Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Chapter 14 Part 2
Roadway Design
15FCVE211
Summer 2017
Dr Taha Ahmed
Highway Earthwork and Final Plans
Final element in the locations process is to
establish the horizontal and vertical
alignments of the highway project
Elements of the final process
Highway grades and terrain
Earthwork Volumes
Ordinates of mass Diagram
Overhaul payments
Preparation of highway plans
Highway Grades and Terrain
Terrain of the land is most significant in the
selection of highway location
Primary factor when considering grade line is
the amount of earthwork involved.
Selecting grade line as close to natural ground
level will reduce requirements
Grade line is dictated by expected floodwater
level
Computing Earthwork Volumes
With a certain grade line chosen there is a
certain amount of earthwork involved.
The amount of earthwork involved is
determined by taking cross sections 15-20 m
apart.
Types of Cross Sections
Example: Computing Fill and Cut Volumes Using
Average End-Area Method
6
Example: Computing Fill and Cut Volumes Using
Average End-Area Method
Computing Fill and Cut Volumes Using Average End-
Area Method
Computing Ordinates of the Mass
Diagram
Mass Diagram is a series of connected lines
that depicts the net accumulation of cut or
fill between any two stations
9
Computing Ordinates of the Mass
Diagram
10
Computing Ordinates of the Mass Diagram
Computing Ordinates of the Mass Diagram
12
Computing Ordinates of the Mass Diagram
Computing Overhaul Payments