CUADRO DE METRADOS

PROYECTO
DESCRIP.

:BIBLIOTECA

BIBLIOTECA

PARTIDA
01.02
01.02.01
01.02.01.01
01.02.01.01.01

01.02.01.01.02

01.02.01.02
01.02.01.02.01

01.02.01.02.02

DEPARTAMENTO

DESCRIPCION
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION PARA ZAPATAS
TIPO I
TIPO II
EXCAVACION PARA CIMIENTO CORRIDO
EJE A
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE C
ENTRE EJES 2 Y 3
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE E
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE F
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE 1
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
EJE 2
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 3
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 4
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
RELLENOS
RELLENOS PARA ZAPATAS
TIPO I
TIPO II
RELLENOS PARA CIMIENTO CORRIDO
EJE A
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE C
ENTRE EJES 2 Y 3
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE E
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE F
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE 1
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
EJE 2
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 3
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 4
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F

UND

N
VEC.

PROVINCIA
DISTRITO
DIMENSIONES
LARGO
ANCHO

ALTO

: LIMA
: LIMA
: CARABAYLLO
METRADO
AREA
PARCIAL

M3

TOTAL

45.25
22
6

1.90
1.80

1.70
1.80

0.50
0.50

1.62
1.62

35.53
9.72

M3
M3
M3

1
1
1

5.52
5.75
5.53

0.40
0.40
0.40

0.70
0.70
0.70

1.55
1.61
1.55

1.55
1.61
1.55

M3

5.52

0.40

0.70

1.55

1.55

M3

8.68

0.40

0.70

2.43

2.43

M3
M3

1
1

5.52
5.46

0.40
0.40

0.70
0.70

1.55
1.53

1.55
1.53

M3
M3
M3

1
1
1

5.55
5.70
5.52

0.40
0.40
0.40

0.70
0.70
0.70

1.55
1.60
1.55

1.55
1.60
1.55

M3
M3
M3

1
1
1

5.55
5.70
5.55

0.40
0.40
0.40

0.70
0.70
0.70

1.55
1.60
1.55

1.55
1.60
1.55

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.19
3.25
3.42
2.99
5.60

0.40
0.40
0.40
0.40
0.40
0.40

0.70
0.70
0.70
0.70
0.70
0.70

1.36
1.45
0.91
0.96
0.84
1.57

1.36
1.45
0.91
0.96
0.84
1.57

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

0.70
0.70
0.70

1.36
1.45
0.84

1.36
1.45
0.84

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

0.70
0.70
0.70

1.36
1.45
0.84

1.36
1.45
0.84

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.20
3.24
3.44
3.00
5.39

0.40
0.40
0.40
0.40
0.40
0.40

0.70
0.70
0.70
0.70
0.70
0.70

1.36
1.46
0.91
0.96
0.84
1.51

1.36
1.46
0.91
0.96
0.84
1.51

22
6

1.90
1.80

1.70
1.80

0.40
0.40

1.29
1.30

28.42
7.78

M3

40.24

38.01

M3

36.50

M3
M3
M3

1
1
1

5.52
5.75
5.53

0.40
0.40
0.40

0.50
0.50
0.50

1.10
1.15
1.11

1.10
1.15
1.11

M3

5.52

0.40

0.50

1.10

1.10

M3

8.68

0.40

0.50

1.74

1.74

M3
M3

1
1

5.52
5.46

0.40
0.40

0.50
0.50

1.10
1.09

1.10
1.09

M3
M3
M3

1
1
1

5.55
5.70
5.52

0.40
0.40
0.40

0.50
0.50
0.50

1.11
1.14
1.10

1.11
1.14
1.10

M3
M3
M3

1
1
1

5.55
5.70
5.55

0.40
0.40
0.40

0.50
0.50
0.50

1.11
1.14
1.11

1.11
1.14
1.11

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.19
3.25
3.42
2.99
5.60

0.40
0.40
0.40
0.40
0.40
0.40

0.50
0.50
0.50
0.50
0.50
0.50

0.97
1.04
0.65
0.68
0.60
1.12

0.97
1.04
0.65
0.68
0.60
1.12

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

0.50
0.50
0.50

0.97
1.04
0.60

0.97
1.04
0.60

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

0.50
0.50
0.50

0.97
1.04
0.60

0.97
1.04
0.60

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.20
3.24
3.44
3.00
5.39

0.40
0.40
0.40
0.40
0.40
0.40

0.50
0.50
0.50
0.50
0.50
0.50

0.97
1.04
0.65
0.69
0.60
1.08

0.97
1.04
0.65
0.69
0.60
1.08

594.09

594.09

114.19

114.19

1.55

1.55

01.02.01.03
01.02.01.03.01

NIVELACIN DE TERRENO
NIVELACION INTERIOR Y APISONADO

M2

594.09

01.02.01.04
01.02.01.04.01

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE 30% DE ESPONJAMIENTO

M3

87.84

01.02.02
01.02.02.01
01.02.02.01.01

OBRAS DE CONCRETO SIMPLE


CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS 1:10 + 30% P.G.
EJE A
ENTRE EJES 1 Y 2

M3

5.52

AREA TOTAL

114.19

44.71
0.40

0.70

ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE C
ENTRE EJES 2 Y 3
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE E
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE F
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE 1
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
EJE 2
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 3
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 4
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
01.02.02.02
01.02.02.02.01

