TOP 1 NUEVO CAMPAMENTO PERMANENTE DE OPERACIONES


SISTEMA 880 (CAMPAMENTO PERMANENTE OPERACIONES)
880-01 NEW CONSTRUCT CAMP DORMITORY BUILDING
Site Development
8HCM08902

MOVILIZACION

21

15DEC00A

15JAN01A

15DEC00A

15JAN01A

8HCM08904

INSTALACION DE FAENA

20

03JAN01A

14MAR01A

03JAN01A

14MAR01A

8HCB18903

MOV. TIERRA TERRAZAS W256-3, W256-4

10

07JAN01A

18JAN01A

07JAN01A

18JAN01A

2,865

8HCB18901

MOV. TIERRA TERRAZAS W256-1, W256-2

10

10JAN01A

16JAN01A

10JAN01A

16JAN01A

5,120

8HCB18906

MOV. TIERRA TERRAZAS W256-6, W256-7

10

13JAN01A

06FEB01A

13JAN01A

06FEB01A

4,258

8HCB18907

MOV. TIERRA TERRAZAS W256-8 Y W256-9

11

14JAN01A

27JAN01A

14JAN01A

27JAN01A

4,795

8HCB18905

MOV. TIERRA TERRAZAS F128-2, F128-3

10

20JAN01A

06FEB01A

20JAN01A

06FEB01A

2,865

8HCB18904

MOV. TIERRA TERRAZAS W256-5, F128-1

10

21JAN01A

31JAN01A

21JAN01A

31JAN01A

1,199

8HCB18908

MOV. TIERRA TERRAZAS W256-10, W256-11

11

05FEB01A

08FEB01A

05FEB01A

08FEB01A

1,268

8HCB18910

MOV. TIERRA TERRAZAS G-1, G-2, G-3, G-4 y ADM.

49

05FEB01A

25FEB01A

05FEB01A

25FEB01A

1,268

8HCB18911

MOV. TIERRA TERRAZAS S-1, S-2, S-3 y S-4

12

05FEB01A

28FEB01A

05FEB01A

28FEB01A

1,338

8HCG58901

FUNDACIONES TRABAJADORES W256-1

14

11JAN01A

25JAN01A

11JAN01A

25JAN01A

11,175

8HCG58902

FUNDACIONES TRABAJADORES W256-2

14

20JAN01A

31JAN01A

20JAN01A

31JAN01A

11,175

8HCG58903

FUNDACIONES TRABAJADORES W256-3

14

24JAN01A

11FEB01A

24JAN01A

11FEB01A

1,175

8HCG58909

FUNDACIONES TRABAJADORES W256-6

14

25JAN01A

28FEB01A

25JAN01A

28FEB01A

6,175

8HCG58904

FUNDACIONES TRABAJADORES W256-4

14

28JAN01A

05FEB01A

28JAN01A

05FEB01A

6,175

8HCG58906

FUNDACIONES CAPATACES F128-1

14

28JAN01A

05FEB01A

28JAN01A

05FEB01A

6,175

8HCG58905

FUNDACIONES TRABAJADORES W256-5

14

29JAN01A

04MAR01A

29JAN01A

04MAR01A

1,175

8HCG58911

FUNDACIONES TRABAJADORES W256-8

14

29JAN01A

28FEB01A

29JAN01A

28FEB01A

1,175

8HCG58908

FUNDACIONES CAPATACES F128-3

14

05FEB01A

08APR01A

05FEB01A

08APR01A

1,175

8HCG58910

FUNDACIONES TRABAJADORES W256-7

14

05FEB01A

21FEB01A

05FEB01A

21FEB01A

1,175

8HCG58913

FUNDACIONES TRABAJADORES W256-10

14

05FEB01A

13MAR01A

05FEB01A

13MAR01A

1,175

8HCG58907

FUNDACIONES CAPATACES F128-2

14

12FEB01A

08APR01A

12FEB01A

08APR01A

1,175

8HCG58917

FUNDACIONES GERENTES G1

14

01MAR01A 17MAR01A 01MAR01A 17MAR01A

816

8HCG58918

FUNDACIONES GERENTES G2

14

01MAR01A 19APR01A 01MAR01A

19APR01A

816

8HCG58919

FUNDACIONES GERENTES G3

14

01MAR01A 20APR01A 01MAR01A

20APR01A

816

Earthwork

Concrete

Project Start

01JUN98

Early Bar

Project Finish

27JAN03

Target Bar

Data Date

14DEC01

Progress Bar

Run Date

17DEC01

Critical Activity

Primavera Systems, Inc.

BSKK

Sheet 1 of 76

Date

MINERA ESCONDIDA LIMITADA (MEL)


LEVEL II TOP SUBSYSTEM
U:\IN\DETAILS.PRN

Rev 22 Nov 2001


Revision

Checked Approved

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

8HCG58920

FUNDACIONES GERENTES G4

14

01MAR01A 24MAR01A 01MAR01A 24MAR01A

816

8HCG58912

FUNDACIONES TRABAJADORES W256-9

14

04MAR01A 11MAR01A 04MAR01A 11MAR01A

1,175

8HCG58914

FUNDACIONES TRABAJADORES W256-11

14

11MAR01A 18MAR01A 11MAR01A 18MAR01A

1,175

8HCG58921

FUNDACIONES SUPERVISORES S1

14

18MAR01A 31MAR01A 18MAR01A 31MAR01A

816

8HCG58922

FUNDACIONES SUPERVISORES S2

14

18MAR01A 31MAR01A 18MAR01A 31MAR01A

816

8HCG58923

FUNDACIONES SUPERVISORES S3

14

18MAR01A 22APR01A 18MAR01A

22APR01A

816

8HCG58924

FUNDACIONES SUPERVISORES S4

14

26MAR01A 08APR01A 26MAR01A

08APR01A

816

8HCK28901

MONTAJE Y TERMINACIONES W256-01

28

25JAN01A

01APR01A

25JAN01A

01APR01A

2,506

8HCK28902

MONTAJE Y TERMINACIONES W256-02

28

05FEB01A

08APR01A

05FEB01A

08APR01A

6,506

8HCK28904

MONTAJE Y TERMINACIONES W256-04

21

05FEB01A

08APR01A

05FEB01A

08APR01A

6,350

8HCK28906

MONTAJE Y TERMINACIONES F128-1

20

05FEB01A

02MAY01A

05FEB01A

02MAY01A

2,321

8HCK98901

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 1

05FEB01A

08APR01A

05FEB01A

08APR01A

626

8HCK28903

MONTAJE Y TERMINACIONES W256-03

21

08FEB01A

08APR01A

08FEB01A

08APR01A

6,350

8HCK28909

MONTAJE Y TERMINACIONES W256-06

21

03MAR01A 05MAY01A 03MAR01A 05MAY01A

2,350

8HCK28911

MONTAJE Y TERMINACIONES W256-08

20

03MAR01A 07MAY01A 03MAR01A 07MAY01A

2,321

8HCK28913

MONTAJE Y TERMINACIONES W256-10

30

05MAR01A 02MAY01A 05MAR01A 02MAY01A

2,540

8HCK28905

MONTAJE Y TERMINACIONES W256-05

20

11MAR01A 01APR01A 11MAR01A

01APR01A

6,350

8HCK28910

MONTAJE Y TERMINACIONES W256-07

20

12MAR01A 26APR01A 12MAR01A

26APR01A

2,321

8HCK28912

MONTAJE Y TERMINACIONES W256-09

20

12MAR01A 11MAY01A 12MAR01A 11MAY01A

2,320

8HCK98902

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 2

12MAR01A 08APR01A 12MAR01A

08APR01A

1,626

8HCK98903

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 3

12MAR01A 08APR01A 12MAR01A

08APR01A

2,783

8HCK98904

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 4

12MAR01A 08APR01A 12MAR01A

08APR01A

783

8HCK98905

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 5

12MAR01A 08APR01A 12MAR01A

08APR01A

783

8HCK98906

TERMINO DE EQUIPAMIENTO Y PRUEBAS F128-1

12MAR01A 08APR01A 12MAR01A

08APR01A

8HCK28914

MONTAJE Y TERMINACIONES W256-11

30

21MAR01A 12MAY01A 21MAR01A 12MAY01A

8HCK98910

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 7

26MAR01A 15APR01A 26MAR01A

15APR01A

813

8HCK98911

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256-08

26MAR01A 08APR01A 26MAR01A

08APR01A

813

8HCK98912

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 9

17

26MAR01A 15APR01A 26MAR01A

15APR01A

813

8HCK98913

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 10

26MAR01A 15APR01A 26MAR01A

15APR01A

593

8HCK28907

MONTAJE Y TERMINACIONES F128-2

20

01APR01A

05MAY01A 01APR01A

05MAY01A

2,321

8HCK28908

MONTAJE Y TERMINACIONES F128-3

25

01APR01A

05MAY01A 01APR01A

05MAY01A

2,447

8HCK98907

TERMINO DE EQUIPAMIENTO Y PRUEBAS F128-2

01APR01A

15APR01A

01APR01A

15APR01A

812

8HCK98908

TERMINO DE EQUIPAMIENTO Y PRUEBAS F128-3

01APR01A

15APR01A

01APR01A

15APR01A

685

8HCK28922

MONTAJE Y TERMINACIONES G2

34

07APR01A

24JUN01A

07APR01A

24JUN01A

1,805

Architectural

Sheet 2 of 76

812
2,540

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

8HCK98909

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 6

07APR01A

15APR01A

07APR01A

15APR01A

783

8HCK28924

MONTAJE Y TERMINACIONES G4

26

08APR01A

24JUN01A

08APR01A

24JUN01A

1,852

8HCK98914

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256 - 11

09APR01A

12MAY01A 09APR01A

12MAY01A

593

8HCK28925

MONTAJE Y TERMINACIONES S1

20

10APR01A

30APR01A

10APR01A

30APR01A

1,612

8HCK28921

MONTAJE Y TERMINACIONES G1

48

15APR01A

30APR01A

15APR01A

30APR01A

1,900

8HCK98921

TERMINO DE EQUIPAMIENTO Y PRUEBAS G-2

15APR01A

24JUN01A

15APR01A

24JUN01A

371

8HCK98920

TERMINO DE EQUIPAMIENTO Y PRUEBAS G-1

19APR01A

12MAY01A 19APR01A

12MAY01A

277

8HCK28923

MONTAJE Y TERMINACIONES G3

34

29APR01A

24JUN01A

29APR01A

24JUN01A

1,926

8HCK98923

TERMINO DE EQUIPAMIENTO Y PRUEBAS G-4

30APR01A

24JUN01A

30APR01A

24JUN01A

325

8HCK98922

TERMINO DE EQUIPAMIENTO Y PRUEBAS G-3

05MAY01A

24JUN01A

05MAY01A

24JUN01A

251

8HCK98924

TERMINO DE EQUIPAMIENTO Y PRUEBAS S-1

05MAY01A

24JUN01A

05MAY01A

24JUN01A

565

8HCK28927

MONTAJE Y TERMINACIONES S3

20

06MAY01A

24JUN01A

06MAY01A

24JUN01A

1,612

8HCK28928

MONTAJE Y TERMINACIONES S4

20

08MAY01A

24JUN01A

08MAY01A

24JUN01A

1,612

8HCK28926

MONTAJE Y TERMINACIONES S2

20

11MAY01A

24JUN01A

11MAY01A

24JUN01A

1,612

8HCK98926

TERMINO DE EQUIPAMIENTO Y PRUEBAS S-3

12MAY01A

24JUN01A

12MAY01A

24JUN01A

565

8HCK98927

TERMINO DE EQUIPAMIENTO Y PRUEBAS S-4

12MAY01A

24JUN01A

12MAY01A

24JUN01A

565

8HCK98925

TERMINO DE EQUIPAMIENTO Y PRUEBAS S-2

19MAY01A

24JUN01A

19MAY01A

24JUN01A

565

8HCR18901

URBANIZACION ALCANTARILLADO TERRAZA W256-01 Y 02

10JAN01A

08APR01A

10JAN01A

08APR01A

12,390

8HCR18907

URBANIZACION ALCANTARILLADO W256-03 Y 04

12JAN01A

05APR01A

12JAN01A

05APR01A

12,390

8HCR18912

URBANIZACION ALCANTARILLADO W256-06 Y 07

21JAN01A

07APR01A

21JAN01A

07APR01A

102

8HCR18928

URBANIZACION AGUA POTABLE E INCENDIO F128-2 Y 3

10

28JAN01A

15MAY01A

28JAN01A

15MAY01A

249

8HCR18903

URBANIZACION AGUA POTABLE E INCENDIO W256-1 Y 2

10

30JAN01A

08APR01A

30JAN01A

08APR01A

249

8HCR18910

URBANIZACION ALCANTARILLADO W256-05 Y F128-1

01FEB01A

05APR01A

01FEB01A

05APR01A

102

8HCR18909

URBANIZACION AGUA POTABLE E INCENDIO W256-03/04

10

05FEB01A

10APR01A

05FEB01A

10APR01A

249

8HCR18927

URBANIZACION AGUA POTABLE E INCENDIO W256-05/F1

10

05FEB01A

30APR01A

05FEB01A

30APR01A

249

8HCR18911

URBANIZACION ALCANTARILLADO F128-2 Y 3

07FEB01A

15MAY01A

07FEB01A

15MAY01A

102

8HCR18914

URBANIZACION ALCANTARILLADO W256-10 Y 11

10FEB01A

29APR01A

10FEB01A

29APR01A

102

8HCR18913

URBANIZACION ALCANTARILLADO W256-08 Y 09

11FEB01A

07MAY01A

11FEB01A

07MAY01A

102

8HCR18931

URBANIZACION AGUA POTABLE E INCENDIO W256-10 Y 1

10

12FEB01A

11MAY01A

12FEB01A

11MAY01A

249

8HCR18929

URBANIZACION AGUA POTABLE E INCENDIO W256-06/07

10

28FEB01A

05MAY01A

28FEB01A

05MAY01A

249

8HCR18930

URBANIZACION AGUA POTABLE E INCENDIO W256-08/09

10

28FEB01A

12MAY01A

28FEB01A

12MAY01A

249

8HCR18935

URBANIZACION AGUA POTABLE E INCENDIO S1 AL S4

10

04APR01A

18JUN01A

04APR01A

18JUN01A

249

8HCR18918

URBANIZACION ALCANTARILLADO S1 AL S4

10

05APR01A

20MAY01A 05APR01A

20MAY01A

201

Piping

Sheet 3 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Electrical Equipment
8HCT38924

INSTALACIONES SANIT Y ELECT W256-04

34

05FEB01A

08APR01A

05FEB01A

08APR01A

833

8HCT38925

INSTALACIONES SANIT Y ELECT W256-03

34

05FEB01A

01APR01A

05FEB01A

01APR01A

833

8HCT38926

INSTALACIONES SANIT Y ELECT W256-02

42

05FEB01A

01APR01A

05FEB01A

01APR01A

1,900

8HCT38935

INSTALACIONES SANIT Y ELECT F128-1

62

09FEB01A

28APR01A

09FEB01A

28APR01A

1,068

8HCT28940

URBANIZACION ELECTRICA PARA EDIFIC. W256 Y F128

30

11MAR01A 05MAY01A 11MAR01A 05MAY01A

930

8HCT38928

INSTALACIONES SANIT Y ELECT W256-05

34

11MAR01A 12MAY01A 11MAR01A 12MAY01A

833

8HCT38930

INSTALACIONES SANIT Y ELECT W256-07

34

15MAR01A 08MAY01A 15MAR01A 08MAY01A

833

8HCT38931

INSTALACIONES SANIT Y ELECT W256-08

34

15MAR01A 12MAY01A 15MAR01A 12MAY01A

833

8HCT38932

INSTALACIONES SANIT Y ELECT W256-09

34

17MAR01A 14MAY01A 17MAR01A 14MAY01A

833

8HCT38929

INSTALACIONES SANIT Y ELECT W256-06

34

18MAR01A 30APR01A 18MAR01A

30APR01A

833

8HCT38927

INSTALACIONES SANIT Y ELECT W256-01

42

19MAR01A 01APR01A 19MAR01A

01APR01A

900

8HCT38936

INSTALACIONES SANIT Y ELECT F128-2

57

26MAR01A 06MAY01A 26MAR01A 06MAY01A

1,027

8HCT38937

INSTALACIONES SANIT Y ELECT F128-3

65

26MAR01A 12MAY01A 26MAR01A 12MAY01A

1,086

8HCT38939

INSTALACIONES SANIT Y ELECT G2

34

01APR01A

24JUN01A

01APR01A

24JUN01A

8HCT38940

INSTALACIONES SANIT Y ELECT G3

34

01APR01A

24JUN01A

01APR01A

24JUN01A

833

8HCT38941

INSTALACIONES SANIT Y ELECT G4

65

01APR01A

24JUN01A

01APR01A

24JUN01A

1,095

8HCT38933

INSTALACIONES SANIT Y ELECT W256-10

54

02APR01A

11MAY01A 02APR01A

11MAY01A

1,001

8HCT38938

INSTALACIONES SANIT Y ELECT G1

34

02APR01A

24JUN01A

02APR01A

24JUN01A

833

8HCT38934

INSTALACIONES SANIT Y ELECT W256-11

54

09APR01A

05MAY01A 09APR01A

05MAY01A

1,001

8HCT28943

URBANIZACION ELECTRICA DORMITORIOS S1 AL S4

25

22APR01A

18JUN01A

22APR01A

18JUN01A

775

8HCT38942

INSTALACIONES SANIT Y ELECT S1

34

05MAY01A

24JUN01A

05MAY01A

24JUN01A

833

8HCT38943

INSTALACIONES SANIT Y ELECT S2

34

13MAY01A

20JUN01A

13MAY01A

20JUN01A

833

8HCT38944

INSTALACIONES SANIT Y ELECT S3

34

13MAY01A

20JUN01A

13MAY01A

20JUN01A

833

8HCT38945

INSTALACIONES SANIT Y ELECT S4

34

13MAY01A

20JUN01A

13MAY01A

20JUN01A

833

833

Pre-Op & No Load Testing


8HCY38901

PUESTA EN MARCHA W256-01

25

14MAY01A 17MAY01A 14MAY01A 17MAY01A

82

8HCY38902

PUESTA EN MARCHA W256-02

25

14MAY01A 17MAY01A 14MAY01A 17MAY01A

82

8HCY38903

PUESTA EN MARCHA W256-03

25

14MAY01A

10JUN01A

14MAY01A

10JUN01A

82

8HCY38904

PUESTA EN MARCHA W256-04

25

14MAY01A

10JUN01A

14MAY01A

10JUN01A

82

8HCY38905

PUESTA EN MARCHA W256-05

25

14MAY01A

10JUN01A

14MAY01A

10JUN01A

82

8HCY38906

PUESTA EN MARCHA F128-1

25

14MAY01A

15JUN01A

14MAY01A

15JUN01A

82

8HCY38907

PUESTA EN MARCHA F128-2

25

14MAY01A

15JUN01A

14MAY01A

15JUN01A

82

8HCY38908

PUESTA EN MARCHA F128-3

25

14MAY01A

15JUN01A

14MAY01A

15JUN01A

82

8HCY38909

PUESTA EN MARCHA W256-06

20

14MAY01A

10JUN01A

14MAY01A

10JUN01A

82

Sheet 4 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

8HCY38910

PUESTA EN MARCHA W256-07

20

14MAY01A

10JUN01A

14MAY01A

10JUN01A

82

8HCY38912

PUESTA EN MARCHA W256-09

20

14MAY01A

10JUN01A

14MAY01A

10JUN01A

82

8HCY38913

PUESTA EN MARCHA W256-10

20

14MAY01A

10JUN01A

14MAY01A

10JUN01A

82

8HCY38914

PUESTA EN MARCHA W256-11

20

14MAY01A

15JUN01A

14MAY01A

15JUN01A

82

8HCY38911

PUESTA EN MARCHA W256-08

20

20MAY01A

10JUN01A

20MAY01A

10JUN01A

82

8HCY38921

PUESTA EN MARCHA G1

20

02JUL01A

20JUL01A

02JUL01A

20JUL01A

3,082

8HCY38922

PUESTA EN MARCHA G2

20

02JUL01A

20JUL01A

02JUL01A

20JUL01A

3,082

8HCY38923

PUESTA EN MARCHA G3

02JUL01A

20JUL01A

02JUL01A

20JUL01A

3,082

8HCY38924

PUESTA EN MARCHA G4

02JUL01A

20JUL01A

02JUL01A

20JUL01A

3,082

8HCY38925

PUESTA EN MARCHA S1

15

02JUL01A

20JUL01A

02JUL01A

20JUL01A

3,082

8HCY38926

PUESTA EN MARCHA S2

15

02JUL01A

20JUL01A

02JUL01A

20JUL01A

82

8HCY38927

PUESTA EN MARCHA S3

15

02JUL01A

20JUL01A

02JUL01A

20JUL01A

82

8HCY38928

PUESTA EN MARCHA S4

12

02JUL01A

20JUL01A

02JUL01A

20JUL01A

82

880-02 RELOCATED CONSTRUCT CAMP DORMITORY BUILD


Earthwork
8HCB18913

MOV. TIERRA TERRAZAS 1P-1 Y 1P-2

15FEB01A

21FEB01A

15FEB01A

21FEB01A

989

8HCB18914

MOV. TIERRA TERRAZAS 1P-3, 1P-4, 1P-5 Y 1P-6

14

20FEB01A

05MAR01A

20FEB01A

05MAR01A

1,478

8HCB18915

MOV. TIERRA TERRAZAS 1P-7, 1P-8, 1P-9 Y 1P-10

14

06MAR01A 19MAR01A 06MAR01A 19MAR01A

1,478

8HCB18916

MOV. TIERRA TERRAZAS 1P-11, 1P-12, 1P-13 Y 1P-14

14

19MAR01A 25MAR01A 19MAR01A 25MAR01A

1,478

8HCB18912

MOV. TIERRA TERRAZAS RECR 1 Y 2 GIMN ANTIGUO 2 P

21

25MAR01A 09APR01A 25MAR01A

09APR01A

1,967

8HCB18917

INSTALACIONES SANIT Y ELECTR W256-13

17

25JUN01A

21JUL01A

25JUN01A

21JUL01A

1,527

8HCG58932

FUNDACIONES EDIFICIO USADO 1P-5

17

18JUN01A

04JUL01A

18JUN01A

04JUL01A

560

8HCG58933

FUNDACIONES EDIFICIO USADO 1P-6

17

25JUN01A

08JUL01A

25JUN01A

08JUL01A

560

8HCG58934

FUNDACIONES EDIFICIO USADO 1P-7

17

25JUN01A

08JUL01A

25JUN01A

08JUL01A

560

8HCG58940

FUNDACIONES TRABAJADORES W256-12

17

25JUN01A

02JUL01A

25JUN01A

02JUL01A

1,175

8HCG58915

FUNDACIONES EDIF. LAVANDERIA USADO

14

02JUL01A

15JUL01A

02JUL01A

15JUL01A

893

8HCG58935

FUNDACIONES EDIFICIO USADO 1P-8

17

02JUL01A

15JUL01A

02JUL01A

15JUL01A

560

8HCG58941

FUNDACIONES TRABAJADORES W256-13

19

02JUL01A

10JUL01A

02JUL01A

10JUL01A

1,175

8HCG58928

FUNDACIONES EDIFICIO USADO 1P-1

17

05JUL01A

16JUL01A

05JUL01A

16JUL01A

560

8HCG58929

FUNDACIONES EDIFICIO USADO 1P-2

17

05JUL01A

16JUL01A

05JUL01A

16JUL01A

560

8HCG58936

FUNDACIONES EDIFICIO USADO 1P-9

17

05JUL01A

20JUL01A

05JUL01A

20JUL01A

1,560

8HCG58930

FUNDACIONES EDIFICIO USADO 1P-3

17

10JUL01A

19JUL01A

10JUL01A

19JUL01A

1,560

8HCG58931

FUNDACIONES EDIFICIO USADO 1P-4

17

10JUL01A

19JUL01A

10JUL01A

19JUL01A

1,560

8HCG58937

FUNDACIONES EDIFICIO USADO 1P-10

17

16JUL01A

31JUL01A

16JUL01A

31JUL01A

1,556

Concrete

Sheet 5 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float
05AUG01A

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

8HCG58938

FUNDACIONES EDIFICIO USADO 1P-11

17

23JUL01A

23JUL01A

05AUG01A

1,560

8HCG58939

FUNDACIONES EDIFICIO USADO 1P-12

17

01AUG01A 15AUG01A 01AUG01A

15AUG01A

1,560

8HCK28945

MONTAJE Y TERMINACIONES W256-12

19

03JUL01A

22JUL01A

03JUL01A

22JUL01A

3,835

8HCK28946

MONTAJE Y TERMINACIONES W256-13

20

04JUL01A

23JUL01A

04JUL01A

23JUL01A

3,835

8HCK28937

MONTAJE Y TERMINACIONES 1P-05

19

06JUL01A

17AUG01A

06JUL01A

17AUG01A

1,184

8HCK28929

MONTAJE Y TERMINACIONES RECR. 2 PISO ANTIGUO

20

10JUL01A

08AUG01A

10JUL01A

08AUG01A

3,127

8HCK28933

MONTAJE Y TERMINACIONES 1P-01

19

15JUL01A

31JUL01A

15JUL01A

31JUL01A

2,184

8HCK28934

MONTAJE Y TERMINACIONES 1P-02

19

15JUL01A

31JUL01A

15JUL01A

31JUL01A

2,184

8HCK28939

MONTAJE Y TERMINACIONES 1P-07

19

17JUL01A

05AUG01A

17JUL01A

05AUG01A

1,184

8HCK28935

MONTAJE Y TERMINACIONES 1P-03

19

20JUL01A

20AUG01A

20JUL01A

20AUG01A

2,184

8HCK28936

MONTAJE Y TERMINACIONES 1P-04

19

20JUL01A

20AUG01A

20JUL01A

20AUG01A

2,184

8HCK98928

TERMINO DE EQUIPAMIENTO Y PRUEBAS REC 2 PISOS

20JUL01A

08AUG01A

20JUL01A

08AUG01A

1,505

8HCK28918

MONTAJE Y TERMINACIONES LAVANDERIA

20

23JUL01A

15AUG01A

23JUL01A

15AUG01A

1,233

8HCK28940

MONTAJE Y TERMINACIONES 1P-08

19

26JUL01A

12AUG01A

26JUL01A

12AUG01A

1,184

8HCK28941

MONTAJE Y TERMINACIONES 1P-09

19

30JUL01A

05AUG01A

30JUL01A

05AUG01A

1,184

8HCK98915

TERMINO DE EQUIPAMIENTO Y PRUEBAS LAVANDERIA USA

06AUG01A 17AUG01A 06AUG01A

17AUG01A

1,042

8HCK28942

MONTAJE Y TERMINACIONES 1P-10

19

07AUG01A 15AUG01A 07AUG01A

15AUG01A

1,184

8HCK28938

MONTAJE Y TERMINACIONES 1P-06

19

13AUG01A 24AUG01A 13AUG01A

24AUG01A

1,184

8HCK28943

MONTAJE Y TERMINACIONES 1P-11

19

14AUG01A 24AUG01A 14AUG01A

24AUG01A

1,184

8HCK28944

MONTAJE Y TERMINACIONES 1P-12

19

01SEP01A

10SEP01A

01SEP01A

10SEP01A

1,184

Architectural

Unit Construction
8HCL18928

INSTALACIONES SANIT Y ELECTR W256-12

20

25JUN01A

21JUL01A

25JUN01A

21JUL01A

437

8HCL18916

DESARME Y TRASLADO P-1

20

27JUN01A

16JUL01A

27JUN01A

16JUL01A

437

8HCL18917

DESARME Y TRASLADO P-2

20

27JUN01A

16JUL01A

27JUN01A

16JUL01A

437

8HCL18918

DESARME Y TRASLADO P-3

20

30JUN01A

19AUG01A

30JUN01A

19AUG01A

437

8HCL18919

DESARME Y TRASLADO P-4

20

30JUN01A

19AUG01A

30JUN01A

19AUG01A

437

8HCL18920

DESARME Y TRASLADO P-5

20

05JUL01A

31JUL01A

05JUL01A

31JUL01A

437

8HCL18921

DESARME Y TRASLADO P-6

20

09JUL01A

06AUG01A

09JUL01A

06AUG01A

437

8HCL18922

DESARME Y TRASLADO P-7

20

16JUL01A

21JUL01A

16JUL01A

21JUL01A

437

8HCL18911

DESARME Y TRASLADO LAVANDERIA USADA

20

22JUL01A

12AUG01A

22JUL01A

12AUG01A

893

8HCL18923

DESARME Y TRASLADO P-8

20

24JUL01A

31JUL01A

24JUL01A

31JUL01A

437

8HCL18924

DESARME Y TRASLADO P-9

20

28JUL01A

03AUG01A

28JUL01A

03AUG01A

437

8HCL18929

PUESTA EN MARCHA W256-12

20

28JUL01A

03AUG01A

28JUL01A

03AUG01A

437

8HCL18925

DESARME Y TRASLADO P-10

20

06AUG01A 10AUG01A 06AUG01A

10AUG01A

437

Sheet 6 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

8HCL18926

DESARME Y TRASLADO P-11

20

13AUG01A 18AUG01A 13AUG01A

18AUG01A

437

8HCL18927

DESARME Y TRASLADO P-12

20

22AUG01A 31AUG01A 22AUG01A

31AUG01A

437

8HCR18922

URBANIZACION ALCANTARILLADO 1P1 Y 1P2

07MAY01A 28MAY01A 07MAY01A 28MAY01A

102

8HCR18924

URBANIZACION ALCANTARILLADO 1P7 AL 1P10

15

10MAY01A 20AUG01A 10MAY01A 20AUG01A

303

8HCR18923

URBANIZACION ALCANTARILLADO 1P3 AL 1P6

28MAY01A

08JUN01A

303

8HCR18939

URBANIZACION AGUA POTABLE E INCENDIO 1P3 AL 1P6

10

8HCR18938

URBANIZACION AGUA POTABLE E INCENDIO 1P1 Y 1P2

10

8HCR18926

PUESTA EN MARCHA W256-13

15

8HCR18940

URBANIZACION AGUA POTABLE E INCENDIO 1P7 AL 1P10

8HCR18925
8HCR18941

Piping

08JUN01A

28MAY01A

09JUN01A

11JUN01A

09JUN01A

11JUN01A

249

10JUL01A

10AUG01A

10JUL01A

10AUG01A

249

31JUL01A

12AUG01A

31JUL01A

12AUG01A

895

10

06AUG01A 20AUG01A 06AUG01A

20AUG01A

249

URBANIZACION ALCANTARILLADO 1P11 AL 1P14

15

13AUG01A

30SEP01A

13AUG01A

30SEP01A

303

URBANIZACION AGUA POTABLE E INCENDIO 1P11 A 1P14

10

13AUG01A

30SEP01A

13AUG01A

30SEP01A

249

Electrical Equipment
8HCT28946

INSTALACIONES RECR. 1 ANTIGUO

20

30JUN01A

10AUG01A

30JUN01A

10AUG01A

1,054

8HCT28944

URBANIZACION ELECTRICA 1P1 AL 1P6 Y 1P15 AL 1P18

30

10JUL01A

30SEP01A

10JUL01A

30SEP01A

942

8HCT38908

INSTALACIONES P-3

20

10JUL01A

31AUG01A

10JUL01A

31AUG01A

793

8HCT38909

INSTALACIONES P-4

20

10JUL01A

31AUG01A

10JUL01A

31AUG01A

793

8HCT28936

INSTALACIONES SANIT Y ELECT RECR. 2 PISO ANTIGUO

34

14JUL01A

08AUG01A

14JUL01A

08AUG01A

1,381

8HCT28947

INSTALACIONES RECR. 2 ANTIGUO

20

15JUL01A

31JUL01A

15JUL01A

31JUL01A

1,054

8HCT38918

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256-12

20

23JUL01A

27JUL01A

23JUL01A

27JUL01A

545

8HCT38919

TERMINO DE EQUIPAMIENTO Y PRUEBAS W256-13

14

24JUL01A

30JUL01A

24JUL01A

30JUL01A

1,287

8HCT28925

INSTALACIONES SANIT Y ELECT LAVANDERIA

34

30JUL01A

17AUG01A

30JUL01A

17AUG01A

1,381

8HCT38906

INSTALACIONES P-1

20

01AUG01A 10AUG01A 01AUG01A

10AUG01A

793

8HCT38907

INSTALACIONES P-2

20

01AUG01A 10AUG01A 01AUG01A

10AUG01A

793

8HCT38912

INSTALACIONES P-7

20

05AUG01A 12AUG01A 05AUG01A

12AUG01A

793

8HCT38905

URBANIZACION ELECTRICA 1P7 AL 1P14

20

10AUG01A

30SEP01A

10AUG01A

30SEP01A

619

8HCT38913

INSTALACIONES P-8

20

12AUG01A

30SEP01A

12AUG01A

30SEP01A

793

8HCT38914

INSTALACIONES P-9

20

12AUG01A

30SEP01A

12AUG01A

30SEP01A

793

8HCT38910

INSTALACIONES P-5

20

15AUG01A 31AUG01A 15AUG01A

31AUG01A

793

8HCT38915

INSTALACIONES P-10

20

15AUG01A

15AUG01A

30SEP01A

793

8HCT38911

INSTALACIONES P-6

20

20AUG01A 31AUG01A 20AUG01A

31AUG01A

793

8HCT38916

INSTALACIONES P-11

20

23AUG01A

30SEP01A

23AUG01A

30SEP01A

793

8HCT38917

INSTALACIONES P12

20

11SEP01A

17SEP01A

11SEP01A

17SEP01A

793

18AUG01A 20AUG01A 18AUG01A

20AUG01A

82

30SEP01A

Pre-Op & No Load Testing


8HCY38918

PUESTA EN MARCHA LAVANDERIA

Sheet 7 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

880-03 CAMP POWER SUPPLY & ELECTRICAL SYSTEM


Electrical Equipment
8HCT38803

13.8 KV POWERLINE POLES EXCAVATION

28

31JAN01A

12APR01A

31JAN01A

12APR01A

600

8HCT38802

13.8 KV POWERLINE ROW OPENING

21

01FEB01A

31MAR01A

01FEB01A

31MAR01A

5,656

8HCT18902

URBANIZACION ELECTRICA

155

01MAR01A 15AUG01A 01MAR01A 15AUG01A

5,125

8HCT38804

13.8 KV POWERLINE CONCRETE POLES INSTALLATION

28

01MAR01A 20APR01A 01MAR01A

8HCT38801

811513.8 KV POWERLINE SURVEYING

05MAR01A 15MAR01A 05MAR01A 15MAR01A

8HCT38902

URBANIZACION ELECTRICA HASTA PLANTA TRATAMIENTO

20

14MAR01A

15JUN01A

14MAR01A

15JUN01A

619

8HCT38903

URBANIZACION ELECTRICA PLANTA AGUA POPTABLE/CAMP

20

14MAR01A

09JUN01A

14MAR01A

09JUN01A

619

8HCT38805

13.8 KV POWERLINE POLES BACKFILL

28

15MAR01A 20APR01A 15MAR01A

20APR01A

551

8HCT38810

13.8 KV POWERLINE GROUNDING INSTALLATION

21

25MAR01A 20APR01A 25MAR01A

20APR01A

8,485

8HCT38806

13.8 KV POWERLINE GUY WIRES

28

24APR01A

20MAY01A 24APR01A

20MAY01A

551

8HCT38807

13.8 KV POWERLINE POLES HARDWARE INSTALLATION

28

26APR01A

18MAY01A 26APR01A

18MAY01A

551

8HCT38808

13.8 KV POWERLINE CABLE INSTALLATION PREPARATION

28

02MAY01A 19MAY01A 02MAY01A 19MAY01A

551

8HCT38809

13.8 KV POWERLINE CABLE INSTALLATION

21

07MAY01A

02JUN01A

07MAY01A

02JUN01A

476

8HCT98801

25013.8 KV POWERLINE PUNCH LIST

01JUN01A

08JUN01A

01JUN01A

08JUN01A

569

09JUN01A

10JUN01A

09JUN01A

10JUN01A

82

PIPELINE ROAD CROSSING (CULVERTS/PIPES)

