.52 1.23 123.84 99.07 24.77 103.89 128.66
V = Velocidad inicial del agua (m/s) Ea = mdulo de elasticidad del agua (20700 kg/cm) Et = mdulo de elasticidad de las paredes del tubo asbesto cemento = 210,000 kg/cm, acero = 2'100,000 kg/cm)
fierro fundido = 930,000 kg/cm, PVC = 28,100 kg/cm concreto simple = 125,000 kg/cm
CONCEPTO DIAMETRO: 150 mm (6") acero ced 80 DIAMETRO: 200 mm (8") acero ced 80 DIAMETRO: 250 mm (10") pvc ced 40
cantidad UNID. P.U. IMPORTE cantidad UNID. P.U. IMPORTE cantidad UNID. P.U. IMPORTE
EXCAV.MAT.CLASE A 161.70 m 16.66 2,693.92 181.12 m 16.66 3,017.46 170.75 m 16.66 2,844.70
EXCAV.MAT.CLASE B 485.10 m 49.52 24,022.15 543.38 m 49.52 26,908.18 512.26 m 49.52 25,367.12
EXCAV.MAT.CLASE C 161.70 m 415.99 67,265.58 181.12 m 415.99 75,344.11 170.75 m 415.99 71,030.29
PLANTILLA APISONADA 73.50 m 329.74 24,235.89 78.75 m 329.74 25,967.03 70.98 m 329.74 23,404.95
INST.JUNTEO Y PRUEBA TUBERIA 1,050.00 m 29.20 30,660.00 1,050.00 m 34.18 35,889.00 890.00 m 49.36 43,930.40
RELLENO COMPACTO 320.07 m 283.52 90,746.25 369.41 m 283.52 104,735.12 355.48 m 283.52 100,785.69
RELLENO A VOLTEO 392.05 m 12.76 5,002.56 417.09 m 12.76 5,322.07 375.29 m 12.76 4,788.70
ATRAQUES DE CONCRETO, fc=90 m m m
COSTO DE TUBERIA 1,050.00 m 207.87 218,263.50 1,050.00 m 385.88 405,174.00 890.00 m 716.35 637,551.50
COSTO TOTAL DE CONDUCCION $ 462,889.85 $ 682,356.96 $ 909,703.34
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
R E S U M E N
PRESION DE TRABAJO DIAMETRO NOMINAL H.P. K.W.h. COSTO POR HORA CARGO ANUAL COSTO TOTAL DE CARGO ANUAL DE AMORTI- COSTO ANUAL DE BOMBEO
TUBERIA kg/cm BOMBEO $ DE BOMBEO $ CONDUCCION ZACION (CONDUCCION) PARA OPERACIN
mm. Pulg. ( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) (20 AOS AL 11.90% ANUAL) ( 6 ) DE 365 DIAS ( 7 )
72 152.4 6 239.43 178.54 $ 299.95 2,627,557.14 $ $ 462,889.85 $ 61,583.09 $ 2,689,140.23
55 203.2 8 173.83 129.62 $ 217.77 1,907,663.64 $ $ 682,356.96 $ 90,781.10 $ 1,998,444.74
9.8 254 10 158.91 118.50 $ 199.08 1,743,941.25 $ $ 909,703.34 $ 121,027.37 $ 1,864,968.62
44 254 10 156.63 116.80 $ 196.23 1,718,959.46 $ $ 163,303.25 $ 21,725.94 $ 1,740,685.40
Costo del KWH = $ 1.68 ( 2 ) = ( 1 ) x 0.7457 ( 3 ) = ( 2 ) x $ 1.68 ( 4 ) = ( 3 ) X 8760 ( 6 ) = ( 5 ) x Anualidad ( 7 ) = ( 4 ) + ( 6 )
NOTA: El dimetro ms econmico est dado por el menor costo determinado en la columna 7