01.02.02.03
01.02.02.03.01

01.02.02.03.02

SOLADO f'c = 100 kg/cm2, e = 10 cm (ZAPATAS)


SOLADO PARA ZAPATAS E=4" MEZCLA 1:10
TIPO I
TIPO II
SOBRECIMIENTOS
CONCRETO SOBRECIMIENTOS f'c=175 kg/cm2 + 25% P.M.
EJE A
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE C
ENTRE EJES 2 Y 3
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE E
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE F
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE 1
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
EJE 2
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 3
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 4
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS
EJE A
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE C
ENTRE EJES 2 Y 3
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE E
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE F
ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
ENTRE EJES 3 Y 4
EJE 1
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
EJE 2

M3
M3

1
1

5.75
5.53

0.40
0.40

0.70
0.70

1.61
1.55

1.61
1.55

M3

5.52

0.40

0.70

1.55

1.55

M3

8.68

0.40

0.70

2.43

2.43

M3
M3

1
1

5.52
5.46

0.40
0.40

0.70
0.70

1.55
1.53

1.55
1.53

M3
M3
M3

1
1
1

5.55
5.70
5.52

0.40
0.40
0.40

0.70
0.70
0.70

1.55
1.60
1.55

1.55
1.60
1.55

M3
M3
M3

1
1
1

5.55
5.70
5.55

0.40
0.40
0.40

0.70
0.70
0.70

1.55
1.60
1.55

1.55
1.60
1.55

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.19
3.25
3.42
2.99
5.60

0.40
0.40
0.40
0.40
0.40
0.40

0.70
0.70
0.70
0.70
0.70
0.70

1.36
1.45
0.91
0.96
0.84
1.57

1.36
1.45
0.91
0.96
0.84
1.57

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

0.70
0.70
0.70

1.36
1.45
0.84

1.36
1.45
0.84

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

0.70
0.70
0.70

1.36
1.45
0.84

1.36
1.45
0.84

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.20
3.24
3.44
3.00
5.39

0.40
0.40
0.40
0.40
0.40
0.40

0.70
0.70
0.70
0.70
0.70
0.70

1.36
1.46
0.91
0.96
0.84
1.51

1.36
1.46
0.91
0.96
0.84
1.51

M2
M2

22
6

1.90
1.80

1.70
1.80

3.23
3.24

71.06
19.44

95.03

M3

15.97

M3
M3
M3

1
1
1

5.52
5.75
5.53

0.25
0.25
0.25

0.40
0.40
0.40

0.55
0.58
0.55

0.55
0.58
0.55

M3

5.52

0.25

0.40

0.55

0.55

M3

8.68

0.25

0.40

0.87

0.87

M3
M3

1
1

5.52
5.46

0.25
0.25

0.40
0.40

0.55
0.55

0.55
0.55

M3
M3
M3

1
1
1

5.55
5.70
5.52

0.25
0.25
0.25

0.40
0.40
0.40

0.56
0.57
0.55

0.56
0.57
0.55

M3
M3
M3

1
1
1

5.55
5.70
5.55

0.25
0.25
0.25

0.40
0.40
0.40

0.56
0.57
0.56

0.56
0.57
0.56

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.19
3.25
3.42
2.99
5.60

0.25
0.25
0.25
0.25
0.25
0.25

0.40
0.40
0.40
0.40
0.40
0.40

0.49
0.52
0.33
0.34
0.30
0.56

0.49
0.52
0.33
0.34
0.30
0.56

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.25
0.25
0.25

0.40
0.40
0.40

0.49
0.52
0.30

0.49
0.52
0.30

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.25
0.25
0.25

0.40
0.40
0.40

0.49
0.52
0.30

0.49
0.52
0.30

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.20
3.24
3.44
3.00
5.39

0.25
0.25
0.25
0.25
0.25
0.25

0.40
0.40
0.40
0.40
0.40
0.40

0.49
0.52
0.32
0.34
0.30
0.54

0.49
0.52
0.32
0.34
0.30
0.54

M3
M3
M3

1
1
1

5.52
5.75
5.53

0.40
0.40
0.40

2.21
2.30
2.21

M3

5.52

0.40

M3

8.68

0.40

M3
M3

1
1

5.52
5.46

0.40
0.40

M3
M3
M3

1
1
1

5.55
5.70
5.52

0.40
0.40
0.40

M3
M3
M3

1
1
1

5.55
5.70
5.55

0.40
0.40
0.40

2.21
2.30
2.21
0.00
2.21
0.00
3.47
0.00
2.21
2.18
0.00
2.22
2.28
2.21
0.00
2.22
2.28
2.22

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.19
3.25
3.42
2.99
5.60

0.40
0.40
0.40
0.40
0.40
0.40

1.94
2.08
1.30
1.37
1.20
2.24

1.94
2.08
1.30
1.37
1.20
2.24

M2

60.84

2.21
3.47
2.21
2.18
2.22
2.28
2.21
2.22
2.28
2.22

ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 3
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES E' Y E
EJE 4
ENTRE EJES A Y B
ENTRE EJES B Y C
ENTRE EJES C Y D
ENTRE EJES D Y E'
ENTRE EJES E' Y E
ENTRE EJES E Y F
01.02.02.04
01.02.02.04.01