20

18MAR01A 30MAR01A 18MAR01A 30MAR01A

42

8HCB38901

EXCAVACIONES RED MATRIZ AGUA POTABLE

80

15JAN01A

15AUG01A

15JAN01A

15AUG01A

4,907

8HCB48901

RELLENOS COMPACTADOS RED AGUA POTABLE

75

29JAN01A

17AUG01A

29JAN01A

17AUG01A

5,110

8HCB38801

PIPELINE ROAD CROSSING STRUCTURAL EXCAVATION

20

01MAR01A 17MAR01A 01MAR01A 17MAR01A

8HCB18919

TERRAZAS ESTANQUE PTA OSMOSIS Y PTA AGUA POTABLE

10

25MAR01A 03APR01A 25MAR01A

03APR01A

1,199

8HCB48801

PIPELINE ROAD CROSSING STRUCTURAL BACKFILL

20

31MAR01A 20APR01A 31MAR01A

20APR01A

42

8HCB18918

MOV. TIERRA PLANTA TRATAMIENTO DE AGUA

10

15APR01A

05MAY01A 15APR01A

05MAY01A

1,199

8HCB48802

3 MTS PIPELINE STRUCTURAL FILL EACH 50 MTS

28

16APR01A

10MAY01A 16APR01A

10MAY01A

25

CONFECCION DE CAMARAS RED AGUA POTABLE

75

04FEB01A

15AUG01A

04FEB01A

15AUG01A

2,139

120

20MAR01A

24JUN01A

20MAR01A

24JUN01A

14,887

PLANTA OSMOSIS REVERSA

120

05APR01A

14JUN01A

05APR01A

14JUN01A

2,680

INSTALACIONES DE TUBERIAS MATRIZ AGUA POTABLE

90

17JAN01A

10AUG01A

17JAN01A

10AUG01A

2,247

20APR01A

551
8,115

Pre-Op & No Load Testing


8HCY18801

13.8 KV POWERLINE TESTING

880-04 CAMP POTABLE WATER SUPPLY


Site Development
8HCA38801
Earthwork

42

Concrete
8HCG58947

Mechanical Bulks
8HCM18901

ESTANQUES DE AGUA POTABLE

Mechanical Equipment
8HCN18902
Piping
8HCR18936

Sheet 8 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

8HCR18803

PERMANENT CAMP FEED, FRW 6" C.S. PIPELINE

30

01MAR01A 15APR01A 01MAR01A

15APR01A

2,610

8HCR18801

PERM. CAMP RO REJECTED WATER 6" HDPE PIPELINE

15

22MAR01A 15APR01A 22MAR01A

15APR01A

2,560

8HCR18802

TEMP CONSTR. RO REJECTED WATER 4" HDPE PIPELINE

15

16APR01A

30APR01A

2,560

8HCR98801

PIPELINE PUNCH LIST

28

02MAY01A 15MAY01A 02MAY01A 15MAY01A

2,593

8HCR38801

PIPELINE TESTING & FLUSHING

28

16MAY01A 25MAY01A 16MAY01A 25MAY01A

2,593

10

11JUN01A

31AUG01A

11JUN01A

31AUG01A

82

30APR01A

16APR01A

Pre-Op & No Load Testing


8HCY38931

ENTREGA Y PUESTA EN MARCHA RED AGUA POTABLE

880-05 CAMP SANITARY SEWAGE SYSTEM


Earthwork
8HCB38903

EXCAVACIONES RED MATRIZ ALCANTARILLADO

90

15JAN01A

24JUN01A

15JAN01A

24JUN01A

1,873

8HCB48903

RELLENOS COMPACTADOS RED MATRIZ ALCANTARILLADO

75

29JAN01A

24JUN01A

29JAN01A

24JUN01A

3,403

CONFECCION DE CAMARAS RED ALCANTARILLADO

75

09FEB01A

20AUG01A

09FEB01A

20AUG01A

1,781

PLANTA TRATAMIENTO AGUAS SERVIDAS

110

04APR01A

25MAY01A 04APR01A

25MAY01A

2,680

8HCR18919

INSTALACIONES TUBERIAS RED MATRIZ ALCANTARILLADO

110

14MAR01A

24JUN01A

14MAR01A

24JUN01A

2,220

8HCR18920

URBANIZACION ALCANTARILLADO PLANTA TRATAMIENTO

15

10APR01A 20AUG01A

10APR01A

20AUG01A

303

10

27AUG01A 31AUG01A 27AUG01A

31AUG01A

152

Concrete
8HCG58946

Mechanical Equipment
8HCN18901
Piping

Pre-Op & No Load Testing


8HCY38930

ENTREGA Y PUESTA EN MARCHA RED ALCANTARILLADO

880-06 FIRE PROTECTION SYSTEM


Earthwork
8HCB38902

EXCAVACIONES RED INCENDIO

90

17JAN01A

15AUG01A

17JAN01A

15AUG01A

5,341

8HCB48902

RELLENOS COMPACTADOS RED INCENDIO

105

24JAN01A

20AUG01A

24JAN01A

20AUG01A

5,642

CONFECCION DE CAMARAS RED INCENDIO

90

28FEB01A

14AUG01A

28FEB01A

14AUG01A

1,803

INSTALACIONES TUBERIAS Y PRUEBAS RED INCENDIO

100

21JAN01A

20AUG01A

21JAN01A

20AUG01A

12,858

25

20AUG01A 31AUG01A 20AUG01A

31AUG01A

82

Concrete
8HCG58948
Piping
8HCR98901

Pre-Op & No Load Testing


8HCY38932

ENTREGA Y PUESTA EN MARCHA RED INCENDIO

880-08 CASINO
Earthwork
8HCB18909

MOV. TIERRA CASINO, COMEDORES

24

01FEB01A

24FEB01A

01FEB01A

24FEB01A

2,105

8HCB18921

MOV. TIERRA TERRAZAS, LAVANDERIA, GIMN Y RECR

14

01FEB01A

03APR01A

01FEB01A

03APR01A

1,478

8HCB18920

MOV. TIERRA TERRAZAS ESTACIONAMIENTO BUSES

16

05FEB01A

05APR01A

05FEB01A

05APR01A

1,618

8HCG48903

FUNDACIONES EDIF.CASINO:SECTOR COCINA

30

25JAN01A

28FEB01A

25JAN01A

28FEB01A

1,016

8HCG48901

FUNDACIONES EDIF.CASINO: COMEDOR ALA 1

25

31JAN01A

17FEB01A

31JAN01A

17FEB01A

847

Concrete

Sheet 9 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float
24FEB01A

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

8HCG48902

FUNDACIONES ALA 2

25

11FEB01A

11FEB01A

24FEB01A

1,191

8HCG48906

RADIER Y PAVIMENTOS COCINA METALICA

40

20MAR01A 15APR01A 20MAR01A

15APR01A

1,354

8HCG18907

RADIER Y PAVIMENTOS ALA 1

32

02APR01A

19MAY01A 02APR01A

19MAY01A

1,086

8HCG18908

RADIER Y PAVIMENTOS ALA 2

27

21APR01A

18MAY01A 21APR01A

18MAY01A

915

8HCH18901

ESTRUCTURA METALICA ALA 1

30

21FEB01A

10MAR01A

21FEB01A

10MAR01A

2,489

8HCH18902

ESTRUCTURA METALICA ALA 2

20

28FEB01A

20MAR01A

28FEB01A

20MAR01A

1,660

8HCH18903

ESTRUCTURA METALICA COCINA

40

03MAR01A 13MAR01A 03MAR01A 13MAR01A

3,319

8HCK38903

REV EXTERIORES Y CUBIERTA COCINA

20

10MAR01A 13APR01A 10MAR01A

13APR01A

1,660

8HCK38901

REVESTIMIENTO EXTERIOR Y CUBIERTA ALA 1

20

22MAR01A 14APR01A 22MAR01A

14APR01A

1,830

8HCK28915

DIVISIONES INTERIORES Y TERMINACIONES ALA 1

27

01APR01A

22JUN01A

01APR01A

22JUN01A

2,240

8HCK38902

REVESTIMIENTO EXTERIOR Y CUBIERTA ALA 2

20

09APR01A

20JUN01A

09APR01A

20JUN01A

1,830

8HCK28917

DIVISIONES INTERIORES Y TERMINACIONES COCINA

32

10APR01A

21APR01A

10APR01A

21APR01A

2,655

8HCK28916

DIVISIONES INTERIORES Y TERMINACIONES ALA 2

17

30APR01A

22JUN01A

30APR01A

22JUN01A

1,410

25

07APR01A

15JUN01A

07APR01A

15JUN01A

2,075

Structural Steel

Architectural

Unit Construction
8HCL18901

BAOS MODULARES ALAS COMEDORES

Mechanical Equipment
8HCN28901

CAMARAS DE FRIO

30

10APR01A

15JUN01A

10APR01A

15JUN01A

2,920

8HCN18903

EQUIPOS DE COCINA BIIGGI

30

29APR01A

15JUN01A

29APR01A

15JUN01A

2,489

8HCR18944

INSTALACIONES SANITARIAS BAOS CASINO

110

12FEB01A

15APR01A

12FEB01A

15APR01A

2,278

8HCR18915

URBANIZACION ALCANTARILLADO CASINO, LAVANDERIA

25

25MAR01A

22JUN01A

25MAR01A

22JUN01A

505

8HCR18932

URBANIZACION AGUA POTABLE E INCENDIO CASINO, LAV

10

25MAR01A

22JUN01A

25MAR01A

22JUN01A

249

8HCR18945

INSTALACIONES DE GAS BAOS CASINO

110

01APR01A

28APR01A

01APR01A

28APR01A

2,278

8HCR18943

RED EXTERNA DE GAS

126

22APR01A

15JUN01A

22APR01A

15JUN01A

1,340

Piping

Electrical Equipment
8HCT18901

INSTALACIONES ELECTRICAS BAOS CASINO

110

30MAR01A

22JUN01A

30MAR01A

22JUN01A

9,135

8HCT38901

URBANIZACION ELECTRICA CASINO Y LAVANDERIA

20

11APR01A

30APR01A

11APR01A

30APR01A

619

15

02MAY01A

15JUN01A

02MAY01A

15JUN01A

82

FUNDACIONES EDIF. ADMINISTRACION NUEVO

14

02MAR01A 21APR01A 02MAR01A

21APR01A

482

8HCK28920

MONTAJE Y TERMINACIONES ADMINISTRACION

40

02MAY01A 19MAY01A 02MAY01A 19MAY01A

8HCK98917

TERMINO DE EQUIPAMIENTO Y PRUEBAS ADMINISTRACION

16JUN01A

Pre-Op & No Load Testing


8HCY38917

EQUIPAMIENTO Y PUESTA EN MARCHA BAOS CASINO

880-10 ADMINISTRATION BUILDING


Concrete
8HCG58916
Architectural

20JUN01A

Sheet 10 of 76

16JUN01A

20JUN01A

1,368
240

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Piping
8HCR18917

URBANIZACION ALCANTARILLADO ADM Y G1 AL G4

12

20APR01A

15JUN01A

20APR01A

15JUN01A

242

8HCR18934

URBANIZACION AGUA POTABLE E INCENDIO ADM Y G1 AL

10

30APR01A

15JUN01A

30APR01A

15JUN01A

249

Electrical Equipment
8HCT28942

URBANIZACION ELECTRICA DORMITORIOS ADM, G1 AL G4

25

22APR01A

06MAY01A 22APR01A

06MAY01A

775

8HCT28927

INSTALACIONES SANIT Y ELECT ADMINISTRACION

27

10JUN01A

24JUN01A

10JUN01A

24JUN01A

1,321

16JUN01A

20JUN01A

16JUN01A

20JUN01A

82

Pre-Op & No Load Testing


8HCY38920

PUESTA EN MARCHA ADMINISTRACION

880-11 RECREATION CENTER


Concrete
8HCG58927

FUNDACIONES EDIF RECREACION USADO 1PISO

16

18JUN01A

30JUN01A

18JUN01A

30JUN01A

893

8HCG58925

FUNDACIONES EDIF. RECREACION 2 PISOS USADA

14

20JUN01A

03JUL01A

20JUN01A

03JUL01A

1,340

8HCG58926

FUNDACIONES EDIF RECREACION USADO 1PISO

17

30JUN01A

12JUL01A

30JUN01A

12JUL01A

893

8HCK28932

MONTAJE Y TERMINACIONES RECREACION 2

18

05JUL01A

15JUL01A

05JUL01A

15JUL01A

1,010

8HCK28931

MONTAJE Y TERMINACIONES RECREACION 1

19

16JUL01A

05AUG01A

16JUL01A

05AUG01A

1,010

Architectural

Unit Construction
8HCL18912

DESARME Y TRASLADO RECREACION 2 PLANTAS ANTIGUO

20

23JUN01A

10JUL01A

23JUN01A

10JUL01A

1,340

8HCL18914

DESARME Y TRASLADO RECREACION 1

20

30JUN01A

16JUL01A

30JUN01A

16JUL01A

893

8HCL18915

DESARME Y TRASLADO RECREACION 2

18

01JUL01A

10JUL01A

01JUL01A

10JUL01A

893

09AUG01A 10AUG01A 09AUG01A

10AUG01A

82

Pre-Op & No Load Testing


8HCY38929

PUESTA EN MARCHA RECREA. 2 PISOS ANTIGUO

880-12 GYMNASIUM
Concrete
8HCG48904

FUNDACIONES EDIF. GIMNASIO NUEVO

10APR01A

30APR01A

10APR01A

30APR01A

452

8HCG48905

FUNDACIONES EDIF GIMNASIO USADO

30

29APR01A

07JUL01A

29APR01A

07JUL01A

1,786

8HCK28919

MONTAJE Y TERMINACIONES GIMNASIO NUEVO

20

08MAY01A 19MAY01A 08MAY01A 19MAY01A

1,116

8HCK98916

TERMINO DE EQUIPAMIENTO Y PRUEBAS GIMNASIO NUEVO

16MAY01A

22JUN01A

16MAY01A

22JUN01A

8HCK28930

TERMINACIONES EDIFICIO GIMNASIO USADO

29

20AUG01A

16DEC01

20AUG01A

16DEC01

20

08JUL01A

08AUG01A

08JUL01A

08AUG01A

1,786

MONTAJE EDIFICIO GIMNASIO USADO

30

30JUL01A

12AUG01A

30JUL01A

12AUG01A

1,275

8HCR18916

URBANIZACION ALCANTARILLADO GIM NUEVO Y RECREACI

12

01APR01A

15JUN01A

01APR01A

15JUN01A

242

8HCR18933

URBANIZACION AGUA POTABLE E INCENDIO GIM NUEVO Y

10

06MAY01A

15JUN01A

06MAY01A

15JUN01A

249

8HCR18921

URBANIZACION ALCANTARILLADO GIM USADO Y RECRACIO

10

10JUN01A

17AUG01A

10JUN01A

17AUG01A

49

Architectural

391
7

1,275

Unit Construction
8HCL18913

DESARME Y TRASLADO GIMNASIO ANTIGUO

Mechanical Equipment
8HCN18910
Piping

Sheet 11 of 76

Activity
ID
8HCR18937

Activity
Description
URBANIZACION AGUA POTABLE E INCENDIO GIM USADO Y

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

10

10JUN01A

17AUG01A

10JUN01A

17AUG01A

249

Electrical Equipment
8HCT28941

URBANIZACION ELECTRICA GIM NUEVO Y RECREACION

30

22APR01A

15JUN01A

22APR01A

15JUN01A

930

8HCT28926

INSTALACIONES SANIT Y ELECT GIMNASIO NUEVO

27

10JUN01A

24JUN01A

10JUN01A

24JUN01A

1,321

8HCT28945

INSTALACIONES GIMNASIO ANTIGUO

30

20AUG01A

20SEP01A

20AUG01A

20SEP01A

503

8HCT38904

URBANIZACION ELECTRICA GIM USADO Y RECREACION

20

20AUG01A

20SEP01A

20AUG01A

20SEP01A

619

23JUN01A

24JUN01A

23JUN01A

24JUN01A

82

27

27

17DEC01

23JAN02

17DEC01

23JAN02

Pre-Op & No Load Testing


8HCY38919

PUESTA EN MARCHA GIMNASIO NUEVO

Site Development
8HCM08906

DESMOVILIZACION

205

TOP 2 ROADS
SISTEMA 710 MAIN ACCES ROAD
SUBSISTEMA 710-01 ACCES ROAD EARTHWORK
Earthwork
7ACB07110

MAIN ACCESS ROAD EXCAVATION

42

27JAN01A

20MAY01A

27JAN01A

20MAY01A

71,710

7ACB07130

EXCAVATION FOR ELECTRICAL BY-PASS 13.8 KV

12FEB01A

15MAY01A

12FEB01A

15MAY01A

796

7ACB07140

BACKFILL FOR ELECTRICAL BY-PASS 13.8 KV

19MAR01A 18MAY01A 19MAR01A 18MAY01A

7ACB07120

MAIN ACCESS ROAD MASSFILL & COMPAC.

91

20MAR01A

7ACG07110

LEAN CONCRETE FOR ELECTRICAL PITS

26MAY01A 26MAY01A 26MAY01A 26MAY01A

27

7ACG07120

REBARS FOR ELECTR. PITS & U/G CONDUIT REINFORC.

27MAY01A

05JUN01A

27MAY01A

05JUN01A

329

7ACG07130

FORMS FOR ELECTR. PITS & U/G CONDUIT REINFORC.

14

03JUN01A

16JUN01A

03JUN01A

16JUN01A

1,411

7ACG07140

CONCRETE ELECTR. PITS & U/G CONDUIT REINFORC.

14

12JUN01A

22JUN01A

12JUN01A

22JUN01A

1,197

7ACH07120

REMOVE EXISTING ELECTRICAL POST N 71 & 72

10JUL01A

11JUL01A

10JUL01A

11JUL01A

500

7ACH07110

INSTALL STRUCTURE TYPE A11 (PRECAST POST)

12JUL01A

16JUL01A

12JUL01A

16JUL01A

500

15JUL01A

20MAR01A

15JUL01A

3,116
159,263

Concrete

Structural Steel

Raceway & Conduit


7ACU07120

INSTALL U/G PVC CONDUIT BY PASS

28

01JUN01A

18JUN01A

01JUN01A

18JUN01A

7,122

7ACU07130

INSTALL MISCELANEOUS ELECTR. MATERIALS FOR POST

17JUL01A

20JUL01A

17JUL01A

20JUL01A

66

7ACW07140

REMOVE EXISTING ELECTRICAL CABLES LINE 13.8 KV

28MAY01A 31MAY01A 28MAY01A 31MAY01A

7ACW07110

INSTALL ELECTRICAL CABLE BY PASS

05JUN01A

11JUN01A

05JUN01A

11JUN01A

1,837

7ACW07130

TERMINATE ELECTRICAL CABLE BY PASS

12JUN01A

18JUN01A

12JUN01A

18JUN01A

521

7ACW07120

INSTALL GROUNDING CU CABLE BY PASS

20JUN01A

22JUN01A

20JUN01A

22JUN01A

311

Cable & Wire

Sheet 12 of 76

37

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

SUBSISTEMA 710-02 ACCES ROAD PAVING


Site Development
7ACA0712A

MAIN ACCESS ROAD (HASTA SUB BASE GRANU) COMPLETE

84

19MAR01A

20JUN01A

19MAR01A

20JUN01A

223,296

7ACA07110

INSTALL CORRUG. CULVERT (RECL. WATER INTERC.660)

10

23APR01A

20MAY01A 23APR01A

20MAY01A

129

7ACA07120

INSTALL CORRUG. CULVERT (TAILING INTERC. 650)

14

10MAY01A

01JUN01A

10MAY01A

01JUN01A

257

7ACA07140

BASE Y CARPETA DE RODADO

40

20JUN01A

30SEP01A

20JUN01A

30SEP01A

7ACA07132

OBRAS DE ARTE

30

01OCT01A 21OCT01A 01OCT01A

21OCT01A

15,712

7ACA07150

DOBLE TRATAMIENTO ASFALTICO (INCLUYE POLVO ROCA)

42

01OCT01A 30NOV01A 01OCT01A

30NOV01A

5,754

7ACA07152

SEALES CAMINERAS

22

10OCT01A

09DEC01

7ACB07150

CRUCE SAN LORENZO

25

15NOV01A 01DEC01A 15NOV01A

01DEC01A

7ACB07160

CRUCE CAMPAMENTO

12

15NOV01A 28NOV01A 15NOV01A

28NOV01A

TERCERA PISTA LENTA DESDE EMPALME A GARITA

10

10

19FEB02

7ACB07190

ADJUDICACION TERCERA PISTA POR BSK-MEL

15DEC01*

7ACB07170

TERCERA PISTA LENTA EMPALME =>GARITA

25

40

10JAN02

18FEB02

10JAN02

20

20

01MAR02

20MAR02

01MAR02

220 KV SWITCHING STATION FENCING

27NOV01A 01DEC01A 27NOV01A

7CCB37351

220 KV DOMEYKO SWITCHING STATION PLATFORM

20

12JUN01A

11JUL01A

7CCB27311

220 KV SW. STATION GROUNDING GRID TRENCH EXC.

12JUL01A

07AUG01A

7CCB37352

220 KV SWITCHING STATION STRUCTURAL EXCAVATION

15JUL01A

7CCB27312

220 KV SW. STATION GROUNDING GRID BACKFILL

23JUL01A

7CCB47311

220KV SWITCHING STATION ELEC.TRENCH EXCAVATION

7CCB37354

220 KV SWITCHING STATION STRUCTURAL BACKFILL

7CCB47312

220KV SWITCHING STATION ELEC.TRENCH BACKFILL

7CCB37374

16DEC01

10OCT01A

254

5,712

SUBSISTEMA 710-04 NEW PASSING AT ESCOND MAIN ENT


Site Development
7ACB07180

28FEB02

19FEB02

28FEB02

171

171

18FEB02

171

20MAR02

171

61,762

Earthwork
15DEC01*

SUBSISTEMA 710-05 ACCES ROAD FINAL PAVING


Site Development
7ACB07100

REPAIR TOPPING FOR MAIN ACCESS ROAD

TOP 4 POWER SUPPLY


SISTEMA 730 DOMEYKO EXPANSION & 220KV LINE
SUBSISTEMA 730-01 DOMEYKO SUBSTATION EXPANSION
Site Development
7CCA37353

01DEC01A

12JUN01A

11JUL01A

580

12JUL01A

07AUG01A

469

10AUG01A

15JUL01A

10AUG01A

353

10AUG01A

23JUL01A

10AUG01A

40

06AUG01A 24AUG01A 06AUG01A

24AUG01A

68

25AUG01A 16NOV01A 25AUG01A

16NOV01A

254

10SEP01A

15SEP01A

10SEP01A

15SEP01A

637

220 KV SWITCHING STATION GRAVEL PLACE

04DEC01A

20DEC01

04DEC01A

13DEC01

7CCG37355

220 KV SWITCHING STATION CONCRETE FORMS

30JUL01A

20AUG01A

30JUL01A

20AUG01A

149

7CCG37356

220 KV SWITCHING STATION CONCRETE REBAR

01AUG01A 22AUG01A 01AUG01A

22AUG01A

555

Earthwork

340

178

Concrete

Sheet 13 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

7CCG37357

220 KV SWITCHING STATION EMBEDS

01AUG01A 23AUG01A 01AUG01A

23AUG01A

14

7CCG37358

220 KV SWITCHING STATION CONCRETE POUR

06AUG01A 30NOV01A 06AUG01A

30NOV01A

351

7CCG47311

220KV SWITCHING STATION ELEC.TRENCH FOUND. REBAR

13AUG01A 18AUG01A 13AUG01A

18AUG01A

159

7CCG47312

220KV SWITCHING STATION ELEC.TRENCH FOUND. EMBED

15AUG01A

15AUG01A

10SEP01A

40

7CCG47315

220KV SWITCHING STATION ELEC.TRENCH WALL REBAR

15AUG01A 24AUG01A 15AUG01A

24AUG01A

173

7CCG47314

220KV SWITCHING STATION ELEC.TRENCH WALL EMBEDS

17AUG01A 15NOV01A 17AUG01A

15NOV01A

40

7CCG47313

220KV SWITCHING STATION ELEC.TRENCH FOUND. POUR

18AUG01A 15NOV01A 18AUG01A

15NOV01A

191

7CCG47316

220KV SWITCHING STATION ELEC.TRENCH WALL FORMS

20AUG01A 15NOV01A 20AUG01A

15NOV01A

27

7CCG47317

220KV SWITCHING STATION ELEC.TRENCH WALL POUR

21AUG01A 15NOV01A 21AUG01A

15NOV01A

191

7CCG37359

220 KV SWITCHING STATION STRIP FORMS

17OCT01A 20OCT01A 17OCT01A

20OCT01A

293

7CCG47318

220KV SWITCHING ST. ELEC.TRENCH WALL STRIP FORMS

21OCT01A 16NOV01A 21OCT01A

16NOV01A

179

7CCH37361

220 KV SWITCHING STATION STRUCTURAL STEEL TOWERS

12

10AUG01A 15OCT01A 10AUG01A

15OCT01A

831

7CCH47311

220KV SW. STATION ELEC.TRENCH STEEL PLATE COVER

14NOV01A 01DEC01A 14NOV01A

01DEC01A

10

7CCH37362

PUNCH LIST ESTRUCTURAL WORKS

01DEC01A

08DEC01

10SEP01A

Structural Steel

15DEC01

01DEC01A

345

136

Electrical Equipment
7CCT37365

15OCT01A 16OCT01A 15OCT01A

16OCT01A

2,125

7CCT373473 LLEGADA DE SUMINISTRO DE ALUMBRADO

220 KV SWITCHING STATION LIGHTING PANELS INSTALL

15OCT01A

15OCT01A

7CCT37390

LIGHTING ARRESTORS (0730-VL-731A/B/C)

17OCT01A 21OCT01A 17OCT01A

21OCT01A

2,603

7CCT37310

220 KV SWITCHING STATION DISCONNECTORS INSTALL

10

18OCT01A 05NOV01A 18OCT01A

05NOV01A

6,728

7CCT17301

220KV PROTECTIONS PANEL INSTALL

19OCT01A 20OCT01A 19OCT01A

20OCT01A

4,463

7CCT373483 LLEGADA DE PANEL DE DISTRIBUCION

18OCT01A

18OCT01A

7CCT373463 220 KV SWITCHING STATION LIGHTING FIXTURES INST.

21OCT01A 10NOV01A 21OCT01A

10NOV01A

2,057

Raceway & Conduit


7CCU37462

220 KV SWITCHING STATION LIGHTING CONDUIT INST.

12

15OCT01A 07NOV01A 15OCT01A

07NOV01A

5,844

7CCU47312

220KV SWITCHING STATION ELEC.TRENCH CABLETRAY

14

16OCT01A 10NOV01A 16OCT01A

10NOV01A

3,291

7CCU47313

220KV SWITCHING STATION UNDERGROUND CONDUIT

18OCT01A 05NOV01A 18OCT01A

05NOV01A

62

7CCW37352

220 KV SWITCHING STATION GROUNDING GRID

15

09JUL01A

09JUL01A

12AUG01A

5,202

7CCW37388

ELECTRICAL CABLE 25 KV AND MINOR

25

10OCT01A 20OCT01A 10OCT01A

20OCT01A

80,252

7CCW47311

220KV SWITCHING STATION ELEC.TRENCH CABLE INST.

10

16OCT01A 12NOV01A 16OCT01A

12NOV01A

358

7CCW37365

220 KV SWITCHING STATION ELECT CABLE TERMINATION

01NOV01A 04DEC01A 01NOV01A

04DEC01A

1,539

7CCW37364

220 KV SWITCHING STATION LIGHTING CABLES INST.

10NOV01A 14NOV01A 10NOV01A

14NOV01A

1,123

7CCW37366

220 KV SWITCHING STATION LIGHT CABLE TERMINATION

13NOV01A 14NOV01A 13NOV01A

14NOV01A

3,079

7CCW37362

220 KV SWITCHING STATION CABLE INTERCONNECTION

14NOV01A 14NOV01A 14NOV01A

14NOV01A

1,578

7CCW37363

PUNCH LIST ELECTRICAL WORKS

21NOV01A

08DEC01

Cable & Wire


12AUG01A

15DEC01

Sheet 14 of 76

21NOV01A

345

395

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Pre-Op & No Load Testing


7CCT37363

220 KV DOMEYKO SWITCHING STATION COMMISSIONING

05DEC01A

20DEC01

05DEC01A

13DEC01

01AUG01A

19FEB01A

01AUG01A

-15

SUBSISTEMA 730-02 220KV - FEED TO NEW MAIN SUBST


Earthwork
7CCB07300

220KV POWER LINE RIGHT OF WAY OPENING

30

19FEB01A

1,071

7CCB17301

220KV TOWER 1@5 STRUCTURAL EXCAV.

01MAR01A 06MAR01A 01MAR01A 06MAR01A

176

7CCB17302

220KV TOWER 6@10 STRUCTURAL EXCAV.

07MAR01A 20MAR01A 07MAR01A 20MAR01A

176

7CCB17303

220KV TOWER 11@15 STRUCTURAL EXCAV.

21MAR01A 05APR01A 21MAR01A

05APR01A

176

7CCB17304

220KV TOWER 16@20 STRUCTURAL EXCAV.

06APR01A

11APR01A

06APR01A

11APR01A

176

7CCB17305

220KV TOWER 21@25 STRUCTURAL EXCAV.

12APR01A

16APR01A

12APR01A

16APR01A

176

7CCB17306

220KV TOWER 26@30 STRUCTURAL EXCAV.

16APR01A

20APR01A

16APR01A

20APR01A

176

7CCB27301

220KV TOWER 1@5 STRUCTURAL BACKFILL

16APR01A

20APR01A

16APR01A

20APR01A

188

7CCB17307

220KV TOWER 31@35 STRUCTURAL EXCAV.

21APR01A

24APR01A

21APR01A

24APR01A

176

7CCB27302

220KV TOWER 6@10 STRUCTURAL BACKFILL

21APR01A

24APR01A

21APR01A

24APR01A

188

7CCB27303

220KV TOWER 11@15 STRUCTURAL BACKFILL

24APR01A

27APR01A

24APR01A

27APR01A

188

7CCB17308

220KV TOWER 36@40 STRUCTURAL EXCAV.

25APR01A

28APR01A

25APR01A

28APR01A

176

7CCB27304

220KV TOWER 16@20 STRUCTURAL BACKFILL

27APR01A

29APR01A

27APR01A

29APR01A

188

7CCB27305

220KV TOWER 21@25 STRUCTURAL BACKFILL

29APR01A

30APR01A

29APR01A

30APR01A

188

7CCB17309

220KV TOWER 41@45 STRUCTURAL EXCAV.

02MAY01A 05MAY01A 02MAY01A 05MAY01A

176

7CCB27306

220KV TOWER 26@30 STRUCTURAL BACKFILL

02MAY01A 04MAY01A 02MAY01A 04MAY01A

188

7CCB27307

220KV TOWER 31@35 STRUCTURAL BACKFILL

04MAY01A 07MAY01A 04MAY01A 07MAY01A

188

7CCB27308

220KV TOWER 36@40 STRUCTURAL BACKFILL

07MAY01A 11MAY01A 07MAY01A 11MAY01A

188

7CCB27309

220KV TOWER 41@45 STRUCTURAL BACKFILL

12MAY01A 17MAY01A 12MAY01A 17MAY01A

188

7CCB17310

220KV TOWER 46 STRUCTURAL EXCAV.

15MAY01A 20MAY01A 15MAY01A 20MAY01A

176

7CCB27310

220KV TOWER 46 STRUCTURAL BACKFILL

21MAY01A 23MAY01A 21MAY01A 23MAY01A

188

7CCB27320

220KV MOV TIERRA SOLUCION TORRE 8

10

22SEP01A

10OCT01A

22SEP01A

10OCT01A

7CCG0730A

220KV TOWER 1@5 LEAN CONCRETE

08APR01A

12APR01A

08APR01A

12APR01A

102

7CCG07301

220KV TOWER 1@5 CONCRETE FORMS

09APR01A

12APR01A

09APR01A

12APR01A

316

7CCG27301

220KV TOWER 1@5 EMBEDS

09APR01A

12APR01A

09APR01A

12APR01A

313

7CCG27302

220KV TOWER 6@10 EMBEDS

09APR01A

12APR01A

09APR01A

12APR01A

306

7CCG37301

220KV TOWER 1@5 CONCRETE POUR

09APR01A

12APR01A

09APR01A

12APR01A

124

7CCG0730B

220KV TOWER 6@10 LEAN CONCRETE

13APR01A

15APR01A

13APR01A

15APR01A

115

7CCG17301

220KV TOWER 1@5 CONCRETE REBAR

13APR01A

15APR01A

13APR01A

15APR01A

29

7CCG37302

220KV TOWER 6@10 CONCRETE POUR

14APR01A

16APR01A

14APR01A

16APR01A

140

7CCG07302

220KV TOWER 6@10 CONCRETE FORMS

15APR01A

19APR01A

15APR01A

19APR01A

289

Concrete

Sheet 15 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

7CCG27303

220KV TOWER 11@15 EMBEDS

15APR01A

17APR01A

15APR01A

17APR01A

313

7CCG0730C

220KV TOWER 11@15 LEAN CONCRETE

18APR01A

20APR01A

18APR01A

20APR01A

102

7CCG37303

220KV TOWER 11@15 CONCRETE POUR

18APR01A

21APR01A

18APR01A

21APR01A

123

7CCG17302

220KV TOWER 6@10 CONCRETE REBAR

20APR01A

21APR01A

20APR01A

21APR01A

29

7CCG27304

220KV TOWER 16@20 EMBEDS

20APR01A

21APR01A

20APR01A

21APR01A

313

7CCG07303

220KV TOWER 11@15 CONCRETE FORMS

22APR01A

24APR01A

22APR01A

24APR01A

316

7CCG0730D

220KV TOWER 16@20 LEAN CONCRETE

22APR01A

23APR01A

22APR01A

23APR01A

170

7CCG47301

220KV TOWER 1@5 STRIP FORMS

22APR01A

23APR01A

22APR01A

23APR01A

140

7CCG27305

220KV TOWER 21@25 EMBEDS

23APR01A

24APR01A

23APR01A

24APR01A

313

7CCG37304

220KV TOWER 16@20 CONCRETE POUR

23APR01A

25APR01A

23APR01A

25APR01A

123

7CCG17303

220KV TOWER 11@15 CONCRETE REBAR

24APR01A

27APR01A

24APR01A

27APR01A

29

7CCG0730E

220KV TOWER 21@25 LEAN CONCRETE

25APR01A

26APR01A

25APR01A

26APR01A

171

7CCG47302

220KV TOWER 6@10 STRIP FORMS

25APR01A

27APR01A

25APR01A

27APR01A

212

7CCG07304

3220KV TOWER 16@20 CONCRETE FORMS

26APR01A

28APR01A

26APR01A

28APR01A

316

7CCG27306

220KV TOWER 26@30 EMBEDS

27APR01A

28APR01A

27APR01A

28APR01A

321

7CCG37305

220KV TOWER 21@25 CONCRETE POUR

27APR01A

28APR01A

27APR01A

28APR01A

123

7CCG0730F

220KV TOWER 26@30 LEAN CONCRETE

28APR01A

30APR01A

28APR01A

30APR01A

102

7CCG17304

220KV TOWER 16@20 CONCRETE REBAR

29APR01A

30APR01A

29APR01A

30APR01A

29

7CCG27307

220KV TOWER 31@35 EMBEDS

30APR01A

02MAY01A 30APR01A

02MAY01A

213

7CCG37306

220KV TOWER 26@30 CONCRETE POUR

30APR01A

03MAY01A 30APR01A

03MAY01A

125

7CCG47303

220KV TOWER 11@15 STRIP FORMS

30APR01A

02MAY01A 30APR01A

02MAY01A

140

7CCG07305

220KV TOWER 21@25 CONCRETE FORMS

02MAY01A 04MAY01A 02MAY01A 04MAY01A

316

7CCG0730G

220KV TOWER 31@35 LEAN CONCRETE

02MAY01A 03MAY01A 02MAY01A 03MAY01A

102

7CCG17305

220KV TOWER 21@25 CONCRETE REBAR

02MAY01A 04MAY01A 02MAY01A 04MAY01A

29

7CCG27308

220KV TOWER 36@40 EMBEDS

04MAY01A 05MAY01A 04MAY01A 05MAY01A

210

7CCG47304

220KV TOWER 16@20 STRIP FORMS

04MAY01A 05MAY01A 04MAY01A 05MAY01A

140

7CCG0730H

220KV TOWER 36@40 LEAN CONCRETE

05MAY01A 08MAY01A 05MAY01A 08MAY01A

172

7CCG37307

220KV TOWER 31@35 CONCRETE POUR

05MAY01A 07MAY01A 05MAY01A 07MAY01A

125

7CCG07306

220KV TOWER 26@30 CONCRETE FORMS

06MAY01A 07MAY01A 06MAY01A 07MAY01A

316

7CCG17306

220KV TOWER 26@30 CONCRETE REBAR

06MAY01A 07MAY01A 06MAY01A 07MAY01A

29

7CCG27309

220KV TOWER 41@45 EMBEDS

07MAY01A 08MAY01A 07MAY01A 08MAY01A

210

7CCG47305

220KV TOWER 21@25 STRIP FORMS

07MAY01A 08MAY01A 07MAY01A 08MAY01A

140

7CCG07307

220KV TOWER 31@35 CONCRETE FORMS

09MAY01A 11MAY01A 09MAY01A 11MAY01A

316

7CCG17307

220KV TOWER 31@35 CONCRETE REBAR

09MAY01A 11MAY01A 09MAY01A 11MAY01A

89

7CCG37308

220KV TOWER 36@40 CONCRETE POUR

09MAY01A 12MAY01A 09MAY01A 12MAY01A

200

Sheet 16 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

7CCG0730I

220KV TOWER 41@45 LEAN CONCRETE

10MAY01A 12MAY01A 10MAY01A 12MAY01A

172

7CCG47306

220KV TOWER 26@30 STRIP FORMS

10MAY01A 11MAY01A 10MAY01A 11MAY01A

206

7CCG27310

220KV TOWER 46 EMBEDS

11MAY01A 12MAY01A 11MAY01A 12MAY01A

213

7CCG07308

220KV TOWER 36@40 CONCRETE FORMS

13MAY01A 14MAY01A 13MAY01A 14MAY01A

298

7CCG17308

220KV TOWER 36@40 CONCRETE REBAR

13MAY01A 14MAY01A 13MAY01A 14MAY01A

78

7CCG47307

220KV TOWER 31@35 STRIP FORMS

13MAY01A 15MAY01A 13MAY01A 15MAY01A

175

7CCG0730J

220KV TOWER 46 LEAN CONCRETE

14MAY01A 15MAY01A 14MAY01A 15MAY01A

102

7CCG37309

220KV TOWER 41@45 CONCRETE POUR

14MAY01A 16MAY01A 14MAY01A 16MAY01A

198

7CCG37310

220KV TOWER 46 CONCRETE POUR

14MAY01A 15MAY01A 14MAY01A 15MAY01A

123

7CCG07309

220KV TOWER 41@45 CONCRETE FORMS

16MAY01A 17MAY01A 16MAY01A 17MAY01A

298

7CCG17309

220KV TOWER 41@45 CONCRETE REBAR

16MAY01A 17MAY01A 16MAY01A 17MAY01A

78

7CCG47308

220KV TOWER 36@40 STRIP FORMS

17MAY01A 17MAY01A 17MAY01A 17MAY01A

160

7CCG07310

220KV TOWER 46 CONCRETE FORMS

19MAY01A 21MAY01A 19MAY01A 21MAY01A

316

7CCG17310

220KV TOWER 46 CONCRETE REBAR

19MAY01A 21MAY01A 19MAY01A 21MAY01A

78

7CCG47309

220KV TOWER 41@45 STRIP FORMS

19MAY01A 20MAY01A 19MAY01A 20MAY01A

338

7CCG47310

220KV TOWER 46 STRIP FORMS

22MAY01A 23MAY01A 22MAY01A 23MAY01A

459

7CCG47320

220 KV TOWER 8 EMBEDS (REPAIR)

07OCT01A 08OCT01A 07OCT01A

08OCT01A

7CCG47330

220KV TOWER 8 CONCRETE FORMS (REPAIR)

09OCT01A 10OCT01A 09OCT01A

10OCT01A

7CCG47350

LLEGADA SUMINISTRO STUBS PARA TORRE 8

08OCT01A

08OCT01A

7CCG47340

220KV TOWER 8 CONCRETE POUR (REPAIR)

11OCT01A 13OCT01A 11OCT01A

13OCT01A

7CCH07301

220KV TOWER 1@5 STRUCTURAL STEEL ERECTION

26MAY01A 30MAY01A 26MAY01A 30MAY01A

193

7CCH07302

220KV TOWER 6@10 STRUCTURAL STEEL ERECTION

31MAY01A

04JUN01A

31MAY01A

04JUN01A

193

7CCH07303

220KV TOWER 11@15 STRUCTURAL STEEL ERECTION

05JUN01A

09JUN01A

05JUN01A

09JUN01A

193

7CCH07304

220KV TOWER 16@20 STRUCTURAL STEEL ERECTION

10JUN01A

18JUN01A

10JUN01A

18JUN01A

193

7CCH07305

220KV TOWER 21@25 STRUCTURAL STEEL ERECTION

19JUN01A

23JUN01A

19JUN01A

23JUN01A

193

7CCH07306

220KV TOWER 26@30 STRUCTURAL STEEL ERECTION

24JUN01A

29JUN01A

24JUN01A

29JUN01A

193

7CCH07307

220KV TOWER 31@35 STRUCTURAL STEEL ERECTION

30JUN01A

04JUL01A

30JUN01A

04JUL01A

193

7CCH07308

220KV TOWER 36@40 STRUCTURAL STEEL ERECTION

05JUL01A

09JUL01A

05JUL01A

09JUL01A

193

7CCH07309

220KV TOWER 41@45 STRUCTURAL STEEL ERECTION

11JUL01A

25JUL01A

11JUL01A

25JUL01A

193

7CCH07310

220KV TOWER 46 STRUCTURAL STEEL ERECTION

26JUL01A

31JUL01A

26JUL01A

31JUL01A

71

7CCH07321

220KV TOWER 8 STRUCTURAL STEEL ERECTION (REPAIR

12OCT01A 14OCT01A 12OCT01A

14OCT01A

7CCH07331

LLEGADA SUMINISTROS MONTAJE TORRE 8 (FMR FE-107)

11OCT01A

11OCT01A

7CCH07311

PUNCH LIST STRUCTURAL STEEL ERECTION

21NOV01A 28NOV01A 21NOV01A

28NOV01A

98

Structural Steel

Sheet 17 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Architectural
7CCK07300

PAINT TOUCH UP FOR POWER SUPPLY

21

02NOV01A 29NOV01A 02NOV01A

29NOV01A

7,423

Electrical Equipment
7CCT17311

220KV TOWER 1@5 HARDWARE INSTALLATION

21

27JUL01A

31JUL01A

27JUL01A

31JUL01A

2,934

7CCT17302

220KV TOWER 6@10 HARDWARE INSTALLATION

31JUL01A

05AUG01A

31JUL01A

05AUG01A

2,217

7CCT17303

220KV TOWER 11@15 HARDWARE INSTALLATION

21

03AUG01A 10AUG01A 03AUG01A

10AUG01A

2,217

7CCT17309

220KV TOWER 41@45 HARDWARE INSTALLATION

21

07AUG01A 11AUG01A 07AUG01A

11AUG01A

2,217

7CCT17304

220KV TOWER 16@20 HARDWARE INSTALLATION

21

08AUG01A 15AUG01A 08AUG01A

15AUG01A

2,217

7CCT17305

220KV TOWER 21@25 HARDWARE INSTALLATION

21

09AUG01A 12AUG01A 09AUG01A

12AUG01A

2,217

7CCT17306

220KV TOWER 26@30 HARDWARE INSTALLATION

21

09AUG01A 12AUG01A 09AUG01A

12AUG01A

2,217

7CCT17307

220KV TOWER 31@35 HARDWARE INSTALLATION

21

09AUG01A 12AUG01A 09AUG01A

12AUG01A

2,217

7CCT17308

220KV TOWER 36@40 HARDWARE INSTALLATION

21

09AUG01A 12AUG01A 09AUG01A

12AUG01A

2,216

7CCT17310

220KV TOWER 46 HARDWARE INSTALLATION

14

14AUG01A 20AUG01A 14AUG01A

20AUG01A

2,216

7CCT97318

220KV TOWER 8 HARDWARE INSTALLATION

14OCT01A 16OCT01A 14OCT01A

16OCT01A

7CCT97308

220 KV OVERHEAD TRANSMISSION LINE TESTING

14DEC01

15DEC01

07DEC01

08DEC01

7CCW27301

220KV TOWER 1@5 GROUNDING GRID INSTALLATION

12JUL01A

14JUL01A

12JUL01A

14JUL01A

21

7CCW27302

220KV TOWER 6@10 GROUNDING GRID INSTALLATION

15JUL01A

17JUL01A

15JUL01A

17JUL01A

7CCW27303

220KV TOWER 11@15 GROUNDING GRID INSTALLATION

18JUL01A

20JUL01A

18JUL01A

20JUL01A

7CCW27304

220KV TOWER 16@20 GROUNDING GRID INSTALLATION

21JUL01A

23JUL01A

21JUL01A

23JUL01A

15

7CCW27305

220KV TOWER 21@25 GROUNDING GRID INSTALLATION

24JUL01A

26JUL01A

24JUL01A

26JUL01A

12

7CCW27306

220KV TOWER 26@30 GROUNDING GRID INSTALLATION

27JUL01A

29JUL01A

27JUL01A

29JUL01A

24

7CCW27307

220KV TOWER 31@35 GROUNDING GRID INSTALLATION

30JUL01A

01AUG01A

30JUL01A

01AUG01A

7CCW27308

220KV TOWER 36@40 GROUNDING GRID INSTALLATION

02AUG01A 04AUG01A 02AUG01A

04AUG01A

15

7CCW27309

220KV TOWER 41@45 GROUNDING GRID INSTALLATION

05AUG01A 07AUG01A 05AUG01A

07AUG01A

7CCW27310

220KV TOWER 46 GROUNDING GRID INSTALLATION

08AUG01A 08AUG01A 08AUG01A

08AUG01A

24

7CCW27321

220KV LLEGADA SALDO ACCESORIOS CABLE FLING

01SEP01A

01SEP01A

7CCW27311

220KV LLEGADA EQUIPO DE TENDIDO

18SEP01A

18SEP01A

7CCW07305

220 KV TOWER 21@40 FIRST PHASE CABLE INSTALL

22SEP01A

02OCT01A

22SEP01A

02OCT01A

125

7CCW07308

220 KV TOWER 21@40 SECOND PHASE CABLE INSTALL

22SEP01A

05OCT01A

22SEP01A

05OCT01A

125

7CCW07311

220 KV TOWER 21@40 THIRD PHASE CABLE INSTALL

22SEP01A

08OCT01A

22SEP01A

08OCT01A

125

7CCW27331

220KV LLEGADA SALDO ACCESORIOS CABLE OPGW

06OCT01A

06OCT01A

7CCW07309

220 KV TOWER 41@46 SECOND PHASE CABLE INSTALL

09OCT01A 09OCT01A 09OCT01A

09OCT01A

38

7CCW07303

220 KV TOWER 41@46 GUARD CABLE INSTALL

10OCT01A 10OCT01A 10OCT01A

10OCT01A

38

7CCW07306

220 KV TOWER 41@46 FIRST PHASE CABLE INSTALL

10OCT01A 10OCT01A 10OCT01A

10OCT01A

38

-10

2,405

Cable & Wire

Sheet 18 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

7CCW17304

220 KV FIRST PHASE LINE TENSION

10OCT01A 22NOV01A 10OCT01A

22NOV01A

125

7CCW27320

220 KV TOWER 8 GROUNDING GRID INSTALLATION

10OCT01A 10OCT01A 10OCT01A

10OCT01A

7CCW07302

220 KV TOWER 21@40 GUARD CABLE INSTALL

11OCT01A 13OCT01A 11OCT01A

13OCT01A

125

7CCW07312

220 KV TOWER 41@46 THIRD PHASE CABLE INSTALL

11OCT01A 11OCT01A 11OCT01A

11OCT01A

38

7CCW17306

220 KV SECOND PHASE LINE TENSION

14OCT01A 22NOV01A 14OCT01A

22NOV01A

125

7CCW07304

220 KV TOWER 1@20 FIRST PHASE CABLE INSTALL

15OCT01A 22NOV01A 15OCT01A

22NOV01A

125

7CCW07307

220 KV TOWER 1@20 SECOND PHASE CABLE INSTALL

18OCT01A 22NOV01A 18OCT01A

22NOV01A

125

7CCW17308

220 KV THIRD PHASE LINE TENSION

18OCT01A 22NOV01A 18OCT01A

22NOV01A

125

7CCW07310

220 KV TOWER 1@20 THIRD PHASE CABLE INSTALL

20OCT01A 22NOV01A 20OCT01A

22NOV01A

125

7CCW07301

220 KV TOWER 1@20 GUARD CABLE INSTALL

21OCT01A 22NOV01A 21OCT01A

22NOV01A

125

7CCW17302

220 KV GUARD CABLE LINE TENSION

02NOV01A 22NOV01A 02NOV01A

22NOV01A

250

7CCW17312

PUNCH LIST ELECTRICAL WORKS

22NOV01A

14DEC01

22NOV01A

07DEC01

-9

31

TOP 5 AGUA FRESCA & 8KV BOOSTER N1 ->BARGES


SISTEMA 721
SUBSIST 721-01 MONTURAQUI FRESH WATER ST & PIPEL
Site Development
7BCA07217