DIAMETRO ANCHO PROFUNDIDAD
0.3 0.8 1.2
0.35 0.85 1.25
0.4 0.95 1.35
DIAMETRO NOMINAL AREA GASTO VELOCIDAD LONG.LINEA COEF.FRIC. CONSTANTE PERDIDA FRIC. 5% hf hf1 = hf + %h Qhft 76 n HP = (Q)(hft)
mm. Pulg. (A) m (Q) m/s (V) m/s (L) m (Q) MANNING n MANNING (K) hf = KLQ, m OTRAS PERD. (Q en l.p.s.) n = 85% 76 n ( 1 )
250 10 0.0491 0.16670 3.40 165.00 0.02778889 0.010 1.53730 7.05 0.35 7.40 1,233.78 64.60 19.10
450 18 0.1590 0.16670 1.05 165.00 0.02778889 0.010 0.06690 0.31 0.02 0.32 53.69 64.60 0.83
PRESION DE DIAME. ESPESOR VELOCI- 145V Ea d Et e Ea d Ea d Ea d SOBREPRES. SOBREPRES. SOBREPRES. CARGA PRESION TOTAL
TRABAJO DE NOM.(d) PARED DAD 1 + 1 + h = 145 v ABSORVIDA ABSORVIDA NORMAL DE 20%h +
LA TUBERIA cm. TUBO m/s Et e Et e Et e 1+ Ea d POR VALVULA POR TUBERIA OPERACIN CARGA NORMAL
Kg/cm (e) cm Et e R.P.=80%h 20%h m DE OPERACIN
14 25 2.85 3.40 492.42 516,750.00 684,000.00 0.76 1.76 1.32 371.65 297.32 74.33 7.40 81.73
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
7 45 2.75 1.05 151.98 930,150.00 660,000.00 1.41 2.41 1.55 97.91 78.33 19.58 0.32 19.90
V = Velocidad inicial del agua (m/s) -Ea = mdulo de elasticidad del agua (20670 kg/cm) -Et = mdulo de elasticidad de las paredes del tubo (para asbesto cemento = 240 000, para acero = 2 100 000 kg/cm)
CONCEPTO DIAMETRO: 250mm. (10") CLASE:A-14 DIAMETRO: 200mm. (8") CLASE:A-10 DIAMETRO: CLASE:
CONCEP. UNID. P.U. IMPORTE CONCEPTO UNID. P.U. IMPORTE CONCEPTO UNID. P.U. IMPORTE
EXCAV.MAT.CLASE A m m m
EXCAV.MAT.CLASE B 142.31 m 34.00 4,838.63 242.55 m 34.00 8,246.70 m
EXCAV.MAT.CLASE C m m m
PLANTILLA APISONADA 18.56 m 39.15 726.72 25.99 m 39.15 1,017.41 m
INST.JUNTEO Y PRUEBA TUBERIA 165.00 m 18.90 3,118.50 165.00 m 21.00 3,465.00 m
RELLENO COMPACTO 30.94 m 25.00 773.44 77.96 m 25.00 1,949.06 m
RELLENO A VOLTEO 123.75 m 13.00 1,608.75 173.25 m 13.00 2,252.25 m
ATRAQUES DE CONCRETO, fc=90 m m m
COSTO DE TUBERIA 165.00 m 586.00 96,690.00 165.00 m 1,540.00 254,100.00 m
COSTO TOTAL DE CONDUCCION $ 107,756.03 $ 271,030.42
PRESION DE TRABAJO DIAMETRO NOMINAL H.P. K.W.h. COSTO POR HORA CARGO ANUAL COSTO ANUAL DE CARGO ANUAL DE AMORTI- COSTO ANUAL DE BOMBEO
TUBERIA kg/cm BOMBEO $ DE BOMBEO $ CONDUCCION ZACION (CONDUCCION) PARA OPERACIN
mm. Pulg. ( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) (__ AOS AL __% ANUAL) ( 6 ) DE 365 DIAS ( 7 )