01.02.03
01.02.03.01
01.02.03.01.01

01.02.03.01.02

FALSO PISO
FALSO PISO DE 4"
BIBLIOTECA
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS fc = 210 kg/cm2
- TIPO I
- TIPO II
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 EN ZAPATAS
ZAPATA TIPO Z-1 Y Z-2
- ACERO 1/2" fy=4200 Kg/cm2

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

1.94
2.08
1.20

1.94
2.08
1.20

M3
M3
M3

1
1
1

4.86
5.19
3.00

0.40
0.40
0.40

1.94
2.08
1.20

1.94
2.08
1.20

M3
M3
M3
M3
M3
M3

1
1
1
1
1
1

4.86
5.20
3.24
3.44
3.00
5.39

0.40
0.40
0.40
0.40
0.40
0.40

1.94
2.08
1.30
1.38
1.20
2.16

1.94
2.08
1.30
1.38
1.20
2.16

M2

454.89

454.89

1.62
1.62

35.53
9.72

23.76
26.08
9.41
10.75

548.78
164.32
213.19
67.74

454.89

M3

01.02.03.02.02

01.02.03.02.03

COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2
- TIPO C-1
1, 2 Y 3 PISO
EJE A
ENTRE EJES 1, 2, 3 Y 4
EJE B
ENTRE EJES 1, 2, 3 Y 4
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
EJE E
ENTRE EJES 1, 2, 3 Y 4
EJE F
ENTRE EJES 1, 2, 3 Y 4
- TIPO C-2
1, 2 Y 3 PISO
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
- TIPO C-1
1, 2 Y 3 PISO
EJE A
ENTRE EJES 1, 2, 3 Y 4
EJE B
ENTRE EJES 1, 2, 3 Y 4
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
EJE E
ENTRE EJES 1, 2, 3 Y 4
EJE F
ENTRE EJES 1, 2, 3 Y 4
- TIPO C-2
1, 2 Y 3 PISO
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 EN COLUMNAS
COLUMNAS TIPO C-1
- ACERO 3/4" fy=4200 Kg/cm2
1, 2 Y 3 PISO
EJE A
ENTRE EJES 1, 2, 3 Y 4
EJE B
ENTRE EJES 1, 2, 3 Y 4
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
EJE E
ENTRE EJES 1, 2, 3 Y 4
EJE F
ENTRE EJES 1, 2, 3 Y 4
COLUMNAS TIPO C-2
- ACERO 5/8" fy=4200 Kg/cm2
1, 2 Y 3 PISO
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
COLUMNAS TIPO C-1
- ACERO 3/8" fy=4200 Kg/cm2

47.51
22
6

1.90
1.80

1.70
1.80

22
6
22
6

23.90
26.24
16.80
19.20

Z-1
Z-2
Z-1
Z.2

0.50
0.50

Kg

994.02
994.02

acero

- ACERO 3/8" fy=4200 Kg/cm2

01.02.03.02
01.02.03.02.01

AREA TOTAL

0.99
0.99
0.56
0.56

M3

49.70

0.30

0.45

13.28

1.79

7.17

0.30

0.45

13.28

1.79

7.17

0.30

0.45

13.28

1.79

3.59

0.30

0.45

13.28

1.79

3.59

0.30

0.45

13.28

1.79

3.59

0.30

0.30

13.28

1.20

4.78

0.30

0.30

13.28

1.20

4.78

0.40

0.40

13.28

2.11

4.22

0.40

0.40

13.28

2.11

4.22

0.40

0.40

13.28

2.11

4.22

M2

533.46

0.30

0.45

13.28

19.92

79.68

0.30

0.45

13.28

19.92

79.68

0.30

0.45

13.28

19.92

39.84

0.30

0.45

13.28

19.92

39.84

0.30

0.45

13.28

19.92

39.84

0.30

0.30

13.28

15.94

63.74

0.30

0.30

13.28

15.94

63.74

0.40

0.40

13.28

21.18

42.36

0.40

0.40

13.28

21.18

42.36

0.40

0.40

13.28

21.18

42.36

Kg

5496.10
5496.10
acero

3781.28

53.12

2.24

118.72

474.89

53.12

2.24

118.72

474.89

53.12

2.24

118.72

237.45

53.12

2.24

118.72

237.45

53.12

2.24

118.72

237.45

53.12

2.24

118.72

474.89

53.12

2.24

118.72

474.89

106.24

1.55

164.88

329.77

106.24

1.55

164.88

329.77

106.24

1.55

164.88

329.77

1714.82

1, 2 Y 3 PISO
EJE A
ENTRE EJES 1, 2, 3 Y 4
EJE B
ENTRE EJES 1, 2, 3 Y 4
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
EJE E
ENTRE EJES 1, 2, 3 Y 4
EJE F
ENTRE EJES 1, 2, 3 Y 4
COLUMNAS TIPO C-2
- ACERO 3/8" fy=4200 Kg/cm2
1, 2 Y 3 PISO
EJE C
ENTRE EJES 1, 2, 3 Y 4
EJE D
ENTRE EJES 1, 2, 3 Y 4
EJE E'
ENTRE EJES 1, 2, 3 Y 4
01.02.03.03
01.02.03.03.01

VIGAS
CONCRETO VIGAS f'c=210 kg/cm2
1 PISO
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