STONE FILL DRAINAGE PIT

06JUL01A

13JUL01A

06JUL01A

13JUL01A

441

7BCA07205

PLATFORM BACKFILL ON VALVE PIT

15JUL01A

20JUL01A

15JUL01A

20JUL01A

7BCA07207

TIE-IN DRAINAGE PIT FILL

14DEC01

14DEC01

07DEC01

07DEC01

346

7BCA07201

VALVE STATION FENCING

14JAN02

17JAN02

07JAN02

10JAN02

321

61

7BCB07200

MASS EXCAVATION MONTURAQUI TO VALV ST WATER LINE

28

14FEB01A

15APR01A

14FEB01A

15APR01A

23,226

7BCB07203

STRUCT EXCAVATION PIT, U/G PIPE & CONCR. ANCHOR

14

18FEB01A

17JUL01A

18FEB01A

17JUL01A

7BCB07202

MASS FILL MONTURAQUI TO VALV ST. WATER LINE BASE

28

12MAR01A 21OCT01A 12MAR01A 21OCT01A

7BCB07204

STRUCT. BACKFILL PIT, U/G PIPE & CONCRET. ANCHOR

14APR01A

14APR01A

16APR01A

320

7BCB27203

VALVE STATION STRUCTURAL EXCAVATION

10NOV01A 05DEC01A 10NOV01A

05DEC01A

845

7BCB17204

24" CS PIPE BERMING

60

11

20NOV01A

04JAN02

20NOV01A

04JAN02

142

305

7BCB27204

VALVE STATION STRUCTURAL BACKFILL

20NOV01A

17DEC01

20NOV01A

10DEC01

144

1,973

7BCB27206

EXCAV. DUCT BANK & PITS TO E. ROOM 220-ER-405

21NOV01A

16DEC01

21NOV01A

09DEC01

123

741

7BCB27207

BACKFILL DUCT BANK & PITS TO E. ROOM 220-ER-405

11JAN02

14JAN02

04JAN02

07JAN02

123

853

7BCG07206

REBARS VALVE PIT BASE

13MAY01A 14MAY01A 13MAY01A 14MAY01A

60

7BCG07207

FORMS VALVE PIT BASE

15MAY01A 21MAY01A 15MAY01A 21MAY01A

510

7BCG07208

PLACE CONCRETE & STRIP FORMS VALVE PIT BASE

17MAY01A 23MAY01A 17MAY01A 23MAY01A

479

7BCG07211

INSTALL EMBEDS & 26" PIPE INSERT (MK-06)

23MAY01A 26MAY01A 23MAY01A 26MAY01A

677

58

Earthwork

16APR01A

3,339

Concrete

Sheet 19 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

7BCG07210

REBAR VALVE PIT WALLS

25MAY01A 26MAY01A 25MAY01A 26MAY01A

474

7BCG07209

FORMS VALVE PIT WALLS

27MAY01A

02JUN01A

27MAY01A

02JUN01A

752

7BCG07212

PLACE CONCRETE & STRIP FORMS WALLS

29MAY01A

04JUN01A

29MAY01A

04JUN01A

521

7BCG07216

LEAN CONCRETE VALVE PIT BASE

18JUN01A

24JUN01A

18JUN01A

24JUN01A

248

7BCG07221

REBARS PIPE CONCRETE ANCHOR

25JUN01A

26JUN01A

25JUN01A

26JUN01A

28

7BCG07222

FORMS PIPE CONCRETE ANCHOR

27JUN01A

03JUL01A

27JUN01A

03JUL01A

936

7BCG07223

PLACE CONCRET & STRIP FORMS PIPE CONCRETE ANCHOR

29JUN01A

05JUL01A

29JUN01A

05JUL01A

448

7BCG27208

VALVE STATION FOUNDATION - LEAN CONCRETE

18NOV01A

17DEC01

18NOV01A

10DEC01

343

52

7BCG27209

VALVE STATION FOUNDATION - FORMS

19NOV01A

15DEC01

19NOV01A

08DEC01

131

483

7BCG27210

VALVE STATION FOUNDATION - REBAR

19NOV01A

17DEC01

19NOV01A

10DEC01

343

131

7BCG27213

VALVE ST FOUND - PLACE CONCRETE & STRIP FORMS

21NOV01A

18DEC01

21NOV01A

11DEC01

131

983

7BCG27211

VALVE STATION FOUND - EMBEDS & ANCHOR BOLTS

22NOV01A

18DEC01

22NOV01A

11DEC01

342

1,189

7BCG27214

PIPE CONCRETE ANCHOR - REBARS

10

01DEC01A 06DEC01A 01DEC01A

7BCG27215

PIPE CONCRETE ANCHOR FORMS

14DEC01

21DEC01

07DEC01

14DEC01

336

7BCG27217

DUCT BANCK & ELECTR. PIT - REBARS

17DEC01

20DEC01

10DEC01

13DEC01

123

34

7BCG27216

PIPE CONCRETE ANCHOR - PLACE CONCR & STRIP FORMS

18DEC01

04JAN02

11DEC01

17DEC01

336

290

7BCG27218

DUCT BANCK & ELECTR. PIT - FORMS

19DEC01

22DEC01

12DEC01

15DEC01

123

922

7BCG27219

DUCT BANCK & ELECTR. PIT - CONCRT. & STRIP FORMS

03JAN02

08JAN02

16DEC01

21DEC01

123

622

7BCH07212

INSTALL BEAMS,HAND RAIL,LADDER STEEL ON PIT

23MAY01A 23MAY01A 23MAY01A 23MAY01A

136

7BCH07201

PIT VALVE COVERS INSTALLATION

26MAY01A 26MAY01A 26MAY01A 26MAY01A

22

7BCH07222

PUNCH LIST STRUTURAL STEEL WORKS

27MAY01A 27MAY01A 27MAY01A 27MAY01A

20

7BCH27201

VALVE STATION STRUCTURAL STEEL PLATFORMS

22DEC01

06JAN02

15DEC01

19DEC01

7BCR07201

UNDERGROUND PIPE INSTALLATION (14 m.)

23JUN01A

25JUN01A

23JUN01A

25JUN01A

10,300

7BCR07203

PUNCH LIST U/G PIPING & TIE IN

26JUN01A

26JUN01A

26JUN01A

26JUN01A

10,287

7BCR07202

TIE-IN TO EXISTENT 24" VALVE

27JUN01A

03JUL01A

27JUN01A

03JUL01A

17,457

7BCR17201

24"CS PIPE STRINGING

80

20JUL01A

21OCT01A

20JUL01A

21OCT01A

24,573

7BCR17202

24" CS PIPE WELDING

80

21JUL01A

15NOV01A

21JUL01A

15NOV01A

39,241

7BCR17212

SC19 READY TO START WORK ON SITE

19OCT01A 19OCT01A 19OCT01A

19OCT01A

7BCR17203

24" CS PIPE INTERIOR JOINT EPOXY APPLY

30

25OCT01A 22NOV01A 25OCT01A

22NOV01A

7BCR17205

PUNCH LIST PIPING WATER SUPPLY

12

20NOV01A

18DEC01

20NOV01A

11DEC01

143

440

7BCR17204

24" CS PIPE FLUSHING & TESTING

48

14DEC01

18DEC01

10DEC01

14DEC01

142

1,099

7BCR27202

INSTALL PIPE SPOOLS

19DEC01

21DEC01

12DEC01

14DEC01

136

2,359

7BCR27207

INSTALL PIPING SUPPORTS

22DEC01

04JAN02

15DEC01

17DEC01

332

234

06DEC01A

142
1,119

Structural Steel

131

38

Piping

Sheet 20 of 76

5,842

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

7BCR27203

VALVE STATION VALVES (5) INSTALLATION

11JAN02

13JAN02

04JAN02

06JAN02

122

360

7BCR27206

PUNCH LIST PIPING VALVE STATION

16JAN02

19JAN02

09JAN02

12JAN02

321

446

INSTALL U/G CONDUIT TO ELECTR. ROOM 220-ER-405

19DEC01

22DEC01

12DEC01

15DEC01

123

2,533

7BCW27201

U/G CABLE INSTALLATION - VALVE STATION

03JAN02

06JAN02

16DEC01

19DEC01

131

607

7BCW27202

POWER CABLE INSTALLATION - VALVE STATION

10JAN02

12JAN02

03JAN02

05JAN02

123

70

7BCW27203

CONTROL CABLE INSTALLATION - VALVE STATION

10JAN02

12JAN02

03JAN02

05JAN02

123

1,051

7BCW27206

TERMINATE GROUNDING CABLE - VALVE STATION

12JAN02

13JAN02

05JAN02

06JAN02

327

99

7BCW27204

TERMINATE POWER CABLE - VALVE STATION

14JAN02

15JAN02

07JAN02

08JAN02

122

16

7BCW27205

TERMINATE CONTROL CABLE - VALVE STATION

14JAN02

15JAN02

07JAN02

08JAN02

122

215

7BCW27207

PUCHLIST ELECTRICAL & INSTRUMENT WORKS

16JAN02

17JAN02

09JAN02

10JAN02

122

552

VALVE STATION INSTRUMENT INSTALLATION

19DEC01

21DEC01

12DEC01

14DEC01

136

720

16JAN02

19JAN02

09JAN02

12JAN02

122

98

Raceway & Conduit


7BCU27201
Cable & Wire

Instrumentation
7BCX27201

Pre-Op & No Load Testing


7BCR97201

MONTURAQUI VALVE STATION TESTING

SISTEMA 722
SUBSIST 722-01 PTA NEGRA FRESH WATER ST & PIPEL
Earthwork
7BCB97299

TEMPORARY WATER LINE RIGHT OF WAY

12

21DEC00A

12JAN01A

21DEC00A

12JAN01A

739

7BCB97289

TEMPORARY WATER LINE BERMING

30

21JAN01A

30APR01A

21JAN01A

30APR01A

1,000

7BCR97299

CONSTRUCTION 10" HDPE TEMPORARY WATER LINE

34

20DEC00A

28JAN01A

20DEC00A

28JAN01A

61,152

7BCR97298

CONSTRUCTION TEMPORARY WATER LINE TIE-IN

24MAR01A 31MAR01A 24MAR01A 31MAR01A

Piping

173

SUBSIST 721-01 MONTURAQUI FRESH WATER ST & PIPEL


Piping
7BCR27222

LLEGADA SUMINISTRO DE FITTING

21NOV01A

14DEC01

21NOV01A

7BCR27232

FABRICACION SPOOL CUADRO VALVULAS

21NOV01A

16DEC01

21NOV01A

7BCR27242

REVESTIMIENTO EPOXICO SC-19

03DEC01A 06DEC01A 03DEC01A

7BCR27252

PRUEBA HIDRAULICA SPOOL

14DEC01

15DEC01

07DEC01

08DEC01

139

7BCR17214

TOUCH UP PIPING WATER SUPPLY

60

11

16OCT01A

04JAN02

16OCT01A

04JAN02

336

Sheet 21 of 76

07DEC01

346

09DEC01

344

06DEC01A

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

TOP 6 69 KV POWER
SISTEMA 941 POWER DISTRIBUT & S/E 69 KV
SUBSISTEMA 941-01 NEW 69KV SWITCHING STAT ER-440
Site Development
9DCA39412

69 KV SWITCHING STATION FENCING

30

12

14DEC01

05JAN02

13DEC01

04JAN02

26

2,379

9DCB39461

69 KV SWITCHING EXTRUCTURAL EXCAVATION

29JUN01A

04JUL01A

29JUN01A

04JUL01A

2,824

9DCB39412

69 KV SWITCHING STATION STRUCTURAL BACKFILL

10

10OCT01A 19OCT01A 10OCT01A

19OCT01A

3,580

9DCB39463

69 KV SWITCHING STATION GRAVEL PLACE

06JAN02

06JAN02

05JAN02

05JAN02

9DCG39411

69 KV SWITCHING STATION STRUCTURAL FOUNDATION

40

05JUL01A

05AUG01A

05JUL01A

05AUG01A

3,386

9DCG39412

69 KV SWITCHING STATION EQUIPMENT FOUNDATION

40

05JUL01A

05AUG01A

05JUL01A

05AUG01A

3,388

9DCG29421

69KV SWITCHING STATION E-ROOM ER-440 FOUNDATION

14

13JUL01A

08AUG01A

13JUL01A

08AUG01A

1,217

9DCG29411

69KV SWITCHING STATION ELEC.TRENCH FOUNDATION

28

30JUL01A

10AUG01A

30JUL01A

10AUG01A

2,491

9DCG19411

69 KV SWITCHING STATION DUCT BANK CONCRETE

01AUG01A 10AUG01A 01AUG01A

10AUG01A

159

9DCH39412

69 KV SWITCHING STATION STRUCTURAL STEEL

01AUG01A

15DEC01

01AUG01A

08DEC01

345

520

9DCH29411

69KV SW. STATION ELEC.TRENCH STEEL PLATE COVER

14DEC01

19DEC01

07DEC01

12DEC01

30

221

69 KV SWITCHING E-ROOM ER-440 ARQUITECTURE

28

20AUG01A 05NOV01A 20AUG01A

05NOV01A

2,204

Earthwork

26

92

Concrete

Structural Steel

Architectural
9DCG19421

Electrical Equipment
9DCG29441

ELECTRICAL ROOM 940-ER-440 INSTALLATION

10

15AUG01A 17AUG01A 15AUG01A

17AUG01A

250

9DCT39424

69 KV SWITCHING STATION E.ROOM ELECT. PANEL INST

12

15AUG01A 17AUG01A 15AUG01A

17AUG01A

1,618

9DCT39411

69 KV SWITCHING STATION DISCONNECTORS INSTALL

28

05OCT01A 20OCT01A 05OCT01A

20OCT01A

1,000

9DCT39433

INSTALACION DESCONECTADORES

12

06OCT01A 17OCT01A 06OCT01A

17OCT01A

9DCT39423

INSTALACION DE TRANSFORMADORES CORRIENTE

09OCT01A 14OCT01A 09OCT01A

14OCT01A

9DCG29451

LLEGADA DE TRANSFORMADORES CORRIENTE

10OCT01A

10OCT01A

9DCG29471

LLEGADA DESCONECTADORES

10OCT01A

10OCT01A

9DCG29481

LLEGADA PARARRAYOS

10OCT01A

10OCT01A

9DCG29491

LLEGADA TRANSFORMADORES DE POTENCIA

10OCT01A

10OCT01A

9DCT39431

INSTALACION DE PARARRAYOS

11OCT01A 13OCT01A 11OCT01A

13OCT01A

9DCG29461

LLEGADA MUFA FIBRA

12OCT01A

12OCT01A

9DCT39443

INSTALACION TRANSFORMADORES POTENCIA

16OCT01A 06NOV01A 16OCT01A

06NOV01A

9DCT39421

69 KV SWITCHING STATION POLES INSTALL

21OCT01A

14DEC01

21OCT01A

14DEC01

27

200

9DCT39412

69 KV SWITCHING STATION POLES HARDWARE INSTALL

01NOV01A

18DEC01

01NOV01A

18DEC01

342

200

9DCT39413

69 KV SWITCHING STATION LIGHTING FIXTURES INST.

10NOV01A 10NOV01A 10NOV01A


Sheet 22 of 76

10NOV01A

200

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Raceway & Conduit


9DCU19411

69KV SWITCHING STATION DUCT BANK CONDUIT INSTALL

28

10AUG01A 05DEC01A 10AUG01A

05DEC01A

9DCU29412

69KV SWITCHING STATION ELEC.TRENCH CABLETRAY

21

10AUG01A 25OCT01A 10AUG01A

25OCT01A

9DCU19412

69KV SWITCHING STATION CONDUIT INSTALL

55

15AUG01A 20OCT01A 15AUG01A

20OCT01A

9DCU39412

69 KV SWITCHING STATION LIGHTING CONDUIT INSTALL

25OCT01A

08DEC01

9DCU39411

69 KV SWITCHING STATION LIGHTING PANELS INSTALL

01NOV01A 01NOV01A 01NOV01A

9DCW39411

69 KV SWITCHING STATION GROUNDING GRID CABLE

08JUL01A

9DCW39423

CABLEADO DE TRANFORM Y DESCONECTADORES

15OCT01A 07NOV01A 15OCT01A

07NOV01A

9DCW29421

69 KV SWITC. STATION OVERHEAD LINE & INSULATOR

14

17OCT01A

15DEC01

9DCW29411

69KV SWITCHING STATION CABLE INSTALL

21OCT01A 05DEC01A 21OCT01A

05DEC01A

9DCW39412

69 KV SWITCHING STATION LIGHTING CABLES INSTALL

01NOV01A 03NOV01A 01NOV01A

03NOV01A

85

9DCW39413

69 KV SWITCHING STATION CABLE INTERCONNECTION

02DEC01A 07DEC01A 02DEC01A

07DEC01A

102

10

10

20DEC01

09JAN02

19DEC01

08JAN02

15DEC01

25OCT01A

345

01NOV01A

0
0

Cable & Wire


15DEC01

15DEC01

08JUL01A

17OCT01A

08DEC01

345

855
0

35

292
109

Pre-Op & No Load Testing


9DCT99411

69 KV SWITCHING STATION PRE-OP TEST

26

2,023

SUBSISTEMA 941-02 69KV FROM CONC TO SWITCH STAT


Earthwork
9DCB39401

69 KV POLES 1@21 STRUCTURAL EXCAV.

10JUL01A

17JUL01A

10JUL01A

17JUL01A

244

9DCB39400

69 KV POWER LINE RIGHT OF WAY OPENING

15JUL01A

30JUL01A

15JUL01A

30JUL01A

100

9DCB69401

869 KV POLES 1@21 STRUCTURAL BACKFILL

15JUL01A

25JUL01A

15JUL01A

25JUL01A

496

9DCB39402

69 KV POLES 22@43 STRUCTURAL EXCAV.

18JUL01A

28JUL01A

18JUL01A

28JUL01A

244

9DCB69402

69 KV POLES 22@43 STRUCTURAL BACKFILL

27JUL01A

01AUG01A

27JUL01A

01AUG01A

946

9DCB39403

69 KV POLES 44@64 STRUCTURAL EXCAV.

01AUG01A 05AUG01A 01AUG01A

05AUG01A

602

9DCB69403

69 KV POLES 44@64 STRUCTURAL BACKFILL

03AUG01A 08AUG01A 03AUG01A

08AUG01A

946

12

14JUL01A

26JUL01A

14JUL01A

26JUL01A

2,618

Electrical Equipment
9DCT39401

69 KV POLES 1@21 ERECTION

9DCW59401

69 KV POLES 1@21 GROUNDING GRID INSTALLATION

14JUL01A

01AUG01A

14JUL01A

01AUG01A

319

9DCT39402

69 KV POLES 22@43 ERECTION

12

28JUL01A

08AUG01A

28JUL01A

08AUG01A

1,618

9DCT49401

69 KV POLES 1@21 HARDWARE INSTALLATION

01AUG01A 10AUG01A 01AUG01A

10AUG01A

944

9DCW59402

69 KV POLES 22@43 GROUNDING GRID INSTALLATION

03AUG01A 06AUG01A 03AUG01A

06AUG01A

319

9DCT39403

69 KV POLES 44@64 ERECTION

12

09AUG01A 20AUG01A 09AUG01A

20AUG01A

1,618

9DCW59403

69 KV POLES 44@64 GROUNDING GRID INSTALLATION

10AUG01A 16AUG01A 10AUG01A

16AUG01A

319

9DCT49402

69 KV POLES 22@43 HARDWARE INSTALLATION

12AUG01A 18AUG01A 12AUG01A

18AUG01A

944

9DCT49403

69 KV POLES 44@64 HARDWARE INSTALLATION

19AUG01A 25AUG01A 19AUG01A

25AUG01A

944

69 KV POLES 1@32 1ST PHASE CABLE

05OCT01A 01DEC01A 05OCT01A

01DEC01A

41

Cable & Wire


9DCW39403

Sheet 23 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

9DCW39405

69 KV POLES 1@32 2ND PHASE CABLE

07OCT01A 01DEC01A 07OCT01A

01DEC01A

64

9DCW39408

69 KV POLES 33@64 3RD PHASE CABLE

08OCT01A 09OCT01A 08OCT01A

09OCT01A

42

9DCW39404

69 KV POLES 33@64T 1ST PHASE CABLE

10OCT01A 12OCT01A 10OCT01A

12OCT01A

61

9DCW39406

69 KV POLES 33@64 2ND PHASE CABLE

10OCT01A 08NOV01A 10OCT01A

08NOV01A

64

9DCW39407

69 KV POLES 1@32 3RD PHASE CABLE

10OCT01A 01DEC01A 10OCT01A

01DEC01A

65

9DCW39421

LLEGADA DE GRAMPAS PARA CONDUCTOR CAIRO

10OCT01A 10OCT01A 10OCT01A

10OCT01A

9DCW49402

69 KV FIRST PHASE LINE TENSION

10OCT01A 01DEC01A 10OCT01A

01DEC01A

45

9DCW49403

69 KV SECOND PHASE LINE TENSION

10OCT01A 01DEC01A 10OCT01A

01DEC01A

41

9DCW49404

69 KV THIRD PHASE LINE TENSION

12OCT01A 01DEC01A 12OCT01A

01DEC01A

45

9DCW39401

69 KV POLES 1@32 GUARD CABLE INSTALL

30NOV01A 01DEC01A 30NOV01A

01DEC01A

9DCW39402

69 KV POLES 33@64 GUARD CABLE INSTALL

30NOV01A

09DEC01

9DCW49401

69 KV GUARD CABLE LINE TENSION

03DEC01A 05DEC01A 03DEC01A

12

12

16DEC01

30NOV01A

63
344

05DEC01A

86
41

Pre-Op & No Load Testing


9DCT99401

69KV MAIN SUBST.TO SWITCH ST.OH LINE PRE-OP TEST

14DEC01

05JAN02

07DEC01

18DEC01

30

3,776

SUBSISTEMA 941-03 69KV TAILING PUMP ST->ER-440


Earthwork
9DCB39451

69 KV POLES 64@85 STRUCTURAL EXCAV.

06AUG01A 10AUG01A 06AUG01A

10AUG01A

577

9DCB39453

69 KV POLES 86@106 STRUCTURAL EXCAV.

11AUG01A 15AUG01A 11AUG01A

15AUG01A

577

9DCB69451

69 KV POLES 64@85 STRUCTURAL BACKFILL

12AUG01A 18AUG01A 12AUG01A

18AUG01A

725

9DCB39454

69 KV POLES 107@130 STRUCTURAL EXCAV.

16AUG01A

17DEC01

16AUG01A

10DEC01

9DCB69452

69 KV POLES 86@106 STRUCTURAL BACKFILL

23AUG01A

15SEP01A

23AUG01A

15SEP01A

9DCB69453

69 KV POLES 107@130 STRUCTURAL BACKFILL

20SEP01A

17DEC01

20SEP01A

10DEC01

19

725

9DCB39450

69 KV POWER LINE RIGHT OF WAY OPENING

18DEC01

22DEC01

11DEC01

15DEC01

12

550

12

577
467

Electrical Equipment
9DCT39451

69 KV POLES 64@85 ERECTION

20

08AUG01A 18AUG01A 08AUG01A

18AUG01A

2,697

9DCW59451

69 KV POLES 64@85 GROUNDING GRID INSTALLATION

10

14AUG01A 23AUG01A 14AUG01A

23AUG01A

394

9DCT39452

69 KV POLES 86@106 ERECTION

20

20AUG01A

15SEP01A

20AUG01A

15SEP01A

2,697

9DCT49451

69 KV POLES 86@106 HARDWARE INSTALLATION

10

01SEP01A

10SEP01A

01SEP01A

10SEP01A

1,348

9DCW59452

69 KV POLES 86@106 GROUNDING GRID INSTALLATION

01SEP01A

08SEP01A

01SEP01A

08SEP01A

353

9DCT39454

69 KV POLES 64@85 HARDWARE INSTALLATION

05SEP01A

12SEP01A

05SEP01A

12SEP01A

9DCT39453

69 KV POLES 107@130 ERECTION

20

15SEP01A

22DEC01

15SEP01A

15DEC01

12

2,697

9DCT49452

69 KV POLES 107@130 HARDWARE INSTALLATION

10

16SEP01A

04JAN02

16SEP01A

17DEC01

12

1,348

9DCW59453

69 KV POLES 107@130 GROUNDING GRID INSTALLATION

13

16SEP01A

06JAN02

16SEP01A

19DEC01

19

353

9DCW39451

69 KV POLES 64@130 GUARD CABLE INSTALL

05JAN02

08JAN02

18DEC01

21DEC01

12

63

9DCW39452

69 KV POLES 64@130 1ST PHASE CABLE

09JAN02

12JAN02

22DEC01

05JAN02

12

61

1,326

Cable & Wire

Sheet 24 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

9DCW49451

69 KV GUARD CABLE LINE TENSION

09JAN02

12JAN02

22DEC01

05JAN02

13

61

9DCW39453

69 KV POLES 64@130 2ND PHASE CABLE

13JAN02

15JAN02

06JAN02

08JAN02

12

44

9DCW49452

69 KV FIRST PHASE LINE TENSION

13JAN02

15JAN02

06JAN02

08JAN02

13

66

9DCW49453

69 KV SECOND PHASE LINE TENSION

14JAN02

16JAN02

07JAN02

09JAN02

13

42

9DCW39454

69 KV POLES 64@130 3RD PHASE CABLE

15JAN02

18JAN02

08JAN02

11JAN02

12

44

9DCW49454

69 KV THIRD PHASE LINE TENSION

18JAN02

21JAN02

11JAN02

14JAN02

12

52

10

10

14JAN02

23JAN02

07JAN02

16JAN02

12

1,888

Pre-Op & No Load Testing


9DCT99450

69 KV SWITCH STATION TO MINE OH LINE PRE-OP TEST

SUBSISTEMA 941-04 69KV LAGUNA SECA->BOOSTER N1


Earthwork
9DCB09401

69 KV POLES 1@22 STRUCTURAL EXCAV.

12APR01A

10JUN01A

12APR01A

10JUN01A

244

9DCB09400

69 KV POWER LINE RIGHT OF WAY OPENING

31MAY01A

02JUN01A

31MAY01A

02JUN01A

100

9DCB29401

69 KV POLES 1@22 STRUCTURAL BACKFILL

02JUN01A

25JUN01A

02JUN01A

25JUN01A

496

9DCB09402

69 KV POLES 23@44 STRUCTURAL EXCAV.

03JUN01A

05JUL01A

03JUN01A

05JUL01A

244

9DCB29402

69 KV POLES 23@44 STRUCTURAL BACKFILL

11JUN01A

08JUL01A

11JUN01A

08JUL01A

496

9DCB09403

69 KV POLES 45@66 STRUCTURAL EXCAV.

23JUN01A

10JUL01A

23JUN01A

10JUL01A

244

9DCB09404

69 KV POLES 67@90 STRUCTURAL EXCAV.

05JUL01A

20AUG01A

05JUL01A

20AUG01A

244

9DCB29403

69 KV POLES 45@66 STRUCTURAL BACKFILL

05JUL01A

15JUL01A

05JUL01A

15JUL01A

496

9DCB29404

69 KV POLES 66@90 STRUCTURAL BACKFILL

10JUL01A

23AUG01A

10JUL01A

23AUG01A

1,037

Electrical Equipment
9DCT09401

69 KV POLES 1@22 ERECTION

14

01JUN01A

14JUN01A

01JUN01A

14JUN01A

3,888

9DCT09402

69 KV POLES 23@44 ERECTION

14

15JUN01A

28JUN01A

15JUN01A

28JUN01A

3,888

9DCW29401

69 KV POLES 1@22 GROUNDING GRID INSTALLATION

20JUN01A

23JUN01A

20JUN01A

23JUN01A

319

9DCW29402

69 KV POLES 23@44 GROUNDING GRID INSTALLATION

24JUN01A

27JUN01A

24JUN01A

27JUN01A

501

9DCW29403

69 KV POLES 45@66 GROUNDING GRID INSTALLATION

28JUN01A

01JUL01A

28JUN01A

01JUL01A

319

9DCT09403

69 KV POLES 45@66 ERECTION

14

29JUN01A

12JUL01A

29JUN01A

12JUL01A

4,888

9DCW29404

69 KV POLES 67@90 GROUNDING GRID INSTALLATION

02JUL01A

05JUL01A

02JUL01A

05JUL01A

319

9DCT09404

69 KV POLES 67@90 ERECTION

14

13JUL01A

23AUG01A

13JUL01A

23AUG01A

4,888

9DCT19401

69 KV POLES 1@22 HARDWARE INSTALLATION

14

06AUG01A

01SEP01A

06AUG01A

01SEP01A

1,888

9DCT19402

69 KV POLES 23@44 HARDWARE INSTALLATION

14

10AUG01A

08SEP01A

10AUG01A

08SEP01A

1,888

9DCT19403

69 KV POLES 45@66 HARDWARE INSTALLATION

14

15AUG01A

14SEP01A

15AUG01A

14SEP01A

1,888

9DCT19404

69 KV POLES 67@90 HARDWARE INSTALLATION

20AUG01A

20SEP01A

20AUG01A

20SEP01A

1,079

9DCW09411

LLEGADA DE SOPORTES PARA CABLE OPGW

01SEP01A

01SEP01A

01SEP01A

01SEP01A

9DCW09404

69 KV POLES 1@45 FIRST PHASE CABLE INSTALL

03SEP01A

03SEP01A

03SEP01A

03SEP01A

22

9DCW09405

69 KV POLES 46@90 FIRST PHASE CABLE INSTALL

03SEP01A

03SEP01A

03SEP01A

03SEP01A

23

Cable & Wire

Sheet 25 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

9DCW09407

69 KV POLES 1@45 SECOND PHASE CABLE INSTALL

03SEP01A

05SEP01A

03SEP01A

05SEP01A

22

9DCW19404

69 KV FIRST PHASE LINE TENSION

06SEP01A

08SEP01A

06SEP01A

08SEP01A

66

9DCW09408

69 KV POLES 46@90 SECOND PHASE CABLE INSTALL

08SEP01A

08SEP01A

08SEP01A

08SEP01A

22

9DCW09409

69 KV POLES 1@45 THIRD PHASE CABLE INSTALL

08SEP01A

08SEP01A

08SEP01A

08SEP01A

22

9DCW0940A

69 KV POLES 46@90 THIRD PHASE CABLE INSTALL

09SEP01A

09SEP01A

09SEP01A

09SEP01A

24

9DCW19406

69 KV SECOND PHASE LINE TENSION

10SEP01A

11SEP01A

10SEP01A

11SEP01A

46

9DCW19407

69 KV THIRD PHASE LINE TENSION

11SEP01A

12SEP01A

11SEP01A

12SEP01A

46

9DCW09421

LLEGADA DE PREFORMADAS PARA CABLE AZUZA

10OCT01A 10OCT01A 10OCT01A

10OCT01A

9DCW09401

69 KV POLES 1@45 GUARD CABLE INSTALL

15OCT01A 01DEC01A 15OCT01A

01DEC01A

64

9DCW19402

69 KV GUARD CABLE LINE TENSION

15OCT01A 01DEC01A 15OCT01A

01DEC01A

61

9DCW09402

69 KV POLES 46@90 GUARD CABLE INSTALL

18OCT01A 03NOV01A 18OCT01A

03NOV01A

83

10

14DEC01

03JAN02

07DEC01

16DEC01

-14

1,079

INSTALL FENCING AROUND ELECT ROOM/XFRMRS

14DEC01

20DEC01

07DEC01

13DEC01

16

158

6CCB06314

STRUC. EXCAV FROM BSP 1 & WALK IN AREA (GROUND.)

14

01NOV01A 18NOV01A 01NOV01A

18NOV01A

6CCB06320

BACKFILL FROM BSP 1 & WALK IN AREA (GROUNDING)

10

18NOV01A

18NOV01A

11DEC01

342

3,553

14

18NOV01A 18NOV01A 18NOV01A

11DEC01

565

Pre-Op & No Load Testing


9DCT99407

69 KV LAGUNA SECA TAILINGS DAM LINE PRE-OP TEST

TOP 15 LAGUNA SECA RECLAIM WATER


SISTEMA 630 PROCESS WATER
SUBSISTEMA 630-01 BARGE PUMP MCC 630-MC-635
Site Development
6CCA06319
Earthwork

18DEC01

119

Mechanical Equipment
6CCN06337

INSTALL HVAC SYSTEM INSIDE MCC WALK-IN ROOM

Electrical Equipment
6CCT06331

INSTALL MCC 0630-MC-635

18NOV01A 28NOV01A 18NOV01A

28NOV01A

318

6CCT16355

INSTALL PREFABRICATED ELECTR ROOM (MCC WALK-IN)

20NOV01A 05DEC01A 20NOV01A

05DEC01A

204

6CCT06318

INSTALL MISCELAN. SMALL ELECTR. EQUIPMENTS

29NOV01A

18DEC01

29NOV01A

11DEC01

11

154

6CCT06314

INSTALL LIGHT. EQUIPMENTS

11JAN02

17JAN02

04JAN02

10JAN02

-1

92

Raceway & Conduit


6CCU06320

INSTALL POWER&CONTROL CONDUIT WALK IN AREA

14DEC01

14DEC01

07DEC01

07DEC01

-2

133

6CCU06324

INSTALL CABLE TRAY WALK IN ROOM

14

14

14DEC01

07JAN02

07DEC01

20DEC01

122

6CCU06328

INSTALL LIGHTING CONDUIT WALK IN AREA

10

10

14DEC01

03JAN02

07DEC01

16DEC01

-11

6CCW06316

INSTALL GROUNDING CABLE FOR WALK IN ROOM

17NOV01A 21NOV01A 17NOV01A

21NOV01A

6CCW06322

INSTALL POWER CABLE WALK IN AREA

14

10

14DEC01A

04JAN02

08DEC01

17DEC01

-2

2,859

6CCW06330

INSTALL CONTROL & LIGHT. CABLE WALK IN AREA

12

04JAN02

10JAN02

17DEC01

03JAN02

-11

1,602

1,155

Cable & Wire

Sheet 26 of 76

366

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6CCW06342

TERMINATION POWER CABLE WALK IN AREA

05JAN02

11JAN02

18DEC01

04JAN02

-2

369

6CCW06332

TERMINATION CONTROL & LIGHT. CABLE WALK IN AREA

11JAN02

17JAN02

04JAN02

10JAN02

-1

328

6CCW06328

PUNCH LIST ELECTRICAL & INSTRUMENTATION WORKS

21JAN02

27JAN02

14JAN02

20JAN02

-11

408

6CCX06334

INSTALL PLC/DCS INSIDE ELECT ROOM

11JAN02

17JAN02

04JAN02

10JAN02

-1

277

6CCX06340

INSTALL FIRE DETECTION SYSTEM INSIDE ELECT ROOM

14

14

11JAN02

24JAN02

04JAN02

17JAN02

-8

40

6CCX06344

INSTALL FIELD MOUNTED INSTRUMENTS

10

10

11JAN02

20JAN02

04JAN02

13JAN02

-11

277

6CCX06354

LOOP CHECK

14

10

14JAN02

23JAN02

07JAN02

16JAN02

-3

Instrumentation

Pre-Op & No Load Testing


6CCT06332

MISC ELECT TESTING

28JAN02

03FEB02

21JAN02

27JAN02

-11

6CCT86310

ENERGIZE BARGE AREA ELECTRICAL ROOM

04FEB02

06FEB02

28JAN02

30JAN02

-11

201

64,808

SUBSISTEMA 630-02 BARGES & PUMPS


Earthwork
6CCB06312

MASS FILL & COMPACT ROW CONCENTR ->B. PUMPS ST#1

120

08FEB01A

16DEC01

08FEB01A

16DEC01

6CCB06323

CLEAR & GRUB - RECLAIM BARGE DIKE

30

12FEB01A

11MAY01A

12FEB01A

11MAY01A

4,340

6CCB06310

MASS EXCAV. ROW CONCENTR. ->BOOSTER PUMPS ST # 1

80

14FEB01A

15APR01A

14FEB01A

15APR01A

44,511

6CCB06325

MASS FILL PLATFORM DIKE - 1st BARGE

70

05MAR01A 18MAY01A 05MAR01A 18MAY01A

9,919

6CCB06335

MASS FILL EMBANKMENT - BARGE DIKE (REST)

