Plan MERISS Unidad Operativa Apurimac

Estudio Definitivo Proyecto de Irrigacin Chumbao

HOJA DE METRADOS
OBRA RESERVORIO PAMPACRUZ UND M3 AREA 1.69 L 60 DIAMETRO 3/8" 3/8" 1/2" 3/8" 3/8" TS (60%) 3013.2 ESPESOR LONGITUD 221.2 e 0.2 LONGITUD 6.65 4.30 221.20 45.00 60.00 373.8

MUROS LATERALES C f'c = 175 Kg/cm2 LOSA DE FONDO C f'c = 175 Kg/cm2

M3 UND

A 45.00 CANTIDAD 885 737 41 217 150 RS (40%) 2008.8

540.0 KG/M 0.56 0.56 1.06 0.56 0.56 SUB TOTAL 3295.00 1775.50 9613.35 5460.00 5040.00 TOTAL

ACERO MUROS LATERALES CIMENTACION CIMENTACION LOSA MOVIMIENTO DE TIERRAS PLATAFORMA

KG KG KG KG KG

27702.23 12555 5022

M3

CAJA CANAL

TS (55%) MANO (10%) EQUIPO (45%) 753 3390 M3 e 0.1 L 221.2

RS (40%) EQUIPO 3013 H 2.4

RF (5%) EQUIPO 377 TOTAL 53.088

7533

REFINE

RELLENO

M3

e 0.15

L 60 L 221.2

A 45 h 4.8 LONGITUD 49.2 64.2 LONGITUD 357 72

TOTAL 405 TOTAL 1061.76 SUBTOTAL 688.8 642 TOTAL 357 72 TOTAL 1330.8

ENCOFRADO

M2

WATERSTOP

ML 6"

DIAMETRO

CANTIDAD 14 10

TUBERIA DE DRENAJE

ML 4" 6"

DIAMETRO

CANTIDAD

CANAL ADUCTOR MOVIMIENTO DE TIERRAS

M3

TS (70 %) 322

RS (20%) 92 L 1.6 250

RF (10%) 46 Total 400

460 460

REVESTIMIENTO

M2

Permetro

CANAL SALIDA MOVIMIENTO DE TIERRAS

M3

TS (70 %) 82.04 Permetro 1.4

RS (20%) 23.44 L 34

RF (10%) 11.72 Total 47.6

117.2 117.2

REVESTIMIENTO

M2

CANAL ADUCTOR OBRAS DE MITIGACION DIQUES CON GAVIONES MOVIMIENTO DE TIERRAS MUROS CON GAVIONES CUNETAS DE CORONACION MOVIMIENTO DE TIERRAS

L M3 M3 L M3 560 10

A 1.5

Total 15 22 Total 0.16 89.6

Area