105.12

0.56

58.87

235.48

105.12

0.56

58.87

235.48

105.12

0.56

58.87

117.74

105.12

0.56

58.87

117.74

105.12

0.56

58.87

117.74

105.12

0.56

58.87

235.48

105.12

0.56

58.87

235.48

110.04

0.56

61.62

123.25

110.04

0.56

61.62

123.25

110.04

0.56

61.62

123.25

M3

78.58
5.25
4

4.86

0.30

0.20

0.29

1.17

2
1
1

5.19
5.19
5.20

0.30
0.30
0.30

0.20
0.20
0.20

0.31
0.31
0.31

0.62
0.31
0.31

1
1

3.25
3.24

0.30
0.30

0.20
0.20

0.20
0.19

0.20
0.19

1
1

3.42
3.44

0.30
0.30

0.20
0.20

0.21
0.21

0.21
0.21

1
3

2.99
3.00

0.30
0.30

0.20
0.20

0.18
0.18

0.18
0.54

1
1
1
1

5.60
5.53
5.46
5.39

0.30
0.30
0.30
0.30

0.20
0.20
0.20
0.20

0.34
0.33
0.33
0.32

0.34
0.33
0.33
0.32

1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45

1.06
1.12
1.16
1.16
1.12

1.06
1.12
1.16
1.16
2.25

2
2

5.97
5.70

0.45
0.45

0.45
0.45

1.21
1.15

2.42
2.31

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.45
0.45
0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.12
1.12
1.15
0.85
1.15
1.12
1.12

1.12
1.12
1.15
0.85
1.15
1.12
1.12

1
2
2

4.21
1.85
5.75

0.15
0.15
0.15

0.20
0.20
0.20

0.13
0.06
0.17

0.13
0.11
0.35

4.86

0.30

0.20

0.29

1.17

2
1
1

5.19
5.19
5.20

0.30
0.30
0.30

0.20
0.20
0.20

0.31
0.31
0.31

0.62
0.31
0.31

1
1

3.25
3.24

0.30
0.30

0.20
0.20

0.20
0.19

0.20
0.19

1
1

3.42
3.44

0.30
0.30

0.20
0.20

0.21
0.21

0.21
0.21

1
3

2.99
3.00

0.30
0.30

0.20
0.20

0.18
0.18

0.18
0.54

1
1
1
1

5.60
5.53
5.46
5.39

0.30
0.30
0.30
0.30

0.20
0.20
0.20
0.20

0.34
0.33
0.33
0.32

0.34
0.33
0.33
0.32

1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45

1.06
1.12
1.16
1.16
1.12

1.06
1.12
1.16
1.16
2.25

2
2

5.97
5.70

0.45
0.45

0.45
0.45

1.21
1.15

2.42
2.31

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.45
0.45
0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.12
1.12
1.15
0.85
1.15
1.12
1.12

1.12
1.12
1.15
0.85
1.15
1.12
1.12

1
2

4.21
1.85

0.15
0.15

0.20
0.20

0.13
0.06

0.13
0.11

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

19.11

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
2 PISO
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

0.58

5.25

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

19.11

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2

0.58

ENTRE EJES 2 Y 3
3 PISO
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

5.75

0.15

0.20

0.17

0.35

4.86

0.30

0.20

0.29

1.17

2
1
1

5.19
5.19
5.20

0.30
0.30
0.30

0.20
0.20
0.20

0.31
0.31
0.31

0.62
0.31
0.31

1
1

3.25
3.24

0.30
0.30

0.20
0.20

0.20
0.19

0.20
0.19

1
1

3.42
3.44

0.30
0.30

0.20
0.20

0.21
0.21

0.21
0.21

1
3

2.99
3.00

0.30
0.30

0.20
0.20

0.18
0.18

0.18
0.54

1
1
1
1

5.60
5.53
5.46
5.39

0.30
0.30
0.30
0.30

0.20
0.20
0.20
0.20

0.34
0.33
0.33
0.32

0.34
0.33
0.33
0.32

1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45

1.06
1.12
1.16
1.16
1.12

1.06
1.12
1.16
1.16
2.25

2
2

5.97
5.70

0.45
0.45

0.45
0.45

1.21
1.15

2.42
2.31

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.45
0.45
0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.12
1.12
1.15
0.85
1.15
1.12
1.12

1.12
1.12
1.15
0.85
1.15
1.12
1.12

1
2
2

4.21
1.85
5.75

0.15
0.15
0.15

0.20
0.20
0.20

0.13
0.06
0.17

0.13
0.11
0.35

5.25

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

19.11

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
01.02.03.03.02

ENCOFRADO Y DESENCOFRADO EN VIGAS


1 PISO
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

0.58

M2

598.08
61.27
4

4.86

0.30

0.20

3.40

13.61

2
1
1

5.19
5.19
5.20

0.30
0.30
0.30

0.20
0.20
0.20

3.63
3.64
3.64

7.26
3.64
3.64

1
1

3.25
3.24

0.30
0.30

0.20
0.20

2.28
2.27

2.28
2.27

1
1

3.42
3.44

0.30
0.30

0.20
0.20

2.40
2.41

2.40
2.41

1
3

2.99
3.00

0.30
0.30

0.20
0.20

2.09
2.10

2.09
6.30

1
1
1
1

5.60
5.53
5.46
5.39

0.30
0.30
0.30
0.30

0.20
0.20
0.20
0.20

3.92
3.87
3.82
3.77

3.92
3.87
3.82
3.77

1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45

7.09
7.45
7.74
7.73
7.50

7.09
7.45
7.74
7.73
14.99

2
2

5.97
5.70

0.45
0.45

0.45
0.45

8.06
7.70

16.12
15.39

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.45
0.45
0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45
0.45
0.45