180

11MAY01A 21OCT01A

33,711

6CCB06362

STRUCTURAL EXCAVATION FOR FOUNDATION

15OCT01A 21OCT01A 15OCT01A

21OCT01A

6CCB06327

EXCAVATE FOR BARGE POOL

45

21OCT01A

18DEC01

21OCT01A

11DEC01

-7

154

6CCB06372

STRUCTURAL BACKFILL FOR FOUNDATION

04JAN02

08JAN02

17DEC01

21DEC01

-7

19,089

6CCG06369

LEAN CONCRETE FOR FOUNDATIONS

23OCT01A

18DEC01

23OCT01A

11DEC01

-7

2,530

6CCG06368

FORMS PIPING FOUNDATIONS

14

18NOV01A

03JAN02

18NOV01A

16DEC01

-7

6,282

6CCG06378

REBAR PIPING FOUNDATION

12

20NOV01A

03JAN02

20NOV01A

16DEC01

-7

2,406

6CCG06358

INSTALL CONCRETE & STRIP FORMS PIPE FOUNDATION

14

21NOV01A

03JAN02

21NOV01A

16DEC01

-7

5,091

6CCH26383

INSTALLATION STRUCT. BEAMS FOR PUMPS ERECTION

21

28NOV01A

18DEC01

28NOV01A

11DEC01

2,102

6CCH26373

INSTALLATION STRUCT. PLATF. BRAGE RECLAIM AREA

17

03DEC01A

20DEC01

03DEC01A

20DEC01

15

2,242

6CCH26393

PUNCHLIST STRUCTURE BARGE RECLAIM AREA

12

12

14DEC01

05JAN02

17DEC01

08JAN02

17

2,019

11MAY01A 21OCT01A

19,210

Concrete

Structural Steel

Mechanical Equipment
6CCN06310

PREASSEMBLE RECLAIM BARGE 0630-ZM-151@154

24

28NOV01A

18DEC01

28NOV01A

15DEC01

369

6CCN06312

FINAL ASSEMBLY/INSTALL. BARGE 0630-ZM-151@154

24

13DEC01A

21DEC01

16DEC01

11JAN02

331

458

6CCN06362

BARGES MECH. MISCELL. INSTALL:16 WINCHES

21

21DEC01

09JAN02

16DEC01

09JAN02

230

6CCN06330

INSTALLATION BARGE PUMPS/MTR 0630-PP-151@154

12

04JAN02

11JAN02

17DEC01

04JAN02

-4

560

6CCN06373

PUNCHLIST MECHANICAL EQUIPMENT BARGE AREA

14

10

29JAN02

07FEB02

22JAN02

31JAN02

-3

390

Sheet 27 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Piping
6CCR06320

FABRICACION DE SPOOL

6CCR06310

INSTAL. SUCTION PIPING/VALVES BARGE ZM151-ZM154

14

10

10OCT01A 12OCT01A 10OCT01A


09JAN02

18JAN02

22DEC01

12OCT01A
11JAN02

-7

227

6CCR06312

INST. PIPE FROM BARGES TO MANIFOLD IN BARGE AREA

14

10

12JAN02

21JAN02

05JAN02

14JAN02

-3

543

6CCR06322

INSTALL. PIPING SUPPORTS BARGE AREA

14

10

19JAN02

28JAN02

12JAN02

21JAN02

-7

937

6CCR06302

PUNCHLIST PIPING BARGE AREA

29JAN02

04FEB02

22JAN02

28JAN02

-7

83

6CCR06362

PIPE TESTING BARGE AREA

05FEB02

11FEB02

29JAN02

04FEB02

-7

46

20JAN02

24JAN02

13JAN02

17JAN02

-4

46

INSTALL POWER, CTRL & LIGHT. CONDUIT-BARGE AREA

20

15

05JAN02

19JAN02

18DEC01

12JAN02

-4

1,417

6CCW06356

INSTALL CONTROL & LIGHT. CABLE BARGE

10

10

10JAN02

19JAN02

03JAN02

12JAN02

-4

1,841

6CCW06346

INSTALL POWER CABLE BARGE

12JAN02

16JAN02

05JAN02

09JAN02

-4

1,457

6CCW06386

TERMINATION POWER CABLE BARGE

10

17JAN02

24JAN02

10JAN02

17JAN02

-4

369

6CCW06396

TERMINATION CONTROL & LIGHT. CABLE BARGE

20JAN02

26JAN02

13JAN02

19JAN02

283

6CCW06336

PUNCH LIST ELECTRICAL & INSTRUMENTATION WORKS

25JAN02

30JAN02

18JAN02

23JAN02

-4

366

6CCX06310

INSTALL INSTRUMENTS & CTRL. VALVES - BARGE AREA

17JAN02

21JAN02

10JAN02

14JAN02

-1

277

6CCX06320

LOOP CHECK

22JAN02

27JAN02

15JAN02

20JAN02

-1

20

07FEB02

15FEB02

31JAN02

08FEB02

-11

14

10

19JAN02

28JAN02

12JAN02

21JAN02

-3

200

CONSTRUCT BERM ANCHORS - 36" CS RECLAIM WATER LN

35

35

22DEC01

05FEB02

15DEC01

29JAN02

-6

11,861

6CCR06336

INSTALL PIPE 36" CARB.STEEL RECL. WATER LINE

40

04SEP01A

21DEC01

04SEP01A

14DEC01

-6

21,463

6CCR06338

INSTALL AIR VENTS

21

01DEC01A 06DEC01A 01DEC01A

6CCR06368

PUNCHLIST PIPING

12

12

14DEC01

05JAN02

07DEC01

18DEC01

13

1,168

6CCR06358

PIPING HYDROTEST

12

12

06JAN02

17JAN02

19DEC01

10JAN02

13

583

06FEB02

10FEB02

30JAN02

03FEB02

-6

Electrical Equipment
6CCT06341

LIGHTING EQUIPMENTS

Raceway & Conduit


6CCU06344
Cable & Wire

Instrumentation

Pre-Op & No Load Testing


6CCN06311

PRECOMMISSIONING ACTIVITIES BARGE AREA

SUBSISTEMA 630-03 MAINTAINENCE BOAT


Mechanical Equipment
6CCN06363

BARGE MAINTENANCE SERVICE BOAT 6 M LONG 4 TON

SUBSISTEMA 630-04 PIPELINE-BARGES TO BOOSTER#1


Earthwork
6CCB06346
Piping

06DEC01A

1,892

Pre-Op & No Load Testing


6CCN06319

PREOPERATIONS ACTIVITIES (DIKE -> BPS #1)

Sheet 28 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

SUBSISTEMA 630-05 RECLAIM WATER BOOSTER#1 ER-418


Site Development
6CCA06323

INSTALL FENCING AROUND ELECT ROOM/XFRMRS

14DEC01

19DEC01

07DEC01

12DEC01

16

474

6CCB26312

CONSTRUCT PLATFORM FOR ELECTR. ROOM & BSP 1

15MAY01A 23MAY01A 15MAY01A 23MAY01A

2,463

6CCB06334

EXCAVATE FOR ELEC. ROOM & S/S (FOUND. & PITS)

60

24MAY01A 15AUG01A 24MAY01A 15AUG01A

1,231

6CCB06340

BACKFILL ELEC.ROOM & S/S FOUNDATIONS

22

10AUG01A

10SEP01A

10AUG01A

10SEP01A

1,654

6CCG06348

LEAN CONCRETE ELECTR. ROOM &S/S (FOUND. & PITS)

50

10JUL01A

06SEP01A

10JUL01A

06SEP01A

193

6CCG06388

REBARS ELECTR. ROOM &S/S (FOUND. & PITS)

28

12JUL01A

04SEP01A

12JUL01A

04SEP01A

546

6CCG06398

FORMS & EMBEDD ELECTR. ROOM &S/S (FOUND. & PITS)

56

15JUL01A

10SEP01A

15JUL01A

10SEP01A

429

6CCG06338

PLACE CONCRETE & STRIP FORMS ELECTR. ROOM &S/S

42

18JUL01A

10SEP01A

18JUL01A

10SEP01A

3,572

6CCG06349

LEAN CONCRETE S/S FIRE WALLS

14

01AUG01A 10AUG01A 01AUG01A

10AUG01A

172

6CCG06389

REBARS S/S FIRE WALLS

28

11AUG01A 18AUG01A 11AUG01A

18AUG01A

638

6CCG06399

FORMS & EMBEDD S/S FIRE WALLS

28

18AUG01A 19AUG01A 18AUG01A

19AUG01A

6CCG06339

PLACE CONCRETE & STRIP FORMS S/S FIRE WALLS

28

20AUG01A

18SEP01A

20AUG01A

18SEP01A

693

6CCH26363

INSTALL ALL STRUCTURAL STEEL FOR ELECTRIC S/S

42

13AUG01A

19SEP01A

13AUG01A

19SEP01A

82

6CCH26364

PUNCHLIST STRUCTURAL STEEL FOR ELECTRIC S/S

14

05OCT01A

15DEC01

05OCT01A

15DEC01

26

2,011

21

21

14DEC01

14JAN02

07DEC01

07JAN02

715

Earthwork

Concrete

Structural Steel

Mechanical Equipment
6CCN16333

INSTALL HVAC SYSTEM INSIDE ELECTRICAL ROOM

Electrical Equipment
6CCT26373

LLEGADA SALA ELECTRICA ER-418

10SEP01A

10SEP01A

6CCT26363

INSTALL PREFABRICATED ELECTRICAL ROOM 630ER-418

14

17SEP01A

6CCT16343

INSTALL 69 KV TRANSFORMER

14

17SEP01A

21OCT01A

2,334

10OCT01A 20OCT01A 10OCT01A

20OCT01A

333

6CCT16325

LLEGADA DE TRANSFORMADORES

15OCT01A

15OCT01A

6CCT16353

LLEGADA DESCONECTADOR

15OCT01A

15OCT01A

6CCT16315

INSTALL 69 KV DISCONNECT SWITCH/TRANSFOR/BRAKER

6CCT16333

LIGHTING EQUIPMENTS

14

18OCT01A 05DEC01A 18OCT01A

05DEC01A

42

01NOV01A

16DEC01

6CCT16323

INSTALL BUS DUCT/UPS TRANSFORMER -> E-ROOM

28

26NOV01A 06DEC01A 26NOV01A

6CCT06398

INSTALL GROUNDING RESISTOR FOR ELECT ROOM

14DEC01

19DEC01

07DEC01

12DEC01

16

115

6CCX16337

INSTALL FIRE DETETECTION SYST INSIDE ELECT ROOM

14

14

14DEC01

07JAN02

07DEC01

20DEC01

-2

40

16DEC01

15JUL01A

16DEC01

344

21OCT01A

16DEC01

01NOV01A

245
4

06DEC01A

1,848
845

Raceway & Conduit


6CCU16321

CONDUIT INSTALLATION U/G & A/G EXTER. ELECT ROOM

40

15JUL01A

6CCU16317

INSTALL CONDUIT - DISCONNECT -> BREAKER

21

15OCT01A 05DEC01A 15OCT01A

05DEC01A

1,500

6CCU16327

CONDUIT INSTALLATION ISIDE ELECTR. ROOM

42

17OCT01A 06DEC01A 17OCT01A

06DEC01A

2,481

Sheet 29 of 76

4,362

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float
17DEC01

17OCT01A

10DEC01

343

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6CCU16337

CABLE TRAY INSTALLATION EXTER. ELECTR. ROOM

13

17OCT01A

6CCU16347

CABLE TRAY INSTALL. INSIDE ELECTR. ROOM

14

17OCT01A 05DEC01A 17OCT01A

05DEC01A

1,029
1,220

6CCW16313

INSTALL GROUNDING GRID FOR BREAKER/ELEC.ROOM

21

07OCT01A 20OCT01A 07OCT01A

20OCT01A

2,232

6CCW16319

INSTALL CONTROL CABLE

25

18NOV01A

19DEC01

18NOV01A

19DEC01

5,319

6CCW16327

INSTALL POWER CABLES

26

18NOV01A

20DEC01

18NOV01A

13DEC01

7,075

6CCW16339

TERMINATION CONTROL CABLE

04DEC01A

18DEC01

04DEC01A

11DEC01

396

6CCW16320

INSTALL LIGHTING CABLE

18

10

14DEC01

03JAN02

07DEC01

16DEC01

-3

1,289

6CCW16329

TERMINATION POWER CABLES

12

12

21DEC01

12JAN02

14DEC01

05JAN02

369

6CCW16340

TERMINATION LIGHTING CABLE

04JAN02

08JAN02

20DEC01

04JAN02

-3

153

6CCW16350

PUNCHLIST ELECTRICAL & INSTRUM. WORKS

14JAN02

18JAN02

10JAN02

14JAN02

-3

402

6CCX16331

INSTALL PLC/DCS INSIDE ELECT ROOM

21NOV01A

21DEC01

21NOV01A

14DEC01

177

6CCX16339

INSTALL FIELD MOUNTED INSTRUMENTS

09JAN02

13JAN02

05JAN02

09JAN02

-3

177

6CCX16349

LOOP CHECK

14JAN02

18JAN02

10JAN02

14JAN02

-3

200

Cable & Wire

Instrumentation

Pre-Op & No Load Testing


6CCT16329

MISC ELECT TESTING

19JAN02

24JAN02

15JAN02

20JAN02

-3

442

6CCT16330

ENERGIZE BS#1 ELECTRICAL ROOM 630-ER-418

25JAN02

26JAN02

21JAN02

22JAN02

-3

60

INSTALL PROTECTION POST ARROUND PUMPS

10

10

15JAN02

24JAN02

15JAN02

24JAN02

32,763

6CCB06342

EXCAVAT. PUMPS FOUND, PITS & GROUND (PIPE, WIRE)

28

06APR01A

15APR01A

06APR01A

15APR01A

2,047

6CCB06344

BACKFILL PUMPS FOUND, PITS & GROUND (PIPE, WIRE)

42

24JUN01A

16SEP01A

24JUN01A

16SEP01A

3,674

6CCG06352

LEAN CONCRETE PUMP FOUND. & PITS

03JUN01A

13JUN01A

03JUN01A

13JUN01A

182

6CCG06362

REBARS PUMP FOUND. & PITS

40

04JUN01A

05AUG01A

04JUN01A

05AUG01A

696

6CCG06372

FORMS & EMBEDD. PUMPS FOUND. & PITS

40

06JUN01A

10AUG01A

06JUN01A

10AUG01A

2,001

6CCG06382

PLACE CONCRETE & STRIP FORMS PUMP FOUND. & PITS

40

10JUN01A

15AUG01A

10JUN01A

15AUG01A

1,266

1,013

SUBSISTEMA 630-06 RECLAIM WATER BOOSTER #1


Site Development
6CCA06333
Earthwork

Concrete

Mechanical Equipment
6CCN06342

INST.RECLAIM BOOSTER PUMP/MTR 630-PP-161/162/163

28

01SEP01A

22SEP01A

01SEP01A

22SEP01A

6CCN06352

FINAL ALIGNMENT PUMPS

14

17NOV01A

18DEC01

17NOV01A

11DEC01

22

528

6CCN06372

PUNCHLIST MECHANICAL EQUIPMENT

14

05DEC01A

03JAN02

05DEC01A

16DEC01

22

332

6CCR06330

INSTALL INLET PIPE/VALVES TO PUMPS 161@163

35

20AUG01A

16DEC01

20AUG01A

09DEC01

344

3,781

6CCR06360

FABRICACION DE SPOOL

10

10OCT01A 21OCT01A 10OCT01A

21OCT01A

6CCR06332

INSTL DISCH PIPE/VALVES FROM PUMPS 161@163

20

18NOV01A

16DEC01

Piping

16DEC01

Sheet 30 of 76

18NOV01A

0
22

3,781

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6CCR06392

PUNCHLIST PIPING

14

05DEC01A

16DEC01

05DEC01A

16DEC01

22

408

6CCR06372

PIPING HYDROTEST

14

17DEC01

03JAN02

17DEC01

03JAN02

22

408

INSTALL CONDUIT - BOOSTER PUMPS

20AUG01A 15NOV01A 20AUG01A

15NOV01A

137

6CCW16341

INSTALL GROUNDING SYSTEM FOR RECLAIM PUMPS

24

15AUG01A

15AUG01A

15SEP01A

1,097

6CCW16343

INSTALLATION POWER CABLE PUMPS

14

01NOV01A 04DEC01A 01NOV01A

04DEC01A

1,392

6CCW16363

INSTALLATION CONTROL CABLES

14

01NOV01A 05DEC01A 01NOV01A

05DEC01A

6CCW16333

TERMINATION CONTROL CABLES

14

05DEC01A

20DEC01

05DEC01A

20DEC01

396

6CCW16353

TERMINATION POWER CABLE PUMPS

14

14

14DEC01

07JAN02

07DEC01

20DEC01

369

6CCW16376

PUNCHLIST ELECTRICAL & INSTRUM. WORKS

14

14

08JAN02

21JAN02

05JAN02

18JAN02

354

6CCX16347

INSTALL INSTRUMENTATION - BOOSTER PUMPS

14

14

21DEC01

14JAN02

21DEC01

14JAN02

177

6CCX16357

LOOP CHECK

15JAN02

22JAN02

15JAN02

22JAN02

100

12

10

27JAN02

05FEB02

25JAN02

03FEB02

-1

CONSTRUCT BERM ANCHORS - 36" CS RECLAIM WATER LN

14

30

14DEC01

23JAN02

07DEC01

16JAN02

-1

5,035

6CCR06340

INSTALL PIPE 36" CARB.STEEL RECLAIM WATER LINE

90

04AUG01A

19DEC01

04AUG01A

12DEC01

13

24,981

6CCR06342

INSTALL AIR VENTS

30

16NOV01A 05DEC01A 16NOV01A

6CCR06343

PUNCHLIST PIPING

15

15

14DEC01

08JAN02

07DEC01

21DEC01

14

1,359

6CCR06382

PIPING HYDROTEST

24JAN02

29JAN02

17JAN02

22JAN02

-1

680

30JAN02

05FEB02

23JAN02

29JAN02

-1

INSTALL FENCING AROUND ELECT ROOM/XFRMRS

14DEC01

20DEC01

07DEC01

13DEC01

25

474

6CCB26316

CONSTRUCT PLATFORM FOR ELECTR. ROOM & BSP 2

14

14MAY01A

17JUN01A

14MAY01A

17JUN01A

4,132

6CCB06322

EXCAVATE FOR ELECTRICAL ROOM & S/S (FOUND.&PITS)

07JUL01A

10SEP01A

07JUL01A

10SEP01A

1,240

6CCB06328

BACKFILL FOR ELECTRICAL ROOM & S/S (FOUND.&PITS)

11SEP01A

15SEP01A

11SEP01A

15SEP01A

1,301

6CCG06342

LEAN CONCRETE ELECTR. ROOM & S/S (FOUND. & PITS)

14

29JUL01A

15AUG01A

29JUL01A

15AUG01A

349

6CCG06392

REBARS ELECTR. ROOM & S/S (FOUND. & PITS)

35

10AUG01A

08SEP01A

10AUG01A

08SEP01A

546

6CCG06332

FORMS ELECTR. ROOM & S/S (FOUND. & PITS)

42

12AUG01A

12SEP01A

12AUG01A

12SEP01A

770

Raceway & Conduit


6CCU06310
Cable & Wire
15SEP01A

1,293

Instrumentation

Pre-Op & No Load Testing


6CCN06315

PREOPERATIONS ACTIVITIES BPS # 1

SUBSISTEMA 630-07 PIPELINE BOOSTER#1 - BOOSTER#2


Earthwork
6CCB06348
Piping

05DEC01A

2,204

Pre-Op & No Load Testing


6CCN06321

PREOPERATIONS ACTIVITIES (BPS1 -> BPS2)

SUBSISTEMA 630-08 RECLAIM WATER BOOSTR#2 ER-416


Site Development
6CCA06321
Earthwork

Concrete

Sheet 31 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6CCG06322

PLACE CONCRETE & STRIP FORMS ELECTR. ROOM & S/S

42

15AUG01A

17SEP01A

15AUG01A

17SEP01A

586

6CCG06343

LEAN CONCRETE S/S FIRE WALLS

22

01SEP01A

15OCT01A

01SEP01A

15OCT01A

407

6CCG06393

REBARS S/S FIRE WALLS

22

10SEP01A

16DEC01

10SEP01A

09DEC01

27

906

6CCG06333

FORMS S/S FIRE WALLS

35

20SEP01A

18DEC01

20SEP01A

11DEC01

25

1,854

6CCG06323

PLACE CONCRETE & STRIP S/S FIRE WALLS

35

10OCT01A

19DEC01

10OCT01A

19DEC01

24

15,365

6CCH26367

INSTALL ALL STRUCTURAL STEEL S/S

40

01SEP01A

18DEC01

01SEP01A

11DEC01

2,416

6CCH26368

PUNCHLIST STRUCTURAL STEEL S/S

15

15

14DEC01

08JAN02

07DEC01

21DEC01

2,789

14

14

14DEC01

07JAN02

07DEC01

20DEC01

815

Structural Steel

Mechanical Equipment
6CCN06380

INSTALL HVAC SYSTEM INSIDE ELECTRICAL ROOM

Electrical Equipment
6CCT06372

INSTALL 69 KV TRANSFORMER

15OCT01A 21OCT01A 15OCT01A

21OCT01A

333

6CCT06362

INSTALL 69 KV DISCONNECT SWITCH/TRANSFOR/BRAKER

20OCT01A 04DEC01A 20OCT01A

04DEC01A

246

6CCT26367

INSTALL PREFABRICATED ELECTRICAL ROOM 630ER-416

03NOV01A 09NOV01A 03NOV01A

09NOV01A

480

6CCT06370

INSTALL BUS DUCT/UPS - TRANSFORMER -> E-ROOM

14

04DEC01A

20DEC01

04DEC01A

20DEC01

16

830

6CCT06380

LIGHTING EQUIPMENTS

05DEC01A

20DEC01

05DEC01A

13DEC01

-4

234

6CCT06358

INSTALL GROUNDING RESISTOR FOR ELECT ROOM

14DEC01

20DEC01

07DEC01

13DEC01

16

115

Raceway & Conduit


6CCU06368

CONDUIT INSTALL U/G & A/G EXT. ELECT ROOM

56

15OCT01A

16DEC01

15OCT01A

16DEC01

20

3,281

6CCU06384

CABLE TRAY INSTALLATION EXTERIOR ELECT ROOM

28

18OCT01A

18DEC01

18OCT01A

11DEC01

-2

1,012

6CCU06372

CONDUIT INSTALLATION INSIDE ELECTRICAL ROOM

21

15NOV01A 05DEC01A 15NOV01A

05DEC01A

2,456

6CCU06374

CABLE TRAY INSTALLATION INSIDE ELECTRICAL ROOM

21

15NOV01A 05DEC01A 15NOV01A

05DEC01A

1,211

6CCU06364

INSTALL CONDUIT - DISCONNECT -> BREAKER

25

18NOV01A

18DEC01

18NOV01A

11DEC01

1,467

6CCW06360

INSTALL GROUNDING GRID FOR BREAKER/ELEC.ROOM

42

14JUL01A

18DEC01

14JUL01A

11DEC01

25

2,132

6CCW06376

INSTALLATION CONTROL CABLE

10

18NOV01A

16DEC01

18NOV01A

09DEC01

2,204

6CCW06350

TERMINATION CONTROL CABLE

10

04DEC01A

14DEC01

04DEC01A

14DEC01

10

153

6CCW06377

INSTALLATION LIGHTING CABLE

14DEC01

21DEC01

07DEC01

14DEC01

-5

1,843

6CCW06306

INSTALLATION POWER CABLE

10

10

19DEC01

08JAN02

12DEC01

21DEC01

548

6CCW06366

TERMINATION POWER CABLE

10

10

19DEC01

08JAN02

12DEC01

21DEC01

369

6CCW06351

TERMINATION LIGHTING CABLE

10

22DEC01

09JAN02

15DEC01

22DEC01

-5

153

6CCW06367

PUNCHLIST ELECTRICAL & INSTRUM. WORKS

10

10

10JAN02

19JAN02

03JAN02

12JAN02

-3

354

6CCX06378

INSTALL PLC/DCS INSIDE ELECT ROOM

21NOV01A

20DEC01

21NOV01A

13DEC01

277

6CCX06384

INSTALL FIRE DETETECTION SYST INSIDE ELECT ROOM

14DEC01

20DEC01

07DEC01

13DEC01

40

6CCX06386

INSTALL FIELD MOUNTED INSTRUMENTS

08JAN02

14JAN02

21DEC01

07JAN02

-5

277

Cable & Wire

Instrumentation

Sheet 32 of 76

Activity
ID
6CCX06396

Activity
Description
LOOP CHECK

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

15JAN02

21JAN02

08JAN02

14JAN02

-5

Pre-Op & No Load Testing


6CCT06376

MISC ELECT TESTING

22JAN02

28JAN02

15JAN02

21JAN02

-5

443

6CCT16349

ENERGIZE BS#2 ELECTRICAL ROOM 630-ER-416

07FEB02

08FEB02

31JAN02

01FEB02

-14

60

INSTALL PROTECTION POST ARROUND PUMPS

10JAN02

14JAN02

10JAN02

14JAN02

11

2,000

6CCB06330

EXCAVATE PUMP FOUND, PITS (PIPE & WIRE)

28

25JUN01A

04SEP01A

25JUN01A

04SEP01A

1,914

6CCB06332

BACKFILL PUMP FOUND, PITS (PIPE & WIRE)

56

10AUG01A

10SEP01A

10AUG01A

10SEP01A

37,156

6CCG06346

LEAN CONCRETE PUMP FOUND. & PITS

18JUL01A

31JUL01A

18JUL01A

31JUL01A

341

6CCG06356

REBARS PUMP FOUND. & PITS

14

19JUL01A

16AUG01A

19JUL01A

16AUG01A

568

6CCG06366

FORMS PUMP FOUND. & PITS

35

01AUG01A 18AUG01A 01AUG01A

18AUG01A

437

6CCG06376

PLACE CONCRETE & STRIP FORMS PUMP FOUND. & PITS

35

15AUG01A

14SEP01A

15AUG01A

14SEP01A

219

567

SUBSISTEMA 630-09 RECLAIM WATER BOOSTER STAT #2


Site Development
6CCA06343
Earthwork

Concrete

Mechanical Equipment
6CCN06336

INST.RECLAIM BOOSTER PUMP/MTR 630-PP-171/172/173

28

01SEP01A

22SEP01A

01SEP01A

22SEP01A

6CCN06346

FINAL ALIGNMENT PUMPS

17NOV01A

15DEC01

17NOV01A

08DEC01

30

596

6CCN06356

PUNCHLIST MECHANICAL EQUIPMENT

14DEC01

20DEC01

07DEC01

13DEC01

340

332

6CCR06326

INSTALL INLET PIPE/VALVES TO PUMPS 171@173

30

15OCT01A

16DEC01

15OCT01A

09DEC01

6CCR06366

FABRICACION DE SPOOL

13

19OCT01A 04DEC01A 19OCT01A

04DEC01A

6CCR06328

INSTL DISCH PIPE/VALVES FROM PUMPS 171@173

30

19NOV01A

18DEC01

19NOV01A

11DEC01

-1

5,781

6CCR06308

PUNCH LIST PIPING

14

14

19DEC01

12JAN02

12DEC01

05JAN02

-1

408

6CCR06348

PIPING HYDROTEST

14

14

13JAN02

26JAN02

06JAN02

19JAN02

-1

408

INSTALL CONDUIT - BOOSTER PUMPS

13AUG01A 22NOV01A 13AUG01A

22NOV01A

6CCW06388

INSTALL GROUNDING SYSTEM FOR RECLAIM PUMPS

14

23JUL01A

17DEC01

23JUL01A

10DEC01

28

1,097

6CCW06378

INSTALLATION CONTROL CABLES

25

18NOV01A

20DEC01

18NOV01A

20DEC01

4,214

6CCW06392

INSTALLATION POWER CABLES

14

18NOV01A

15DEC01

18NOV01A

15DEC01

2,629

6CCW06358

TERMINATION CONTROL CABLES

16DEC01

22DEC01

16DEC01

22DEC01

353

6CCW06368

TERMINATION POWER CABLES

16DEC01

22DEC01

16DEC01

22DEC01

23

369

6CCW06357

PUNCHLIST ELECTRICAL & INSTRUM. WORKS

14

14

10JAN02

23JAN02

10JAN02

23JAN02

354

6CCX06394

INSTALL INSTRUMENTATION - BOOSTER PUMPS

14

14

16DEC01

09JAN02

16DEC01

09JAN02

277

6CCX06404

LOOP CHECK

10JAN02

16JAN02

10JAN02

16JAN02

Piping
5,781
0

Raceway & Conduit


6CCU06390

137

Cable & Wire

Instrumentation

Sheet 33 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Pre-Op & No Load Testing


6CCN06317

PREOPERATIONS ACTIVITIES BPS # 2

14

10

09FEB02

18FEB02

02FEB02

11FEB02

-14

80

11

06AUG01A

04JAN02

06AUG01A

04JAN02

26

7,238

SUBSISTEMA 630-10 PIPELINE BOOSTER#2 - BOOSTER#3


Earthwork
6CCB06353

BACKFILL FOR HDPE PIPE

6CCB06360

ENTREGA PLATAFORMA

6CCB06350

CONSTRUCT BERM ANCHORS - 36" CS RECLAIM WATER LN

21

21

14DEC01

14JAN02

07DEC01

07JAN02

14

2,094

6CCB06352

CONSTR BERM ANCHORS - 48" HDPE RECLM WATER LN

20

20

15DEC01

14JAN02

15DEC01

14JAN02

5,620

6CCR26305

SET UP FUSION WELDING STATION 48" (FROM FAC.610)

13JUL01A

13JUL01A

13JUL01A

13JUL01A

6CCR06350

FUS. WELD & INSTALL PIPE 48" HDPE PIPE LINE

90

18

15JUL01A

11JAN02

15JUL01A

11JAN02

6CCR06344

INSTALL PIPE 36" CARB.STEEL RECLAIM WATER LINE

60

04SEP01A

10OCT01A

04SEP01A

10OCT01A

6CCR06346

INSTALL AIR VENTS

28

16NOV01A

19DEC01

16NOV01A

19DEC01

2,310

6CCR06347

PUNCHLIST PIPING

21

21

14DEC01

14JAN02

14DEC01

14JAN02

1,424

6CCR06352

INSTALL AIR VENTS

25

25

14DEC01

18JAN02

10DEC01

14JAN02

12

4,626

6CCR06353

PUNCHLIST PIPING

21

15

04JAN02

18JAN02

20DEC01

14JAN02

12

3,619

6CCR06354

TEST 48" HDPE RECLAIM WATER LINE

15

15

12JAN02

26JAN02

12JAN02

26JAN02

4,656

6CCR06356

PIPING HYDROTEST

14

14

15JAN02

28JAN02

15JAN02

28JAN02

713

25OCT01A

25OCT01A

Piping
614
4

8,000
14,168

Pre-Op & No Load Testing


6CCN06323

PREOPERATIONS ACTIVITIES (HIGH PNT. -> BPS3)

27JAN02

31JAN02

27JAN02

31JAN02

6CCN06322

PREOPERATIONS ACTIVITIES (BPS2 -> HIGH PNT.)

29JAN02

04FEB02

29JAN02

04FEB02

COMPACTED GRAVEL TAIL.RECLAIM LINE-> EXIST.POND

20

06AUG01A

21DEC01

06AUG01A

14DEC01

339

6CCB06610

MASS EXCAVATION PLATF.RECLAIM LINE -> EXIST POND

21

05MAR01A 22NOV01A 05MAR01A 22NOV01A

10,580

6CCB06620

MASS FILL PLATF. RECLAIM LINE-->EXIST POND

28

09APR01A 22NOV01A

09APR01A

22NOV01A

9,863

6CCB06630

PLATFORM FINISHING

12

20NOV01A 06DEC01A 20NOV01A

06DEC01A

736

6CCB06612

CONSTR SAFETY BERM - 40" HDPE RECLM WATER LN

15

15

19DEC01

13JAN02

12DEC01

06JAN02

22

1,016

6CCR06612

INSTALL 40" HDPE RECLAIM WATER LINE

84

02JUL01A

18DEC01

02JUL01A

11DEC01

22

13,361

6CCR06610

FUSION WELD 40" HDPE RECLAIM WATER LINE

35

10JUL01A

20DEC01

10JUL01A

16DEC01

20

3,000

6CCR26605

SET UP FUSION WELDING STATION 40" (SAME AS 650)

01AUG01A 01AUG01A 01AUG01A

6CCR06616

TEST 40" HDPE RECLAIM WATER LINE

20

20

16DEC01

15JAN02

12DEC01

11JAN02

20

287

6CCR06614

INSTALL AIR VENTS

12

12

04JAN02

15JAN02

20DEC01

11JAN02

20

829

6CCR26615

PUNCHLIST 40" PIPE

12

12

16JAN02

27JAN02

12JAN02

23JAN02

313

1,075

SUBSISTEMA 630-14 PIPELINE TO EXISTING POND


Site Development
6CCB0661A

34,704

Earthwork

Piping

Sheet 34 of 76

01AUG01A

72

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

TOP 20A EXISTING TAILING PUMPING & LAGUNA SECA


SISTEMA 610 LAGUNA SECA TAILINGS PIPELINE
SUBSISTEMA 610-01 TAIL COLLECT BOX 610-DI-165
Earthwork
6ACB06138

MASS EXCAVATION PLATFORM TAILING BOX 610-DI-165

18MAR01A 30APR01A 18MAR01A

30APR01A

10,685

6ACB06148

MASS FILL PLATFORM TAILING BOX 610-DI-165

15

02MAY01A 16MAY01A 02MAY01A 16MAY01A

18,580

6ACB06120

EXCAVATE FOR TAILINGS COLLECTION BOX 610-DI-165

14

17MAY01A 20MAY01A 17MAY01A 20MAY01A

10,823

6ACB16123

STRUCT.BACKFILL COLLECTION BOX 610-DI-165

14

08AUG01A

15SEP01A

31,247

6ACG06120

LEAN CONCRETE TAILINGS COLL.BOX 610-DI-165

19MAY01A 20MAY01A 19MAY01A 20MAY01A

4,698

6ACG06130

FORMWORK SLAB ON GRADE TAILING BOX 610-DI-165

22MAY01A

07JUN01A

22MAY01A

07JUN01A

5,525

6ACG06140

REBAR SLAB ON GRADE TAILING BOX 610-DI-165

29MAY01A

06JUN01A

29MAY01A

06JUN01A

3,543

6ACG06150

FORMWORK WALLS TAILING BOX 610-DI-165

21

29MAY01A 07AUG01A 29MAY01A 07AUG01A

2,824

6ACG06160

REBAR WALLS TAILING BOX 610-DI-165

14

31MAY01A 07AUG01A 31MAY01A 07AUG01A

1,258

6ACG06170

PLACE CONCRETE SLAB TAILING BOX 610-DI-165

02JUN01A

08JUN01A

02JUN01A

08JUN01A

655

6ACG06180

PLACE CONCR WALLS $ STRIP FORMS BOX 610-DI-165

21

04JUN01A

09AUG01A

04JUN01A

09AUG01A

2,219

6ACH16121

STEEL PLATFORMS INSTALLATION- COLLECT BOX DI-165

14

17SEP01A

04NOV01A

17SEP01A

04NOV01A

1,388

6ACH16131

STEEL PLATFORM PUNCHLIST-COLLECTION BOX DI-165

29NOV01A

15DEC01

29NOV01A

10DEC01

6ACR06145

INSTALL PIPE SUPPORTS BOX 610-DI-165

28

20AUG01A 03NOV01A 20AUG01A

03NOV01A

568

6ACR26120

INSTALL 2 RED. 54"X48" RUBBER LINED

28

15SEP01A

15SEP01A

04NOV01A

295

6ACR16165

DI165 UFLOW 48" HDPE&DRAINAGE HDPE20" TO E.POND

14

05OCT01A 14OCT01A 05OCT01A

14OCT01A

884

6ACR06155

INSTALL & FUSION 48" HDPE PIPE TO EMERGENCY POND

10

24OCT01A 14NOV01A 24OCT01A

14NOV01A

119

6ACR06165

INSTALL & FUSION 20" HDPE PIPE TO EMERGENCY POND

10

31OCT01A 14NOV01A 31OCT01A

14NOV01A

119

6ACR06125

INSTALL 2 54" WEDGE VALVES-TAIL.COLL.BOX DI-165

14

13NOV01A 15NOV01A 13NOV01A

15NOV01A

498

6ACR06185

PUNCHLIST PIPING TO EMERGENCY POND

13NOV01A 16NOV01A 13NOV01A

16NOV01A

119

6ACR06175

INSTALL HDPE < 20" PIPE BOX 610-DI-165

10

20NOV01A 23NOV01A 20NOV01A

23NOV01A

119

6ACR06135

PUNCHLIST PIPING ARROUND TAILING BOX 610-DI-165

14

26NOV01A 14DEC01A 26NOV01A

10DEC01

208

COMPACTED GRAVEL DI165->TAILS DISTRIBUTOR DI171

20

01NOV01A

16DEC01

01NOV01A

09DEC01

6ACB06142

MAS EXCAVATION ROAD &PIPE PLATFORM DI165->DI171

60

12FEB01A

10APR01A

12FEB01A

10APR01A

49,683

6ACG16144

MASS FILL PIPING AND ROAD PLATFORM

35

21FEB01A

19APR01A

21FEB01A

19APR01A

22,033

15SEP01A

08AUG01A

Concrete

Structural Steel

417

Piping

04NOV01A

SUBSISTEMA 610-02 TAIL PIPELINE#1 TO 620-DI-171


Site Development
6ACB06144

344

985

Earthwork

Sheet 35 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Piping
6ACR06105

SET UP FUSION WELDING STATION (LINE #1)

05MAY01A 15MAY01A 05MAY01A 15MAY01A

6ACR06120

FUS. WELD 48" HDPE TAILS DISP. LINE 1 (goto 630)

80

05MAY01A 01AUG01A 05MAY01A 01AUG01A

5,499

6ACR06122

INSTALL 48" HDPE TAILINGS DISPOSAL LINE 1

80

10MAY01A 01SEP01A

10MAY01A

01SEP01A

9,054

6ACR06134

PUNCHLIST LINE 1

14

06NOV01A 24NOV01A 06NOV01A

24NOV01A

828

6ACR06128

TIE-IN 48" TAILS DISPOSAL LINE 1->DISTRIB.BOX171

14NOV01A 14NOV01A 14NOV01A

14NOV01A

328

6ACR06126

TIE-IN 48" TAILS DISPOSAL LINE 1->COLLECT BOX165

15NOV01A 15NOV01A 15NOV01A

15NOV01A

327

25

27NOV01A 06DEC01A 27NOV01A

05DEC01A

Pre-Op & No Load Testing


6ACR06124

TEST 48" HDPE TAILINGS DISPOSAL LINE 1

SISTEMA 620
SUBSISTEMA 620-01 TAILINGS IMPOUNDMENT DAM
Earthwork
6BCB06219

CONSTRUCT BASE - TAILINGS STARTER DAM & DIKE

100

20JAN01A

23OCT01A

20JAN01A

23OCT01A

27,643

6BCB06221

CONSTRUCT EMBANKMENT - TAILINGS STARTER DAM

170

15APR01A 07NOV01A

15APR01A

07NOV01A

54,862

14DEC01

17DEC01

07DEC01

10DEC01

60

12FEB01A

20AUG01A

12FEB01A

20AUG01A

81,857

100

24MAY01A 07DEC01A

24MAY01A 30NOV01A

2,113

Mechanical Equipment
6BCN06210

PORTABLE HYDRAULIC POWER PACK

343

260

SUBSISTEMA 620-03 BARGE DYKE & RECLAIM POND


Earthwork
6BCB06217

CLEAR & GRUB - TAILINGS STARTER DAM & DIKE

SISTEMA 621
SUBSISTEMA 621-01 MAIN DISTRIB BOX 620-DI-171
Site Development
6BCA06200

MISCELL.SITE DEVELOP. FOR LS IMPOUNDMENT/DISTRIB

Earthwork
6BCB16267

MASS EXCAVATION MAIN TAILINGS DISTRIB BOX DI171

10APR01A

13MAY01A 10APR01A

13MAY01A

294

6BCB16257

MASS FILL MAIN TAILINGS DISTRIB BOX DI171

14MAY01A 18MAY01A 14MAY01A 18MAY01A

498

6BCB06226

EXCAVATE FOR MAIN TAIL.DISTRIB BOX DI171 FOUNDS

28MAY01A 30MAY01A 28MAY01A 30MAY01A

36,575

6BCB06228

BACKFILL MAIN TAILINGS DISTRIB BOX DI-171 FOUND.

30

05SEP01A

05SEP01A

13NOV01A

505

6BCB96211

CUT & FILL EARTH DRAINAGE TO IMPOUNDMENT

14

09NOV01A 28NOV01A 09NOV01A

28NOV01A

25,302

6BCG06224

LEAN CONCRETE MAIN TAILS DISTRIB BOX 171

10JUN01A

11JUN01A

10JUN01A

11JUN01A

2,105

6BCG06264

REBAR FLOOR SLABS MAIN TAILS BOX 171

18JUN01A

20JUN01A

18JUN01A

20JUN01A

309

6BCG06226

FORMWORK FLOOR SLABS MAIN TAILS BOX 171

19JUN01A

19JUN01A

19JUN01A

19JUN01A

1,176

6BCG06284

PLACE CONCRETE FLOOR SLABS MAIN TAILS BOX 171

21JUN01A

21JUN01A

21JUN01A

21JUN01A

139

6BCG06274

REBAR WALLS & TRENCH TAILS BOX 171

20

22JUN01A

01SEP01A

22JUN01A

01SEP01A

309

6BCG06244

FORMWORK WALLS $ TRENCH TAILS BOX 171

20

23JUN01A

22SEP01A

23JUN01A

22SEP01A

1,108

6BCG06294

PLACE CONCRETE WALLS & STRIP FORMS BOX 171

25

15JUL01A

22SEP01A

15JUL01A

22SEP01A

793

13NOV01A

Concrete

Sheet 36 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6BCG06296

INSTALL 56" PIPE INSERT IN WALL

20AUG01A 21AUG01A 20AUG01A

21AUG01A

1,162

6BCG06306

REPAIR FLANGES 56"

21SEP01A

21SEP01A

19OCT01A

6BCH96201

INST.PLATFORMS - MAIN TAILS DISTR BOX 171

14

10OCT01A 23NOV01A 10OCT01A

23NOV01A

1,008

6BCH96221

PUCH LIST PLATFORMS DISTRIB. BOX 171

24NOV01A 13DEC01A 24NOV01A

08DEC01

504

6BCR06237

INSTALL PIPE SUPPORTS BOX DI-171

14

03OCT01A 22NOV01A 03OCT01A

22NOV01A

416

6BCR06247

INSTALL OVERFLOW PIPING 14" BOX DI171

20NOV01A 28NOV01A 20NOV01A

28NOV01A

637

6BCR06257

INSTALL OVERFLOW PIPING 48" BOX DI 171

20NOV01A 29NOV01A 20NOV01A

29NOV01A

388

6BCR06267

PUNCHLIST PIPES BOX DI-171

27NOV01A 13DEC01A 27NOV01A

08DEC01

100

INST.VALVES HV005/006- MAIN TAILS DISTR BOX 171

28NOV01A 29NOV01A 28NOV01A

29NOV01A

372

19OCT01A

Structural Steel

Piping

Instrumentation
6BCR06227

SUBSISTEMA 621-02 DROP BOXES & LINE->620-DI-172


Site Development
6BCB16271

PLATFORMS FINISHINGS DROP BOX 620-TK-105@107

14

02JUL01A

15JUL01A

02JUL01A

15JUL01A

3,340

6BCB16251

CRUSHED ROCK GRANULAR BASE ROADS DBOX TK105@107 25

24SEP01A

19OCT01A

24SEP01A

19OCT01A

4,747

6BCB16281

INSTALL CORRUG. CULVERT MP68 15C68(DITCH INTER.)