14 250 10 19.10 14.24 8.55 74,855.83 $ $ 107,756.03 $ 20,130.98 $ 94,986.81
7 450 18 0.83 0.62 0.37 3,257.57 $ $ 271,030.42 $ 50,633.90 $ 53,891.46
Costo del KWH = $ 0.60 ( 2 ) = ( 1 ) x 0.7457 ( 3 ) = ( 2 ) x $ ( 4 ) = ( 3 ) X 8760 ( 6 ) = ( 5 ) x Anualidad ( 7 ) = ( 4 ) + ( 6 )
NOTA: El dimetro ms econmico est dado por el menor costo determinado en la columna 7
DIAMETRO ANCHO PROFUNDIDAD
0.25 0.75 1.15
0.45 1.05 1.4
R E S U M E N
DIAMETRO: 250 mm (10") acero ced 40
cantidad UNID. P.U. IMPORTE
30.64 m 16.66 510.46
91.90 m 49.52 4,550.89
30.64 m 415.99 12,745.93
12.76 m 329.74 4,207.48
160.00 m 49.36 7,897.60
63.19 m 283.52 17,915.63
67.34 m 12.76 859.26
m
160.00 m 716.35 114,616.00
$ 163,303.25
3,605,654.02
166.24
DIAMETRO NOMINAL AREA GASTO VELOCIDAD LONG.LINEA COEF.FRIC. CONSTANTE PERDIDA FRIC. 5% hf hft = hf +5%h Q*Hd 76 n
mm. Pulg. (A) m (Q) m/s (V) m/s (L) m (Q) MANNING n MANNING (K) hf = KLQ, m OTRAS PERD. (Q en l.p.s.) n = 75%
152.4 6 0.0182 0.05342 2.93 1,050.00 0.002853696 0.011 28.36 84.98 4.25 89.23 13,647.39 57.00
203.2 8 0.0324 0.05342 1.65 1,050.00 0.002853696 0.011 6.12 18.32 0.92 19.24 9,908.30 57.00
10 0.0507 0.05342 1.05 160.00 0.002853696 0.011 1.86 0.85 0.04 0.89
10 0.0507 0.05342 1.05 890.00 0.002853696 0.009 1.25 3.16 0.16 3.32 9,105.57 57.00
4.21
PRESION DE DIAME. ESPESOR VELOCI- 145V Ea d Et e Ea d Ea d Ea d SOBREPRES. SOBREPRES. SOBREPRES. CARGA
TRABAJO DE NOM.(d) PARED DAD 1 + 1 + h = 145 v ABSORVIDA ABSORVIDA NORMAL DE
LA TUBERIA cm. TUBO m/s Et e Et e Et e 1+ Ea d POR VALVULA POR TUBERIA OPERACIN
Kg/cm (e) cm Et e R.P.=80%h 20%h m
72 15.24 0.48 2.93 424.63 315,468.00 1,003,800.00 0.31 1.31 1.15 370.40 296.32 74.08 192.23
55 20.32 0.48 1.65 238.86 420,624.00 1,003,800.00 0.42 1.42 1.19 200.51 160.41 40.10 122.24
44 25.4 0.48 1.05 152.87 525,780.00 1,003,800.00 0.52 1.52 1.23 123.84
9.8 25.4 0.93 1.05 152.87 525,780.00 26,133.00 20.12 21.12 4.60 33.26 26.61 6.65 106.92
47.07 37.65 9.41 106.92
V = Velocidad inicial del agua (m/s) Ea = mdulo de elasticidad del agua (20700 kg/cm) Et = mdulo de elasticidad de las paredes del tubo asbesto cemento = 210,000 kg/cm, acero = 2'100,000 kg/cm)
fierro fundido = 930,000 kg/cm, PVC = 28,100 kg/cm concreto simple = 125,000 kg/cm
CONCEPTO DIAMETRO: 150 mm (6") acero grado A DIAMETRO: 200 mm (8") acero grado A DIAMETRO:
CANTIDAD UNID. P.U. IMPORTE CANTIDAD UNID. P.U. IMPORTE CANTIDAD UNID. P.U.