7.46
7.46
7.67
5.69
7.68
7.45
7.49

7.46
7.46
7.67
5.69
7.68
7.45
7.49

1
2
2

4.21
1.85
5.75

0.15
0.15
0.15

0.20
0.20
0.20

2.31
1.02
3.16

2.31
2.04
6.33

4.86

0.30

0.20

3.40

13.61

2
1
1

5.19
5.19
5.20

0.30
0.30
0.30

0.20
0.20
0.20

3.63
3.64
3.64

7.26
3.64
3.64

1
1

3.25
3.24

0.30
0.30

0.20
0.20

2.28
2.27

2.28
2.27

1
1

3.42
3.44

0.30
0.30

0.20
0.20

2.40
2.41

2.40
2.41

1
3

2.99
3.00

0.30
0.30

0.20
0.20

2.09
6.30

1
1
1
1

5.60
5.53
5.46
5.39

0.30
0.30
0.30
0.30

0.20
0.20
0.20
0.20

2.09
2.10
0.00
3.92
3.87
3.82
3.77

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

127.41

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
2 PISO
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

10.67

61.27

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

3.92
3.87
3.82
3.77

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

127.41
1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45

7.09
7.45
7.74
7.73
7.50

7.09
7.45
7.74
7.73
14.99

2
2

5.97
5.70

0.45
0.45

0.45
0.45

8.06
7.70

16.12
15.39

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.45
0.45
0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45
0.45
0.45

7.46
7.46
7.67
5.69
7.68
7.45
7.49

7.46
7.46
7.67
5.69
7.68
7.45
7.49

1
2
2

4.21
1.85
5.75

0.15
0.15
0.15

0.20
0.20
0.20

2.31
1.02
3.16

2.31
2.04
6.33

4.86

0.30

0.20

3.40

13.61

2
1
1

5.19
5.19
5.20

0.30
0.30
0.30

0.20
0.20
0.20

3.63
3.64
3.64

7.26
3.64
3.64

1
1

3.25
3.24

0.30
0.30

0.20
0.20

2.28
2.27

2.28
2.27

1
1

3.42
3.44

0.30
0.30

0.20
0.20

2.40
2.41

2.40
2.41

1
3

2.99
3.00

0.30
0.30

0.20
0.20

2.09
2.10

2.09
6.30

1
1
1
1

5.60
5.53
5.46
5.39

0.30
0.30
0.30
0.30

0.20
0.20
0.20
0.20

3.92
3.87
3.82
3.77

3.92
3.87
3.82
3.77

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3

10.67

3 PISO
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

61.27

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

127.41
1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45

7.09
7.45
7.74
7.73
7.50

7.09
7.45
7.74
7.73
14.99

2
2

5.97
5.70

0.45
0.45

0.45
0.45

8.06
7.70

16.12
15.39

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.45
0.45
0.45
0.45
0.45
0.45
0.45

0.45
0.45
0.45
0.45
0.45
0.45
0.45

7.46
7.46
7.67
5.69
7.68
7.45
7.49

7.46
7.46
7.67
5.69
7.68
7.45
7.49

1
2
2

4.21
1.85
5.75

0.15
0.15
0.15

0.20
0.20
0.20

2.31
1.02
3.16

2.31
2.04
6.33

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
01.02.03.03.03

ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 EN VIGAS


1 PISO
- ACERO 5/8" fy=4200 Kg/cm2
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

10.67

Kg

5118.08
acero

1129.30
543.39

19.45

1.55

30.18

120.73

2
1
1

20.75
20.78
20.81

1.55
1.55
1.55

32.20
32.24
32.29

64.40
32.24
32.29

1
1

13.01
12.95

1.55
1.55

20.19
20.10

20.19
20.10

1
1

13.69
13.76

1.55
1.55

21.25
21.35

21.25
21.35

1
3

11.96
12.00

1.55
1.55

18.57
18.63

18.57
55.89

1
1
1
1

22.39
22.10
21.82
21.55

1.55
1.55
1.55
1.55

34.75
34.31
33.87
33.45

34.75
34.31
33.87
33.45

1
1
1
1
2

21.00
22.07
22.93
22.91
22.21

1.55
1.55
1.55
1.55
1.55

32.59
34.26
35.59
35.55
34.47

32.59
34.26
35.59
35.55
68.93

2
2

23.88
22.80

1.55
1.55

37.06
35.39

74.12
70.78

1
1
1
1
1
1
1

22.10
22.11
22.74
16.85
22.76
22.07
22.20

1.55
1.55
1.55
1.55
1.55
1.55
1.55

34.31
34.31
35.29
26.15
35.32
34.26
34.45

34.31
34.31
35.29
26.15
35.32
34.26
34.45

4.86

4.83

19.33

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

585.91

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- ACERO 1/2" fy=4200 Kg/cm2


- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

acero
0.99

257.99
87.01

2
1
1

5.19
5.19
5.20

0.99
0.99
0.99

5.16
5.16
5.17

10.31
5.16
5.17

1
1

3.25
3.24

0.99
0.99

3.23
3.22

3.23
3.22

1
1

3.42
3.44

0.99
0.99

3.40
3.42

3.40
3.42

1
3

2.99
3.00

0.99
0.99

2.97
2.98

2.97
8.95

1
1
1
1

5.60
5.53
5.46
5.39

0.99
0.99
0.99
0.99

5.56
5.49
5.42
5.36

5.56
5.49
5.42
5.36

1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.99
0.99
0.99
0.99
0.99

5.22
5.48
5.70
5.69
5.52

5.22
5.48
5.70
5.69
11.04

2
2

5.97
5.70

0.99
0.99

5.93
5.67

11.87
11.33

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.99
0.99
0.99
0.99
0.99
0.99
0.99