31OCT01A 02NOV01A 31OCT01A

02NOV01A

6,797

6BCB16291

MASS EXCAVATION -TAILINGS DISTR BOX TK105@107

05MAY01A

03JUN01A

05MAY01A

03JUN01A

257

6BCB16261

MASSFILL -PLATFORMS DISTR DROP BOX TK105@107

14

14MAY01A

10JUL01A

14MAY01A

10JUL01A

182,442

6BCB26205

BACKFILL DROP BOXES 620-TK-105@107

14

01SEP01A

07SEP01A

01SEP01A

07SEP01A

2,179

6BCB26245

BACKFILL EARTH ANCHORS ON 54" HDPE PIPE

15

10SEP01A

22SEP01A

10SEP01A

22SEP01A

268,980

6BCB26215

STRUCTURAL EXCAVATION CULVERT (DITCH INTERCEP.)

20OCT01A 31OCT01A 20OCT01A

31OCT01A

12,229

6BCB26225

SAND BEDDING CULVERT (DITCH INTERCEP.)

31OCT01A 01NOV01A 31OCT01A

01NOV01A

71

6BCB26235

STRUCTURAL BACKFILL CULVERT (DITCH INTERCEP.)

02NOV01A 09NOV01A 02NOV01A

09NOV01A

5,946

6BCG06228

LEAN CONCRETE DROP BOXES TK-105@107

13JUL01A

17JUL01A

13JUL01A

17JUL01A

176

6BCG06230

FORMWORK FOOTING DROP BOXES TK-105@107

14

17JUL01A

20JUL01A

17JUL01A

20JUL01A

1,287

6BCG06240

REBAR FOOTING DROP BOXES TK-105@107

20JUL01A

21JUL01A

20JUL01A

21JUL01A

309

6BCG06250

PLACE CONCRETE FOOTING DROP BOXES TK-105@107

12

27JUL01A

05AUG01A

27JUL01A

05AUG01A

418

6BCG06260

FORMWORK BODY DROP BOXES TK105@107

14

06AUG01A 19AUG01A 06AUG01A

19AUG01A

423

6BCG06270

REBAR BODY DROP BOXES TK-105@107

14

13AUG01A 22AUG01A 13AUG01A

22AUG01A

309

6BCG06232

PLACE CONCR & STRIP FORMS, BODY BOXES TK-105@107

14

18AUG01A

22SEP01A

18AUG01A

22SEP01A

731

6BCG06242

INSTALL GUIDE WITH MK-01 EMBED FOR 54" PIPE

10

24AUG01A

15SEP01A

24AUG01A

15SEP01A

2,905

INSTALL PIPE SUPPORTS DROP BOXES 620-TK-105@107

12

01OCT01A 20OCT01A 01OCT01A

20OCT01A

794

Earthwork

Concrete

Piping
6BCR06246

Sheet 37 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6BCR06226

SETUP FUS. WELD. STATION #2 (FROM NORTH BRANCH)

15OCT01A 19OCT01A 15OCT01A

19OCT01A

44

6BCR06216

FUSION WELDING HDPE PIPE BETWEEN DROP BOXES

20OCT01A 02NOV01A 20OCT01A

02NOV01A

631

6BCR06276

INSTALL 54" HDPE PIPE BETWEE. BOX 620-TK-105@107

31OCT01A 14DEC01A 31OCT01A

08DEC01

480

6BCR06236

54" CS TEE AT EACH BOX 620-TK-105@107

07NOV01A 06DEC01A 07NOV01A

22NOV01A

52

6BCR06296

INSTALL VENTS 14" PIPE BOXES TK-105@107

21NOV01A 14DEC01A 21NOV01A

08DEC01

423

6BCR06217

PUNCH LIST PIPING (BOXES TK-105@107)

12DEC01A

06DEC01A

10DEC01

12DEC01A 12DEC01A

11DEC01

15DEC01

15DEC01

345

248

Pre-Op & No Load Testing


6BCR06306

TEST 54" PIPE BOXES TK-105@107

SUBSISTEMA 621-03 DISTRIB BOX 620-DI-170


Earthwork
6BCB16268

MASS EXCAVATION TAILINGS DISTR BOX 170

25APR01A

23MAY01A 25APR01A

23MAY01A

295

6BCB16258

MASS FILL PLATFORM TAILINGS DISTR BOX 170

03JUN01A

12JUN01A

03JUN01A

12JUN01A

109,212

6BCB16245

EXCAVATE FOR DISTRIB BOX 620-DI-170

10JUL01A

15JUL01A

10JUL01A

15JUL01A

16,160

6BCB16247

BACKFILL DISTRIBUTION BOX 620-DI-170

16

02OCT01A 11NOV01A 02OCT01A

11NOV01A

4,875

6BCB16277

CUT & FILL EARTH DRAINAGE TO IMPOUNDMENT

25

10NOV01A 16NOV01A 10NOV01A

16NOV01A

59,442

6BCG16248

LEAN CONCRETE DISTRIB BOX DI 170

16JUL01A

05AUG01A

16JUL01A

05AUG01A

105

6BCG16278

REBAR FLOOR SLABS DISTRIB BOX DI-170

10

16JUL01A

15AUG01A

16JUL01A

15AUG01A

309

6BCG16258

FORMWORK FLOOR SLABS DISTRIB BOX DI-170

10

18JUL01A

10AUG01A

18JUL01A

10AUG01A

2,261

6BCG16268

FORMWORK WALLS $ TRENCH DISTRIB BOX DI -170

14

25JUL01A

20SEP01A

25JUL01A

20SEP01A

2,233

6BCG16288

PLACE CONCRETE FLOOR SLABS DISTRIB BOX DI-170

26JUL01A

30JUL01A

26JUL01A

30JUL01A

127

6BCG16298

REBAR WALLS $ TRENCH DISTRIB BOX DI-170

28

01AUG01A 15AUG01A 01AUG01A

15AUG01A

307

6BCG16249

PLACE CONCRETE WALLS & STRIP FORMS BOX DI-170

28

16AUG01A

16AUG01A

22SEP01A

1,398

6BCG16238

INSTALL 56" PIPE INSERT IN WALL

20AUG01A 07NOV01A 20AUG01A

07NOV01A

1,162

6BCH96202

INSTALL PLATFORMS - DISTRIB BOX 620-DI-170

20

08OCT01A 22NOV01A 08OCT01A

22NOV01A

1,008

6BCH96212

PUNCHLIST PLATFORMS DI-170

12

21NOV01A 12DEC01A 21NOV01A

09DEC01

504

6BCR06238

INSTALL PIPE SUPPORTS BOX DI-170

18

25OCT01A 22NOV01A 25OCT01A

22NOV01A

416

6BCR06268

INSTALL OVERFLOW PIPING 48" BOX DI-170

10

20NOV01A

20NOV01A

08DEC01

6BCR06278

PUNCHLIST PIPES BOX DI-170

21NOV01A 12DEC01A 21NOV01A

08DEC01

348

INSTALL VALVES HV0010/0011-0012/0013/ BOX DI170

20NOV01A 30NOV01A 20NOV01A

30NOV01A

373

Concrete

22SEP01A

Structural Steel

Piping

16DEC01

344

637

Instrumentation
6BCR06228

SUBSISTEMA 621-07 DIST RING PIPELINE & SPIGOTS


Site Development
6BCB0622B

CRUSHED GRAVEL TAIL.DISTRIB.RING - SOUTH BRANCH

30

12OCT01A 30NOV01A 12OCT01A

30NOV01A

12,567

6BCB16282

INSTALL CORRUG. CULVERT MP68 12C68(DITCH INTER.)

12NOV01A 16NOV01A 12NOV01A

16NOV01A

13,588

Sheet 38 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Earthwork
6BCB06231

MASS EXCAVATION FOR ROW - SOUTH BRANCH

155

29MAR01A 14NOV01A 29MAR01A 14NOV01A

55,219

6BCB06251

MASS FILL FOR ROW & PIPE BASE - SOUTH BRANCH

155

16APR01A 14NOV01A

16APR01A

14NOV01A

166,461

6BCB06255

EXCAVATE FOR DISTRIBUTION BOX 1 @ 20

155

10JUN01A

03NOV01A

10JUN01A

03NOV01A

28,660

6BCB16236

CONSTR BERM ANCHORS - TAILS DISTRIB

110

03AUG01A

17DEC01

03AUG01A

08DEC01

6BCB06235

EXCAVATE FOR EARTH DITCHES - SOUTH BRANCH

150

12AUG01A 08DEC01A 12AUG01A

08DEC01

6BCB06265

BACKFILL FOR DISTRIBUTION BOX 1 @ 20

80

24AUG01A 14NOV01A 24AUG01A

14NOV01A

7,353

6BCB26216

STRUCTURAL EXCAVATION CULVERT (DITCH INTERCEP.)

03NOV01A 12NOV01A 03NOV01A

12NOV01A

12,710

6BCB26236

STRUCTURAL BACKFILL CULVERT (DITCH INTERCEP.)

14NOV01A 16NOV01A 14NOV01A

16NOV01A

2,362

6BCG16246

LEAN CONCRETE DISTRIBUTION BOX 1@ 4

10JUL01A

16JUL01A

10JUL01A

16JUL01A

17

6BCG96304

FORMWORK IDISTRIBUTION BOX 1@4

10

17JUL01A

21JUL01A

17JUL01A

21JUL01A

528

6BCG96314

REBAR DISTRIBUTION BOX 1 @ 4

14

19JUL01A

21JUL01A

19JUL01A

21JUL01A

309

6BCG96294

PLACE CONCRETE & STRIP FORMS DISTRIB BOX 1@4

18

20JUL01A

31JUL01A

20JUL01A

31JUL01A

615

6BCG96324

LEAN CONCRETE DISTRIBUTION BOX 5 @ 8

20

23JUL01A

03AUG01A

23JUL01A

03AUG01A

14

6BCG96334

FORMWORK DISTRIBUTION BOX 5 @ 8

20

27JUL01A

08AUG01A

27JUL01A

08AUG01A

528

6BCG96344

REBAR DISTRIBUTION BOX 5 @ 8

30

01AUG01A 15AUG01A 01AUG01A

15AUG01A

309

6BCG96306

LEAN CONCRETE DISTRIBUTION BOX 9 @ 12

20

06AUG01A 06OCT01A 06AUG01A

06OCT01A

14

6BCG96296

PLACE CONCRETE & STRIP FORMS DISTRIB BOX 5 @ 8

20

10AUG01A

10AUG01A

15SEP01A

374

6BCG96336

PREFABRIC DISTRIBUTION BOX 9 @ 20

75

25AUG01A 10OCT01A 25AUG01A

10OCT01A

6BCG96298

INSTALL DISTRIB BOX 9@ 12

20

20SEP01A

20SEP01A

09OCT01A

1,716

6BCG96308

LEAN CONCRETE DISTRIBUTION BOX 13@16

24

02OCT01A 31OCT01A 02OCT01A

31OCT01A

352

6BCG96299

INSTALL DISTRIB BOX 13 @ 16

15

08OCT01A 04NOV01A 08OCT01A

04NOV01A

1,739

6BCG96309

LEAN CONCRETE DISTRIBUTION BOX 17@20

18

23OCT01A 06NOV01A 23OCT01A

06NOV01A

754

6BCG96295

INSTALL DISTR BOX 17 @ 20

14

25OCT01A 10NOV01A 25OCT01A

10NOV01A

2,139

6BCH96294

INSTALL STRUCT.STEEL DISTR. BOX 1@4

25OCT01A 13NOV01A 25OCT01A

13NOV01A

324

6BCH96296

INSTALL STRUCT.STEEL DISTR. BOX 5@8

01NOV01A 15NOV01A 01NOV01A

15NOV01A

324

6BCH96298

INSTALL STRUC.STEEL DISTR. BOX 9@12 (50% COMPL)

11NOV01A 16NOV01A 11NOV01A

16NOV01A

324

6BCH96299

INSTALL STR.STEEL DISTR. BOX 13@16

13NOV01A 15DEC01A 13NOV01A

22NOV01A

324

6BCH96295

INSTALL STR.STEEL DISTR. BOX 20@17

20NOV01A

17DEC01

20NOV01A

08DEC01

343

324

6BCH96305

PUNCHLIST STRUCTURE SOUTH BRANCH

04DEC01A

18DEC01

09DEC01

12DEC01

-1

331

125

01JUN01A

15SEP01A

01JUN01A

15SEP01A

30,070

02JUN01A

04JUN01A

02JUN01A

04JUN01A

89

120

05JUN01A

15SEP01A

05JUN01A

15SEP01A

19,181

13,446
74,248

Concrete

15SEP01A

09OCT01A

Structural Steel

Piping
6BCR06286

INSTALL 54" HDPE TAILS DISTR DISTR BOX 1@12 -W#1

6BCR06282

SET UP FUSION WELDING STATION 54" #1 [WM2]

6BCR06284

FUSION WELD 54" HDPE TAILS DISTR BOX 1@12 - W/#1

Sheet 39 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6BCR16227

INSTALL VENTS (60) - DISTR BOX 1@12 - W/#1

90

01AUG01A 07DEC01A 01AUG01A

01NOV01A

377

6BCR06283

SET UP FUS. WELD. 54" #2 (FROM DROP BOXES)[WM3]

01SEP01A

01OCT01A

01SEP01A

01OCT01A

89

6BCR06285

FUSION WELD 54" HDPE TAILS DISTR LINE-SOUTH W/#2

50

16SEP01A

11NOV01A

16SEP01A

11NOV01A

1,051

6BCR06281

FUSION WELD 54" HDPE TAILS DISTR BOX 13@END-W/#1

65

20SEP01A

12DEC01A

20SEP01A

06DEC01A

1,138

6BCR06289

INSTALL 54" HDPE TAILS DISTR BOX 13@END -W#1

65

20SEP01A

12DEC01A

20SEP01A

06DEC01A

12,354

6BCR86294

RUBBER LINED TEES 54" X 36" DISTR BOX 1@4

22SEP01A

01NOV01A

22SEP01A

01NOV01A

113

6BCR86296

RUBBER LINED TEES 54" X 36" DISTR BOX 5@8

10OCT01A 13NOV01A 10OCT01A

13NOV01A

6BCR06287

INSTALL 54" HDPE TAILS DISTR LINE - SOUTH W/#2

50

16OCT01A 11NOV01A 16OCT01A

11NOV01A

8,984

6BCR06290

INSTALL 54" GATE VALVE DISTR BOX #4

05NOV01A 06NOV01A 05NOV01A

06NOV01A

49

6BCR86298

RUBBER LINED TEES 54" X 36" DISTR BOX 9@12

06NOV01A 13NOV01A 06NOV01A

13NOV01A

113

6BCR06299

INSTALL 54" GATE VALVE DISTR BOX #12 (50% COMPL)

07NOV01A 08NOV01A 07NOV01A

08NOV01A

49

6BCR16228

INSTALL VENTS (24) - SOUTH W/#2

35

07NOV01A 13DEC01A 07NOV01A

10NOV01A

1,377

6BCR96294

INSTALL IMPOUND PIPING HDPE 40" DISTR BOX 1@4

07NOV01A 03DEC01A 20OCT01A

28OCT01A

286

6BCR86299

RUBBER LINED TEES 54" X 36" DISTR BOX 13@16 (TA)

08NOV01A 09NOV01A 08NOV01A

09NOV01A

113

6BCR06291

INSTALL 54" GATE VALVE DISTR BOX #16

09NOV01A 10NOV01A 09NOV01A

10NOV01A

314

6BCR06297

INSTALL 54" GATE VALVE DISTR BOX #8

09NOV01A 10NOV01A 09NOV01A

10NOV01A

49

6BCR06316

DESPACHO SUMINISTRO DESDE STGO 54"

50

09NOV01A 03DEC01A 09NOV01A

07DEC01

6BCR96296

INSTALL IMPOUND PIPING HDPE 40" DISTR BOX 5@8

19NOV01A 23NOV01A 19NOV01A

23NOV01A

286

6BCR96298

INSTALL IMPOUND PIPING HDPE 40" DISTR BOX 9@12

20NOV01A 05DEC01A 20NOV01A

22NOV01A

286

6BCR96299

INSTALL IMPOUND PIPING HDPE 40" DISTR BOX 13@16

21NOV01A 06DEC01A 21NOV01A

20NOV01A

286

6BCR16287

PUNCHLIST PIPING - DISTR BOX 1@12 - W/#1

15

29NOV01A 14DEC01A 29NOV01A

10DEC01

846

6BCR16205

PUNCHLIST PIPING - DISTR BOX 13@END (DT)

30NOV01A 14DEC01A 30NOV01A

07DEC01

9,473

6BCR86295

RUBBER LINED TEES 54" X 36" DISTR BOX 20@17 (DT)

04DEC01A 14DEC01A 04DEC01A

11DEC01

113

6BCR96295

INSTALL IMPOUND PIPING HDPE 40" DISTR BOX 20@17

04DEC01A 13DEC01A 04DEC01A

10DEC01

286

6BCR06288

TEST 54" HDPE TAILS DISTR LINE - SOUTH

34

06DEC01A 14DEC01A 06DEC01A

16DEC01

2,031

6BCR16229

INSTALL VENTS (60) - DISTR BOX 13@END - W/#1

35

14DEC01A

08DEC01

INSTRUM. FOR LS IMPOUND./DISTR. FIRST SECTION

20

07NOV01A 14DEC01A 07NOV01A

08DEC01

07DEC01

Instrumentation
6BCX06205

Pre-Op & No Load Testing


6BCR06234

PREOPERATIONS ACTIVITIES SOUTH BRANCH FIRST SECT

13DEC01A

15DEC01

11DEC01

16DEC01

-5

6BCR06224

PREOPERATIONS ACTIVITIES SOUTH BRANCH (DT)

19DEC01

20DEC01

17DEC01

22DEC01

-1

14

SISTEMA 640 EXISTING TAILINGS PUMPING MODS


SUBSIST 640-01 EXIST & MOD TAIL PUMP SEAL WATER
Mechanical Equipment
6DCN06461

INSTALL SEAL PUMPS 640-PP-213&214

16OCT01A 30OCT01A 16OCT01A

Sheet 40 of 76

30OCT01A

349

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

SUBSIST 640-02 EXISTING TAIL INSTRUM AIR MODIF


Mechanical Equipment
6DCN06474

INSTALL AIR VESSEL 640-VS-031

17OCT01A 31OCT01A 17OCT01A

31OCT01A

332

6DCN06455

INSTALL AIR DRIER 640-DR-008

28OCT01A 30OCT01A 28OCT01A

30OCT01A

360

SUBSISTEMA 640-03 TAIL DISCHARGE PUMP ST ER-310


Site Development
6DCA06420

BLOCKWORK FOR TRANSFORMERS

14

14JUN01A

25AUG01A

14JUN01A

25AUG01A

1,300

6DCA06410

INSTALL FENCING AROUND ELECT ROOM/XFRMRS

15

08NOV01A 27NOV01A 08NOV01A

27NOV01A

983

Earthwork
6DCB06410

EXCAVATE FOR ELECT ROOM/XFRMR FOUNDATIONS

20MAY01A 24MAY01A 20MAY01A 24MAY01A

3,512

6DCB06404

RECONSTRUCT PLATFORM FOR 69 KV SWITCHING STATION

14

29MAY01A 31MAY01A 29MAY01A 31MAY01A

486

6DCB06412

BACKFILL ELECT ROOM FOUNDATIONS

27JUN01A

03JUL01A

27JUN01A

03JUL01A

767

6DCG06412

LEAN CONCRETE ELEC ROOM AND TRANSF FOUNDATION

25APR01A

30APR01A

25APR01A

30APR01A

277

6DCG06422

FORMWORK ELC ROOM AND TRANSF FOUNDAT

28

10MAY01A 27MAY01A 10MAY01A 27MAY01A

3,381

6DCG06432

PLACE CONCRETE ELEC ROOM AND TRANF FOUNDAT

21

10MAY01A 31MAY01A 10MAY01A 31MAY01A

1,402

6DCG06442

REBAR ELEC ROOM AND TRANSF FOUNDAT

14

28MAY01A

12JUN01A

28MAY01A

12JUN01A

2,236

6DCG06452

LEAN CONCRETE YARD STRUCTURES

01JUN01A

25JUL01A

01JUN01A

25JUL01A

298

6DCG06462

FORMWORK YARD STRUCTURE

21

10JUN01A

31JUL01A

10JUN01A

31JUL01A

1,410

6DCG06472

REBAR YARD STRUCTURE

14

15JUN01A

10AUG01A

15JUN01A

10AUG01A

1,906

6DCG06482

PLACE CONCRETE YARD STRUCTURE

21

24JUN01A

20AUG01A

24JUN01A

20AUG01A

261

6DCH06414

INSTALL 69KV YARD STRUCTURAL STEEL

21

18JUL01A

16SEP01A

18JUL01A

16SEP01A

1,974

6DCH06424

POLES FOR GROUDING AIR ON SITE

06NOV01A 07NOV01A 06NOV01A

07NOV01A

Concrete

Structural Steel

Electrical Equipment
6DCT06466

TRANSFORMER ON SITE

23AUG01A

22SEP01A

23AUG01A

22SEP01A

6DCT06416

INSTALL TRANSFORMER 0640-XF-641

14

01SEP01A

15SEP01A

01SEP01A

15SEP01A

617

6DCT06476

DISCONNET ON SITE

21SEP01A

21SEP01A

6DCT06412

INSTALL 69 KV DISCONNECT 0640-SW-641

16OCT01A 09NOV01A 16OCT01A

09NOV01A

95

6DCT06428

INSTALL TRANSFORMER 0640-JX-642

16OCT01A 09NOV01A 16OCT01A

09NOV01A

617

6DCT06414

INSTALL BREAKER 0640-CB-641

14

23OCT01A 12NOV01A 23OCT01A

12NOV01A

617

6DCT06490

LIGHTING ARRESTERS (0640-VL-610A/B/C)

21

23OCT01A 12NOV01A 23OCT01A

12NOV01A

1,006

6DCT06446

ELECTRIC ROOM ER-310 ON SITE

29OCT01A

29OCT01A

6DCT06424

INSTALL PREFABRICATED E. ROOM 0640-ER-310

31OCT01A 01NOV01A 31OCT01A

01NOV01A

369

6DCT06418

INSTALL BUS DUCT 0640-BD-641

14

01NOV01A 14NOV01A 01NOV01A

14NOV01A

617

6DCT06422

INSTALL GROUND RESISTOR 0640-GR-641

06NOV01A 09NOV01A 06NOV01A

09NOV01A

15

Sheet 41 of 76

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Activity
ID

Activity
Description

6DCT06426

INSTALL SWITCHGEAR 0640-SG-641

06NOV01A 12NOV01A 06NOV01A

12NOV01A

693

6DCT06434

INSTALL EQUIPMENT AIR CONDICION

06NOV01A 15NOV01A 06NOV01A

15NOV01A

6DCT06438

MISC ELECT TESTING OF ELECT ROOM EQUIP

14

06NOV01A

07DEC01

897

6DCT06458

INSTALL POLES/LIGHTING AND LIGHTNING

15

06NOV01A 30NOV01A 06NOV01A

30NOV01A

6DCT06436

INSTALL UPS SYSTEM INSIDE ELECTRICAL ROOM

07NOV01A 14NOV01A 07NOV01A

14NOV01A

264

6DCT06448

LIGHTING EQUIPMENTS ON SITE

07NOV01A

07NOV01A

6DCT06468

INSTALL SUPPORT AND BAR DUCK

20NOV01A 22NOV01A 20NOV01A

22NOV01A

16DEC01

06NOV01A

Raceway & Conduit


6DCU06430

INSTALL CABLE TRAY/CONDUIT OUTSIDE ELECT ROOM

28

20JUL01A

14NOV01A

20JUL01A

14NOV01A

12,541

6DCU06432

INSTALL CABLE TRAY/CONDUIT INSIDE ELECT ROOM

07NOV01A 13NOV01A 07NOV01A

13NOV01A

3,793

6DCW06420

INSTALL GROUNDING FOR ELECTRICAL ROOM

14

01JUN01A

01JUN01A

12NOV01A

2,397

6DCW06458

INSTALL CABLE/TERMINATE OUTSIDE ELECTRICAL ROOM

25

15OCT01A 30NOV01A 15OCT01A

30NOV01A

16,911

6DCW06434

INSTALL CABLE/TERMINATE INSIDE ELECT ROOM

19

02NOV01A 30NOV01A 02NOV01A

30NOV01A

3,128

6DCW06444

PUNCHLIST CABLE/TERMINATE

11

27NOV01A 15DEC01A 27NOV01A

09DEC01

2,810

6DCX06420

INSTALL PLC/DCS INSIDE ELECTR. ROOM 640-ER-310

12NOV01A 12NOV01A 12NOV01A

12NOV01A

108

6DCX06425

COMPLETE DCS INSTALLAT - TRAINS A/B (640-ER-310)

03DEC01A 14DEC01A 03DEC01A

12DEC01

539

12NOV01A 12NOV01A 12NOV01A

12NOV01A

03DEC01A 04DEC01A 04DEC01A

13DEC01

20

15AUG01A 22AUG01A 15AUG01A

22AUG01A

732

Cable & Wire


12NOV01A

Instrumentation

Electrical Installation
6DCX06435

Connection 69Kv Line/from 3.5 to ER-310-Train B

Pre-Op & No Load Testing


6DCT06456

ENERGIZE ELECTRICAL ROOM

SUBSISTEMA 640-04 TAIL PUMP STAT OVERHEAD CRANE


Mechanical Equipment
6DCN06410

BRIDGE CRANE 640-CN-017 INSTALLATION

SUBSIST 640-06 TAIL PUMPING PROCESS WATER DISTR


Piping
6DCR06434

INSTALL PIPING/VALVES- PROCESS WATER LINES

30

15SEP01A

01NOV01A

15SEP01A

01NOV01A

3,968

6DCR06516

MATERIAL ARRIVAL - PROCESS LINES

30

15SEP01A

20OCT01A

15SEP01A

20OCT01A

6DCR06442

INSTALL PIPING SUPPORTS EXISTING PLANT

15

01OCT01A 03NOV01A 01OCT01A

03NOV01A

1,277

6DCR06432

INSTALL PIPING SUPPORTS PUMP STATION AREA

30

16OCT01A 06NOV01A 16OCT01A

06NOV01A

1,350

SUBSISTEMA 640-07 TAILINGS PUMPING TRAIN B


Mechanical Equipment
6DCN06435

INSTALL PUMP/MTR 640-PP-205 - TRAIN B

10OCT01A 07NOV01A 10OCT01A

07NOV01A

494

6DCN06440

INSTALL PUMP/MTR 640-PP-206 - TRAIN B

10OCT01A 08NOV01A 10OCT01A

08NOV01A

494

6DCN06445

INSTALL PUMP/MTR 640-PP-207 - TRAIN B

10OCT01A 09NOV01A 10OCT01A

09NOV01A

494

6DCN06450

INSTALL PUMP/MTR 640-PP-208 - TRAIN B

10OCT01A 06NOV01A 10OCT01A

06NOV01A

2,622

Sheet 42 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6DCN06460

VENDOR REP REQUIRED FOR PUMPS

20

01NOV01A 13NOV01A 01NOV01A

13NOV01A

13

6DCN16415

PUMP/MTR 205@208 ALIGNMENT AND GROUT TRAIN B

02NOV01A 11NOV01A 02NOV01A

11NOV01A

501

6DCN26415

PUMP/MTR 640-PP-205@208 FINAL ALIGNMENT TRAIN B

11NOV01A 13NOV01A 11NOV01A

13NOV01A

501

6DCR06412

INST. PIPING/VALVES - AIR F. EXIST PLANT TRAIN B

15

12SEP01A

12SEP01A

14NOV01A

197

6DCR16418

INSTLL PIPING/VALVES - TRAIN B PANT

14

16OCT01A 06DEC01A 16OCT01A

06DEC01A

173

6DCR06418

INSTLL PIPING/VALVES - TRAIN B CERAMIC

15

30OCT01A 09NOV01A 30OCT01A

09NOV01A

509

6DCR06410

INST 36" PIPE-EXIST TANK->PUMP ST TRAIN B

10

12NOV01A 14DEC01A 12NOV01A

03DEC01A

53

6DCR06422

INSTLL PIPING/VALVES - TRAIN B->HDPE DISP LINES

12NOV01A 16NOV01A 12NOV01A

16NOV01A

2,531

6DCR06426

INSTLL PIPING/VALVES-TRAINS B-> 640-SU-011

12NOV01A 07DEC01A 12NOV01A

05DEC01A

873

6DCR06496

PIPE TESTING PROCESS PIPE ( AIR/WATER) TRAIN B

10

13NOV01A 20NOV01A 13NOV01A

20NOV01A

624

6DCR06506

PUNCHLIST PROCESS PIPE( AIR/WATER) TRAIN B

15

28NOV01A 15DEC01A 28NOV01A

10DEC01

624

6DCR06436

PIPE TESTING EXIST TANKS TO PUMP ST. TRAIN B

05DEC01A

05DEC01A

11DEC01

6DCR06446

PUNCH LIST EXIST TANK TO PUMP STATION TRAIN B

13DEC01A 15DEC01A 05DEC01A

10DEC01

6DCR06466

PUNCHLIST PUMP STATION TRAIN B

13DEC01A

14DEC01

05DEC01A

10DEC01

-5

911

6DCR06456

PIPE TESTING PUMP STATION TRAIN B

14DEC01A

15DEC01

05DEC01A

12DEC01

345

701

12NOV01A

Piping
14NOV01A

14DEC01

146

25
592

Raceway & Conduit


6DCU06462

INSTALL POWER AND CONTROL CONDUIT TRAIN B

21

03JUL01A

03JUL01A

12NOV01A

7,649

6DCU06444

INSTALL CABLE TRAY - TRAIN B

29OCT01A 13NOV01A 29OCT01A

13NOV01A

3,273

6DCW06462

POWER CABLE INSTALLATION TRAIN B

14

24SEP01A

14NOV01A

24SEP01A

14NOV01A

4,272

6DCW06498

CONTROL CABLE INSTALLATION TRAIN B

14

24SEP01A

15NOV01A

24SEP01A

15NOV01A

5,855

6DCW06518

CONTROL CABLE TERMINATION TRAIN B

07NOV01A 16NOV01A 07NOV01A

16NOV01A

277

6DCW06472

POWER CABLE TERMINATION TRAIN B

14

08NOV01A 15NOV01A 08NOV01A

15NOV01A

837

6DCX06405

FIELD MOUNTED INSTRUMENTS - TRAIN B

14

15OCT01A 29NOV01A 15OCT01A

29NOV01A

414

6DCX06415

CONTROL VALVES TRAIN B

20NOV01A 14DEC01A 20NOV01A

08DEC01

181

6DCX06440

LOOP CHECK-TRAIN B

04DEC01A 15DEC01A 20NOV01A

08DEC01

6DCX06460

PUNCHLIST TRAIN B

12DEC01A

12DEC01

TIE IN FROM EXISTING TK TO 36" LINE TRAIN B

14NOV01A 14NOV01A 14NOV01A

14NOV01A

Cable & Wire

Instrumentation

15DEC01

03DEC01A

1,100
-6

Tie - Ins
6DCR06452

SUBSISTEMA 640-08 TAILINGS PUMPING TRAIN A


Mechanical Equipment
6DCN06415

INSTALL PUMP/MTR 640-PP-201 - TRAIN A

16OCT01A 18OCT01A 16OCT01A

18OCT01A

494

6DCN06420

INSTALL PUMP/MTR 640-PP-202 - TRAIN A

17OCT01A 19OCT01A 17OCT01A

19OCT01A

494

6DCN06425

INSTALL PUMP/MTR 640-PP-203 - TRAIN A

18OCT01A 20OCT01A 18OCT01A

20OCT01A

494

Sheet 43 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6DCN16416

PUMP/MTR 201@204 ALIGNMENT AND GROUT TRAIN A

21OCT01A 05DEC01A 21OCT01A

05DEC01A

501

6DCN06430

INSTALL PUMP/MTR 640-PP-204 - TRAIN A

08NOV01A 04DEC01A 08NOV01A

04DEC01A

494

6DCN26416

PUMP/MTR 640-PP-201@204 FINAL ALIGNMENT TRAIN A

05DEC01A

17DEC01

05DEC01A

10DEC01

151

500

6DCR06420

INSTLL PIPING/VALVES - TRAIN A CERAMIC

10

08NOV01A

16DEC01

08NOV01A

09DEC01

146

519

6DCR06430

INST 36" PIPE-EXIST TANKS->PUMP ST TRAIN A

14

20NOV01A

16DEC01

20NOV01A

09DEC01

144

49

6DCR16420

INSTLL PIPING/VALVES - TRAIN A PANT

17

04DEC01A

18DEC01

04DEC01A

11DEC01

140

190

6DCR06424

INSTLL PIPING/VALVES - TRAIN A->HDPE DISP LINES

05DEC01A

19DEC01

05DEC01A

12DEC01

144

2,531

6DCR16436

PIPE TESTING EXIST TANKS TO PUMP ST. TRAIN A

17DEC01

21DEC01

12DEC01

16DEC01

144

284

6DCR06486

PUNCHLIST PUMP STATION TRAIN A

15

20DEC01

04JAN02

13DEC01

17DEC01

144

961

6DCR16446

PUNCH LIST EXIST TANK TO PUMP STATION TRAIN A

15

20DEC01

04JAN02

15DEC01

19DEC01

144

591

6DCR06476

PIPE TESTING PUMP STATION TRAIN A

15

03JAN02

08JAN02

16DEC01

21DEC01

140

640

Piping

Raceway & Conduit


6DCU06446

INSTALL CABLE TRAY - TRAIN A

20NOV01A 05DEC01A 20NOV01A

05DEC01A

4,272

6DCU06472

INSTALL POWER AND CONTROL CONDUIT TRAIN A

21NOV01A

17DEC01

21NOV01A

10DEC01

-8

4,649

6DCW06448

POWER CABLE INSTALLATION TRAIN A

10

01NOV01A

18DEC01

01NOV01A

11DEC01

342

3,534

6DCW06488

CONTROL CABLE TERMINATION TRAIN A

14

01NOV01A

17DEC01

01NOV01A

10DEC01

343

763

6DCW06508

POWER CABLE TERMINATION TRAIN A

01NOV01A

17DEC01

01NOV01A

10DEC01

343

711

6DCW06528

CONTROL CABLE INSTALLATION TRAIN A

01NOV01A

17DEC01

01NOV01A

10DEC01

343

2,547

6DCX06410

FIELD MOUNTED INSTRUMENTS TRAIN A

03DEC01A

20DEC01

03DEC01A

13DEC01

148

720

6DCX06430

CONTROL VALVES TRAIN A

05DEC01A

20DEC01

05DEC01A

13DEC01

168

91

6DCX06470

LOOP CHECK - TRAIN A

05DEC01A

20DEC01

05DEC01A

13DEC01

141

6DCX06450

PUNCHLIST TRAIN A

21DEC01

07JAN02

14DEC01

20DEC01

141

958

TIE IN FROM EXISTING TK TO 36" LINE TRAIN A

17DEC01

17DEC01

10DEC01

10DEC01

146

Cable & Wire

Instrumentation

Tie - Ins
6DCR06482

SUBSISTEMA 640-09 AREA DRAINAGE SYSTEM


Earthwork
6DCB06422

EXCAVATE FOR DOWNSTREAM TRENCH

14

10JUL01A

25JUL01A

10JUL01A

25JUL01A

907

6DCB06476

EXCAVATE FOR DRAINAGE PIPING IN BULDING

55

20SEP01A

08NOV01A

20SEP01A

08NOV01A

400

6DCB06486

COLLECTION DRAINAGE BOX/640-SU-011 - EXCAVACION

01OCT01A 14OCT01A 01OCT01A

14OCT01A

1,200

6DCB06466

BACKFILL DRAINAGE CHAMBER

12

04OCT01A 11NOV01A 04OCT01A

11NOV01A

4,440

6DCR06557

EXCAVATION FOR DRAINAGE TO EMERGENCY POINT

25

04OCT01A 09NOV01A 04OCT01A

09NOV01A

1,200

6DCB06424

BACKFILL FOR DOWNSTREAM TRENCH

14

08OCT01A 11NOV01A 08OCT01A

11NOV01A

2,730

6DCB16476

BACKFILL FOR DRAINAGE PIPING IN BULDING

10

16OCT01A 27NOV01A 16OCT01A

27NOV01A

1,417

Sheet 44 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6DCB06496

COLLECTION DRAINAGE BOX 640-SU-011 - BACKFILL

10

04NOV01A 27NOV01A 04NOV01A

27NOV01A

1,250

6DCR16557

BACKFILL FOR DRAINAGE TO EMERGENCY POINT

15

06NOV01A 06DEC01A 06NOV01A

09DEC01

1,250

6DCG06450

LEAN CONCRETE DRAINAGE CHAMBER

25AUG01A 30AUG01A 25AUG01A

30AUG01A

23

6DCG06504

LEAN CONCRETE DOWNSTREAM TRENCH

30

01SEP01A

15SEP01A

01SEP01A

15SEP01A

34

6DCG06480

FORMWORK DRAINAGE CHAMBER

18

02SEP01A

22OCT01A

02SEP01A

22OCT01A

5,325

6DCG06460

REBAR DRAINAGE CHAMBER

15

05SEP01A

30OCT01A

05SEP01A

30OCT01A

3,038

6DCG06524

REBAR DOWNSTREAM TRENCH

42

10SEP01A

11NOV01A

10SEP01A

11NOV01A

4,144

6DCG06514

FORMWORK DOWNSTREAM TRENCH

25

15SEP01A

12NOV01A

15SEP01A

12NOV01A

21,468

6DCG06534

PLACE CONCRETE DOWNSTREAM TRENCH

35

22SEP01A

13NOV01A

22SEP01A

13NOV01A

18,425

6DCG06470

PLACE CONCRETE DRAINAGE CHAMBER

15

16OCT01A 31OCT01A 16OCT01A

31OCT01A

16,545

6DCG06540

COLLECTION DRAINAGE BOX 640-SU-011 (F/R/C)

25

16OCT01A 21OCT01A 16OCT01A

21OCT01A

4,000

6DCG06550

FND FOR PIPE SUPPORT F/EXIST TANK TO PUMPS STA..

