- DocumentoData Collectioncargado porAdy Fardy
- DocumentoEquipment Data_Fardy (2)cargado porAdy Fardy
- DocumentoFardy Assignment 1cargado porAdy Fardy
- DocumentoFront Covercargado porAdy Fardy
- DocumentoGas Turbine Start Up Check Listcargado porAdy Fardy
- DocumentoGT Operation (Nanjin)cargado porAdy Fardy
- DocumentoHane Assignment 1cargado porAdy Fardy
- DocumentoOffline Water Wash Sequencecargado porAdy Fardy
- DocumentoSPR Was Awarded a Power Purchase Agreement to Buildcargado porAdy Fardy
- DocumentoPreparation and Requirementcargado porAdy Fardy