Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MANAGER FIRMWARE
Procedure:
-New Project
-RC-New-General-Subsation
-RC-New-General-Voltage level
-RC-New-General-Bay
-RC-Select-Select IED types.
VERSIONS OF PCM
1 Menu bar
2 Tool bar
3 Object Types window
4 Project Explorer window
5 Output window
6 Tool window
7 Object Properties window
General Description on PCM
Tool component Description
On the taskbar, click the Start button, and point to All Programs, point to ABB,
and then click Update Manager.
From the list in the upper left corner, select the content to be shown in the
Update
Manager window.
Select Manage Connectivity Packages to display the current
configuration of PCM600 and select the connectivity packages to be used.
Select Export Software Packages to display all the available PCM600
add-ons, hotfixes and connectivity packages. From this view it is possible
to download the needed updates and export to another location/removable
disk.
CONNECTIVITY PACKAGE
On the Tools menu, click Options and then click Customized Menus.
On the Tools tab, select the tools and functions to be shown in the
menus.
Plus (+) sign before the tool name indicates that the tool has functions
for which
the visibility can be separately defined. Clicking the plus sign shows the
tool
functions.
On the Options tab, select the items to be visible in the Options dialog
box.
On the Miscellaneous tab, define the visibility of miscellaneous menu
items
Enabling communication to the IED
Ensure the IED is online and the communication parameters are correct.
In Plant Structure, right-click the IED.
Select Read from IED from the shortcut menu.
Click Yes to confirm. Clicking No cancels the operation.
To close Signal Monitoring, right-click the Signal Monitoring tab on top of the
tool window, and then click Close.
Inserting function blocks