Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Valorizacion 01
Valorizacion 01
- 04
OBRA
UBICACIN
PROPIETARIO
CONSTRUCCION
:
DE SALA DE LOGUE GEOLOGIA
: YAURICOCHA - ALIS -YAUYOS - LIMA
: SOCIEDAD MINERA CORONA S.A
CENTRO DE COSTOS
9012012
SUPERVISOR
: Ing. Carlos Carbajal Berrios
RESIENDENTE
: Ing. Jesus Pariona Taipe
MONTO CONTRATADO : S/. 2,339.33
FECHA
FEBRERO
:
DEL 2013
ITEM
DESCRIPCION DE PARTIDA
METRADOS
UNIDAD
CANT.
COSTO (S/.)
P.UNIT
P.PARC.
AVANCE ANTERIOR
CANT.
PARCIAL %AVANC.
CANT.
AVANCE ACTUAL
PARCIAL
%AVANC.
AVANCE ACUMULADO
CANT.
PARCIAL
%AVANC.
CANT.
SALDO
PARCIAL
%AVANC.
M2
14.31
2.50
4.58
0.00
0.00
0.00%
5.00
12.50
34.94%
5.00
12.50
34.94%
9.31
23.28
65.06%
M2
38.16
22.00
610.56
0.00
0.00
0.00%
10.00
220.00
26.21%
10.00
220.00
26.21%
28.16
619.52
73.79%
M3
5.72
60.00
171.72
0.00
0.00
0.00%
3.00
180.00
52.45%
3.00
180.00
52.45%
2.72
163.20
47.55%
M2
19.08
25.00
217.51
0.00
0.00
0.00%
10.00
250.00
52.41%
10.00
250.00
52.41%
9.08
227.00
47.59%
M3
1.43
35.00
42.93
0.00
0.00
0.00%
0.50
17.50
34.97%
0.50
17.50
34.97%
0.93
32.55
65.03%
M3
0.09
55.00
3.66
0.00
0.00
0.00%
0.009
0.50
10.00%
0.01
0.50
10.00%
0.08
4.46
90.00%
COSTO DIRECTO
1,050.96
0.00
680.50
680.50
1070.00
BENEFICIOS SOCIALES
1,078.18
0.00
698.12
698.12
1097.71
105.10
0.00
68.05
68.05
107.00
UTILIDAD 10.00%
105.10
0.00
68.05
68.05
2,339.33
1.28
0.05%
1,514.71
36.75%
0.00
64.75%
1,514.71
0.00
107.00
64.75%
2,381.71
0.00
101.81%
VALORIZACION N.- 02
OBRA
UBICACIN
PROPIETARIO
:
:
:
SUPERVISOR
:
RESIENDENTE
:
MONTO CONTRATADO : S/. 3,896.43
FECHA
FEBRERO
:
DEL 2013
ITEM
DESCRIPCION DE PARTIDA
MAYO
METRADOS
UNIDAD
CANT.
COSTO (S/.)
P.UNIT
P.PARC.
JUNIO
AVANCE ANTERIOR
CANT.
PARCIAL %AVANC.
AVANCE ACTUAL
CANT.
PARCIAL
%AVANC.
AVANCE ACUMULADO
CANT.
PARCIAL
%AVANC.
CANT.
SALDO
PARCIAL
%AVANC.
