PTW System
The workman for his own safety must ensure that he does not work on equipment without work permit The workman should read carefully the contents of PTW and ensure that the permit has been issued on the same equipment for which it was required and also ensure that the equipment is safe to work. If the work is to be carried by group on an item of plant ,the group leader will draw the permit and explain to whole group.
PTW System
All copies of a permit to work (PTW) must be signed when they are issued or cancelled.
PTW must not be signed expect in the presence of the engineer issuing or canceling it.
On PTW, recipient will be required to sign a statement that he has completed the work before PTW is cancelled. PTW must be cleared by the person signing for receipt.
In case of carried over job the superviser or Engineer I/C will return the permit and sign.
In case of emergency, when Shift Charge Engineer initiates the action, an emergency job card should be made available from within the operation department giving details of the work to be done . Do not operate - Caution boards should be put on items under PTW.
Issue PM To shop
Shop issues PMS to Workers
Corrective maintenance
Workers fit in the PM along with other BD work Maintenance supervisor signs Data entry in computer
Close
Safety Module: Industrial hazards, Rev 0.0, Mar 2007