EXCAV.MAT.CLASE A 180.60 m 21.66 3,911.80 201.60 m 21.66 4,366.66 222.60 m 21.66
EXCAV.MAT.CLASE B 451.50 m 49.52 22,358.28 504.00 m 49.52 24,958.08 556.50 m 49.52
EXCAV.MAT.CLASE C 270.90 m 415.99 112,691.69 302.40 m 415.99 125,795.38 333.90 m 415.99
PLANTILLA APISONADA 78.75 m 329.74 25,967.03 84.00 m 329.74 27,698.16 89.25 m 329.74
INST.JUNTEO Y PRUEBA TUBERIA 1,050.00 m 55.26 58,023.00 1,050.00 m 63.97 67,168.50 1,050.00 m 74.99
RELLENO COMPACTO 371.86 m 203.52 75,680.95 422.62 m 203.52 86,011.62 474.19 m 203.52
RELLENO A VOLTEO 413.12 m 12.76 5,271.41 436.63 m 12.76 5,571.40 459.64 m 12.76
ATRAQUES DE CONCRETO, fc=90 m m m
COSTO DE TUBERIA 1,050.00 m 480.85 504,892.50 1,050.00 m 714.78 750,519.00 1,050.00 m 983.88
COSTO TOTAL DE CONDUCCION $ 808,796.65 $ 1,092,088.79 $
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
254
PRESION DE TRABAJO DIAMETRO NOMINAL H.P. K.W.h. COSTO POR HORA CARGO ANUAL COSTO TOTAL DE CARGO ANUAL DE AMORTI- COSTO ANUAL DE BOMBEO
TUBERIA kg/cm BOMBEO $ DE BOMBEO $ CONDUCCION ZACION (CONDUCCION) PARA OPERACIN
mm. Pulg. ( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) (20 AOS AL 11.90% ANUAL) ( 6 ) DE 365 DIAS ( 7 )
72 152.4 6 239.43 178.54 $ 446.35 3,910,055.27 $ $ 808,796.65 $ 107,602.70 $
55 203.2 8 173.83 129.62 $ 324.06 2,838,785.18 $ $ 1,092,088.79 $ 145,292.02 $
9.8 254 10 159.75 119.12 $ 297.81 2,608,799.70 $ $ 1,414,893.41 $ 188,238.10 $
Costo del KWH = $ 2.50 ( 2 ) = ( 1 ) x 0.7457 ( 3 ) = ( 2 ) x $ 2.50 ( 4 ) = ( 3 ) X 8760 ( 6 ) = ( 5 ) x Anualidad ( 7 ) = ( 4 ) + ( 6 )
NOTA: El dimetro ms econmico est dado por el menor costo determinado en la columna 7
DIAMETRO ANCHO PROFUNDIDAD
0.3 0.8 1.2
0.35 0.85 1.25
0.4 0.95 1.35
R E S U M E N
DIAMETRO NOMINAL AREA GASTO VELOCIDAD LONG.LINEA COEF.FRIC. CONSTANTE PERDIDA FRIC. 5% hf hf1 = hf + %h Qhft 76 n
mm. Pulg. (A) m (Q) m/s (V) m/s (L) m (Q) MANNING n MANNING (K) hf = KLQ, m OTRAS PERD. (Q en l.p.s.) n = 85%
250 10 0.0491 0.16670 3.40 165.00 0.02778889 0.010 1.53730 7.05 0.35 7.40 1,233.78 64.60
450 18 0.1590 0.16670 1.05 165.00 0.02778889 0.010 0.06690 0.31 0.02 0.32 53.69 64.60
PRESION DE DIAME. ESPESOR VELOCI- 145V Ea d Et e Ea d Ea d Ea d SOBREPRES. SOBREPRES. SOBREPRES. CARGA
TRABAJO DE NOM.(d) PARED DAD 1 + 1 + h = 145 v ABSORVIDA ABSORVIDA NORMAL DE
LA TUBERIA cm. TUBO m/s Et e Et e Et e 1+ Ea d POR VALVULA POR TUBERIA OPERACIN
Kg/cm (e) cm Et e R.P.=80%h 20%h m
14 25 2.85 3.40 492.42 516,750.00 684,000.00 0.76 1.76 1.32 371.65 297.32 74.33 7.40
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
7 45 2.75 1.05 151.98 930,150.00 660,000.00 1.41 2.41 1.55 97.91 78.33 19.58 0.32
V = Velocidad inicial del agua (m/s) -Ea = mdulo de elasticidad del agua (20670 kg/cm) -Et = mdulo de elasticidad de las paredes del tubo (para asbesto cemento = 240 000, para acero = 2 100 000 kg/cm)
CONCEPTO DIAMETRO: 250mm. (10") CLASE:A-14 DIAMETRO: 200mm. (8") CLASE:A-10 DIAMETRO: CLASE:
CONCEP. UNID. P.U. IMPORTE CONCEPTO UNID. P.U. IMPORTE CONCEPTO UNID. P.U.