5.49
5.49
5.65
4.19
5.65
5.48
5.52

5.49
5.49
5.65
4.19
5.65
5.48
5.52

1
2
2

16.82
7.40
23.00

0.99
0.99
0.99

16.72
7.36
22.86

16.72
14.72
45.72

9.72

0.56

5.45

21.78

2
1
1

10.37
10.39
10.40

0.56
0.56
0.56

5.81
5.82
5.83

11.62
5.82
5.83

1
1

6.51
6.47

0.56
0.56

3.64
3.63

3.64
3.63

1
1

6.85
6.88

0.56
0.56

3.83
3.85

3.83
3.85

1
3

5.98
6.00

0.56
0.56

3.35
3.36

3.35
10.08

1
1
1
1

11.19
11.05
10.91
10.78

0.56
0.56
0.56
0.56

6.27
6.19
6.11
6.03

6.27
6.19
6.11
6.03

1
1
1
1
2

10.50
11.04
11.47
11.45
11.10

0.56
0.56
0.56
0.56
0.56

5.88
6.18
6.42
6.41
6.22

5.88
6.18
6.42
6.41
12.44

2
2

11.94
11.40

0.56
0.56

6.69
6.39

13.37
12.77

1
1
1
1
1
1
1

11.05
11.05
11.37
8.42
11.38
11.04
11.10

0.56
0.56
0.56
0.56
0.56
0.56
0.56

6.19
6.19
6.37
4.72
6.37
6.18
6.22

6.19
6.19
6.37
4.72
6.37
6.18
6.22

19.45

1.55

30.18

120.73

2
1
1

20.75
20.78
20.81

1.55
1.55
1.55

32.20
32.24
32.29

64.40
32.24
32.29

1
1

13.01
12.95

1.55
1.55

20.19
20.10

20.19
20.10

1
1

13.69
13.76

1.55
1.55

21.25
21.35

21.25
21.35

1
3

11.96
12.00

1.55
1.55

18.57
18.63

18.57
55.89

1
1
1
1

22.39
22.10
21.82
21.55

1.55
1.55
1.55
1.55

34.75
34.31
33.87
33.45

34.75
34.31
33.87
33.45

1
1
1
1
2

21.00
22.07
22.93
22.91
22.21

1.55
1.55
1.55
1.55
1.55

32.59
34.26
35.59
35.55
34.47

32.59
34.26
35.59
35.55
68.93

2
2

23.88
22.80

1.55
1.55

37.06
35.39

74.12
70.78

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

93.81

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
- ACERO 3/8" fy=4200 Kg/cm2
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

77.17

acero

203.74
98.03

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

105.71

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

2 PISO
- ACERO 5/8" fy=4200 Kg/cm2
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

acero

1129.30
543.39

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

585.91

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- ACERO 1/2" fy=4200 Kg/cm2


- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

1
1
1
1
1
1
1

22.10
22.11
22.74
16.85
22.76
22.07
22.20

4.86

2
1
1

1.55
1.55
1.55
1.55
1.55
1.55
1.55

34.31
34.31
35.29
26.15
35.32
34.26
34.45

34.31
34.31
35.29
26.15
35.32
34.26
34.45

0.99

4.83

19.33

5.19
5.19
5.20

0.99
0.99
0.99

5.16
5.16
5.17

10.31
5.16
5.17

1
1

3.25
3.24

0.99
0.99

3.23
3.22

3.23
3.22

1
1

3.42
3.44

0.99
0.99

3.40
3.42

3.40
3.42

1
3

2.99
3.00

0.99
0.99

2.97
2.98

2.97
8.95

1
1
1
1

5.60
5.53
5.46
5.39

0.99
0.99
0.99
0.99

5.56
5.49
5.42
5.36

5.56
5.49
5.42
5.36

acero

257.99
87.01

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

93.81
1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.99
0.99
0.99
0.99
0.99

5.22
5.48
5.70
5.69
5.52

5.22
5.48
5.70
5.69
11.04

2
2

5.97
5.70

0.99
0.99

5.93
5.67

11.87
11.33

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.99
0.99
0.99
0.99
0.99
0.99
0.99

5.49
5.49
5.65
4.19
5.65
5.48
5.52

5.49
5.49
5.65
4.19
5.65
5.48
5.52

1
2
2

16.82
7.40
23.00

0.99
0.99
0.99

16.72
7.36
22.86

16.72
14.72
45.72

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3
- ACERO 3/8" fy=4200 Kg/cm2
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

