Instructor: Ph.D.

Do Quang Khanh
List of members

Serial Name ID

1 H Hong Phc 31202784


2 Nguyn Mnh Trng 31204214

3 Phm Minh Khnh 31201650


4 Nguyn Bnh Phng 21102662
5 Hong Trung Mnh 31202098
Content Introduction (DTS, Coiled Tubing)
Well Description and Methodology
Job Objectives and Intervention Workflow
Real-Time Treatment Evaluation
Post-job Evaluation
Conclusion
References
Introduction

Matrix stimulation is a technique in which a solvent is injected into


the formation to dissolve some of the materials present and hence
recover or increase the permeability in the near-wellbore region.

Coiled tubing is a continuous length of steel pipe, spooled onto a


large diameter reel. The pipe comes in a variety of sizes and can be
run into any well. Coiled tubing is commonly used to convey tools,
and circulate liquids and gases into and out of the wellbore without
relieving the wellbore pressure
Introduction
Introduction
Coiled Tubing
Introduction
Coiled Tubing Application

Circulating, Cleanouts & N2 Lifting Moving & Setting

Milling & Fishing Tractors

Logging & Perforating E-Coil

Fluid / Chemical Placement CTD (Coiled Tubing Drilling)

Gravel Packs & Sand Control CT Boat Operations

Hydra-Jet Technology Micro-Coil / Capillary Coil

Fracturing
Introduction
Applications of Temperature Data
Wellbore-temperature data
Wireline logging: Record a
Calculating flow contributions.
single temperature snapshot
during occasional and infrequent
Evaluating water-injection
profiles.
Tools
Diagnosing the effectiveness of
fracture jobs. Distributed Temperature
Sensing (DTS): measurement
Finding cement tops behind multiple points simultaneously.
casing.

Identifying crossflow between


zones.
Introduction
Distributed Temperature
Survey (DTS)

A laser launches 10-ns


pulses -->reflective
index contrast between
the core and cladding of
the fiber each laser
pulse is reflected back
along the boundary
between the core and
cladding phenomenon
known as Raman
backscattering
Introduction
Distributed Temperature
Survey (DTS)
Well Description and Methodology
Well A is a horizontal oil well drilled in a carbonate formation whose
thickness varies from 400 to 500 ft.

The oil API is 42.9, with a GOR around 750 scf/STB and no water cut.

The well is cased hole completed with a perforated interval of 3,100 ft

Before the stimulation treatment, Well A was shut in multiple times to


perform wireline interventions during which killing fluids caused
significant damage to the formation The well was not producing, and
therefore running a production log was not possible.

The goal of the stimulation intervention: Revive the well and put it back in production
Well Description and Methodology

Two methodologies:
Evaluates the treatment in real time using a mix of qualitative and
quantitative approaches for DTS interpretation.

Evaluate existing fluid intake zones and adapt the fluid placement
strategy optimize treatment effectiveness.

Uses the pressure data recorded via the bottomhole assembly match
simulated pressure data understanding of the reservoir and its reaction
to the treatment.

Determining skin reduction, wormholes penetration, uniform


stimulation, and giving a post-treatment production profile.
Job Objectives and Intervention Workflow

Identify in real time highly permeable or thief zones


1
Using pressure matching to
Identify in real time damaged or tight zones determine:
2
Skin reduction

3 Monitoring DTS during pre and post-flush stages 7 Wormholes and fluid
penetration depths
4
Place the fluid treatment in each zones
Post treatment production
5
Pump stimulation treatment at an optimum rate profile

6
Compare the DTS interpretation results
Job Objectives and Intervention Workflow
Step 1: RIH with the CT, reach total depth(TD). Shut the well in, and record DTS ( DTS-1 Baseline).

Step 2: Keep the CT at TD, preflush consisting of inert fluid is pumped at constant rate from annulus of CT
and well tubing, and DTS is recorded (DTS- 2 Injection).

Step 3: Once the DTS information evaluation confirms that fluids have reached TD, pumps are shut in and
DTS is recorded to observe the wellbore and reservoir temperature recoveries (DTS- 3 Warmback).

Step 4: After the previous 3 DTS step, data interpretation allows identifying thief zones and tight zones
modifying the pumping schedule to make sure diverter and acid are optimally placed.

Step 5: Diverter is spotted via CT in the thief zones, then pumps are shut in and DTS is recorded to observe
wellbore and reservoir temperature changes (DTS- 4 Post diverter).

Step 6: Acid is spotted via CT, but targeting tight or damaged zones, pump are once again shut in and DTS
is recorded to observe temperature changes of the wellbore and reservoir ( DTS- 5 Post Acid).

Step 7: The treatment is followed by a post-flush pumped via CT, and pumps are shut in to acquire a last
DTS survey ( DTS- 6 Post).
Real-Time Treatment Evaluation

Steps 1 through 4: Acquire baseline, preflush injection, and


warmback DTS and generate an optimized pumping schedule.

Depth correlation was performed using the change in CCL signal at the casing
shoe.

The geothermal gradient displays a flat feature in the horizontal section of the
well.

Zones where the temperature remains cooler during the warmback correspond
to those zones with higher permeability and porosity.
Real-Time Treatment Evaluation

Step 5: Spot the diverter in highly permeable thief zones and acquire
DTS.

POOH RIH Record DTS acquisition.

Step 6: Spot the acid in damaged-tight zones and acquire DTS.

POOH RIH Record DTS acquisition.

Step 7: Pump post-flush, record DTS and compare to preflush DTS.

Pumped while reciprocating the CT (CT POOH and RIH) along the interval
of interest
Post-Job Evaluation
Conclusions
The use of CT enable with fiber optic and real-time DHG has proven to be the
most effective technology for matrix stimulation treatment execution and
evaluation to date.

Such CT units enable the acquisition of not only bottomhole parameters, but also
DTS, so that the job can be evaluated and optimized in real time.

The pressure match is a procedure that needs to be ran iteratively, therefore, the
input of parameters need to carefully verified and validated.

The pressure match of the stimulation treatment resulted in the determination of


wormholes and fluid penetrations, suggesting that a deeper penetration was
required for the acid.

Post-stimulation production logs can help evaluating a job more efficiently.


References

[1] Danish Ahmed, SPE, Pierre Ramondenc, SPE, and Fernando Baez, SPE,
Schlumberger. (2628 February 2014). Advanced Understanding of Matrix
Stimulation Treatments Through In-Job and Post-Job Evaluation of Real-Time
Downhole Measurements with Coiled Tubing: A Case Study. SPE 168156, 11.

[2] Khanh, D. Q. (2014). Matrix Acidizing. Ho Chi Minh: HCMC University of


Technology.

[3] Khoa, N. T. (Nov 14, 2015). Coiled Tubing Basics & Applications. Ho Chi Minh.

[4] Schlumberger . (2009). Downhole Temperatures from Optical Fiber.

[5] Z. Wang, The Uses of Distributed Temperature Survey (DTS) Data, Stanford
University, August 2012.