M2
14.31
2.50
35.78
5.00
12.50
34.94%
9.31
23.28
65.06%
14.31
35.78
100.00%
0.00
0.00
0.00%
M2
38.16
22.00
839.52
10.00
220.00
26.21%
28.16
619.52
73.79%
38.16
839.52
100.00%
0.00
0.00
0.00%
M3
5.72
60.00
343.20
3.00
180.00
52.45%
2.72
163.20
47.55%
5.72
343.20
100.00%
0.00
0.00
0.00%
M2
19.08
25.00
477.00
10.00
250.00
52.41%
9.08
227.00
47.59%
19.08
477.00
100.00%
0.00
0.00
0.00%
M3
1.43
35.00
50.05
0.50
17.50
34.97%
0.93
32.55
65.03%
1.43
50.05
100.00%
0.00
0.00
0.00%
M3
0.09
55.00
4.95
0.09
4.95
100.00%
0.000
0.00
0.00%
0.09
4.95
100.00%
0.00
0.00
0.00%
COSTO DIRECTO
1,750.50
684.95
1065.55
1750.50
0.00
BENEFICIOS SOCIALES
1,795.83
702.69
1093.14
1795.83
0.00
175.05
68.50
106.55
175.05
0.00
UTILIDAD 10.00%
175.05
68.50
106.55
175.05
39.13%
2,371.80
3,896.43
36.75%
0.00
0.00
3,896.43
1,524.63
0.00
100.00%
0.00
0.00
0.00%
METRADOS
Proyecto:
Cliente:
Fecha:
MAYO 2013
Cod.
Descripcin
01.00.00
OBRAS PRELIMINARES
01.01.00
CARTEL DE OBRA
Unidad
Cantidad
Dimensiones
Ancho
GLB
1
01.02.00
ALMACEN Y GUARDIANIA
GLB
1
01.03.00
M2
1
8.45
ZAPATA (Z - 01)
11
0.75
ZAPATA (Z - 02)
0.45
EJE B -B
0.45
EJE A - A
0.45
EJE 01
0.45
EJE 06
0.45
0.50
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
EXCAVACION DE ZANJAS
M3
02.03.00
PERFILADO Y COMPACTADO
M2
LOSA 2FC=140KG/CM2
VEREDA
EJE A Y B
0.80
EJE 01 Y 06
0.80
AREA
M3
ZAPATA
F.E
ZAPATA (Z - 01)
1.20
11
0.75
ZAPATA (Z - 02)
1.20
0.45
EJE B -B
1.20
0.45
EJE A - A
1.20
0.45
EJE 01
1.20
0.45
EJE 06
1.20
0.45
1.20
0.50
CONCRETO SIMPLE
03.01.00
SOLADO FC=140KG/CM2
M3
ZAPATAS
F.D
ZAPATA (Z - 01)
5%
11
0.75
ZAPATA (Z - 02)
5%
0.45
EJE B -B
5%
0.45
EJE A - A
5%
0.45
EJE 01
5%
0.45
EJE 06
5%
0.45
5%
0.50
EJE B -B
5%
0.80
EJE A - A
5%
0.80
EJE 01
5%
0.80
EJE 06
5%
0.80
5%
AREA
EJE B -B
5%
0.15
EJE A - A
5%
0.15
EJE 01
5%
0.15
EJE 06
5%
0.15
EJE 5"-5"
5%
0.20
ZAPATA (Z - 01)
5%
11
0.75
ZAPATA (Z - 02)
5%
0.45
C - 01
5%
11
0.20
C - 02
5%
0.20
M3
F.D
M3
LOSA 2FC=140KG/CM2
M3
M3
04.00.00
CONCRETO ARMADO
M3
04.01.00
F.D
04.02.00
04.03.00
KG
ZAPATAS (PARRILLA)
F. D
Z - 01
Vertical
Nro veces
Largo
0.45
5%
Z- 01
11
Horizontal
Z- 01
11
0.60
Vertical
Z - 02
0.30
Horizontal
Z- 02
0.30
Vertical
11
3.80
Estrivo
11
22
0.98
Vertical
3.80
Estrivo
22
0.68
Z - 02
COLUMNAS
C - 01
C - 02
04.02.00
ENCOFRADO Y DESENCOFRADO
Ancho
SOBRECIMIENTOS
CC - 01
EJE B -B
M2
EJE A - A
EJE 01