77.17

acero

203.74
98.03

9.72

0.56

5.45

21.78

2
1
1

10.37
10.39
10.40

0.56
0.56
0.56

5.81
5.82
5.83

11.62
5.82
5.83

1
1

6.51
6.47

0.56
0.56

3.64
3.63

3.64
3.63

1
1

6.85
6.88

0.56
0.56

3.83
3.85

3.83
3.85

1
3

5.98
6.00

0.56
0.56

3.35
3.36

3.35
10.08

1
1
1
1

11.19
11.05
10.91
10.78

0.56
0.56
0.56
0.56

6.27
6.19
6.11
6.03

6.27
6.19
6.11
6.03

1
1
1
1
2

10.50
11.04
11.47
11.45
11.10

0.56
0.56
0.56
0.56
0.56

5.88
6.18
6.42
6.41
6.22

5.88
6.18
6.42
6.41
12.44

2
2

11.94
11.40

0.56
0.56

6.69
6.39

13.37
12.77

1
1
1
1
1
1
1

11.05
11.05
11.37
8.42
11.38
11.04
11.10

0.56
0.56
0.56
0.56
0.56
0.56
0.56

6.19
6.19
6.37
4.72
6.37
6.18
6.22

6.19
6.19
6.37
4.72
6.37
6.18
6.22

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

105.71

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

3 PISO
- ACERO 5/8" fy=4200 Kg/cm2
- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

acero

1474.30
543.39

19.45

1.55

30.18

120.73

2
1
1

20.75
20.78
20.81

1.55
1.55
1.55

32.20
32.24
32.29

64.40
32.24
32.29

1
1

13.01
12.95

1.55
1.55

20.19
20.10

20.19
20.10

1
1

13.69
13.76

1.55
1.55

21.25
21.35

21.25
21.35

1
3

11.96
12.00

1.55
1.55

18.57
18.63

18.57
55.89

1
1
1
1

22.39
22.10
21.82
21.55

1.55
1.55
1.55
1.55

34.75
34.31
33.87
33.45

34.75
34.31
33.87
33.45

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

585.91
1
1
1
1
2

21.00
22.07
22.93
22.91
22.21

1.55
1.55
1.55
1.55
1.55

32.59
34.26
35.59
35.55
34.47

32.59
34.26
35.59
35.55
68.93

2
2

23.88
22.80

1.55
1.55

37.06
35.39

74.12
70.78

1
1
1
1
1
1
1

22.10
22.11
22.74
16.85
22.76
22.07
22.20

1.55
1.55
1.55
1.55
1.55
1.55
1.55

34.31
34.31
35.29
26.15
35.32
34.26
34.45

34.31
34.31
35.29
26.15
35.32
34.26
34.45

4.86

0.99

4.83

19.33

2
1
1

5.19
5.19
5.20

0.99
0.99
0.99

5.16
5.16
5.17

10.31
5.16
5.17

1
1

3.25
3.24

0.99
0.99

3.23
3.22

3.23
3.22

1
1

3.42
3.44

0.99
0.99

3.40
3.42

3.40
3.42

1
3

2.99
3.00

0.99
0.99

2.97
2.98

2.97
8.95

1
1
1
1

5.60
5.53
5.46
5.39

0.99
0.99
0.99
0.99

5.56
5.49
5.42
5.36

5.56
5.49
5.42
5.36

1
1
1
1
2

5.25
5.52
5.73
5.73
5.55

0.99
0.99
0.99
0.99
0.99

5.22
5.48
5.70
5.69
5.52

5.22
5.48
5.70
5.69
11.04

2
2

5.97
5.70

0.99
0.99

5.93
5.67

11.87
11.33

1
1
1
1
1
1
1

5.53
5.53
5.68
4.21
5.69
5.52
5.55

0.99
0.99
0.99
0.99
0.99
0.99
0.99

5.49
5.49
5.65
4.19
5.65
5.48
5.52

5.49
5.49
5.65
4.19
5.65
5.48
5.52

1
2
2

16.82
7.40
23.00

0.99
0.99
0.99

16.72
7.36
22.86

16.72
14.72
45.72

9.72

0.56

5.45

21.78

2
1
1

10.37
10.39
10.40

0.56
0.56
0.56

5.81
5.82
5.83

11.62
5.82
5.83

1
1

6.51
6.47

0.56
0.56

3.64
3.63

3.64
3.63

1
1

6.85
6.88

0.56
0.56

3.83
3.85

3.83
3.85

1
3

5.98
6.00

0.56
0.56

3.35
3.36

3.35
10.08

1
1
1
1

11.19
11.05
10.91
10.78

0.56
0.56
0.56
0.56

6.27
6.19
6.11
6.03

6.27
6.19
6.11
6.03

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- ACERO 1/2" fy=4200 Kg/cm2


- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

acero

257.99
87.01

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

93.81

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

- TIPO VS-P1ENTRE EJES C,D Y E'


ENTRE EJES 1 Y 2
ENTRE EJES 2 Y 3

77.17

- ACERO 3/8" fy=4200 Kg/cm2


- TIPO VCH-P1-01,02,03,04
ENTRE EJES A Y B
ENTRE EJES B Y C

acero

203.74
98.03

ENTRE EJES C Y D

ENTRE EJES D Y E'