EXCAV.MAT.CLASE A m m m
EXCAV.MAT.CLASE B 142.31 m 34.00 4,838.63 242.55 m 34.00 8,246.70 m
EXCAV.MAT.CLASE C m m m
PLANTILLA APISONADA 18.56 m 39.15 726.72 25.99 m 39.15 1,017.41 m
INST.JUNTEO Y PRUEBA TUBERIA 165.00 m 18.90 3,118.50 165.00 m 21.00 3,465.00 m
RELLENO COMPACTO 30.94 m 25.00 773.44 77.96 m 25.00 1,949.06 m
RELLENO A VOLTEO 123.75 m 13.00 1,608.75 173.25 m 13.00 2,252.25 m
ATRAQUES DE CONCRETO, fc=90 m m m
COSTO DE TUBERIA 165.00 m 586.00 96,690.00 165.00 m 1,540.00 254,100.00 m
COSTO TOTAL DE CONDUCCION $ 107,756.03 $ 271,030.42
PRESION DE TRABAJO DIAMETRO NOMINAL H.P. K.W.h. COSTO POR HORA CARGO ANUAL COSTO ANUAL DE CARGO ANUAL DE AMORTI- COSTO ANUAL DE BOMBEO
TUBERIA kg/cm BOMBEO $ DE BOMBEO $ CONDUCCION ZACION (CONDUCCION) PARA OPERACIN
mm. Pulg. ( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) (__ AOS AL __% ANUAL) ( 6 ) DE 365 DIAS ( 7 )
14 250 10 19.10 14.24 8.55 74,855.83 $ $ 107,756.03 $ 20,130.98 $
7 450 18 0.83 0.62 0.37 3,257.57 $ $ 271,030.42 $ 50,633.90 $
Costo del KWH = $ 0.60 ( 2 ) = ( 1 ) x 0.7457 ( 3 ) = ( 2 ) x $ ( 4 ) = ( 3 ) X 8760 ( 6 ) = ( 5 ) x Anualidad ( 7 ) = ( 4 ) + ( 6 )
NOTA: El dimetro ms econmico est dado por el menor costo determinado en la columna 7
DIAMETRO ANCHO PROFUNDIDAD
0.25 0.75 1.15
0.45 1.05 1.4
R E S U M E N
HP = (Q)(Hd)
76 n ( 1 )
239.43
173.83
159.75
PRESION TOTAL
20%h +
CARGA NORMAL
DE OPERACIN
266.31 26.63
162.34 16.23
113.57 11.35 1.55
116.33 11.65
asbesto cemento = 210,000 kg/cm, acero = 2'100,000 kg/cm)
fierro fundido = 930,000 kg/cm, PVC = 28,100 kg/cm concreto simple = 125,000 kg/cm
IMPORTE
4,821.52
27,557.88
138,899.06
29,429.30
78,739.50
96,507.15
5,865.01
1,033,074.00
1,414,893.41
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
COSTO ANUAL DE BOMBEO
PARA OPERACIN
DE 365 DIAS ( 7 )
4,017,657.96
2,984,077.20
2,797,037.80
( 7 ) = ( 4 ) + ( 6 )
R E S U M E N
HP = (Q)(hft)
76 n ( 1 )
19.10
0.83
PRESION TOTAL
20%h +
CARGA NORMAL
DE OPERACIN
81.73
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
19.90
IMPORTE
COSTO ANUAL DE BOMBEO
PARA OPERACIN
DE 365 DIAS ( 7 )
94,986.81
53,891.46
( 7 ) = ( 4 ) + ( 6 )