20

17OCT01A 03NOV01A 17OCT01A

03NOV01A

7,000

6DCG06560

FUNDATION FOR HIDRAULIC UNIT (F/R/C)

04NOV01A 04NOV01A 04NOV01A

04NOV01A

5,000

INSTALL HYDRAULIC UNIT 640-HU-102

14

30OCT01A 07NOV01A 30OCT01A

07NOV01A

357

6DCR06527

ENG PIPE - DRAINAGE SYSTEM

20

10SEP01A

10SEP01A

07NOV01A

6DCR06526

DRAINAGE PIPE SUPPLY (FITTING, 10", 16"AC)

30

16OCT01A 20OCT01A 16OCT01A

20OCT01A

6DCR06547

PIPES AND CULVERT SUPPLY (P-006) 48", 36";16"

15

23OCT01A 05NOV01A 23OCT01A

05NOV01A

6DCR06537

INSTALL DRAINAGE 48" Y 36" HDPE TO EMERG. POND

30

06NOV01A 13DEC01A 06NOV01A

09DEC01

1,000

INSTALL CULVERTS MP68

01JUN01A

01JUN01A

04JUN01A

163

6DCB06442

MASS EXCAVATION PLATFORM TAIL DISPOSAL STATION

14

05MAR01A 18APR01A 05MAR01A

18APR01A

7,497

6DCB06402

MASS FILL PLATFORM FOR TAILINGS DISPOSAL STATION

21

17MAR01A 20MAY01A 17MAR01A 20MAY01A

16,709

6DCB06414

EXCAVATE FOR TRAINS A/B PUMP FOUNDATIONS

06MAY01A 21MAY01A 06MAY01A 21MAY01A

4,473

6DCB06434

EXCAVATE FOR PUMP STATION BUILDING AX 1-8 / A-B

10MAY01A 16MAY01A 10MAY01A 16MAY01A

4,888

6DCB06456

STRUCTURAL BACKFILL CULVERT

14

09JUN01A

25JUN01A

09JUN01A

25JUN01A

14,121

6DCB06416

BACKFILL TRAINS A/B PUMP FOUNDATIONS

17

15JUN01A

30JUN01A

15JUN01A

30JUN01A

3,197

6DCB06436

BACKFILL FOR PUMP STATION BUILDING AX 1-8/ A-B

21

01JUL01A

19JUL01A

01JUL01A

19JUL01A

6DCB06446

PLATFORM FINISHING

20

20OCT01A

15DEC01

20OCT01A

12DEC01

6DCG06414

LEAN CONCRETE TRAINS A/B PUMP FOUNDATIONS

18MAY01A 23MAY01A 18MAY01A 23MAY01A

54

6DCG06424

FORMWORK BUILDING FOUNDATION

25

19MAY01A 31MAY01A 19MAY01A 31MAY01A

3,203

Concrete

Mechanical Equipment
6DCN06489
Piping
07NOV01A

GENERAL
Site Development
6DCB06432

04JUN01A

Earthwork

2,361
173

874

Concrete

Sheet 45 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6DCG06484

REBAR BUILDING FOUNDATION

18

19MAY01A 24MAY01A 19MAY01A 24MAY01A

3,142

6DCG06434

FORMWORK TRAINS A/B PUMP FOUNDATIONS

15

24MAY01A

05JUN01A

24MAY01A

05JUN01A

2,538

6DCG06444

REBAR TRAINS A/B PUMP FOUNDATIONS

15

28MAY01A

03JUN01A

28MAY01A

03JUN01A

2,236

6DCG06494

PLACE CONCRETE BUILDING FOUNDATION

35

30MAY01A

06JUN01A

30MAY01A

06JUN01A

2,176

6DCG06454

PLACE CONCRETE TRAINS A/B PUMP FOUNDATIONS

13

03JUN01A

06JUN01A

03JUN01A

06JUN01A

761

6DCG06461

FORMWORK SLAB PUMP STATION

12

22JUN01A

03JUL01A

22JUN01A

03JUL01A

1,059

6DCG06464

REBAR SLAB PUMP STATION

14

24JUN01A

05JUL01A

24JUN01A

05JUL01A

1,906

6DCG06474

PLACE CONCRETE SLAB PUMP STATION

15

26JUN01A

10JUL01A

26JUN01A

10JUL01A

330

6DCG06420

FORMWORK MISCELLANEOUS FOUNDATIONS PUMP STATION 24

09JUL01A

21JUL01A

09JUL01A

21JUL01A

1,758

6DCG06430

REBAR MISCELLANEOUS FOUNDATIONS PUMP STATION

14

11JUL01A

24OCT01A

11JUL01A

24OCT01A

2,236

6DCG06440

PLACE CONCRETE MISCELLA FOUNDATIONS PUMP STATION 42

01AUG01A 11NOV01A 01AUG01A

11NOV01A

4,172

6DCR06462

ENG-PIPE C AMELUXEN (F/EXIT. TKT T/PUMP STA)

25

10SEP01A

10SEP01A

16OCT01A

6DCR06472

PIPE SUPPLY C AMELUXEN (F/EXIT. TKT T/PUMP STA)

25

23OCT01A 06NOV01A 23OCT01A

06NOV01A

6DCR16547

PIPES CERAMIC SUPPLY

15

28OCT01A 04NOV01A 28OCT01A

04NOV01A

Piping
16OCT01A

Raceway & Conduit


6DCU06452

INSTALL LIGHTING CONDUIT

16OCT01A 13NOV01A 16OCT01A

13NOV01A

1,168

6DCU06456

PUNCHLIST

14NOV01A 16NOV01A 14NOV01A

16NOV01A

1,392

6DCW06442

INSTALL GROUNDING CABLES

21

01JUN01A

01JUN01A

21JUL01A

3,595

6DCW06452

INSTALL LIGHTING CABLE

14

16OCT01A 15NOV01A 16OCT01A

15NOV01A

2,532

6DCW06468

PUNCHLIST

14NOV01A 16NOV01A 14NOV01A

16NOV01A

2,105

15

15

Cable & Wire


21JUL01A

Pre-Op & No Load Testing


6DCT06440

VENDOR REP REQUIRED FOR AFDS - TRAINS A/B

14JAN02

28JAN02

07JAN02

21JAN02

140

SISTEMA 650 EXISTING TAILINGS PIPELINE EXTENSION


SUBSISTEMA 650-01 PIPELINE 6015 TO 610-DI-165
Piping
6ECR06522

SET UP FUSION WELDING STATION LINE 1

01AUG01A 01AUG01A 01AUG01A

01AUG01A

6ECR06570

FABRICACION DE CAERIA DE 36" HDPE

22

05NOV01A 08NOV01A 05NOV01A

08NOV01A

SUBSISTEMA 650-02 PIPELINE 6033 TO 610-DI-165


Piping
6ECR06510

WELD 36"CS PIPE - TAILINGS DISP LINE 1

60

06AUG01A 23NOV01A 06AUG01A

23NOV01A

135,090

6ECR06512

WELD FLANGES - TAILINGS DISPOSAL LINE 1

50

15AUG01A 24NOV01A 15AUG01A

24NOV01A

6ECR06516

FUSION WELD HDPE LINER - TAILNGS DISPOSAL LINE 1

65

04OCT01A 20NOV01A 04OCT01A

20NOV01A

6ECR06520

INSTALL HDPE LINER - TAILINGS DISPOSAL LINE 1

30

08OCT01A 25NOV01A 08OCT01A

25NOV01A

12,623

6ECR06559

PUNCHLIST LINE 1

14

16NOV01A

14DEC01

17DEC01

Sheet 46 of 76

16NOV01A

3,000

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6ECR06517

FUSION WELD 36" HDPE PIPE - TAIL.DISPOSAL LINE 1

18

20NOV01A 04DEC01A 20NOV01A

09DEC01

6ECR06526

INSTALL 36" HDPE TAILINGS DISPOSAL LINE 1

18

21NOV01A 13DEC01A 21NOV01A

06DEC01A

6ECR06548

TIE-IN TAILINGS DISPOSAL LINE 1 -> COLLECT BOX

21

23NOV01A 12DEC01A 23NOV01A

09DEC01

2,346

6ECR06521

OVERFLOWS AND DRAINAGE 16" HDPE LINE 1

18

03DEC01A 07DEC01A 25NOV01A

06DEC01A

6ECR06540

INSTALL TRANSITION 36" CS -> 36" HDPE LINE 1

13DEC01A

08DEC01

14DEC01

07DEC01

1,399

Pre-Op & No Load Testing


6ECR06514

NON-DESTRUCTIVE TESTING-TAILINGS DISPOSAL LINE 1

50

12NOV01A 03DEC01A 12NOV01A

03DEC01A

6ECR06528

TEST 36" TAILINGS DISPOSAL LINE 1 COMPLETE

07DEC01A

14DEC01

08DEC01

13DEC01

Sc-07/Mobilizations Contractor

60

08JUL01A

31OCT01A

08JUL01A

31OCT01A

6ECB06540

MASS EXCAV. TAIL.CONVEYOR PLATFORM->COLLECT BOX

21

21MAR01A 30OCT01A 21MAR01A 30OCT01A

3,200

6ECB06530

FILL - TAILINGS CONVEYOR PLATFORM -> COLLECT BOX

77

29MAY01A 30OCT01A

3,893

SUMINISTRO DE CAERIA (POR MEL)

10

23OCT01A 31OCT01A 23OCT01A

31OCT01A

GENERAL
Site Development
6ECR06550

Earthwork

29MAY01A 30OCT01A

Piping
6ECR06580

TOP 20B EXISTING TAIL PUMPING & LAGUNA SECA


SISTEMA 610 LAGUNA SECA TAILINGS PIPELINE
SUBSISTEMA 610-02 TAIL PIPELINE#1 TO 620-DI-171
Site Development
6ACG16134

PLATFORM PIPE AND ROAD PLATFORM FINISHING

15

10

22NOV01A

03JAN02

22NOV01A

16DEC01

-4

5,988

INSTALACION DE DELINEADORES

42

12

04DEC01A

05JAN02

04DEC01A

18DEC01

-6

5,940

6ACR06106

SET UP FUSION WELD. STATION (LINE #2) (FROM 630)

05MAY01A 15MAY01A 05MAY01A 15MAY01A

6ACR06123

INSTALL 48" HDPE TAILINGS DISPOSAL LINE 2

80

17

05MAY01A

10JAN02

05MAY01A

10JAN02

191

10,478

6ACR06121

FUSION WELD 48" HDPE TAILS DISPOSAL LINE 2

140

17

15MAY01A

10JAN02

15MAY01A

10JAN02

330

5,499

6ACR06127

TIE-IN 48" TAILS DISPOSAL LINE 2->COLLECT BOX165

16JAN02

19JAN02

16JAN02

19JAN02

209

395

6ACR26134

PUNCHLIST LINE 2

15

15

16JAN02

30JAN02

16JAN02

30JAN02

191

828

6ACR06129

TIE-IN 48" TAILS DISPOSAL LINE 2->DISTRIB.BOX171

31JAN02

05FEB02

31JAN02

05FEB02

191

1,165

70

15

11JAN02

25JAN02

11JAN02

25JAN02

191

SUBSISTEMA 610-03 TAIL PIPELINE#2 TO 620-DI-171


Earthwork
6ACG16124
Piping
166

Pre-Op & No Load Testing


6ACR26124

TEST 48" HDPE TAILINGS DISPOSAL LINE 2

SISTEMA 621
SUBSISTEMA 621-04 DROP BOXES(21) & LINES->DI-172
Site Development
6BCB26240

CRUSHED ROCK GRANULAR BASE ROADS DBOX TK-141@161 30

11NOV01A 22NOV01A 11NOV01A


Sheet 47 of 76

22NOV01A

7,875

Activity
ID
6BCB26230

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float
189

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

PLATFORMS FINISHINGS DROP BOX 620-TK-141@161

20

20

21DEC01

20JAN02

07DEC01

06JAN02

400

6BCB16272

MASS EXCAVATION TAIL DISTRIB BOX DI 141@161

14

21MAY01A

21JUL01A

21MAY01A

21JUL01A

18,146

6BCB16262

MASS FILL PLATFORMS (21ea) DROP BOX 620TK141@161

18

28MAY01A 21OCT01A

28MAY01A 21OCT01A

4,646

6BCB26220

BACKFILL DROP BOXES 620-TK-141@161

50

26AUG01A 05NOV01A 26AUG01A

6BCB26250

BACKFILL EARTH ANCHORS ON 54" HDPE PIPE

60

60

19JAN02

19MAR02

28JAN02

28MAR02

6BCG16257

LEAN CONCRETE (21ea) BETWEEN 620-TK-141@161

20

24JUL01A

08NOV01A

24JUL01A

08NOV01A

238

6BCG16267

FORMWORK FOOTING DROP BOXES TK-141@161

20

27JUL01A

08NOV01A

27JUL01A

08NOV01A

1,056

6BCG16277

REBAR FOOTING DROP BOXES TK-141@161

28

31JUL01A

08NOV01A

31JUL01A

08NOV01A

318

6BCG16287

PLACE CONCRETE FOOTING DROP BOXES TK-141@161

20

05AUG01A 08NOV01A 05AUG01A

08NOV01A

1,273

6BCG16297

FORMWORK BODY DROP BOXES TK-141@161

28

15AUG01A 08NOV01A 15AUG01A

08NOV01A

4,171

6BCG16327

REBAR BODY DROP BOXES 141@161

35

17AUG01A 08NOV01A 17AUG01A

08NOV01A

1,062

6BCG16307

PLACE CONCRETE & STRIP FORMS DROP BOX TK 141@161

35

10SEP01A

10SEP01A

08NOV01A

5,222

6BCG16317

INSTALL GUIDE WITH MK-01 EMBED FOR 54" PIPE

20

10NOV01A 22NOV01A 10NOV01A

22NOV01A

23,963

LINNING HDPE FOR DROP BOXES

50

01NOV01A 01NOV01A 01NOV01A

01NOV01A

3,600

6BCR26270

FUS. WELD HDPE BETW. DROP BOXES(TO SOUTH BRANCH)

28

28

17DEC01

24JAN02

08DEC01

15JAN02

142

6BCR26230

INSTALL PIPE SUPPORTS DROP BOXES TK-141@161

50

35

06JAN02

09FEB02

08DEC01

07DEC01

138

6BCR26220

54" CS TEE AT EACH BOX 620-TK-141@161

100

50

09JAN02

27FEB02

08JAN02

26FEB02

138

1,654

6BCR26240

INSTALL 54" HDPE BETW. DROP BOXES TK-141@161

60

60

09JAN02

09MAR02

18JAN02

18MAR02

138

9,420

6BCR26250

INSTALL VENTS 14" PIPE BOXES TK-141@161

40

40

01FEB02

12MAR02

10FEB02

21MAR02

138

6,365

6BCR26280

PUNCLIST PIPING (BOXES TK-141@161)

14

14

13MAR02

26MAR02

22MAR02

04APR02

138

1,394

14

14

18MAR02

31MAR02

27MAR02

09APR02

138

Earthwork

05NOV01A

4,176
150

174,631

Concrete

08NOV01A

Mechanical Bulks
6BCM06200
Piping

Pre-Op & No Load Testing


6BCR26260

TEST 54" PIPE BOXES TK-141@161

SUBSIST 620-05 NORTH BRANCH DIST BOX 620-DI-172


Earthwork
6BCB16269

MASS EXCAVATION PLATFORM DISTRIB BOX 172

10

28MAY01A

03JUN01A

28MAY01A

03JUN01A

21,071

6BCB16259

MASS FILL PLATFORM TAILINGS DISTRIB BOX 172

14

01JUN01A

14JUN01A

01JUN01A

14JUN01A

109,216

6BCB06230

EXCAVATE FOR TAILS DISTRIB BOX DI172

14

15JUL01A

05AUG01A

15JUL01A

05AUG01A

23,641

6BCB06232

BACKFILL TAILINGS DISTRIB BOX DI172

25

20SEP01A

21OCT01A

20SEP01A

21OCT01A

109,487

6BCB06242

CUT & FILL EARTH DRAINAGE TO IMPOUNDMENT

25

25NOV01A 01DEC01A 01DEC01A

08DEC01

104,819

6BCG06234

LEAN CONCRETE TAILS BOX 610-DI-172

18JUL01A

10AUG01A

18JUL01A

10AUG01A

105

6BCG06256

REBAR FLOOR SLABS DISTRIB BOX DI-172

10

18JUL01A

17AUG01A

18JUL01A

17AUG01A

309

Concrete

Sheet 48 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6BCG06236

FORMWORK FLOOR SLABS DISTRIB BOX DI-172

10

19JUL01A

18AUG01A

19JUL01A

18AUG01A

205

6BCG06246

FORMWORK WALLS $ TRENCH DISTRIB BOX DI-172

35

10AUG01A

20SEP01A

10AUG01A

20SEP01A

3,149

6BCG06266

REBAR WALLS $ TRENCH DISTRIB BOX DI-172

35

10AUG01A

15SEP01A

10AUG01A

15SEP01A

328

6BCG06276

PLACE CONCR. & STRIP FORMS WALLS $ TRENCH DI-172

20

15AUG01A

17SEP01A

15AUG01A

17SEP01A

1,398

6BCG06286

PLACE CONCRETE FLOOR SLABS DISTRIB DI-172

10

16AUG01A 19AUG01A 16AUG01A

19AUG01A

208

6BCG06233

INSTALL 56" PIPE INSERT IN WALL

20AUG01A 31OCT01A 20AUG01A

31OCT01A

4,964

6BCH96203

INSTALL PLATFORMS - DISTR BOX 172

20

04OCT01A 21OCT01A 04OCT01A

21OCT01A

1,007

6BCH96213

PUNCHLIST PLATFORMS DISTRIB. BOX DI172

10

6BCR06239

INSTALL PIPE SUPPORTS BOX DI-172

10

01NOV01A 07NOV01A 01NOV01A

07NOV01A

367

6BCR06249

INSTALL OVERFLOW PIPING 14" BOX DI-172

10

02NOV01A 07NOV01A 02NOV01A

07NOV01A

537

6BCR06259

INSTALL OVERFLOW PIPING 48" BOX DI-172

10

02NOV01A 11NOV01A 02NOV01A

11NOV01A

537

6BCR06229

INSTALL VALVES - HV1001-HV1002 DISTR BOX 172

14

06NOV01A

16DEC01

06NOV01A

09DEC01

-7

161

6BCR06269

PUNCHLIST PIPES BOX DI-172

10

10

17DEC01

06JAN02

10DEC01

19DEC01

-7

100

Structural Steel

14DEC01

20DEC01

07DEC01

13DEC01

189

504

Piping

SUBSISTEMA 621-06 DIST RING PIPELINE & SPIGOTS


Site Development
6BCB0622A

CRUSHED GRAVEL TAIL.DISTRIB.RING - NORTH BRANCH

65

01NOV01A 15NOV01A 01NOV01A

15NOV01A

41,566

6BCA06210

INSTALL CORRUGATED CULVERT INTERCEP. RECL.WATER

30

18NOV01A 23NOV01A 18NOV01A

23NOV01A

13,669

6BCB06229

MASS EXCAVATION FOR ROW - NORTH BRANCH

80

09APR01A 15NOV01A

09APR01A

15NOV01A

30,246

6BCB06207

MASS FILL FOR ROW & PIPE BASE - NORTH BRANCH

96

22APR01A 01DEC01A

22APR01A

14JAN02

259,997

6BCB06239

EXCAVATE FOR DISTRIBUTION BOX 21 @ 24

30

10SEP01A

10SEP01A

15NOV01A

10,990

6BCB06243

EXCAVATE FOR CULVERTS INTERCEP. RECL.WATER

14

06NOV01A 19NOV01A 06NOV01A

19NOV01A

13,478

6BCB06240

BACKFILL FOR DISTRIBUTION BOX 21 @ 24

30

18

16NOV01A

6BCB06245

BACKFILL AROUND CULVERTS INTERCEP. RECL.WATER

20

01DEC01A 02DEC01A

07DEC01

06JAN02

6BCB06233

EXCAVATE FOR EARTH DITCHES - NORTH BRANCH

100

30

14DEC01

23JAN02

15JAN02

13FEB02

202

21,012

6BCG16234

CONSTR BERM ANCHORS - TAILS DISTRIB

30

30

29JAN02

27FEB02

29JAN02

27FEB02

170

1,522

6BCG96268

LEAN CONCRETE DISTRIBUTION BOX 21 @ 24

15

21OCT01A 04NOV01A 21OCT01A

04NOV01A

21

6BCG96278

REBARS DISTRIBUTION BOX 21 @ 24

15

29OCT01A 12NOV01A 29OCT01A

12NOV01A

1,232

6BCG96368

FORMS DISTRIBUTION BOX 21 @ 24

15

30OCT01A 13NOV01A 30OCT01A

13NOV01A

1,878

6BCG96288

PLACE CONCRETE & STRIP FORMS DISTRIB BOX 21 @ 24

15

02NOV01A 16NOV01A 02NOV01A

16NOV01A

739

6BCH96268

INSTALLATION STRUCT.STEEL DISTR BOX 21@24 NORTH

14

14

11JAN02

24JAN02

05JAN02

18JAN02

182

324

6BCH96279

PUNCHLIST STRUCT.STEEL DISTR BOX 21@24 NORTH

25JAN02

27JAN02

19JAN02

21JAN02

182

40

Earthwork

15NOV01A

11JAN02

16NOV01A

11JAN02

217

2,505
61,926

Concrete

Structural Steel

Sheet 49 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Piping
6BCR06258

INSTALL 54" HDPE TAILS DISTR LINE - NORTH

120

51

20JUN01A

13FEB02

20JUN01A

13FEB02

6BCR06254

SET UP FUSION WELDING STATION 54" #2 [WM2]

25JUN01A

28JUN01A

25JUN01A

28JUN01A

141

17,196

6BCR06256

FUSION WELD 54" HDPE LINE NORTH (TO DROP BOXES)

65

38

30JUN01A

31JAN02

30JUN01A

31JAN02

197

2,231

6BCR06266

RUBBER LINED TEES 54" X 36" DISTR BOX 21@24

10

19DEC01

08JAN02

13DEC01

22DEC01

124

113

6BCR16247

INSTALL REDUCTION 54" X 24" HDPE PIPE - DAM

09JAN02

10JAN02

03JAN02

04JAN02

124

571

6BCR06262

INSTALL 24" GATE VALVE DISTR BOX #24

11JAN02

12JAN02

05JAN02

06JAN02

202

314

6BCR16249

INSTALL HDPE PIPE 24", 22" & 16" - DAM

60

60

11JAN02

11MAR02

05JAN02

05MAR02

124

5,064

6BCR06260

TEST 54" HDPE TAILS DISTR LINE - NORTH

45

45

21JAN02

06MAR02

21JAN02

06MAR02

149

1,210

6BCR96268

INSTALL PIPING HDPE 40" DISTR BOX 21@24 NORTH

28JAN02

01FEB02

29JAN02

02FEB02

182

286

6BCR06264

INSTALL VENTS (23) - NORTH

95

11FEB02

13FEB02

11FEB02

13FEB02

149

6BCR76202

INSTALL IMPOUND 6 14" PIPE&VALVE FEED LINES -DAM

24

24

21FEB02

16MAR02

15FEB02

10MAR02

153

376

6BCR16251

INSTALL VENTS (8) - DAM

24

24

26FEB02

21MAR02

20FEB02

15MAR02

124

3,418

6BCR16252

PUNCHLIST PIPING SOUTH BRANCH & DAM

10

10

22MAR02

31MAR02

16MAR02

25MAR02

124

498

INSTRUMENTATION FOR LS IMPOUNDMENT/DISTRIB

60

60

14DEC01

22FEB02

07DEC01

15FEB02

161

1,735

14

14

01APR02

14APR02

26MAR02

08APR02

124

89

Instrumentation
6BCX06200

Pre-Op & No Load Testing


6BCR06220

PREOPERATIONS ACTIVITIES NORTH BRANCH

SISTEMA 650 EXISTING TAILINGS PIPELINE EXTENSION


SUBSISTEMA 650-01 PIPELINE 6015 TO 610-DI-165
Piping
6ECR06530

WELD 36"CS PIPE - TAILINGS DISP LINE 2

60

31

10NOV01A

24JAN02

10NOV01A

24JAN02

316

34,090

6ECR06532

WELD FLANGES - TAILINGS DISPOSAL LINE 2

45

31

10NOV01A

24JAN02

10NOV01A

24JAN02

152

6ECR06536

FUSION WELD HDPE LINER - TAILNGS DISPOSAL LINE 2

45

31

10NOV01A

24JAN02

10NOV01A

24JAN02

159

6ECR06538

INSTALL HDPE LINER - TAILNGS DISPOSAL LINE 2

45

31

10NOV01A

29JAN02

10NOV01A

29JAN02

159

24,277

6ECR06537

FUSION WELD 36" HDPE PIPE - TAIL.DISPOSAL LINE 2

20

14NOV01A

20DEC01

14NOV01A

14DEC01

171

6ECR06544

INSTALL 36" HDPE TAILINGS DISPOSAL LINE 2

42

18NOV01A 06DEC01A 18NOV01A

06DEC01A

6ECR06539

OVERFLOW AND DRAINAGE HDPE 16" LINE 2

14

25NOV01A 06DEC01A 25NOV01A

06DEC01A

6ECR06518

SET UP FUSION WELDING STATION LINE 2

01DEC01A 04DEC01A 01DEC01A

04DEC01A

6ECR06549

TIE-IN TAILINGS DISPOSAL LINE 2 -> COLLECT BOX

20

20

14DEC01

13JAN02

07DEC01

06JAN02

185

1,000

6ECR06541

INSTALL TRANSITION 36" CS -> 36" HDPE LINE 2

10

10

30JAN02

08FEB02

30JAN02

08FEB02

159

6ECR06569

PUNCHLIST LINE 2

15

15

13FEB02

27FEB02

13FEB02

27FEB02

140

1,000

Pre-Op & No Load Testing


6ECR06534

NON-DESTRUCTIVE TESTING-TAILINGS DISPOSAL LINE 2

55

43

15NOV01A

05FEB02

15NOV01A

05FEB02

140

6ECR06546

TEST 36" HDPE TAILINGS DISPOSAL LINE 2

06FEB02

12FEB02

06FEB02

12FEB02

140

1,399

Sheet 50 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

GENERAL
Site Development
6ECB0653A

COMPACTED GRAVEL TAIL.CONV.PLATF -> COLLECT BOX

40

28

02DEC01A

21JAN02

02DEC01A

21JAN02

171

6ECR06560

SC-07/ Demobilizations Contractor

10

10

18FEB02

27FEB02

18FEB02

27FEB02

140

6ECB06588

CONSTRUCT BERM ANCHORS - TAILS DISPOSAL LINE 1&2

66

33

18NOV01A

27JAN02

18NOV01A

27JAN02

171

6ECB06598

PLATFORM FINISHING

21

21

07JAN02

27JAN02

07JAN02

27JAN02

171

INSTALL FENCING AROUND ELECT ROOM/XFRMRS

14

14

14DEC01

07JAN02

07DEC01

20DEC01

219

474

6CCB26314

CONSTRUCT PLATFORM FOR ELECTR. ROOM & BSP 3

14

08APR01A

05MAY01A 08APR01A

05MAY01A

2,254

6CCB16317

EXCAVATE FOR ELECTR. ROOM & S/S FOUNDATIONS

09APR01A

12APR01A

09APR01A

12APR01A

1,402

6CCB16323

BACKFILL ELEC.ROOM & S/S FOUNDATIONS

10JUN01A

15JUN01A

10JUN01A

15JUN01A

3,031

6CCG16367

LEAN CONCRETE ELECTR. ROOM & S/S (FOUND & PITS)

12APR01A

15APR01A

12APR01A

15APR01A

355

6CCG16387

FORMS & EMBED. ELEC. ROOM & S/S (FOUND. & PITS)

28

02MAY01A 10MAY01A 02MAY01A 10MAY01A

6CCG16377

REBARS ELECTR. ROOM & S/S (FOUND. & PITS)

21

07MAY01A 14MAY01A 07MAY01A 14MAY01A

897

6CCG16357

PLACE CONCRETE & STRIP FORMS ELECTR. ROOM & S/S

28

10MAY01A 20MAY01A 10MAY01A 20MAY01A

2,026

6CCG16368

LEAN CONCRETE S/S FIRE WALLS

05JUN01A

10JUN01A

05JUN01A

10JUN01A

333

6CCG16378

REBARS S/S FIRE WALLS

14

20JUN01A

17AUG01A

20JUN01A

17AUG01A

348

6CCG16388

FORMS & EMBED. S/S FIRE WALLS

14

18JUL01A

20AUG01A

18JUL01A

20AUG01A

1,854

6CCG16358

PLACE CONCRETE & STRIP FORMS S/S FIRE WALLS

14

20JUL01A

25AUG01A

20JUL01A

25AUG01A

1,672

6CCH16375

INSTALL ALL STRUCTURAL STEEL S/S

21

01AUG01A

16DEC01

01AUG01A

09DEC01

206

302

6CCH16385

PUNCHLIST STRUCTURAL STEEL S/S

17DEC01

03JAN02

10DEC01

16DEC01

206

2,695

14

14

14DEC01

07JAN02

07DEC01

20DEC01

219

1,160

20JUN01A

Earthwork

TOP 21 PROCESS WATER


SISTEMA 630 PROCESS WATER
SUBSISTEMA 630-11 RECLAIM WATER BOOSTER#3 ER-415
Site Development
6CCA16317
Earthwork

Concrete

3,117

Structural Steel

Mechanical Equipment
6CCN16383

INSTALL HVAC SYSTEM INSIDE ELECTRICAL ROOM

Electrical Equipment
6CCT16359

INSTALL GROUNDING RESISTOR FOR ELECT ROOM

10JUN01A

10JUN01A

20JUN01A

115

6CCT16377

INSTALL BUS DUCT/UPS - TRANSFORMER -> E-ROOM

21

10AUG01A 05DEC01A 10AUG01A

05DEC01A

845

6CCT166379 INSTALL 69 KV TRANSFORMER

20AUG01A

09DEC01

6CCT16375

INSTALL PREFABRICATED ELECTRICAL ROOM ER-415

02DEC01A 06DEC01A 02DEC01A

06DEC01A

6CCT16369

INSTALL 69 KV DISCONNECT SWITCH/TRANSFOR/BRAKERS

03DEC01A

13DEC01

16DEC01

20DEC01

Sheet 51 of 76

20AUG01A

03DEC01A

233

363
480

233

246

Activity
ID
6CCT16390

Activity
Description
LIGHTING EQUIPMENTS

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float
7

03DEC01A

20DEC01

03DEC01A

13DEC01

219

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity
478

Raceway & Conduit


6CCU16371

INSTALL CONDUIT - DISCONNECT -> BREAKER

21

01JUL01A

18JUL01A

01JUL01A

18JUL01A

2,456

6CCU16363

CONDUIT INSTALLATION U/G & A/G EXTER. ELEC. ROOM

28

15JUL01A

18DEC01

15JUL01A

11DEC01

342

5,362

6CCU16373

CABLE-TRAY INSTALLATION EXTER. ELEC. ROOM

14

21NOV01A

15DEC01

21NOV01A

15DEC01

200

1,037

6CCU16379

CONDUIT INSTALLATION INSIDE ELECT ROOM

15

15

14DEC01

08JAN02

07DEC01

21DEC01

188

2,456

6CCU16389

CABLE TRAY INSTALLATION INSIDE ELECT ROOM

14

14

14DEC01

07JAN02

07DEC01

20DEC01

188

1,001

6CCW16361

INSTALL GROUNDING GRID FOR BREAKER/ELEC.ROOM

21

07MAY01A

20JUN01A

07MAY01A

20JUN01A

6CCW16373

INSTALLATION POWER CABLE

14

14

08JAN02

21JAN02

21DEC01

14JAN02

188

1,157

6CCW16393

INSTALLATION CONTROL CABLE

08JAN02

14JAN02

21DEC01

07JAN02

198

1,298

6CCW16394

INSTALLATION LIGHTING CABLE

08JAN02

14JAN02

21DEC01

07JAN02

198

1,843

6CCW16323

TERMINATION CONTROL CABLE

15JAN02

21JAN02

08JAN02

14JAN02

198

253

6CCW16324

TERMINATION LIGHTING CABLE

15JAN02

17JAN02

08JAN02

10JAN02

202

253

6CCW16383

TERMINATION POWER CABLE

25JAN02

31JAN02

18JAN02

24JAN02

188

369

6CCW16384

PUNCHLIST ELECTRICAL & INSTRUMET. WORKS

02FEB02

08FEB02

02FEB02

08FEB02

187

354

6CCX16387

INSTALL PLC/DCS INSIDE ELECT ROOM

14DEC01

20DEC01

07DEC01

13DEC01

212

277

6CCX16389

INSTALL FIRE DETECTION SYST INSIDE ELECT ROOM

14DEC01

20DEC01

07DEC01

13DEC01

226

40

6CCX16399

INSTALL FIELD MOUNTED INSTRUMENTS

26JAN02

01FEB02

26JAN02

01FEB02

187

279

6CCX16377

LOOP CHECK

02FEB02

08FEB02

02FEB02

08FEB02

187

Cable & Wire


1,931

Instrumentation

Pre-Op & No Load Testing


6CCT16391

MISC ELECT TESTING

09FEB02

15FEB02

09FEB02

15FEB02

187

442

6CCT16393

ENERGIZE BS#3 ELECTRICAL ROOM 630-ER-415

16FEB02

18FEB02

16FEB02

18FEB02

187

60

INSTALL PROTECTION POST ARROUND PUMPS

02FEB02

06FEB02

02FEB02

06FEB02

199

5,000

6CCB16329

BACKFILL PUMPS FOUND, PITS & GROUND (PIPE, WIRE)

35

12MAR01A 03APR01A 12MAR01A

03APR01A

4,441

6CCB16327

EXCAVAT. PUMPS FOUND, PITS & GROUND (PIPE, WIRE)

21

18APR01A

22APR01A

18APR01A

22APR01A

2,179

6CCG16351

LEAN CONCRETE PUMP FOUND, PITS

22APR01A

06MAY01A 22APR01A

06MAY01A

341

6CCG16381

PLACE CONCRETE & TRIP FORMS PUMPS FOUND, PITS

14

02MAY01A 26MAY01A 02MAY01A 26MAY01A

991

6CCG16361

REBARS PUMPS FOUND, PITS

07MAY01A 26MAY01A 07MAY01A 26MAY01A

568

6CCG16371

FORMS & EMBEDD. PUMPS FOUND, PITS

14

10MAY01A 29MAY01A 10MAY01A 29MAY01A

2,918

35

10JUL01A

SUBSISTEMA 630-12 RECLAIM WATER BOOSTER STAT # 3


Site Development
6CCA06331
Earthwork

Concrete

Mechanical Equipment
6CCN16347

INST.RECLAIM BOOSTER PUMP/MTR 630-PP-181/182/183

17SEP01A

Sheet 52 of 76

10JUL01A

17SEP01A

805

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

6CCN16357

FINAL ALIGNMENT PUMPS

18NOV01A

15DEC01

18NOV01A

08DEC01

227

728

6CCN16367

PUNCHLIST MECHANICAL EQUIPMENT

10

10

14DEC01

03JAN02

07DEC01

16DEC01

233

381

6CCR16347

INSTALL INLET PIPE/VALVES TO PUMPS 181@183

21

25JUN01A

16DEC01

25JUN01A

09DEC01

233

7,779

6CCR16369

INSTALL DISCH PIPE/VALVES FROM PUMPS 181@183

21

15JUL01A

16DEC01

15JUL01A

09DEC01

199

7,781

6CCR16349

PUNCHLIST PIPING

17DEC01

03JAN02

10DEC01

16DEC01

226

408

6CCR16359

PIPING HYDROTEST

04JAN02

10JAN02

17DEC01

03JAN02

226

488

CONDUIT INSTALLATION - BOOSTER PUMPS

18JUN01A

20SEP01A

18JUN01A

20SEP01A

5,137

6CCW16395

INSTALL GROUNDING SYSTEM FOR RECLAIM PUMPS

14

10JUN01A

20JUN01A

10JUN01A

20JUN01A

1,097

6CCW16397

INSTALLATION POWER CABLE PUMPS

28

15OCT01A

17DEC01

15OCT01A

18DEC01

198

3,156

6CCW16375

INSTALLATION CONTROL CABLE PUMPS

15

04DEC01A

21DEC01

04DEC01A

21DEC01

187

13,006

6CCW16385

TERMINATION POWER CABLE PUMPS

14

14

18DEC01

11JAN02

19DEC01

12JAN02

225

369

6CCW16365

TERMINATION CONTROL CABLE PUMPS

10

10

19DEC01

08JAN02

19DEC01

08JAN02

187

381

6CCW16366

PUNCHLIST ELECTRICAL & INSTRUM. WORKS

02FEB02

05FEB02

02FEB02

05FEB02

200

354

6CCX16398

INSTALL INSTRUMENTATION - BOOSTER PUMPS

24

24

09JAN02

01FEB02

09JAN02

01FEB02

187

277

6CCX16388

LOOP CHECK

14

14

02FEB02

15FEB02

02FEB02

15FEB02

190

14

14

19FEB02

04MAR02

19FEB02

04MAR02

187

212

1,862

Piping

Raceway & Conduit


6CCU16396
Cable & Wire

Instrumentation

Pre-Op & No Load Testing


6CCN16310

PREOPERATIONS ACTIVITIES BPS # 3

SUBSISTEMA 630-13 PIPELINE- BOOSTER 3 TO PLANT


Earthwork
6CCB26349

ENTREGA DE PLATAFORMA

6CCB26339

CONSTRUCT BERM ANCHORS - 36" CS RECLAIM WATER LN

20

20

6CCR26347

ARRIVAL PIPING 36" CS REMAINING

6CCR26337

INSTALL PIPE 36" CARB.STEEL RECLAIM WATER LINE

120

28

6CCR26345

INSTALL AIR VENTS

30

6CCR26346

PUNCHLIST PIPING

20

6CCR26355

PIPING HYDROTEST

01NOV01A
12JAN02

31JAN02

01NOV01A
12JAN02

31JAN02

Piping
10NOV01A
14NOV01A

21JAN02

30

12JAN02

20

09FEB02

12

12

10NOV01A

14NOV01A

21JAN02

176

33,295

10FEB02

12JAN02

10FEB02

176

3,224

28FEB02

09FEB02

28FEB02

176

1,989

25FEB02

08MAR02

25FEB02

08MAR02

176

993

09MAR02

12MAR02

09MAR02

12MAR02

176

Pre-Op & No Load Testing


6CCN26347

PREOPERATIONS ACTIVITIES (BPS3 -> CONCENTRATOR)

Sheet 53 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

TOP 41 PIPELINE LS TO ESCONDIDA


SISTEMA 430
SUBSISTEMA 430-01 INERTIE PIPELINE L SECA TO ESC
Site Development
4CCA60401

EMERGENCY DRAINAGE VALVE BOX DRAIN PIT

19DEC01

21DEC01

15DEC01

17DEC01

100

4CCB10104

PLAFTORM FROM PUMP STATION->TAIL.CONV.PLATF

30

01AUG01A 06DEC01A 01AUG01A

06DEC01A

4CCB30401

TRENCH EXCAV. PUMP STATION->TAIL.CONV.PLATF

30

16SEP01A

14DEC01

16SEP01A

14DEC01

103

1,776

4CCB30101

TRENCH EXCAV. PUMP STATION->TAIL.CONV.PLATF

10

15

06DEC01A

08JAN02

06DEC01A

08JAN02

152

4CCB30402

EMERGENCY DRAINAGE VALVE BOX STRUCTURAL EXCAV.

14DEC01

18DEC01

10DEC01

14DEC01

99

4CCB30403

VALVE STATION STRUCTURAL EXCAVATION

20

20

14DEC01

13JAN02

10DEC01

09JAN02

134

4CCB40402

EMERGENCY DRAINAGE VALVE BOX STRUCTURAL BACKFILL

19JAN02

21JAN02

15JAN02

17JAN02

156

4CCB40403

VALVE STATION STRUCTURAL BACKFILL

20

20

24JAN02

12FEB02

20JAN02

08FEB02

134

4CCB40101

TRENCH BACKF. PUMP STATION->TAIL.CONV.PLATF

14

14

08FEB02

21FEB02

08FEB02

21FEB02

149

4CCB40401

TRENCH BACKF. PUMP STATION->TAIL.CONV.PLATF

30

30

15FEB02

16MAR02

11FEB02

12MAR02

119

4CCG10401

EMERGENCY DRAINAGE VALVE BOX LEAN CONCRETE

19DEC01

19DEC01

15DEC01

15DEC01

99

120

4CCG20401

EMERGENCY DRAINAGE VALVE BOX CONCRETE FORMS

20DEC01

06JAN02

16DEC01

22DEC01

99

54

4CCG30401

EMERGENCY DRAINAGE VALVE BOX CONCRETE REBAR

03JAN02

09JAN02

19DEC01

05JAN02

99

50

4CCG10402

VALVE STATION LEAN CONCRETE

20

20

04JAN02

23JAN02

20DEC01

19JAN02

134

50

4CCG40401

EMERGENCY DRAINAGE VALVE BOX PLACE CONCRETE

07JAN02

13JAN02

03JAN02

09JAN02

99

50

4CCG20402

VALVE STATION CONCRETE FORMS

20

20

09JAN02

28JAN02

05JAN02

24JAN02

134

204

4CCG30402

VALVE STATION CONCRETE REBAR

20

20

14JAN02

02FEB02

10JAN02

29JAN02

134

107

4CCG40402

VALVE STATION PLACE CONCRETE

20

20

19JAN02

07FEB02

15JAN02

03FEB02

134

320

EMERGENCY DRAINAGE VALVE BOX STEEL COVER

11FEB02

11FEB02

07FEB02

07FEB02

135

4CCR10303

ABOVEGROUND PIPING STRING & WELD

60

24AUG01A

22SEP01A

24AUG01A

22SEP01A

4CCR10203

ABOVEGROUND PIPING STRING & WELD

45

26

10SEP01A

19JAN02

10SEP01A

19JAN02

150

4,070

4CCR10305

ESC.IV TO TAILINGS PLATFORM PIPING HDPE LINING

60

26

04OCT01A

19JAN02

04OCT01A

19JAN02

175

5,181

4CCR10205

ESC.IV TO TAILINGS PLATFORM PIPING HDPE LINING

45

26

10OCT01A

19JAN02

10OCT01A

19JAN02

175

2,590

4CCR10103

ABOVEGROUND PIPING STRING & WELD

20

13

03DEC01A

06JAN02

03DEC01A

06JAN02

154

987

4CCR10404

UNDERGROUND PIPING STRING & WELD

30

30

19DEC01

28JAN02

15DEC01

24JAN02

99

2,818

4CCR10405

ESC.IV TO TAILINGS PLATFORM PIPING HDPE LINING

30

30

06JAN02

04FEB02

22DEC01

31JAN02

99

4,042

4CCR10105

ESC.IV TO TAILINGS PLATFORM PIPING HDPE LINING

20

20

09JAN02

28JAN02

09JAN02

28JAN02

149

894

4CCR10104

UNDERGROUND PIPING STRING & WELD

10

10

12JAN02

21JAN02

12JAN02

21JAN02

149

4,243

Earthwork
1,776

Concrete

Structural Steel
4CCH30401
Piping

Sheet 54 of 76

4,627

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4CCR90308

ESC.IV TO TAILINGS PLATFORM PIPING PUNCH LIST

35

15

15JAN02

29JAN02

15JAN02

29JAN02

175

1,628

4CCR30206

ESC.IV TO TAILINGS PLATFORM PIPING TEST & FLUSH

10

10

20JAN02

29JAN02

20JAN02

29JAN02

175

1,278

4CCR30306

ESC.IV TO TAILINGS PLATFORM PIPING TEST & FLUSH

10

10

20JAN02

29JAN02

20JAN02

29JAN02

175

2,070

4CCR90208

ESC.IV TO TAILINGS PLATFORM PIPING PUNCH LIST

35

35

20JAN02

23FEB02

20JAN02

23FEB02

150

1,496

4CCR10401

ABOVE GROUND PIPING @ VALVE STATION

20

20

29JAN02

17FEB02

25JAN02

13FEB02

122

2,569

4CCR40107

UNDERGROUND PIPING WRAPPING & LAY DOWN

10

10

29JAN02

07FEB02

29JAN02

07FEB02

149

1,799

4CCR30106

ESC.IV TO TAILINGS PLATFORM PIPING TEST & FLUSH

10

10

03FEB02

12FEB02

03FEB02

12FEB02

154

837

4CCR40407

UNDERGROUND PIPING WRAPPING & LAY DOWN

30

30

05FEB02

06MAR02

01FEB02

02MAR02

119

1,628

4CCR90108

ESC.IV TO TAILINGS PLATFORM PIPING PUNCH LIST

20

20

05FEB02

24FEB02

05FEB02

24FEB02

149

1,745

4CCR90408

ESC.IV TO TAILINGS PLATFORM PIPING PUNCH LIST

20

20

28FEB02

19MAR02

24FEB02

15MAR02

119

2,061

4CCR30406

ESC.IV TO TAILINGS PLATFORM PIPING TEST & FLUSH

10

10

02MAR02

11MAR02

26FEB02

07MAR02

120

1,745

Raceway & Conduit


4CCU20405

POWER & CONTROL CONDUIT TO VALVE STATION

20

20

31JAN02

19FEB02

27JAN02

15FEB02

99

393

4CCU90407

P& C CONDUIT TO VALVE STATION PUNCH LIST

13FEB02

19FEB02

09FEB02

15FEB02

99

138

4CCU20105

POWER & CONTROL CONDUIT TO MONITORING STATION

20

20

20FEB02

11MAR02

16FEB02

07MAR02

99

430

4CCU90107

P& C CONDUIT TO MONITORING STATION PUNCH LIST

12MAR02

18MAR02

08MAR02

14MAR02

127

151

4CCW20406

POWER CABLE TO VALVE STATION INSTALLATION

25

25

20FEB02

16MAR02

16FEB02

12MAR02

109

3,191

4CCW40407

CONTROL CABLE TO VALVE STATION INSTALLATION

25

25

20FEB02

16MAR02

16FEB02

12MAR02

104

1,945

4CCW20106

POWER CABLE TO MONITORING STATION INSTALLATION

15

15

12MAR02

26MAR02

08MAR02

22MAR02

109

682

4CCW40107

CONTROL CABLE TO MONITORING STATION INSTALLATION

15

15

12MAR02

26MAR02

08MAR02

22MAR02

99

300

4CCW30401

POWER CABLE TO VALVE STATION TERMINATION

20

20

17MAR02

05APR02

13MAR02

01APR02

109

100

4CCW50401

CONTROL CABLE TO VALVE STATION TERMINATION

20

20

17MAR02

05APR02

13MAR02

01APR02

104

137

4CCW90401

CABLE TO VALVE STATION PUNCH LIST

25

25

17MAR02

10APR02

13MAR02

06APR02

104

105

4CCW30101

POWER CABLE TO MONITORING STATION TERMINATION

10

10

27MAR02

05APR02

23MAR02

01APR02

109

118

4CCW50101

CONTROL CABLE TO MONITORING STATION TERMINATION

10

10

27MAR02

05APR02

23MAR02

01APR02

104

47

4CCW90101

CABLE TO MONITORING STATION PUNCH LIST

20

20

27MAR02

15APR02

23MAR02

11APR02

99

94

4CCX10108

FIELD MOUNTED INSTRUMENTS @ MONITORING STATION

15

15

22JAN02

05FEB02

22JAN02

05FEB02

158

245

4CCX10408

FIELD MOUNTED INSTRUMENTS @ VALVE STATION

15

15

29JAN02

12FEB02

25JAN02

08FEB02

151

80

4CCX30401

CONTROL VALVES @ VALVE STATION

10

10

18FEB02

27FEB02

14FEB02

23FEB02

122

180

4CCX90401

INSTRUMENTS @ VALVE STATION PUNCH LIST

10

10

01APR02

10APR02

28MAR02

06APR02

104

57

4CCX50101

LOOP CHECK @ MONITORING STATION

06APR02

10APR02

02APR02

06APR02

104

107

4CCX50401

LOOP CHECK @ VALVE STATION

06APR02

10APR02

02APR02

06APR02

104

89

4CCX90101

INSTRUMENTS @ MONITORING STATION PUNCH LIST

10

10

06APR02

15APR02

02APR02

11APR02

99

216

Cable & Wire

Instrumentation

Sheet 55 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Pre-Op & No Load Testing


4CCY10001

ALL PRECOMM ACTIVITIES FOR CONC.PIPELINE

14

14

16APR02

29APR02

12APR02

25APR02

99

78

TOP 42 EXIST STORAGE MODIF & PUMPING & 6" PIPEL.


