Outline
Quantity Takeof
General Contractors,
Subcontractors,
Cost Consultants,
Quantity Surveyors
Quantity Takeof
Quantity Takeof
Quantity Takeof
Imported materials ()
Suppliers ()
Equipments ()
Labors ()
Work in project ()
Estimated Quantities
Actual Quantities
Bill Of Quantities
1
2
3
4
.
Bill Of Quantities
1
2
3
..
Work order
Items
Items
Items
Items
Items
Items
estimated
estimated
estimated
estimated
estimated
estimated
in
in
in
in
in
in
Measuring Units
Cubic meter (m3)
Used for items such as:
Excavation
Filling
Concrete
Masonry
Masonry
Plastering
Flooring
Painting
Measuring Units
Linear meter (m)
Used for items such as:
Number (unit)
Used for items such as:
Electric outlets
Doors and windows
Sanitary fixtures
Measuring Units
Lump sum(L.S.)
Used for items such as:
Manholes
Lifts
Ground Beams
Columns
Slabs
Solid slabs:
Flat slab:
Beams:
Stairs
Example
5.6m
1
1
710/m
15c
m
4.8m
712/m
A
1
A
1
Example
216 416 + 68/m
2.5
,10.3m x 0.5m 2
0.3m x 0.3m 1
3.0m 1
0.3m x 0.5m
1.2 m
1m x 1m x 0.4m
1.6m x 1.6m x 0.3m
Section A-A
Example
Excavation
1.6 m
1.2 m
4.8
m
1.6 m
.15 m
5.6
m
5.3
1.6
m 0.8
m
3.7
m
.15 m
Excavation ()
No.
Item
1 Excavation
Numb
Unit er
m3
Length Width
Depth
1.6
1.6
Total
12.28
1.2
8
3.7
0.3
0.5
1.11
2.9
0.3
0.5
0.87
PC Concrete Footings ()
No.
Item
2 PC Concrete
1.6 m
0.3
m
1.6 m
Numb
Unit er
Length Width Depth Total
m3
4
1.6
1.6
0.3 3.072
RC Concrete Footings (
)
No.
Item
3 RC Concrete
1.0 m
0.4
m
1.0 m
Numb
Unit er
Length Width Depth Total
m3
4
1
1
0.4
1.6
Ground Beams ()
No.
Item
4 Ground Beams
Numb
Unit er
Length Width Depth Total
m3
2
5.3
0.3
0.5
1.59
2
4.5
0.3
0.5
1.35
5.6
m
5.3
0.3
m
0.15
m
0.3
m
0.15
m
4.5
m
4.8
m
0.5
m
Filling
No.
Item
Numb
Unit er
1 Excavation
m3
Total
14.2
7
2 PC Concrete
m3
3.07
3 RC Concrete
m3
1.60
4 Ground Beams
m3
2.94
Total Concrete
m3
7.61
m3
6.66
5 Filling
Length Width
Depth
Subtot
al
Columns
No.
Item
Columns
6 Concrete
Numb
Unit er
m3
Length Width
0.3
3.0
m
Depth
0.3
3.0
m
3.0
m
Total
1.08
4.5
0.3
0.5
1.35
4.2
0.15
3.15
0.15
m
5.0 m
4.5
m
4.8
m
15
cm
4.2
m
0.15
m
0.5 m
0.3 m
5.6
m
5.3
0.15
m
No.
Numb
Unit er
Length Width Depth Total
m3
2
5.3
0.3
0.5
1.59
Item
Numb
Unit er
1 Excavation
m3
Total
14.2
7
2 PC Concrete
m3
3.07
3 RC Concrete
m3
1.60
4 Ground Beams
m3
2.94
5 Filling
Columns
6 Concrete
m3
6.66
m3
1.08
m3
6.09
14.7
8
Total Concrete
Length Width
Depth
Reinforcement Takeoff
216 416 + 68/m 2.5
30cm
,10.3m x 0.5m 2
2.5cm
710/m
2.5cm
25cm
712/m
50cm 45cm
Reinforcement Takeoff
Unit
(kg)
16 upper
(beams)
16 lower
(beams)
10 long (Slab)
12 short (Slab)
8 stirrup
(beams)
Total Steel
No. Lengt
of
h
bars
Total
length
Unit
Weight
1.63
1.63
Total
Weight
4
4
4.8
5.6
19.2
22.4
31.296
36.512
8
8
34
40
4.8
5.6
5.6
4.8
38.4
44.8
190.4
192
1.63 62.592
1.63 73.024
0.63 119.952
0.92 176.640
60
51
1.55
1.55
93
79.05
0.41
0.41
38.130
32.411
570.55
7
5 ) :,
, , ,(
Questions?