REPORTE DIARIO C.

RUMAGE
OCTUBRE
24/10/2022

Programa de Avance abril 2022.


Cumplimiento Mes: Octubre
Prog. Mes Prog. A la Fecha Ejec. Mes ROTURA TOTAL

658.5 Mts 658.5 Mts 661.2 Mts 25.0 Mts 686.2 Mts

CUMPLIMIENTO DEL PROGRAMA DE AVANCES


Ejec./ Dia Prog./ dia

24/10/2022
Total

Dia 8.8
22.4
18.6 18.2
8.8

36% 21/10/22 22/10/22 23/10/22 24/10/22 25/10/22 26/10/22 27/10/22


Zona Pomarani
30.0 120%
PROGPROG
MES MES
PROG. FECHA EJECPROG. FECHA
FECHA CUMP FECHA CUMP. MESEJEC FECHA

100%
299 Mts 299 Mts 291.9 Mts

299299
Mts Mts
299 Mts 291.9299
Mts 98%
Mts 98%291.9 Mts
20.0 80%

60%
ROTURA TOTAL EJECT CUMP FECHA CUMP. MES
12.1 12.1 12.1 12.1 12.1 12.1 12.1
10.0 40%
432
MTS
9.4 20%
10 301.9 Mts 100% 101.0% 5.9
3.3 3.3
0.0 0%

POMARANI 21-Oct 22-Oct POMARANI


23-Oct 24-Oct 25-Oct 26-Oct 27-Oct

PROG. Mts 12.1 12.1 12.1 Mts 12.1


PROG. 12.1 12.1 12.1
EJEC. Mts 5.9 3.3 EJEC.
9.4 Mts 3.3 EJEC. Mts PROG. Mts
Zona Cruz de Oro
PROG MES PROG. FECHA EJEC FECHA 120%

360 Mts 360 Mts 369 Mts 100%

20.0 80%
360 Mts 360 Mts 369 Mts
ROTURA TOTAL EJECT CUMP FECHA CUMP. MES 60%
13.3 13.3 13.3 13.3 13.3 13.3 13.3
648 0% 0% 40%
MTS
14.9
12.7 13.0
15 384.3 Mts 102.6% 107% 20%
5.5
0.0 0%
CRUZ DE ORO 21-Oct 22-Oct CRUZ DE
23-Oct ORO 25-Oct
24-Oct 26-Oct 27-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct

PROG. Mts 13.3 13.3 13.3PROG.13.3


Mts 13.3 13.3 13.3 .
EJEC. Mts 12.7 14.9 13.0EJEC. 5.5
Mts
EJEC. Mts PROG. Mts
POMARANI - PRODUCTIVIDAD Mts / H-GD.
POMARANI
Descripción U.M. 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct Promedio

# de Trabajadores 24 24 24 24 24
Horas Hombre 240 240 240 240 6,960
Tareas HG 30 30 30 30 870
PROG 299 14.0 14.0 14.0 14.0 385.8
AVANCE m. 5.9 3.3 9.4 3.3 294.5
Linea Base mts/H-G Prog. m. 0.47 0.47 0.47 0.47 0.44
Metros / H-G Ejec m. 0.20 0.11 0.31 0.11 0.34
PU m. 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29
PR O DUC T IVIDAD (M ET R O S / HO M B RE G UA R DIA )
0.50 10.0
0.47 0.47 0.47 0.47
9.4
0.40 8.0

0.30 0.29 0.29 0.31


0.29 0.29 0.29 0.29 0.29 6.0
5.9
0.20 0.20 4.0

0.10 3.30.11 3.30.11 2.0

0.00 0.0
21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct

AVANCE Metros / H-G Ejec Linea Base mts/H-G Prog. PU


CRUZ DE ORO - PRODUCTIVIDAD Mts / H-GD.
CRUZ DE ORO
Descripción U.M. 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct Promedio
# de Trabajadores 28 28 28 28 28
Tareas HG 35 35 35 35 1015
PROG 360 17.5 17.5 17.5 17.5 479.9
AVANCE 12.7 14.9 13.0 5.5 386.20
Linea Base m. 0.50 0.50 0.50 0.50 0.47
Metros / H-G Ejecutado m. 0.36 0.43 0.37 0.16 0.38
PU m. 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35

PRO DUCTIVIDAD (METRO S / HOMBRE GUAR DIA )


0.55 16.0
0.50 12.7 14.9 13.0 14.0
0.45 0.50 0.50 0.50 0.50
0.43 12.0
0.40 5.5
0.37 10.0
0.35 0.36
0.35 0.35 0.35 0.35 0.35 0.35 0.35
8.0
0.30
0.25 6.0
0.20 4.0
0.15 0.16 2.0
0.10 0.0
21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct

AVANCE Metros / H-G Ejecutado Linea Base PU


Prog. Mes Prog. A la Fecha Ejec. Mes

3627 pernos 3627 pernos 3610 pernos


7

Ind. Prog. 5.5 Per./ml. Ind. Ejec. 5.5 Per./ml. Cumpl. 100%

5.5 Per./ml.
5.5 Per./ml.

Ind. Prog. Ind. Ejec.


Reporte Rotura
FECHA 24-Oct
EJECUTADO (Varios elementos)
DATOS PROGRAMADOS DATOS EJECUTADOS
ZONA NIVEL LABOR SECCION ANCHO. ALTO. ANCHO ALTO SOBREROTURA.
Cruz de Oro 4460 RP-380 4.0 x 4.0 4.0 4.0 4.6 4.3 23.6%
Pomarani 4960 GL-01N 4.0 x 4.0 4.0 4.0 4.1 4 2.5%
Esperanza 4380 RP-380 4.5 X 4.0 4.5 4.0 4.7 4.2 9.7%
Total general 11.9%

FECHA MINA NIVEL FASE LABOR SECCION PROGRAMADO EJECUTADO CUMPLIMIENTO


24-Oct Pomarani 4960 Preparacion GL-01N 4.0 x 4.0 3.5 3.30 94%
24-Oct Esperanza 4380 Desarrollo RP-380 4.5 X 4.0 3 2.80 93%
24-Oct Cruz de Oro 4460 Desarrollo RP-380 4.0 x 4.0 3 2.70 90%