NO-001-DESGLOSE DE PRECIO DE LA OFERTA NOTA DE OFICINA: DESGLOSE DEL PRECIO DEL OFERTANTE (PRECIO DE LA OFERTA) 29AGO13. AUTOR: ING.

CARLOS CARRILLO HDZ The breakdown of tender price is illustrated in Figure 1.5. The tender price consists of two components, the construction cost estimate and mark-up (margin). The direct cost is the combined costs of labor, equipment, material, and subcontractors costs. The addition of site overheads and office overheads to the direct cost produces the construction cost estimates. The second component of the tender price is the mark-up (margin) which consists of the profit margin, risk allowance, and financial charge.

TRADUCCION: El desglose de precio de la oferta se ilustra en la Figura 1.5. El precio de la oferta consiste en dos componentes. La estimacin de costos de construccin y margen comercial. El costo directo corresponde a los costos combinados de la mano de obra, equipos, materiales y costos del subcontratista. La adicin de los gastos generales de sitio (Indirecto de campo) y los generales de oficina (Indirecto de Of. Central) a los costos directos produce el estimado del costo de construccin. El segundo componente del precio de la oferta es el margen comercial, que consiste en la utilidad (beneficios), imprevistos (riesgos asignados), y la carga financiera (financiamiento).

También podría gustarte