R E S U M E N
DIAMETRO NOMINAL AREA GASTO VELOCIDAD LONG.LINEA COEF.FRIC. CONSTANTE PERDIDA FRIC. 5% hf hf1 = hf + %h Qhft 76 n
mm. Pulg. (A) m (Q) m/s (V) m/s (L) m (Q) MANNING n MANNING (K) hf = KLQ, m OTRAS PERD. (Q en l.p.s.) n = 85%
PRESION DE DIAME. ESPESOR VELOCI- 145V Ea d Et e Ea d Ea d Ea d SOBREPRES. SOBREPRES. SOBREPRES. CARGA
TRABAJO DE NOM.(d) PARED DAD 1 + 1 + h = 145 v ABSORVIDA ABSORVIDA NORMAL DE
LA TUBERIA cm. TUBO m/s Et e Et e Et e 1+ Ea d POR VALVULA POR TUBERIA OPERACIN
Kg/cm (e) cm Et e R.P.=80%h 20%h m
V = Velocidad inicial del agua (m/s) Ea = mdulo de elasticidad del agua (20700 kg/cm) Et = mdulo de elasticidad de las paredes del tubo asbesto cemento = 210,000 kg/cm, acero = 2'100,000 kg/cm)
fierro fundido = 930,000 kg/cm, PVC = 28,100 kg/cm concreto simple = 125,000 kg/cm
CONCEPTO DIAMETRO: CLASE: DIAMETRO: CLASE: DIAMETRO: CLASE:
CONCEP. UNID. P.U. IMPORTE CONCEPTO UNID. P.U. IMPORTE CONCEPTO UNID. P.U.
EXCAV.MAT.CLASE A m m m
EXCAV.MAT.CLASE B m m m
EXCAV.MAT.CLASE C m m m
PLANTILLA APISONADA m m m
INST.JUNTEO Y PRUEBA TUBERIA m m m
RELLENO COMPACTO m m m
RELLENO A VOLTEO m m m
ATRAQUES DE CONCRETO, fc=90 m m m
COSTO DE TUBERIA m m m
COSTO TOTAL DE CONDUCCION
PRESION DE TRABJO DIAMETRO NOMINAL H.P. K.W.h. COSTO POR HORA CARGO ANUAL COSTO ANUAL DE CARGO ANUAL DE AMORTI- COSTO ANUAL DE BOMBEO
TUBERIA kg/cm BOMBEO $ DE BOMBEO $ CONDUCCION ZACION (CONDUCCION) PARA OPERACIN
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
R E S U M E N
mm. Pulg. ( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) (__ AOS AL __% ANUAL) ( 6 ) DE 365 DIAS ( 7 )
Costo del KWH = $ ( 2 ) = ( 1 ) x 0.7457 ( 3 ) = ( 2 ) x $ ( 4 ) = ( 3 ) X 8760 ( 6 ) = ( 5 ) x Anualidad ( 7 ) = ( 4 ) + ( 6 )
NOTA: El dimetro ms econmico est dado por el menor costo determinado en la columna 7
HP = (Q)(hft)
76 n ( 1 )
PRESION TOTAL
20%h +
CARGA NORMAL
DE OPERACIN
asbesto cemento = 210,000 kg/cm, acero = 2'100,000 kg/cm)
IMPORTE
COSTO ANUAL DE BOMBEO
PARA OPERACIN
CALCULO DEL DIAMETRO MAS ECONOMICO EN LAS LINEAS DE CONDUCCION
GOLPE DE ARIETE
R E S U M E N
DE 365 DIAS ( 7 )
( 7 ) = ( 4 ) + ( 6 )