EJE 06
CC - 02
EJE 5"-5"
COLUMNAS
2
M2
1.0
11
2.0
VEREDA
M2
HORIZONTAL
VERTICAL
Dimensiones
Largo
Parcial
Alto
Total
1.00
1.00
1.00
1.00
130.55
15.45
130.55
13.98
0.60
0.80
3.96
0.45
0.80
0.32
10.16
0.50
2.29
12.75
0.50
2.87
3.90
0.50
0.88
6.20
0.50
1.40
9.08
0.50
2.27
13.98
171.86
33.01
0.50
9.08
0.50
33.01
9.08
111.37
111.37
15.00
12.00
8.00
6.40
16.78
0.60
0.80
4.75
0.45
0.80
0.39
10.16
0.50
2.74
12.75
0.50
3.44
3.90
0.50
1.05
6.20
0.50
1.67
9.08
0.50
2.72
0.57
0.60
0.10
0.53
0.45
0.10
0.04
M2
0.57
10.16
0.50
2.41
12.75
0.50
3.01
3.90
0.50
0.92
6.20
0.50
1.47
0.50
2.38
10.18
33.01
9.08
6.18
16.60
0.15
2.08
16.60
0.15
2.08
8.00
0.15
1.01
8.00
0.15
1.01
111.37
0.15
17.55
11.80
0.40
0.75
14.10
0.40
0.89
4.80
0.40
0.30
7.10
0.40
0.45
9.08
0.75
1.43
17.55
3.81
3.81
0.60
0.70
3.66
0.45
0.70
0.30
0.35
2.95
2.382
0.20
2.95
0.246
Diametro
Peso
3.96
2.63
401.59
421.67
1/2"
0.994
24.60
1/2"
0.994
26.24
1/2"
0.994
2.39
1/2"
0.994
2.39
1/2"
0.994
166.20
3/8"
0.56
132.81
1/2"
0.994
30.22
3/8"
0.56
16.76
11.80
0.40
9.44
14.10
0.40
11.28
4.80
0.40
3.84
7.10
0.40
5.68
9.08
0.75
13.62
Largo
Alto
43.86
40.42
1.10
2.95
35.70
0.80
2.95
4.72
16.60
0.15
4.98
9.65
0.15
2.90
7.88
92.15
Partida
01.03.00
Rendimiento
Cdigo
Descripcin Insumo
Mano de Obra
CAPATAZ
TOPOGRAFO
PEON
Unidad
HH
HH
HH
Cuadrilla
Cantidad
1
1
3
Precio
0.016
0.016
0.048
15.43
12
9.22
0.25
0.05
0.008
4.37
9.26
38
5
0.016
0.016
0.88144
0.78
0.05
Materiales
ACERO ESTRUCTURAL
CAL HIDRATADA DE 30 KG
PINTURA ESMALTE
KG
KG
GLN
Equipos
HERRAMIENTAS MANUALES %MO
JALON
HM
LAMPARA
HM
1
1
2.80
Parcial
0.24688
0.192
0.44256
0.88144
1.0925
0.463
0.304
1.8595
0.044072
0.01248
0.0008
0.057352
PRESUPUESTO
Proyecto:
Cliente:
Fecha:
MAYO 2013
Item
Descripcin
01.00.00
OBRAS PRELIMINARES
01.01.00
CARTEL DE OBRA
Metrado
Precio
Parcial
GLB
1.00
300.00
300.00
01.02.00
ALMACEN Y GUARDIANIAGLB
1.00
316.61
316.61
01.03.00
130.55
2.80
139.77
02.00.00
Unidad
756.38
MOVIMIENTO DE TIERRAS
1912.53
02.01.00
EXCAVACION DE ZANJAS M3
13.98
4.70
65.78
02.02.00
PERFILADO Y COMPACTADO
M2
171.86
8.88
1526.89
02.03.00
ELIMINACION DE MATERIAL
M3EXEDENTE
16.78
19.06
319.86
03.00.00
Subtotal
CONCRETO SIMPLE
3.29
03.01.00
SOLADO FC=140KG/CM2 M3
0.57
5.80
3.29
04.00.00
CONCRETO ARMADO
0.00
299.69
0.00
M3
COSTO DIRECTO
S/.
S/.
TOTAL PRESUPUESTO
S/.
Total
2,672.20
561.16
3,233.36