ENTRE EJES E' Y E

ENTRE EJES E Y F

- TIPO VP-P1-01,02,03,04,05,06
ENTRE EJES 1 Y 2

105.71
1
1
1
1
2

10.50
11.04
11.47
11.45
11.10

0.56
0.56
0.56
0.56
0.56

5.88
6.18
6.42
6.41
6.22

5.88
6.18
6.42
6.41
12.44

2
2

11.94
11.40

0.56
0.56

6.69
6.39

13.37
12.77

1
1
1
1
1
1
1

11.05
11.05
11.37
8.42
11.38
11.04
11.10

0.56
0.56
0.56
0.56
0.56
0.56
0.56

6.19
6.19
6.37
4.72
6.37
6.18
6.22

6.19
6.19
6.37
4.72
6.37
6.18
6.22

ENTRE EJES 2 Y 3

ENTRE EJES 3 Y 4

01.02.03.04
01.02.03.04.01

01.02.03.04.02

LOSAS ALIGERADAS
CONCRETO LOSAS f'c= 210 kg/cm2
1 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 Y 4
2 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 Y 4
3 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 Y 4
LADRILLO PARA TECHO DE h=0.20 m

M3

UND

257.23
1

AREA TOTAL

395.16

0.20

79.03

79.03

AREA TOTAL

414.88

0.20

82.98

82.98

AREA TOTAL

414.88

0.20

82.98

82.98

10717

1 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
2 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
3 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
01.02.03.04.03

01.02.03.04.04

01.02.03.05
01.02.03.05.01

01.02.03.05.02

01.02.03.05.03

ENCOFRADO Y DESENCOFRADO PARA LOSA ALIGERADA


1 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
2 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
3 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 PARA LOSA ALIGERADA
1 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
- ACERO 3/8" fy=4200 Kg/cm2
- ACERO 1/2" fy=4200 Kg/cm2
2 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
- ACERO 3/8" fy=4200 Kg/cm2
- ACERO 1/2" fy=4200 Kg/cm2
3 PISO
ENTRE EJE 1 Y 2, 2 Y 3, 3 y 4
- ACERO 3/8" fy=4200 Kg/cm2
- ACERO 1/2" fy=4200 Kg/cm2
ESCALERAS
CONCRETO f'c=175 kg/cm2 PARA ESCALERAS
TRAMO 01
BASE
CUERPO
TRAMO 02
CUERPO
TRAMO 03
CUERPO
TRAMO 04
CUERPO
TRAMO 05
CUERPO
TRAMO 06
CUERPO

UNIDADES DE LADRILLO/AREA TOTAL

3293

3293

UNIDADES DE LADRILLO/AREA TOTAL

3457

3457

UNIDADES DE LADRILLO/AREA TOTAL

3457

3457

0.20

411.60

411.60

0.20

431.99

431.99

0.20

431.99

431.99

M2

1275.58

BASE DE TECHO

82.21

395.16
BASE DE TECHO

85.58

414.88
BASE DE TECHO

85.58

414.88

Kg

1403.14
acero

467.71
4
4

21.80
99.98

0.56
0.994

12.21
99.38

50.30
417.42

4
4

21.80
99.98

0.56
0.994

12.21
99.38

50.30
417.42

4
4

21.80
99.98

0.56
0.994

12.21
99.38

50.30
417.42

1
1

1.07
1.07

0.50
AREA=

0.60
0.90

0.32
0.96

0.32
0.96

1.07

AREA=

1.18

1.26

1.26

1.07

AREA=

1.18

1.26

1.26

1.07

AREA=

1.18

1.26

1.26

1.07

AREA=

1.18

1.26

1.26

1.07

AREA=

1.18

1.26

1.26

467.71

467.71

M3

ENCOFRADO Y DESENCOFRADO EN ESCALERAS


TRAMO 01
BASE
CONTRAPASOS
COSTADO DE CONTRAPASO
TRAMO 02
CONTRAPASOS
COSTADO DE CONTRAPASO
TRAMO 03
CONTRAPASOS
COSTADO DE CONTRAPASO
TRAMO 04
CONTRAPASOS
COSTADO DE CONTRAPASO
TRAMO 05
CONTRAPASOS
COSTADO DE CONTRAPASO
TRAMO 06
CONTRAPASOS
COSTADO DE CONTRAPASO

M2

ACERO EN ESCALERA
TRAMO 01
CUERPO
CONTRAPASOS
TRAMO 02
CUERPO
CONTRAPASOS
TRAMO 03
CUERPO
CONTRAPASOS
TRAMO 04
CUERPO
CONTRAPASOS
TRAMO 05
CUERPO
CONTRAPASOS
TRAMO 06
CUERPO
CONTRAPASOS

KG

5.32

35.09
2
10
10

1.07
1.07
0.25

10
10

4.32
0.175
0.175

4.62
0.19
0.09

9.24
1.87
0.88

1.07
0.25

0.175
0.175

0.37
0.09

3.75
0.88

10
10

1.07
0.25

0.175
0.175

0.37
0.09

3.75
0.88

10
10

1.07
0.25

0.175
0.175

0.37
0.09

3.75
0.88

10
10

1.07
0.25

0.175
0.175

0.37
0.09

3.75
0.88

10
10

1.07
0.25

0.175
0.175

0.37
0.09

3.75
0.88
1353.45

acero

4
1

10.71
54.57

0.994
0.994

21.28
108.49

85.13
108.49

4
1

12.04
62.06

0.994
0.994

23.93
123.38

95.70
123.38

4
1

12.04
62.06

0.994
0.994

23.93
123.38

95.70
123.38

4
1

12.04
62.06

0.994
0.994

23.93
123.38

95.70
123.38

4
1

12.04
62.06

0.994
0.994

23.93
123.38

95.70
123.38

4
1

12.04
62.06

0.994
0.994

23.93
123.38

95.70
123.38