Está en la página 1de 1

Logo Contratista

VALORIZACION N 01
Nombre del Proyecto:

PRESUPUESTO ORIGINAL N de Contrato. (Orden de Compra LAP): Contratista :


CONTRATO ACUMULADO ANTERIOR TOTAL USD S/. CANT % MONTO USD S/. CANT PRESENTE PERIODO % MONTO USD S/. CANT

USD S/. USD S/. USD S/.


SALDO ACTUAL CANT % MONTO USD S/.

Fecha : Periodo :
ITEM

Modalidad del Contrato

ORDENES DE CAMBIO PRESUPUESTO ACTUAL


ACUMULADO ACTUAL % MONTO USD S/.

0.00

DESCRIPCION

U.M

CANT

P.U

TOTAL COSTO DIRECTO GASTOS GENERALES UTILIDADES TOTAL PRESUPUESTO

MONTO ENTREGADO POR ADELANTO

20%

0%

0%

CONTRATISTA

COORDINADOR LAP

(A) TOTAL (B) MENOS: ADELANTOS FECHA: (C) SUBTOTAL (A+B) (D) IGV [18% of (C)] (E) TOTAL (C+D) FECHA: (F) OTRAS DEDUCCIONES (*) (G) RETENCION (6%) (H) MONTO A PAGAR (E+F+G)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

+ + + + + + + +

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

= = = = = = = =

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

= = = = = = = =

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

FECHA:

CONTROL DE PROYECTOS

GERENTE DE INFRAESTRUCTURA

FECHA:

También podría gustarte