SISTEMA 420
SUBSISTEMA 420-02 CONCENTRATE PIPELINE LINE 1
Site Development
4ECA62501

Ejecucin pozo derrames con grava Tmn 2"

05MAR02

07MAR02

05MAR02

07MAR02

92

73

4ECA13240

Mejoramiento de acceso a Estacin SFM2

09MAR02

11MAR02

09MAR02

11MAR02

113

4ECA13255

Limpieza general en area de la estacin

12MAR02

15MAR02

12MAR02

15MAR02

119

4ECA13275

Reparacin de cierre perimetral y portn existen

15MAR02

18MAR02

15MAR02

18MAR02

113

41

4ECA13260

Aseo general y retoques de pintura sala elctric

16MAR02

18MAR02

16MAR02

18MAR02

119

4ECA62401

Ejecucin pozo derrames con grava Tmn 2"

21MAR02

22MAR02

21MAR02

22MAR02

80

73

4ECA13455

Mejoramiento de acceso a Estacin SFM1

26MAR02

29MAR02

26MAR02

29MAR02

96

4ECA13470

Limpieza general en area de la estacin

30MAR02

01APR02

30MAR02

01APR02

101

4ECA13490

Reparacin de cierre perimetral y portn existen

01APR02

05APR02

01APR02

05APR02

96

15

4ECA13475

Aseo general y retoques de pintura sala elctric

02APR02

05APR02

02APR02

05APR02

102

4ECB11735

Ditching

16

25SEP01A

12NOV01A

25SEP01A

12NOV01A

530

4ECB11730

Surveying

19OCT01A 10NOV01A 19OCT01A

10NOV01A

765

4ECR11095

Bell Holes Km 16+900 to 8+000

14NOV01A

15DEC01

14NOV01A

15DEC01

345

137

4ECB11805

Surveying

13

13

05JAN02

17JAN02

18DEC01

10JAN02

96

892

4ECB11785

Sand Padding

17

17

06JAN02

22JAN02

19DEC01

15JAN02

115

4ECB11795

Backfill

16

16

08JAN02

23JAN02

21DEC01

16JAN02

113

43

4ECB11810

Ditching

17

17

18JAN02

03FEB02

11JAN02

27JAN02

96

506

4ECB11815

Re-Ditching

12

12

04FEB02*

15FEB02

04FEB02*

15FEB02

116

413

4ECB11860

Sand Padding

35

35

04FEB02

10MAR02

28JAN02

03MAR02

96

4ECB11870

Backfill

35

35

05FEB02

11MAR02

29JAN02

04MAR02

96

91

4ECB11800

R.O.W. Restoration

17FEB02

21FEB02

10FEB02

14FEB02

86

22

4ECB11875

R.O.W. Restoration

30

30

22FEB02

23MAR02

15FEB02

16MAR02

86

128

4ECB32503

Excavacin Cmara

23FEB02

26FEB02

23FEB02

26FEB02

79

157

4ECB13375

Base Estabilizada e=20 cm

28FEB02

01MAR02

28FEB02

01MAR02

94

4ECB13395

Excavacin conduit enterrado

28FEB02

28FEB02

28FEB02

28FEB02

92

11

4ECB13210

(SFM2)Trazados y niveles Estacin

02MAR02

04MAR02

23FEB02

25FEB02

80

33

4ECB13435

(SFM1)Trazados y niveles Estacin

05MAR02

08MAR02

26FEB02

01MAR02

80

33

4ECB13215

Relleno de zanja con material comn

08MAR02

08MAR02

08MAR02

08MAR02

92

Earthwork

Sheet 56 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECB13230

Rellenos en cmaras de inspeccin e instrumentos

09MAR02

10MAR02

09MAR02

10MAR02

92

4ECB42503

Relleno de zanja con mat. seleccionado

09MAR02

10MAR02

09MAR02

10MAR02

92

154

4ECB32403

Excavacin Cmara

10MAR02

14MAR02

10MAR02

14MAR02

79

157

4ECB13580

Base Estabilizada e=20 cm

15MAR02

16MAR02

15MAR02

16MAR02

79

4ECB13595

Excavacin conduit enterrado

15MAR02

15MAR02

15MAR02

15MAR02

80

11

4ECB42403

Relleno de zanja con mat. seleccionado

23MAR02

24MAR02

23MAR02

24MAR02

80

154

4ECB13625

Relleno de zanja con material comn

25MAR02

25MAR02

25MAR02

25MAR02

80

4ECB13445

Rellenos en cmaras de inspeccin e instrumentos

26MAR02

28MAR02

26MAR02

28MAR02

80

4ECG12501

Emplantillado con H10 de 110 Kg-cem/m3 (HE)

02MAR02

02MAR02

02MAR02

02MAR02

94

14

4ECG32501

Armaduras A 63-42 H Losa

03MAR02

11MAR02

03MAR02

11MAR02

94

104

4ECG13425

Hormign Losa H30 Mpa

12MAR02

12MAR02

12MAR02

12MAR02

94

21

4ECG13420

Armaduras A 6342 H Muros

14MAR02

16MAR02

14MAR02

16MAR02

94

60

4ECG12401

Emplantillado con H10 de 110 Kg-cem/m3 (HE)

17MAR02

17MAR02

17MAR02

17MAR02

79

14

4ECG22501

Moldaje de muros

17MAR02

23MAR02

17MAR02

23MAR02

94

321

4ECG32401

Armaduras A 63-42 H Losa

18MAR02

26MAR02

18MAR02

26MAR02

79

104

4ECG42501

Hormign Muros H30

25MAR02

25MAR02

25MAR02

25MAR02

80

45

4ECG13635

Hormign Losa H30 Mpa

29MAR02

29MAR02

29MAR02

29MAR02

79

21

4ECG13340

Escalines

30MAR02

31MAR02

30MAR02

31MAR02

94

4ECG13620

Armadura A 63-42 H Muros

30MAR02

01APR02

30MAR02

01APR02

79

60

4ECG22401

Moldaje de Muros

02APR02

08APR02

02APR02

08APR02

79

321

4ECG13370

Machones de Hormign

09APR02

12APR02

09APR02

12APR02

94

66

4ECG42401

Hormign Muros H30

09APR02

09APR02

09APR02

09APR02

79

45

4ECG13545

Escalines

15APR02

16APR02

15APR02

16APR02

79

4ECG13575

Machones de Hormign

26APR02

28APR02

26APR02

28APR02

79

66

4ECH13320

Suministro y reemplazo de diagonal faltante

19MAR02

21MAR02

19MAR02

21MAR02

116

40

4ECH13525

Suministro y reemplazo de diagonal faltante

06APR02

07APR02

06APR02

07APR02

100

31

4ECH13350

Instalacin tapa cmara con pl diamantada e=6mm

09APR02

11APR02

09APR02

11APR02

95

4ECH13555

Instalacin tapa cmara con pl diamantada e=6mm

26APR02

27APR02

26APR02

27APR02

80

4ECK13265

Reparacin de barra seg. sala elctrica

14MAR02

15MAR02

14MAR02

15MAR02

119

4ECK13270

SFM2 Sellos con silicona en puertas

16MAR02

16MAR02

16MAR02

16MAR02

119

4ECK13325

Reparacin de barra de cierre de puerta de acces

21MAR02

22MAR02

21MAR02

22MAR02

114

4ECK13330

Sumunistro y reemplazo de aldaba puerta

22MAR02

22MAR02

22MAR02

22MAR02

113

Concrete

Structural Steel

Architectural

Sheet 57 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECK13335

Instalacin de bisagras nuevas y barra de seguri

23MAR02

24MAR02

23MAR02

24MAR02

113

4ECK13480

Reparacin de barra seg. sala elctrica

31MAR02

01APR02

31MAR02

01APR02

102

4ECK13485

SFM1 Sellos con silicona en puertas

02APR02

02APR02

02APR02

02APR02

101

4ECK13530

Reparacin de barra de cierre de puerta de acces

07APR02

08APR02

07APR02

08APR02

97

4ECK13535

Sumunistro y reemplazo de aldaba puerta

08APR02

08APR02

08APR02

08APR02

96

4ECK13540

Instalacin de bisagras nuevas y barra de seguri

09APR02

11APR02

09APR02

11APR02

96

4ECR11740

Load & Transport Pipe

15

24

25SEP01A

17JAN02

25SEP01A

17JAN02

107

4ECR11750

Steel Pipe Stringing

15

24

19OCT01A

17JAN02

19OCT01A

17JAN02

124

8,755

4ECR11130

Flanges Km 16+900 to 8+000

15NOV01A

15DEC01

15NOV01A

15DEC01

117

5,331

4ECR11070

Clean Km 16+900 to 9+000

01DEC01A

14DEC01

01DEC01A

12DEC01

346

8,396

4ECR11760

Pipe Bending

16

16

05JAN02

20JAN02

18DEC01

13JAN02

113

2,439

4ECR11765

Steel Pipe Welding 6"/7"

16

16

05JAN02

20JAN02

18DEC01

13JAN02

113

3,595

4ECR11770

X-Ray

16

16

05JAN02

20JAN02

18DEC01

13JAN02

113

4ECR11775

Joint Coating

17

17

06JAN02

22JAN02

19DEC01

15JAN02

113

3,527

4ECR11790

Lower-In

16

16

08JAN02

23JAN02

21DEC01

16JAN02

113

2,399

4ECR11820

Load & Transport Pipe

36

36

21JAN02

25FEB02

21JAN02

25FEB02

107

4ECR11825

Steel Pipe Stringing

36

36

21JAN02

25FEB02

21JAN02

25FEB02

107

4,215

4ECR11835

Pipe Bending

29

29

21JAN02

18FEB02

21JAN02

18FEB02

108

4,356

4ECR11840

Steel Pipe Welding 6"/7"

35

35

22JAN02

25FEB02

22JAN02

25FEB02

107

4,704

4ECR11845

X-Ray

35

35

22JAN02

25FEB02

22JAN02

25FEB02

107

4ECR11850

Joint Coating

35

35

23JAN02

26FEB02

23JAN02

26FEB02

107

7,558

4ECR11865

Lower-In

35

35

04FEB02

10MAR02

28JAN02

03MAR02

96

5,141

4ECR11975

Weld Flange

16

16

06FEB02

21FEB02

30JAN02

14FEB02

84

6,751

4ECR11985

Stringing / Laydown

16

16

06FEB02*

21FEB02

30JAN02*

14FEB02

84

8,859

4ECR11995

Fusion Welding

17

17

07FEB02

23FEB02

31JAN02

16FEB02

91

3,542

4ECR12020

Stringing / Laydown

29

29

12FEB02*

12MAR02

05FEB02*

05MAR02

84

9,999

4ECR12000

Liner Pulling

16

16

14FEB02

01MAR02

07FEB02

22FEB02

91

3,306

4ECR12030

Fusion Welding

35

35

15FEB02

21MAR02

08FEB02

14MAR02

84

7,084

4ECR12005

Stub-end installation

14

14

19FEB02

04MAR02

12FEB02

25FEB02

91

1,236

4ECR12015

Weld Flange

30

30

20FEB02

21MAR02

13FEB02

14MAR02

88

6,538

4ECR12045

Liner Pulling

36

36

20FEB02

27MAR02

13FEB02

20MAR02

84

8,320

4ECR12010

Flange Bolt-up &Air test

11

11

25FEB02

07MAR02

18FEB02

28FEB02

91

456

4ECR12055

Stub-end installation

32

32

26FEB02

29MAR02

19FEB02

22MAR02

84

2,885

4ECR12065

Flange Bolt-up &Air test

33

33

01MAR02

02APR02

22FEB02

26MAR02

87

1,278

Piping

Sheet 58 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECR12075

Stringing / Laydown

03MAR02*

03MAR02

24FEB02*

24FEB02

96

7,511

4ECR12085

Fusion Welding

22MAR02

22MAR02

15MAR02

15MAR02

87

236

4ECR12070

Weld Flange

25MAR02

25MAR02

18MAR02

18MAR02

88

483

4ECR12090

Liner Pulling

29MAR02

29MAR02

22MAR02

22MAR02

85

236

4ECR12095

Stub-end installation

30MAR02

30MAR02

23MAR02

23MAR02

84

103

4ECR12501

Piping de Estacin SFM2 (incluye soportes)

02APR02

08APR02

02APR02

08APR02

94

4,966

4ECR12100

Flange Bolt-up &Air test

03APR02

03APR02

27MAR02

27MAR02

87

46

4ECR12401

Piping de Estacin SFM1 ( incluye soportes )

19APR02

25APR02

19APR02

25APR02

79

4,966

Pre-Op & No Load Testing


4ECM13365

Entrega (SFM2)

13APR02

13APR02

13APR02

13APR02

94

4ECM13570

Entrega (SFM1)

29APR02

29APR02

29APR02

29APR02

79

26OCT01A

SUBSISTEMA 420-03 CONCENTRATE PIPELINE VS1B


Site Development
4ECM13175

VALVE STATION START

26OCT01A

4ECA72001

PERIMETRAL FENCE

12

12

31JAN02

11FEB02

28JAN02

08FEB02

126

653

4ECM13105

Entrega (VS1B)

06MAR02

06MAR02

06MAR02

06MAR02

104

4ECB12860

(VS1B) TRACING & LEVELS

05DEC01A 07DEC01A 05DEC01A

07DEC01A

4ECB13055

GROUNDING EXCAVATION

05DEC01A

14DEC01

05DEC01A

13DEC01

90

44

4ECB12985

GROUNDING & DUCT BANK TRACING VS1B

14DEC01

14DEC01

07DEC01

07DEC01

346

4ECB13145

DUCT BANK EXCAVATION

15DEC01

15DEC01

14DEC01

14DEC01

123

4ECB13165

EXCAVATIONS FOR EROOM FOUNDATIONS

16DEC01

17DEC01

15DEC01

16DEC01

123

15

4ECB13125

BACKFILL GROUNDING TRENCH

11

11

19DEC01

09JAN02

12DEC01

22DEC01

89

20

4ECB13190

STABILIZED BASE e=20 cm (EROOM & VALVE STATION)

20DEC01

22DEC01

19DEC01

21DEC01

123

4ECB32003

EXCAVATIONS FOR VALVE STATION FOUNDATIONS

04JAN02

06JAN02

17DEC01

19DEC01

121

126

4ECB13110

DRAIN TO EMERGENCY POND

10JAN02

13JAN02

03JAN02

06JAN02

89

4ECG12001

LEAN CONCRETE

03JAN02

04JAN02

22DEC01

03JAN02

123

14

4ECG62001

DUCTS REINFORCE (H-20)

04JAN02

05JAN02

03JAN02

04JAN02

160

259

4ECG32001

REBARS

07JAN02

13JAN02

04JAN02

10JAN02

121

164

4ECG12920

CONCRETE EROOM FOUNDATIONS

14JAN02

14JAN02

11JAN02

11JAN02

199

70

4ECG12930

TRENCH & GRATING

15JAN02

17JAN02

12JAN02

14JAN02

121

213

4ECG42001

CONCRETE VALVE STATION & SOLAR PANEL

15JAN02

17JAN02

12JAN02

14JAN02

121

236

4ECG12975

DRAIN PIT

19JAN02

19JAN02

16JAN02

16JAN02

121

70

4ECG13115

Machones de Hormign (2 un)

18FEB02

20FEB02

18FEB02

20FEB02

117

213

Earthwork
14

Concrete

Sheet 59 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Structural Steel
4ECH12980

OPERATION PLATFORM

21JAN02

26JAN02

18JAN02

23JAN02

142

4ECH12990

SOLAR PANEL STEEL STRUCTURES

10

10

21JAN02

30JAN02

18JAN02

27JAN02

121

4ECR12001

PIPING VS1B (INCL SUPPORT)

11FEB02

17FEB02

11FEB02

17FEB02

104

8,322

4ECR32006

HYDROSTATIC TEST (VS1B)

19FEB02

20FEB02

19FEB02

20FEB02

117

473

Piping

Electrical Equipment
4ECT32001

EROOM ERECTION

04JAN02

04JAN02

04JAN02

04JAN02

149

648

4ECT13070

ELECTRICAL PANELS ERECTION

02FEB02

07FEB02

30JAN02

04FEB02

121

258

4ECT32002

SOLAR PANEL ERECTION AND CONECTION

02FEB02

05FEB02

30JAN02

02FEB02

121

352

4ECT13075

EQUIPMENT TEST

03MAR02

05MAR02

03MAR02

05MAR02

104

POWER & CONTROL CONDUIT INSTALLATION

16DEC01

03JAN02

15DEC01

22DEC01

159

1,717

4ECU13035

Pasadas de ductos (reservas electricas)

15JAN02

17JAN02

12JAN02

14JAN02

124

401

4ECU13045

CABLETRAYS INSTALLATION

20JAN02

26JAN02

17JAN02

23JAN02

122

802

4ECW12001

GROUNDING GRID INSTALLATION

15DEC01

03JAN02

08DEC01

16DEC01

89

784

4ECW13005

GROUNDING THERMOWELD

12

12

17DEC01

08JAN02

10DEC01

21DEC01

89

391

4ECW22006

CABLE INSTALLATION

05JAN02

06JAN02

04JAN02

05JAN02

159

9,774

4ECX13065

TUBING INSTALLATION

27JAN02

31JAN02

24JAN02

28JAN02

122

307

4ECX13020

INSTRUMENT CALIBRATION

18FEB02

18FEB02

18FEB02

18FEB02

104

62

4ECX12008

FIELD MOUNTED INSTRUMENTS

12

12

19FEB02

02MAR02

19FEB02

02MAR02

104

722

Bell Holes Km 43+575 to 24+324

13

10SEP01A

14NOV01A

10SEP01A

14NOV01A

4ECR11065

Clean Km 43+575 to 24+324

11

38

15AUG01A

31JAN02

15AUG01A

31JAN02

309

12,793

4ECR11125

Flanges Km 43+575 to 24+324

29OCT01A

15DEC01

29OCT01A

15DEC01

345

6,378

Cerco perimetral desmontable

11

11

19FEB02

01MAR02

19FEB02

01MAR02

107

653

4ECB12510

(VS2B)Trazados y Niveles Estacin

25OCT01A 26OCT01A 25OCT01A

26OCT01A

4ECB12690

Trazado mallas tierra y banco ductos VS2B

25OCT01A 25OCT01A 25OCT01A

25OCT01A

4ECB12540

Excavacin zanja mallas de tierra

09NOV01A 15NOV01A 09NOV01A

15NOV01A

44

4ECB12550

Tapado y compactacin zanja mallas tierra

11

14NOV01A 22NOV01A 14NOV01A

22NOV01A

20

Raceway & Conduit


4ECU22005

Cable & Wire

Instrumentation

SUBSISTEMA 420-04
Earthwork
4ECR11090

199

Piping

SUBSISTEMA 420-05 CONCENTRATE PIPELINE VS2B


Site Development
4ECA72101
Earthwork

Sheet 60 of 76

15

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECB12560

Excavacin banco de ductos

16NOV01A

22DEC01

16NOV01A

22DEC01

338

4ECB12570

Excavacin fundacin sala elctrica

17NOV01A

17DEC01

17NOV01A

17DEC01

343

4ECB12580

Base estabilizada e=20 cm(sala elec. y Estacin)

20NOV01A

21DEC01

20NOV01A

21DEC01

339

4ECB32103

Excavacin fundacin de estacin

20NOV01A

21DEC01

20NOV01A

21DEC01

128

127

4ECB12805

Drenaje a piscina de emergencia

14DEC01

21DEC01

07DEC01

14DEC01

339

25

4ECG12101

Emplantilado con H10 de 110 Kg-cem/m3 (HE)

31

04DEC01A

24JAN02

04DEC01A

24JAN02

104

14

4ECG12615

Refuerzo ductos con H20 Mpa

04JAN02

05JAN02

04JAN02

05JAN02

158

142

4ECG32101

Armaduras A 63-42 H

26JAN02

31JAN02

26JAN02

31JAN02

104

164

4ECG12625

Hormign H30 Mpa fundacin sala elctrica

02FEB02

02FEB02

02FEB02

02FEB02

126

70

4ECG12635

Canaleta y graiting

03FEB02

05FEB02

03FEB02

05FEB02

130

213

4ECG42101

Hormign H30 Mpa Estacin y losa Panel Solar

03FEB02

05FEB02

03FEB02

05FEB02

104

236

4ECG12680

Pozo de derrame

06FEB02

06FEB02

06FEB02

06FEB02

130

70

4ECG12810

Machones de Hormign (8 un )

14FEB02

17FEB02

14FEB02

17FEB02

119

213

4ECH12530

Estructura metlica para panel solar

10

10

09FEB02

18FEB02

09FEB02

18FEB02

107

4ECH12685

Plataforma de Operacin de la Estacin

09FEB02

14FEB02

09FEB02

14FEB02

107

4ECR12101

Piping de estacin VS2B (incluye soportes)

07FEB02

13FEB02

07FEB02

13FEB02

104

8,322

4ECR32106

HYDROSTATIC TEST (VS2B)

16FEB02

17FEB02

16FEB02

17FEB02

119

473

Concrete

Structural Steel

Piping

Electrical Equipment
4ECT32101

Montaje sala elctrica

04FEB02

04FEB02

04FEB02

04FEB02

126

340

4ECT12755

Montaje de paneles y tablero elctrico

05FEB02

11FEB02

05FEB02

11FEB02

126

490

4ECT32102

Montaje y conexionado panel solar

20FEB02

23FEB02

20FEB02

23FEB02

111

352

4ECT12760

Pruebas de equipos (marcha blanca)

28FEB02

01MAR02

28FEB02

01MAR02

107

Raceway & Conduit


4ECU12740

Tendido de ductos elctricos a la vista

17NOV01A 22NOV01A 17NOV01A

22NOV01A

669

4ECU22105

Tendido de ductos

17NOV01A

22DEC01

17NOV01A

22DEC01

158

1,717

4ECU12730

Pasadas de ductos (reservas electricas)

03FEB02

05FEB02

03FEB02

05FEB02

304

401

4ECW12101

Tendido conductor de tierra

10

10NOV01A 25NOV01A 10NOV01A

25NOV01A

825

4ECW12700

Termofusiones conductor de tierra

11

13NOV01A 22NOV01A 13NOV01A

22NOV01A

434

4ECW22106

Cableado elctrico

21NOV01A 22NOV01A 21NOV01A

22NOV01A

2,649

4ECX12750

Tendido de tubing

15DEC01

20DEC01

15DEC01

20DEC01

161

307

4ECX12715

Calibracin de instrumentos

14FEB02

14FEB02

14FEB02

14FEB02

107

62

Cable & Wire

Instrumentation

Sheet 61 of 76

Activity
ID

Activity
Description

4ECX12108

Montaje y conexionado de instrumentos

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

12

12

16FEB02

27FEB02

16FEB02

27FEB02

107

877

02MAR02

02MAR02

02MAR02

02MAR02

107

Bell Holes Km 68+140 to 44+649

12

22SEP01A

08OCT01A

22SEP01A

08OCT01A

187

4ECR11115

Flanges Km 103+000 to 81+000

11SEP01A

21OCT01A

11SEP01A

21OCT01A

22,101

4ECR11110

Flanges Km 151+850 to 144+596

21SEP01A

09OCT01A

21SEP01A

09OCT01A

10,562

4ECR11120

Flanges Km 81+000 to 44+649

20

25SEP01A

14NOV01A

25SEP01A

14NOV01A

13,573

4ECR11060

Clean Km 96+800 to 44+649

29

13NOV01A

15DEC01

13NOV01A

15DEC01

345

26,256

Cerco perimetral desmontable

11

11

17JAN02

27JAN02

10JAN02

20JAN02

139

653

4ECB12160

(VS3B)Trazados y Niveles Estacin

25OCT01A 26OCT01A 25OCT01A

26OCT01A

15

4ECB12290

Trazado mallas tierra y banco ductos VS3B

25OCT01A 25OCT01A 25OCT01A

25OCT01A

4ECB12440

Excavacin zanja mallas de tierra

26OCT01A 10NOV01A 26OCT01A

10NOV01A

44

4ECB32203

Excavacin fundacin de estacin y panel solar

35

26OCT01A 24NOV01A 26OCT01A

24NOV01A

134

4ECB12460

Tapado y compactacin zanja mallas tierra

12

31OCT01A 15NOV01A 31OCT01A

15NOV01A

20

4ECB12475

Excavacin banco de ductos

01NOV01A 22NOV01A 01NOV01A

22NOV01A

4ECB12490

Excavacin fundacin sala elctrica

25NOV01A

13DEC01

25NOV01A

06DEC01

347

4ECB12500

Base estabilizada e=20 cm(sala elec. y Estacin)

25NOV01A

15DEC01

25NOV01A

08DEC01

345

4ECB12415

Drenaje a piscina de emergencia

14DEC01

18DEC01

07DEC01

11DEC01

342

25

4ECG32201

Armaduras A 63-42 H

20NOV01A

16DEC01

20NOV01A

09DEC01

344

164

4ECG12201

Emplantilado con H10 de 110 Kg-cem/m3(H.E)

24NOV01A

13DEC01

24NOV01A

06DEC01

347

14

4ECG12225

Hormign H30 Mpa fundacin sala elctrica

24NOV01A

18DEC01

24NOV01A

11DEC01

162

70

4ECG42201

Hormign H30 Mpa Estacin y losa Panel Solar

25NOV01A

17DEC01

25NOV01A

10DEC01

139

375

4ECG12215

Canaleta y graiting

14DEC01

17DEC01

07DEC01

10DEC01

168

213

4ECG12205

Refuerzo ductos con H20 Mpa

16DEC01

17DEC01

09DEC01

10DEC01

165

70

4ECG12275

Pozo de derrame

18DEC01

18DEC01

11DEC01

11DEC01

168

70

4ECG12420

Machones de Hormign (4 un )

06JAN02

09JAN02

19DEC01

22DEC01

157

213

4ECH12285

Plataforma de Operacin de la Estacin

20DEC01

06JAN02

13DEC01

19DEC01

139

4ECH12355

Estructura metlica para panel solar

17

17

20DEC01

16JAN02

13DEC01

09JAN02

139

Pre-Op & No Load Testing


4ECM12800

Entrega (VS2B)

SUBSISTEMA 420-06 CONCETRATE PIPELINE LINE 3


Earthwork
4ECR11085
Piping

SUBSISTEMA 420-07 CONCENTRATE PIPELINE VS3B


Site Development
4ECA72201
Earthwork

Concrete

Structural Steel

Sheet 62 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Piping
4ECR12201

Piping de estacin VS3B (incluye soportes)

19DEC01

05JAN02

12DEC01

18DEC01

139

7,322

4ECR32206

HYDROSTATIC TEST (VS3B)

07JAN02

09JAN02

20DEC01

22DEC01

157

473

Electrical Equipment
4ECT32201

Montaje sala elctrica

20DEC01

20DEC01

13DEC01

13DEC01

162

340

4ECT12370

Montaje de paneles y tablero elctrico

12JAN02

18JAN02

05JAN02

11JAN02

151

500

4ECT32202

Montaje y conexionado panel solar

18JAN02

21JAN02

11JAN02

14JAN02

145

523

4ECT12375

Pruebas de equipos (marcha blanca)

20JAN02

21JAN02

13JAN02

14JAN02

145

Raceway & Conduit


4ECU22205

Tendido de ductos

06NOV01A

15DEC01

06NOV01A

08DEC01

165

1,717

4ECU12335

Pasadas de ductos (reservas electricas)

14DEC01

17DEC01

07DEC01

10DEC01

152

401

4ECU12340

Tendido de ductos elctricos a la vista

19DEC01

05JAN02

12DEC01

18DEC01

151

802

Cable & Wire


4ECW12201

Tendido conductor de tierra

01NOV01A

16DEC01

01NOV01A

09DEC01

344

825

4ECW12315

Termofusiones conductor de tierra

12

04NOV01A

15DEC01

04NOV01A

08DEC01

345

434

4ECW22206

Cableado elctrico

17DEC01

18DEC01

10DEC01

11DEC01

166

2,649

4ECX12300

Calibracin de instrumentos

06JAN02

06JAN02

19DEC01

19DEC01

145

62

4ECX12350

Tendido de tubing

06JAN02

11JAN02

19DEC01

04JAN02

151

307

4ECX12208

Montaje y conexionado de instrumentos

13

13

07JAN02

19JAN02

20DEC01

12JAN02

145

722

28JAN02

28JAN02

21JAN02

21JAN02

139

Instrumentation

Pre-Op & No Load Testing


4ECM12410

Entrega (VS3B)

SUBSISTEMA 420-08 CONCENTRATE PIPELINE LINE 4


Site Development
4ECA62301

Drenaje a piscina de emergencia

23JAN02

26JAN02

21JAN02

24JAN02

89

25

4ECA62701

Ejecucin pozo derrames con grava Tmn 2"

08FEB02

09FEB02

08FEB02

09FEB02

110

73

4ECA13880

Mejoramiento de acceso a Estacin SFM4B

14FEB02

16FEB02

14FEB02

16FEB02

110

4ECA13895

Limpieza general en area de la estacin

17FEB02

20FEB02

17FEB02

20FEB02

115

4ECA72701

Reparacin de cierre perimetral y portn existen

20FEB02

23FEB02

20FEB02

23FEB02

110

49

4ECA13900

Aseo general y retoques de pintura sala elctric

21FEB02

22FEB02

21FEB02

22FEB02

117

4ECA62601

Ejecucin pozo derrames con grava Tmn 2"

23FEB02

24FEB02

23FEB02

24FEB02

96

73

4ECA13660

Mejoramiento de acceso a Estacin SFM4B

01MAR02

03MAR02

01MAR02

03MAR02

96

4ECA72301

Cerco perimetral desmontable

12

12

02MAR02

13MAR02

28FEB02

11MAR02

97

467

4ECA13675

Limpieza general en area de la estacin

04MAR02

06MAR02

04MAR02

06MAR02

100

4ECA13695

Reparacin de cierre perimetral y portn existen

06MAR02

10MAR02

06MAR02

10MAR02

96

40

4ECA13680

Aseo general y retoques de pintura sala elctric

08MAR02

09MAR02

08MAR02

09MAR02

103

Sheet 63 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Earthwork
4ECB11345

Surveying

31JUL01A

02AUG01A

31JUL01A

02AUG01A

4ECB11565

Surveying

02AUG01A

13DEC01

02AUG01A

06DEC01

4ECB11350

Trenching

03AUG01A

07SEP01A

03AUG01A

07SEP01A

46

4ECB11470

Surveying

03AUG01A 04AUG01A 03AUG01A

04AUG01A

253

4ECB11575

Ditching & Backfill

18

03AUG01A

17DEC01

03AUG01A

10DEC01

4ECR11080

Bell Holes Km 103 to 68+140

16

01SEP01A

21SEP01A

01SEP01A

21SEP01A

245

4ECB11475

Trenching

08SEP01A

24SEP01A

08SEP01A

24SEP01A

17

4ECR11100

Bell Holes Km 151+850 to 144+596

12SEP01A

15SEP01A

12SEP01A

15SEP01A

67

4ECR11105

Bell Holes Km 119+000 to 103+000

25SEP01A

12OCT01A

25SEP01A

12OCT01A

4ECB11645

Surveying

11

01NOV01A

16DEC01

01NOV01A

09DEC01

96

2,154

4ECB11650

Ditching

19

06NOV01A

17DEC01

06NOV01A

10DEC01

132

571

4ECB11710

Sand Padding

21NOV01A

18DEC01

21NOV01A

11DEC01

122

4ECB11720

Backfill

22NOV01A

17DEC01

22NOV01A

10DEC01

132

76

4ECB11440

Sand Padding

13

13

14DEC01

06JAN02

07DEC01

19DEC01

86

4ECB11580

Re-Ditching

47

47

14DEC01*

09FEB02

07DEC01*

02FEB02

91

776

4ECB11725

R.O.W. Restoration

14DEC01

21DEC01

07DEC01

14DEC01

132

76

4ECB14070

(VSRR)Trazados y Niveles Estacin

14DEC01

16DEC01

07DEC01

09DEC01

80

15

4ECB11625

Sand Padding

46

46

15DEC01

09FEB02

08DEC01

02FEB02

92

4ECB11545

Sand Padding

50

50

19DEC01

17FEB02

12DEC01

10FEB02

86

4ECB11635

Backfill

46

46

19DEC01

13FEB02

12DEC01

06FEB02

88

140

4ECB11455

Backfill

25

25

20DEC01

24JAN02

13DEC01

17JAN02

87

28

4ECB11465

R.O.W. Restoration

25

25

21DEC01

25JAN02

14DEC01

18JAN02

87

49

4ECB11555

Backfill

50

50

21DEC01

19FEB02

14DEC01

12FEB02

86

15

4ECB11560

R.O.W. Restoration

50

50

22DEC01

20FEB02

15DEC01

13FEB02

86

22

4ECB11640

R.O.W. Restoration

46

46

22DEC01

16FEB02

15DEC01

09FEB02

86

227

4ECB32303

Excavacin Cmara

16JAN02

21JAN02

14JAN02

19JAN02

89

156

4ECB42303

Base estabilizada e=20 cm(sala elec. y Estacin)

23JAN02

24JAN02

21JAN02

22JAN02

97

152

4ECB32703

Excavacin Cmara

28JAN02

01FEB02

28JAN02

01FEB02

89

157

4ECB14010

Base Estabilizada e=20 cm

02FEB02

03FEB02

02FEB02

03FEB02

94

4ECB14030

Excavacin conduit enterrado

02FEB02

02FEB02

02FEB02

02FEB02

110

11

4ECB42703

Relleno de zanja con mat. seleccionado

10FEB02

11FEB02

10FEB02

11FEB02

110

154

4ECB32603

Excavacin Cmara

12FEB02

16FEB02

12FEB02

16FEB02

80

157

4ECB13860

Relleno de zanja con material comn

13FEB02

13FEB02

13FEB02

13FEB02

110

4ECB13870

Rellenos en cmaras de inspeccin e instrumentos

14FEB02

15FEB02

14FEB02

15FEB02

118

Sheet 64 of 76

687
92

91

313

62

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECB13855

(SFM4B)Trazados y niveles Estacin

16FEB02

19FEB02

09FEB02

12FEB02

80

33

4ECB13790

Base Estabilizada e=20 cm

17FEB02

18FEB02

17FEB02

18FEB02

80

4ECB13810

Excavacin conduit enterrado

17FEB02

17FEB02

17FEB02

17FEB02

96

11

4ECB13640

(SFM3)Trazados y niveles Estacin

25FEB02

27FEB02

18FEB02

20FEB02

80

33

4ECB42603

Relleno de zanja con mat. seleccionado

25FEB02

26FEB02

25FEB02

26FEB02

96

154

4ECB13840

Relleno de zanja con material comn

27FEB02

27FEB02

27FEB02

27FEB02

96

4ECB13650

Rellenos en cmaras de inspeccin e instrumentos

01MAR02

02MAR02

01MAR02

02MAR02

98

4ECG12301

Emplantilado con H10 de110 Kg-cem/m3 (HE)

25JAN02

26JAN02

23JAN02

24JAN02

97

13

4ECG32301

Armaduras A 63-42 H Losa

27JAN02

02FEB02

25JAN02

31JAN02

97

164

4ECG12701

Emplantillado con H10 de 110 Kg-cem/m3 (HE)

04FEB02

04FEB02

04FEB02

04FEB02

94

13

4ECG14090

Hormign H30 Losa Estacin

04FEB02

04FEB02

02FEB02

02FEB02

97

70

4ECG22301

Moldajes de muros

06FEB02

11FEB02

04FEB02

09FEB02

97

121

4ECG32701

Armaduras A 63-42 H Losa

06FEB02

14FEB02

06FEB02

14FEB02

94

104

4ECG42301

Hormign H30 Muros

13FEB02

13FEB02

11FEB02

11FEB02

97

93

4ECG14060

Hormign Losa H30 Mpa

15FEB02

15FEB02

15FEB02

15FEB02

94

21

4ECG14055

Armadura A 63-42 H Muros

16FEB02

18FEB02

16FEB02

18FEB02

94

60

4ECG14160

Escalines

18FEB02

20FEB02

16FEB02

18FEB02

97

4ECG12601

Emplantillado con H10 de 110 Kg-cem/m3 (HE)

19FEB02

19FEB02

19FEB02

19FEB02

80

13

4ECG14140

Machones de anclaje de Hormign lnea 6"

20FEB02

20FEB02

18FEB02

18FEB02

98

70

4ECG22701

Moldaje de muros

20FEB02

25FEB02

20FEB02

25FEB02

94

321

4ECG32601

Armaduras A 63-42 H Losa

10

10

20FEB02

01MAR02

20FEB02

01MAR02

80

104

4ECG42701

Hormign Muros H30 Mpa

27FEB02

27FEB02

27FEB02

27FEB02

94

45

4ECG13850

Hormign Losa H30 Mpa

02MAR02

02MAR02

02MAR02

02MAR02

80

21

4ECG13835

Armadura A 63-42 H Muros

03MAR02

05MAR02

03MAR02

05MAR02

80

60

4ECG13975

Escalines

04MAR02

06MAR02

04MAR02

06MAR02

94

4ECG22601

Moldaje de muros

06MAR02

12MAR02

06MAR02

12MAR02

80

321

4ECG42601

Hormign Muros H30 Mpa

13MAR02

13MAR02

13MAR02

13MAR02

80

45

4ECG14005

Machones de Hormign

15MAR02

17MAR02

15MAR02

17MAR02

94

66

4ECG13755

Escalines

19MAR02

20MAR02

19MAR02

20MAR02

80

4ECG13785

Machones de Hormign

30MAR02

01APR02

30MAR02

01APR02

80

66

4ECH14100

Plataforma de acceso a la estacin

18FEB02

24FEB02

16FEB02

22FEB02

101

4ECH13955

Suministro y reemplazo de diagonal faltante

24FEB02

25FEB02

24FEB02

25FEB02

114

40

4ECH32301

Cubierta de acero de estacin

01MAR02

02MAR02

27FEB02

28FEB02

97

589

Concrete

Structural Steel

Sheet 65 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECH13735

Suministro y reemplazo de diagonal faltante

11MAR02

12MAR02

11MAR02

12MAR02

100

40

4ECH13985

Instalacin tapa cmara con pl diamantada e=6mm

15MAR02

16MAR02

15MAR02

16MAR02

95

4ECH13765

Instalacin tapa cmara con pl diamantada e=6mm

30MAR02

31MAR02

30MAR02

31MAR02

81

4ECK13905

Reparacin de barra seg. sala elctrica

18FEB02

20FEB02

18FEB02

20FEB02

117

4ECK13910

SFM4B Sellos con silicona en puertas

21FEB02

21FEB02

21FEB02

21FEB02

115

4ECK13960

Reparacin de barra de cierre de puerta de acces

25FEB02

27FEB02

25FEB02

27FEB02

112

4ECK13965

Sumunistro y reemplazo de aldaba puerta

27FEB02

27FEB02

27FEB02

27FEB02

110

4ECK13970

Instalacin de bisagras nuevas y barra de seguri

28FEB02

01MAR02

28FEB02

01MAR02

110

4ECK13685

Reparacin de barra seg. sala elctrica

05MAR02

06MAR02

05MAR02

06MAR02

103

4ECK13690

SFM3 Sellos con silicona en puertas

08MAR02

08MAR02

08MAR02

08MAR02

100

4ECK13740

Reparacin de barra de cierre de puerta de acces

12MAR02

13MAR02

12MAR02

13MAR02

97

4ECK13745

Sumunistro y reemplazo de aldaba puerta

13MAR02

13MAR02

13MAR02

13MAR02

96

4ECK13750

Instalacin de bisagras nuevas y barra de seguri

15MAR02

16MAR02

15MAR02

16MAR02

96

4ECR11055

Clean Km 103 to 99+422

22AUG01A 30NOV01A 22AUG01A

30NOV01A

4,399

4ECR11030

Clean / Test Km 106 to 109

10SEP01A

25SEP01A

10SEP01A

25SEP01A

2,500

4ECR11035

Clean / Test Km 106 to 103

12SEP01A

26SEP01A

12SEP01A

26SEP01A

2,500

4ECR11045

Clean / Test Km 116 to 112

13SEP01A

04OCT01A

13SEP01A

04OCT01A

4,415

4ECR11040

Repair Leak Km 116 - 112

02OCT01A 04OCT01A 02OCT01A

04OCT01A

4ECR11140

Stringing / Laydown

09OCT01A 16OCT01A 09OCT01A

16OCT01A

8,425

4ECR11150

Fusion Welding

10OCT01A 19OCT01A 10OCT01A

19OCT01A

1,889

4ECR11160

Liner Pulling

12OCT01A 05NOV01A 12OCT01A

05NOV01A

1,181

4ECR11215

Stub-end installation

20

28OCT01A 05DEC01A 28OCT01A

05DEC01A

3,061

4ECR11170

Stub-end installation

06NOV01A 10NOV01A 06NOV01A

10NOV01A

1,118

4ECR11180

Flange Bolt-up &Air test

09NOV01A 15NOV01A 09NOV01A

15NOV01A

819

4ECR11185

Stringing / Laydown

10NOV01A 05DEC01A 10NOV01A

05DEC01A

1,122

4ECR11195

Fusion Welding

19

13NOV01A 05DEC01A 13NOV01A

05DEC01A

2,723

4ECR11655

Load & Transport Pipe

32

14NOV01A

17DEC01

14NOV01A

10DEC01

343

4ECR11665

Steel Pipe Stringing

31

14NOV01A

19DEC01

14NOV01A

12DEC01

341

2,800

4ECR11205

Liner Pulling

20

15NOV01A 05DEC01A 15NOV01A

05DEC01A

4ECR11675

Pipe Bending

32

15NOV01A

19DEC01

15NOV01A

12DEC01

113

3,704

4ECR11685

Steel Pipe Welding 6"/7"

30

16NOV01A

19DEC01

16NOV01A

12DEC01

118

6,677

4ECR11695

X-Ray

30

16NOV01A

19DEC01

16NOV01A

12DEC01

341

4ECR11050

Clean / Test Km 96+800 to 99+422

15

25NOV01A 07DEC01A 25NOV01A

Architectural

Piping

Sheet 66 of 76

07DEC01A

2,723

5,699

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECR11225

Flange Bolt-up &Air test

20

26NOV01A 05DEC01A 26NOV01A

05DEC01A

4ECR11230

Stringing / Laydown

02DEC01A

15DEC01

4ECR11075

Clean Km 136+880 to 135+946

03DEC01A 04DEC01A 03DEC01A

04DEC01A

4ECR11240

Fusion Welding

10

04DEC01A

16DEC01

04DEC01A

16DEC01

158

3,125

4ECR11250

Liner Pulling

11

05DEC01A

17DEC01

05DEC01A

17DEC01

163

3,097

4ECR11260

Stub-end installation

11

06DEC01A

18DEC01

06DEC01A

18DEC01

169

2,133

4ECR11700

Joint Coating

06DEC01A

19DEC01

06DEC01A

12DEC01

340

6,550

4ECR11715

Lower-In

06DEC01A

20DEC01

06DEC01A

13DEC01

340

4,284

4ECR11270

Flange Bolt-up &Air test

14DEC01

22DEC01

11DEC01

19DEC01

172

911

4ECR11275

Stringing / Laydown

14DEC01

18DEC01

07DEC01

11DEC01

157

518

4ECR11320

Stringing / Laydown

14DEC01

18DEC01

07DEC01

11DEC01

168

415

4ECR11370

Load & Transport Pipe

14DEC01*

22DEC01

07DEC01*

15DEC01

86

4ECR11380

Steel Pipe Stringing

14DEC01

22DEC01

07DEC01

15DEC01

86

1,330

4ECR11880

Weld Flange

35

35

14DEC01*

28JAN02

07DEC01*

21JAN02

84

3,268

4ECR11890

Stringing / Laydown

35

35

14DEC01*

28JAN02

07DEC01*

21JAN02

96

8,651

4ECR11895

Fusion Welding

35

35

14DEC01

28JAN02

07DEC01

21JAN02

96

2,833

4ECR11285

Fusion Welding

15DEC01

03JAN02

08DEC01

16DEC01

157

3,361

4ECR11395

Pipe Bending

11

11

15DEC01

05JAN02

08DEC01

18DEC01

86

4ECR11585

Load & Transport Pipe

47

47

15DEC01

10FEB02

08DEC01

03FEB02

91

4ECR11590

Steel Pipe Stringing

40

40

15DEC01

03FEB02

08DEC01

27JAN02

91

6,252

4ECR11600

Pipe Bending

42

42

15DEC01

05FEB02

08DEC01

29JAN02

91

4,188

4ECR11605

Steel Pipe Welding 6"/7"

46

46

15DEC01

09FEB02

08DEC01

02FEB02

91

6,529

4ECR11900

Liner Pulling

35

35

15DEC01

29JAN02

08DEC01

22JAN02

96

2,833

4ECR11135

Flanges Km 119+250 to 103+000

16DEC01

21DEC01

16DEC01

21DEC01

117

5,696

4ECR11295

Liner Pulling

16DEC01

03JAN02

13DEC01

20DEC01

160

1,889

4ECR11405

Steel Pipe Welding 6"/7"

10

10

16DEC01

05JAN02

09DEC01

18DEC01

86

3,054

4ECR11425

X-Ray

10

10

16DEC01

05JAN02

09DEC01

18DEC01

87

4ECR11495

Load & Transport Pipe

45

45

16DEC01

09FEB02

09DEC01

02FEB02

91

4ECR11500

Steel Pipe Stringing

45

45

16DEC01

09FEB02

09DEC01

02FEB02

91

811

4ECR11430

Joint Coating

20

20

17DEC01

16JAN02

10DEC01

09JAN02

86

2,515

4ECR11515

Pipe Bending

45

45

17DEC01

10FEB02

10DEC01

03FEB02

91

1,023

4ECR11305

Stub-end installation

18DEC01

04JAN02

15DEC01

21DEC01

166

721

4ECR11445

Lower-In

20

20

18DEC01

17JAN02

11DEC01

10JAN02

86

2,042

4ECR11520

Steel Pipe Welding 6"/7"

45

45

18DEC01

11FEB02

11DEC01

04FEB02

91

1,784

4ECR11535

X-Ray

50

50

18DEC01

16FEB02

11DEC01

09FEB02

87

15DEC01

Sheet 67 of 76

02DEC01A

1,913
157

1,537
3,899

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4ECR11615

X-Ray

47

47

18DEC01

13FEB02

11DEC01

06FEB02

88

4ECR11540

Joint Coating

50

50

19DEC01

17FEB02

12DEC01

10FEB02

86

1,508

4ECR11620

Joint Coating

46

46

19DEC01

13FEB02

12DEC01

06FEB02

88

6,590

4ECR11630

Lower-In

46

46

19DEC01

13FEB02

12DEC01

06FEB02

88

3,883

4ECR11315

Flange Bolt-up &Air test

20DEC01

05JAN02

17DEC01

22DEC01

166

274

4ECR11550

Lower-In

50

50

20DEC01

18FEB02

13DEC01

11FEB02

86

1,067

4ECR11905

Stub-end installation

30

30

21DEC01

30JAN02

14DEC01

23JAN02

96

1,236

4ECR11915

Flange Bolt-up &Air test

30

30

04JAN02

02FEB02

17DEC01

26JAN02

96

502

4ECR11325

Fusion Welding

06JAN02

10JAN02

19DEC01

03JAN02

157

945

4ECR11330

Liner Pulling

07JAN02

09JAN02

21DEC01

03JAN02

157

708

4ECR11335

Stub-end installation

08JAN02

10JAN02

22DEC01

04JAN02

157

309

4ECR11340

Flange Bolt-up &Air test

09JAN02

11JAN02

03JAN02

05JAN02

157

137

4ECR11920

Weld Flange

28

28

09JAN02

05FEB02

22DEC01

29JAN02

84

6,011

4ECR11930

Stringing / Laydown

19

19

09JAN02*

27JAN02

22DEC01*

20JAN02

93

9,170

4ECR11940

Fusion Welding

18

18

09JAN02

26JAN02

22DEC01

19JAN02

102

4,250

4ECR11950

Liner Pulling

18

18

10JAN02

27JAN02

03JAN02

20JAN02

108

5,903

4ECR11960

Stub-end installation

20

20

11JAN02

30JAN02

04JAN02

23JAN02

110

3,885

4ECR11970

Flange Bolt-up &Air test

20

20

31JAN02

19FEB02

24JAN02

12FEB02

96

1,415

4ECR14095

Inst lnea de 6" desde disco ruptura a piscina

21FEB02

24FEB02

19FEB02

22FEB02

98

4ECR12301

Piping de estacin RR (incluye soportes)

22FEB02

28FEB02

20FEB02

26FEB02

97

7,696

4ECR12701

Piping de Estacin SFM4B ( incluye soportes )

08MAR02

14MAR02

08MAR02

14MAR02

94

4,966

4ECR12105

Stringing / Laydown

12MAR02*

16MAR02

05MAR02*

09MAR02

96

7,823

4ECR12110

Fusion Welding

22MAR02

26MAR02

15MAR02

19MAR02

87

945

4ECR12601

Piping de Estacin SFM3 (incluye soportes)

23MAR02

29MAR02

23MAR02

29MAR02

80

4,966

4ECR12115

Liner Pulling

27MAR02

31MAR02

20MAR02

24MAR02

87

945

4ECR12120

Stub-end installation

02APR02

05APR02

26MAR02

29MAR02

84

137

4ECR12125

Flange Bolt-up &Air test

07APR02

10APR02

31MAR02

03APR02

84

137

Pre-Op & No Load Testing


4ECM14135

Entrega (RR)

14MAR02

14MAR02

12MAR02

12MAR02

97

4ECM14000

Entrega (SFM4B)

18MAR02

18MAR02

18MAR02

18MAR02

94

4ECM13780

Entrega (SFM3)

02APR02

02APR02

02APR02

02APR02

80

SUBSISTEMA 420-09 COLOSO DISIPATION STATION


Earthwork
4ECB32803

DISSIPATION STATION STRUCTURAL EXCAVATION

20FEB02

22FEB02

13FEB02

15FEB02

88

84

4ECB42803

DISSIPATION STATION STRUCTURAL BACKFILL

06MAR02

08MAR02

27FEB02

01MAR02

124

63

Sheet 68 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Concrete
4ECG12801

DISSIPATION STATION LEAN CONCRETE

23FEB02

23FEB02

16FEB02

16FEB02

88

14

4ECG32801

DISSIPATION STATION CONCRETE REBAR

23FEB02

25FEB02

16FEB02

18FEB02

88

746

4ECG22801

DISSIPATION STATION CONCRETE FORMS

24FEB02

26FEB02

17FEB02

19FEB02

88

170

4ECG42801

DISSIPATION STATION PLACE CONCRETE

26FEB02

26FEB02

19FEB02

19FEB02

88

132

DISSIPATION ST. NITROGEN CYLINDERS INSTALL

14APR02

15APR02

07APR02

08APR02

91

64

4ECR22801

DISSIPATION STATION STRUCT. STEEL PIPE SUPPORTS

14

14

03MAR02

16MAR02

24FEB02

09MAR02

88

921

4ECR12801

DISSIPATION STATION PIPING

28

28

17MAR02

13APR02

10MAR02

06APR02

88

6,649

4ECR32806

DISSIPATION STATION PIPING TEST & FLUSH

14APR02

16APR02

07APR02

09APR02

88

223

4ECR92808

DISSIPATION STATION PIPING PUNCH LIST

14APR02

18APR02

07APR02

11APR02

88

239

4ECX12808

FIELD MOUNTED INSTRUMENTS @ DISSIPATION STATION

14APR02

17APR02

07APR02

10APR02

88

153

4ECX92801

INSTRUMENTS @ DISSIPATION STATION PUNCH LIST

18APR02

20APR02

11APR02

13APR02

88

119

Mechanical Equipment
4ECN32801
Piping

Instrumentation

GENERAL
Site Development
4ECA10001

SC-08 CONTRACT MOBILIZATION

20

23JUN01A

25AUG01A

23JUN01A

25AUG01A

4ECA52901

PRESSURE RELIEF STATION DEMOLITION

20

20

23FEB02

14MAR02

16FEB02

07MAR02

125

1,618
23

4ECA12145

R.O.W. Restoration & Cleanup

30

30

08APR02

08MAY02

01APR02

30APR02

71

4ECB11015

Bell Holes Excavation

40

22

16AUG01A

15JAN02

16AUG01A

10DEC01

325

4ECB12155

Surveying & As-built

70

70

27FEB02

08MAY02

20FEB02

30APR02

71

4ECB12140

Bell Hole Backfilling

30

30

06APR02

06MAY02

30MAR02

28APR02

71

4ECR11005

Bellholes Marking

10

02JUL01A

02AUG01A

02JUL01A

02AUG01A

4ECR11020

Hydrostatic test (Sections 7,9 &10)

27

23JUL01A

14AUG01A

23JUL01A

14AUG01A

13,038

4ECR11010

Pipe & F.O. Detection (Calicatas)

40

25JUL01A

15DEC01

25JUL01A

08DEC01

4ECR11025

Pipe Cleaning (135 kms Original Sch.)

54

30JUL01A

15DEC01

30JUL01A

08DEC01

71

4ECR12901

PRESSURE RELIEF STATION PIPING

21

21

22FEB02

14MAR02

15FEB02

07MAR02

125

4,028

4ECR12135

Flange Coating

64

64

25FEB02

29APR02

18FEB02

22APR02

71

10

10

02FEB02

11FEB02

26JAN02

04FEB02

-18

758

116

116

18DEC01

23APR02

11DEC01

16APR02

71

5,955

Earthwork

Piping

345

Electrical Equipment
4ECT33001

COLOSO EROOM ER-314 MODIFICATION

Pre-Op & No Load Testing


4ECR12130

PRUEBAS HIDROSTATICA SISTEMA

Sheet 69 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

SISTEMA 441
SUBSISTEMA 441-03 NEW EQUIPMNT INSIDE EXIS EROOM
Site Development
4DCB30184

DEMOLICION

10

15JUL01A

20AUG01A

15JUL01A

20AUG01A

4DCB30194

DEMOLICION (ADICIONAL)

22JAN02

26JAN02

15JAN02

19JAN02

4DCB30103

FAC. 440 STRUCTURAL EXCAVATION

15

20JUL01A

14NOV01A

20JUL01A

14NOV01A

681

4DCB40104

FAC. 440 STRUCTURAL BACKFILL

15

15NOV01A 04DEC01A 15NOV01A

04DEC01A

459

4DCG50101

FAC. 440 LEAN CONCRETE

15AUG01A

20SEP01A

15AUG01A

20SEP01A

95

4DCG50102

FAC. 440 FORMS

25

16AUG01A

22SEP01A

16AUG01A

22SEP01A

395

4DCG50103

FAC. 440 REBAR

21

16AUG01A 20NOV01A 16AUG01A

20NOV01A

1,006

4DCG50105

FAC. 440 PLACE CONCRETE

25

24AUG01A 20NOV01A 24AUG01A

20NOV01A

3,366

4DCK50101

FAC. 440 BLOCKWORK (ER-06 EXPANSION)

15

15

22DEC01

16JAN02

15DEC01

09JAN02

146

251

4DCK20110

FAC.440 DOORS RELOCATION & OTHER ARCH.FINISHES

15

15

22JAN02

05FEB02

15JAN02

29JAN02

141

290

4DCK30101

FAC. 440 SIDING & ROOFING

20

20

22JAN02

10FEB02

15JAN02

03FEB02

141

269

4DCK90101

FAC. 440 ARCHITECTURAL PUNCH LIST

15

15

11FEB02

25FEB02

04FEB02

18FEB02

152

325

311

Earthwork

Concrete

Architectural

Electrical Equipment
4DCT20116

EQUIPMENT INSIDE ER-06 INSTALLATION

15

15

10JAN02

24JAN02

10JAN02

24JAN02

142

130

4DCT30102

MISCELLANEOUS ELECTRICAL EQUIPMENT INSTALLATION

14

14

25JAN02

07FEB02

25JAN02

07FEB02

153

88

4DCT30103

LIGHTING FIXTURES INSTALLATION

14

14

14FEB02

27FEB02

14FEB02

27FEB02

133

33

4DCT90101

FAC. 0440 ELECTRICAL EQUIPMENT PUNCH LIST

15

15

14MAR02

28MAR02

14MAR02

28MAR02

119

82

TOP 43 EXIST STORAGE MOD & PUMPING FOR 9" PIPEL


SISTEMA 441
SUBSISTEMA 441-02 CONCENTRATE PUMPING 9"
Site Development
4DCB30185

DEMOLICION

10

15JUL01A

20AUG01A

15JUL01A

20AUG01A

4DCA50102

FAC. 440 DEMOLITION

05JAN02

09JAN02

05JAN02

09JAN02

326

4DCA10101

FAC. 440 PAVEMENTS

10JAN02

14JAN02

10JAN02

14JAN02

326

81

4DCB30120

FAC. 440 STRUCTURAL EXCAVATION

15

20JUL01A

25OCT01A

20JUL01A

25OCT01A

142

4DCB30121

FAC. 440 STRUCTURAL BACKFILL

15

06NOV01A 15NOV01A 06NOV01A

15NOV01A

72

4DCB30123

DEF. TRABAJOS PREVIOS MEL-(REBALSE DE RELAVES)

15

07DEC01A

21DEC01

128

4DCB30173

ENTREGA AREA POR MEL

04JAN02*

119

4DCB30163

RETIRO DE ESTRUCTURA/EQUIPOS EXISTENTES (MEL)

20

20

30JAN02

119

Earthwork

21DEC01

07DEC01A

04JAN02*
11JAN02

30JAN02

Sheet 70 of 76

11JAN02

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4DCB30113

DEMOLICION AREA DISTRIBUIDORES (2 UND)

14

14

31JAN02

13FEB02

31JAN02

13FEB02

119

4DCB30133

DEMOLICION AREA BOMBAS (4 UND)

14

14

31JAN02

13FEB02

31JAN02

13FEB02

119

4DCB30143

DEMOLICION AREA PLATAF OPERACION(8UND)

10

10

03FEB02

12FEB02

03FEB02

12FEB02

139

4DCB30153

DEMOLIC. - MISCELANE

10

10

03FEB02

12FEB02

03FEB02

12FEB02

139

4DCG10101

FAC. 440 LEAN CONCRETE

15AUG01A 25OCT01A 15AUG01A

25OCT01A

119

4DCG20106

FAC. 440 FORMS

25

16AUG01A 02NOV01A 16AUG01A

02NOV01A

3,443

4DCG30105

FAC. 440 REBAR

21

16AUG01A 05NOV01A 16AUG01A

05NOV01A

2,176

4DCG40107

FAC. 440 PLACE CONCRETE

25

24AUG01A 07NOV01A 24AUG01A

07NOV01A

1,803

4DCG40117

LLEGADA DE PERNOS PARA INSERTOS

15OCT01A

15OCT01A

4DCG40127

CONSTRUCCION DE RADIER

10

20OCT01A 10NOV01A 20OCT01A

4DCG20116

HORMIGONADO AREA PLATF (ACERO/MOLDAJE/CONCRETO)

14

14

13FEB02

26FEB02

13FEB02

26FEB02

139

4DCG20136

HORMIGONADO MISCL. (ACERO/MOLDAJE/CONCRETO)

14

14

13FEB02

26FEB02

13FEB02

26FEB02

139

4DCG10111

HORMIGONADO AREA DISTRIB (ACERO/MOLDAJE/CONCRET) 14

14

14FEB02

27FEB02

14FEB02

27FEB02

131

4DCG10121

HORMIGONADO AREA BOMBAS (ACERO/MOLDAJE/CONCRETO)14

14

14FEB02

27FEB02

14FEB02

27FEB02

119

4DCH10108

FAC. 440 MAJOR STRUCTURAL STEEL

21

23AUG01A 31OCT01A 23AUG01A

31OCT01A

1,342

4DCH20109

FAC. 440 MISCELLANEOUS STRUCTURAL STEEL

30

18OCT01A 05NOV01A 18OCT01A

05NOV01A

83

4DCH40101

FAC. 440 BRIDGE CRANE RAILS EXTENSION

10

05NOV01A 15NOV01A 05NOV01A

15NOV01A

199

Concrete

10NOV01A

Structural Steel

Mechanical Bulks
4DCM30101

DISTRIBUTOR 440-DI-020@022 INSTALLATION

28FEB02

06MAR02

28FEB02

06MAR02

131

740

4DCM90111

INSTALL. DE MISCELANEOS

07MAR02

13MAR02

07MAR02

13MAR02

131

4DCM90101

FAC. 0440 MECHANICAL BULKS PUNCH LIST

12MAR02

18MAR02

12MAR02

18MAR02

131

42

Mechanical Equipment
4DCN30101

SLURRY PUMP 440-PP-285 INSTALLATION

20

20

22DEC01

21JAN02

15DEC01

14JAN02

141

638

4DCN30102

PUMPS 440-PP-281@ 284 INSTALLATION

10

10

28FEB02

09MAR02

28FEB02

09MAR02

119

335

4DCN30112

FILTERS 440-FL-021@024 INSTALLATION

10MAR02

16MAR02

10MAR02

16MAR02

119

1,000

4DCN90101

FAC. 0440 MECHANICAL EQUIPMENT PUNCH LIST

17MAR02

23MAR02

17MAR02

23MAR02

119

435

4DCR20105

FAC. 440 PIPE SUPPORTS

15

15

14DEC01

08JAN02

11DEC01

05JAN02

151

20

4DCR10113

FAC. 440 PPING INSTALLATION

15

15

04JAN02

18JAN02

21DEC01

15JAN02

151

45

4DCR40107

FAC. 440 PIPING INSULATION

10

10

19JAN02

28JAN02

16JAN02

25JAN02

160

18

4DCR30106

FAC. 440 PIPE TESTING & FLUSHING

15

15

24JAN02

07FEB02

21JAN02

04FEB02

160

4DCR90108

FAC. 440 PPING PUNCH LIST

10

10

08FEB02

17FEB02

05FEB02

14FEB02

160

03JAN02

06JAN02

03JAN02

06JAN02

195

43

Piping

Electrical Equipment
4DCT30101

TRANSFORMER 440-PP-285SG & XF INSTALLATION

Sheet 71 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Raceway & Conduit


4DCU20115

FAC. 440 POWER & CONTROL CONDUIT

25

13

18NOV01A

25JAN02

18NOV01A

25JAN02

144

4,279

4DCU30115

FAC. 440 CABLE TRAYS

25

22

20NOV01A

15JAN02

20NOV01A

15JAN02

133

2,092

4DCU10101

FAC. 440 LIGHTING CONDUIT

15

15

16JAN02

30JAN02

16JAN02

30JAN02

133

1,022

4DCU90107

FAC. 440 RACEWAY PUNCH LIST

20

20

31JAN02

19FEB02

31JAN02

19FEB02

158

2,148

4DCW10114

FAC. 440 GROUNDING

14

22

16NOV01A

15JAN02

16NOV01A

15JAN02

185

1,028

4DCW20117

FAC. 440 POWER CABLE INSTALLATION

11

11

26JAN02

05FEB02

26JAN02

05FEB02

144

2,939

4DCW40118

FAC. 440 CONTROL CABLE INSTALLATION

16

16

26JAN02

10FEB02

26JAN02

10FEB02

144

28,431

4DCW60101

FAC. 440 LIGHTING CABLE INSTALLATION

14

14

31JAN02

13FEB02

31JAN02

13FEB02

133

874

4DCW30107

FAC. 440 POWER CABLE TERMINATION

10

10

06FEB02

15FEB02

06FEB02

15FEB02

154

480

4DCW50108

FAC. 440 CONTROL CABLE TERMINATION

10

10

11FEB02

20FEB02

11FEB02

20FEB02

149

1,420

4DCW90109

FAC. 440 CABLE PUNCH LIST

21FEB02

28FEB02

21FEB02

28FEB02

149

1,255

4DCX30101

CONTROL VALVES INSTALLATION

18

18

19JAN02

05FEB02

16JAN02

02FEB02

164

1,005

4DCX20101

FAC. 440 DCS INSTALLATION

24

24

25JAN02

17FEB02

25JAN02

17FEB02

142

1,857

4DCX10119

FAC. 440 FIELD MOUNTED INSTRUMENTS

21

21

26JAN02

15FEB02

26JAN02

15FEB02

144

2,310

4DCX50101

FAC. 0440 LOOP CHECK

21FEB02

28FEB02

21FEB02

28FEB02

149

1,309

4DCX90101

FAC. 0440 INSTRUMENT PUNCH LIST

18

18

13MAR02

30MAR02

13MAR02

30MAR02

119

1,957

Cable & Wire

Instrumentation

Pre-Op & No Load Testing


4DCY10120

FAC. 440 ALL PRECOMMISSIONING ACTIVITIES

14

14

31MAR02

13APR02

31MAR02

13APR02

119

4DCY20101

FAC. 440 NO LOAD TEST

14

14

14APR02

27APR02

14APR02

27APR02

119

4DCY30101

FAC. 440 DRY & WET TEST

14

14

28APR02

12MAY02

28APR02

12MAY02

119

TOP 62 TRUCK SCALE AT GATE HOUSE


SISTEMA 870 TRUCK SCALE & GATE HOUSE
SUBSISTEMA 870-01 TRUCK SCALE & GATE HOUSE
Site Development
8GCA10202

SCALE ACCESS ROAD PAVEMENT

10

10

10JAN02

19JAN02

03JAN02

12JAN02

216

568

8GCA10102

HIGH TONNAGE WIDE ROAD PAVEMENT

10

10

20JAN02

29JAN02

13JAN02

22JAN02

216

506

8GCA70102

VEHICULE ACCESS GATE

30JAN02

03FEB02

23JAN02

27JAN02

216

2,123

8GCB10101

SCALE ANCILLARY PLATFORMS MASS EARTHWORK

14

07MAY01A 17MAY01A 07MAY01A 17MAY01A

4,070

8GCB30101

SCALE STRUCTURAL EXCAVATION

15MAY01A 20MAY01A 15MAY01A 20MAY01A

326

8GCB40101

SCALE STRUCTURAL BACKFILL

01JUL01A

07JUL01A

01JUL01A

07JUL01A

163

8GCB10202

SCALE ACCESS ROAD MASS EW

16

20SEP01A

17DEC01

20SEP01A

10DEC01

216

940

8GCB10102

HIGH TONNAGE WIDE ROAD MASS EW

14

14

18DEC01

11JAN02

11DEC01

04JAN02

224

940

Earthwork

Sheet 72 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Concrete
8GCG10101

SCALE LEAN CONCRETE

24MAY01A 27MAY01A 24MAY01A 27MAY01A

154

8GCG20101

SCALE CONCRETE FORMS

04JUN01A

11JUN01A

04JUN01A

11JUN01A

368

8GCG30101

SCALE CONCRETE REBARS

04JUN01A

12JUN01A

04JUN01A

12JUN01A

1,375

8GCG40101

SCALE CONCRETE PLACEMENT

18JUN01A

10JUL01A

18JUN01A

10JUL01A

196

8GCG50101

SCALE DUCT BANKS

01JUL01A

07JUL01A

01JUL01A

07JUL01A

157

Mechanical Equipment
8GCN30101

TRUCK SCALE 0870-SL-013 INSTALL

12JUL01A

21JUL01A

12JUL01A

21JUL01A

8GCN90101

MECHANICAL EQUIPMENT PUNCH LIST

14DEC01

18DEC01

07DEC01

11DEC01

818

TRUCK SCALE PIPING INSTALL

17JUL01A

15AUG01A

17JUL01A

15AUG01A

326

175

100

Piping
8GCR10101

Electrical Equipment
8GCT30101

TRUCK SCALE CONTROL DEVICES INSTALL

25JUL01A

10AUG01A

25JUL01A

10AUG01A

8GCT30201

TRUCK SCALE LIGHTING POLES & FIXTURES INSTALL

20NOV01A

15DEC01

20NOV01A

08DEC01

228

8GCT90101

ELECTRICAL EQUIPMENT PUNCH LIST

14DEC01

18DEC01

07DEC01

11DEC01

228

Raceway & Conduit


8GCU20101

TRUCK SCALE POWER & CONTROL CONDUIT INSTALL

12JUL01A

17JUL01A

12JUL01A

17JUL01A

254

8GCU10101

TRUCK SCALE LIGHTING CONDUIT INSTALL

18JUL01A

20AUG01A

18JUL01A

20AUG01A

277

8GCU90101

RACEWAYS PUNCH LIST

14DEC01

18DEC01

07DEC01

11DEC01

8GCW10101

TRUCK SCALE GROUNDING CABLE INSTALL

20MAY01A

13JUN01A

20MAY01A

13JUN01A

215

8GCW20101

TRUCK SCALE POWER CABLE INSTALL

10JUL01A

15JUL01A

10JUL01A

15JUL01A

1,453

8GCW30101

TRUCK SCALE POWER CABLE TERMINATIONS

16JUL01A

19JUL01A

16JUL01A

19JUL01A

21

8GCW40101

TRUCK SCALE CONTROL CABLE INSTALL

16JUL01A

19JUL01A

16JUL01A

19JUL01A

73

8GCW60101

TRUCK SCALE LIGHTING CABLE INSTALL

16JUL01A

21JUL01A

16JUL01A

21JUL01A

63

8GCW50101

TRUCK SCALE CONTROL CABLE TERMINATIONS

20JUL01A

21JUL01A

20JUL01A

21JUL01A

8GCW90101

CABLE INSTALLATION PUNCH LIST

14DEC01

18DEC01

07DEC01

11DEC01

8GCX10101

TRUCK SCALE COMUNICATION EQUIPMENT INSTALL

10JUL01A

21JUL01A

10JUL01A

21JUL01A

8GCX50101

LOOP CHECK

20JUL01A

20AUG01A

20JUL01A

20AUG01A

8GCX90101

COMUNICATION EQUIPMENT PUNCH LIST

14DEC01

18DEC01

07DEC01

11DEC01

227

17DEC01

21DEC01

10DEC01

14DEC01

227

228

434

Cable & Wire

61
227

270

Instrumentation

Pre-Op & No Load Testing


8GCY10101

TRUCK SCALE PRE-OP TESTS

Sheet 73 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

TOP8 13.8KV CAMP & TEMPORARY CONST POWER FROM OX


SISTEMA 943
SUBSISTEMA 943-03 13.8KV TEMPORARY CONST POWER
Electrical Equipment
7CCT07310

13.8KV O/H LINES INITIAL POWER (ALL-IN) (temp)

90

15FEB01A

14JUN01A

15FEB01A

14JUN01A

18,063

14

14

04MAR02

17MAR02

04MAR02

17MAR02

264

BANDEJAS ELCTRICAS (NEW)

10

10

15JAN02

24JAN02

15JAN02

24JAN02

309

6DCH06490

BUILDING STRUCTURAL STEEL ERECTION

35

18JUN01A

21JUL01A

18JUN01A

21JUL01A

6DCH06500

MISCELL. STRUCTURAL STEEL ERECTION

20

10JUL01A

18DEC01

10JUL01A

11DEC01

6DCH06510

BRIDGE CRANE RAILS

24

15AUG01A 21AUG01A 15AUG01A

21AUG01A

6DCH06520

PUNCH LIST

20

10

20SEP01A

03JAN02

20SEP01A

16DEC01

165

406

INSTALL ROOFING

14JAN02

20JAN02

07JAN02

13JAN02

148

29JAN02

29JAN02

22JAN02

22JAN02

169

SUBSISTEMA 441-02 CONCENTRATE PUMPING 9"


Structural Steel
4DCN90111

MONTAJE ESTRUCTURA PULPOS (NEW)

SUBSISTEMA 441-03 NEW EQUIPMNT INSIDE EXIS EROOM


Cable & Wire
4DCT90111

OB
Structural Steel
2,199
148

1,649
1,319

Architectural
6DCK16520

Electrical Installation
6DCX06445

Connection 69Kv /940-ER-440 to ER-310-Train A

Pre-Op & No Load Testing


6DCY06456

ENERGIZE ELECTRICAL ROOM

21

21

14DEC01

14JAN02

07DEC01

07JAN02

-25

6DCY06424

PREOPERATIONS ACTIVITIES TRAIN A

20

20

09JAN02

28JAN02

22DEC01

21JAN02

140

6DCY86460

PREOPERATIONS ACTIVITIES TRAIN B

14

13

15JAN02

27JAN02

08JAN02

20JAN02

-25

REINICIO TRABAJOS POR BSK

14DEC01*

151

4DCB30205

SUMINISTRO SOPORTES PIPING

06DEC01

151

4DCB30215

SUMINISTRO SIDING & ROOFING

14DEC01

14DEC01

07DEC01

07DEC01

346

4DCB30225

SUMINISTROS INTRUMENTACION

24

24

14DEC01

17JAN02

07DEC01

10JAN02

323

4DCB30235

SUMINISTROS MECNICOS

14DEC01

14DEC01

07DEC01

07DEC01

346

4DCB30245

SUMINISTROS ELCTRICOS

16

16

14DEC01

09JAN02

07DEC01

22DEC01

331

4DCB30255

ER 441 ON SITE (NEW)

22DEC01*

22DEC01

22DEC01*

22DEC01

195

Site Development
4DCB30195

11DEC01*

Suministros
13DEC01

Sheet 74 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

Earthwork
4DCB30203

DEFINICIN DE CONFINAMIENTO AREAS

04JAN02

102

4DCB30183

CONFINAMIENTO Y LIMPIEZA AREAS

05JAN02

04JAN02
10JAN02

05JAN02

10JAN02

102

4DCB30193

REPLATEO TOPOGRFICO

10JAN02

10JAN02

10JAN02

10JAN02

119

4DCB40114

EXCAVACIONES ESTRUCT. RAMPA ACCESO (NEW)

22JAN02

23JAN02

15JAN02

16JAN02

312

4DCG50115

LEAN CONCRETE RAMPA ACCESO (NEW)

24JAN02

24JAN02

17JAN02

17JAN02

312

4DCG50125

FORMS RAMPA ACCESO (NEW)

25JAN02

26JAN02

18JAN02

19JAN02

312

4DCG50135

REBARS RAMPA ACCESO (NEW)

25JAN02

27JAN02

18JAN02

20JAN02

312

4DCG50155

PICADO PASADAS EN LOSAS (NEW)

27JAN02

29JAN02

20JAN02

22JAN02

311

4DCG50145

PLACE CONCRETE RAMPA ACCESO (NEW)

28JAN02

28JAN02

21JAN02

21JAN02

312

6DCG06490

BUILDING STRUCTURAL STEEL ERECTION

18JUN01A

21JUL01A

18JUN01A

21JUL01A

6DCG06500

MISCELL. STRUCTURAL STEEL ERECTION

10JUL01A

27NOV01A

10JUL01A

27NOV01A

6DCG06510

BRIDGE CRANE RAILS

15AUG01A 21AUG01A 15AUG01A

21AUG01A

6DCG06520

PUNCH LIST

20SEP01A

13DEC01

6DCG16520

INSTALL ROOFING(no aplica)

12NOV01A 16NOV01A 12NOV01A

6ACR06195

INSTALACION DE LUMINARIAS

14DEC01

18DEC01

11DEC01

15DEC01

6ACR06205

INSTALACION DE BANCODUCTO

14DEC01

19DEC01

11DEC01

16DEC01

4DCN90121

CUADRO CAERAS HACIA BBA IMPULSIN (NEW)

10

10

28FEB02

09MAR02

28FEB02

09MAR02

257

4DCN90141

CUADRO VLVULAS (DEF LMITE BATERY SC-07) (NEW)

10

10

28FEB02

09MAR02

28FEB02

09MAR02

272

4DCN90151

TIE-IN (USO RECURSOS) (NEW)

10MAR02

15MAR02

10MAR02

15MAR02

266

4DCN90161

ZAPATAS PARA AISLACIN (NEW)

10MAR02

14MAR02

10MAR02

14MAR02

257

4DCN90131

AISLACIN CAERAS MENORES (NEW)

10

10

15MAR02

24MAR02

15MAR02

24MAR02

257

03JAN02

06JAN02

03JAN02

06JAN02

195

Concrete

Structural Steel

15DEC01

20SEP01A

299

16NOV01A

0
0

Piping

Electrical Equipment
4DCT90131

INSTALL ELECTRICAL ROOM # 440-ER-441(NEW)

Raceway & Conduit


4DCU90147

CANALIZACIN ESTACIN DE CONTROL (NEW)

29

29

14DEC01

22JAN02

07DEC01

15JAN02

269

4DCU90117

ESCALERILLAS PARTE ALTA ESTANQUES (NEW)

17

17

11JAN02

27JAN02

05JAN02

21JAN02

269

4DCU90137

CANALIZACIN BOMBAS 4 c/u (NEW)

12

12

11JAN02

22JAN02

05JAN02

16JAN02

309

4DCU90127

CANALIZACIN PARTE ALTA ESTANQUES(NEW)

10

10

28JAN02

06FEB02

22JAN02

31JAN02

269

4DCW90139

CABLEADO BOMBAS 4c/u (NEW)

23JAN02

28JAN02

17JAN02

22JAN02

309

4DCT90121

CABLEADO Y CONEXIONADO (NEW)

25JAN02

31JAN02

25JAN02

31JAN02

309

4DCW90119

CABLEADO PARTE ALTA ESTANQUES(NEW)

16

16

07FEB02

22FEB02

01FEB02

16FEB02

269

Cable & Wire

Sheet 75 of 76

Activity
ID

Activity
Description

Orig Rem Early Start Early Finish Target 1


Target 1 Total
Dur Dur
Early Start Early Finish Float

2001
2002
Budgeted
J F MAM J J A S O N D J F MAM J J A S O N D
Quantity

4DCW90159

CABLEADO ESTACIN DE CONTROL (NEW)

16

16

07FEB02

22FEB02

01FEB02

16FEB02

269

4DCW90129

CONEXIONADO PARTE ALTA ESTANQUES(NEW)

02MAR02

04MAR02

24FEB02

26FEB02

269

4DCW90169

CONEXIONADO ESTACIN DE CONTROL (NEW)

03MAR02

04MAR02

25FEB02

26FEB02

269

4DCW90149

CONEXIONADO BOMBAS 4 c/u (NEW)

10MAR02

12MAR02

10MAR02

12MAR02

269

MONTAJE ESTACIN DE CONTROL (NEW)

04FEB02

11FEB02

04FEB02

11FEB02

298

Instrumentation
4DCX90111

Pre-Op & No Load Testing


6DCN86460

PREOPERATIONS ACTIVITIES TRAIN B

14DEC01A

18DEC01

07DEC01

15DEC01

297

4DCY30111

PRUEBAS BOMBAS 4 c/u (NEW)

05MAR02

12MAR02

27FEB02

06MAR02

269