TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA TEST REPORT FOR HI POT TEST
1. Equipment Details :

Page No
Sheet No 1 of 9

Make : UNIVERSAL CABLES Type : XLPE/ AI ARM Size/ Length : 3CX400 SQ MM System : Earthed Rated Volts : 11KV Rated current : 400A Cable Tag no : P1-Z- 016 Cable RUN : 2 2. Location & Feeder Name :11KV MRS S/S [TROG-3 TO MELT S/S INCOMER-1)] 3. General Inspection 4. Insulation Resistance Test Make: KYORITSU REF R ph to Earth Y ph to Earth B ph to Earth R ph to Y ph Y ph to B ph B ph to R ph 5. DC High Voltage Test Voltage Applied between Leakage current in Micro Amps Start Finish Cable-1 Cable-2 Cable-1 Cable-2 66.7 64.2 67.2 77.4 64.2 70.1 80.2 80.2 70.2 68.2 88.4 79.2 Result OK OK OK : OK : (values in Ohms) (Using 5 & 0.5 KV Megger) Range: 0.5-5KVSl. No.VE-2644 Cali due Date:14.12.2010 After HV Test Cable-1 Cable-2 984000 76400 38200 32400 63400 62000 942000 42000 644000 86900 720000 92600

Before HV Test Cable-1 Cable-2 >1T 84900 44300 46500 84700 84600 >1T 55800 91900 >1T 97900 >1T

REF

R ph to Earth + Y + B Y ph to Earth + B + R B ph to Earth + R + Y

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA

Page No
Sheet No 2 of 9

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available) 1 2 3 4 Check cable proper clearance Check cable earthed or unearthed, When earthed cable should be earthed Cable end lugs properly crimped After Hi pot test terminals tightness to be checked OK OK OK OK

7. Remarks

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA TEST REPORT FOR HI POT TEST
1. Equipment Details :

Page No
Sheet No 3 of 9

Make : UNIVERSAL CABLES Type : XLPE/ AI ARM Size/ Length : 3CX400 SQ MM System : Earthed Rated Volts : 11KV Rated current : 400A Cable Tag no : P1-Z- 017 Cable RUN : 2 2. Location & Feeder Name :11KV MRS S/S [TROG-4 TO MELT S/S INCOMER-2] 3. General Inspection 4. Insulation Resistance Test Make: KYORITSU REF R ph to Earth Y ph to Earth B ph to Earth R ph to Y ph Y ph to B ph B ph to R ph 5. DC High Voltage Test Voltage Applied between Leakage current in Micro Amps Start Finish Cable-1 Cable-2 Cable-1 Cable-2 80 76.1 94 84.2 74 84.2 88 96.2 71 74.6 82 78.6 Result OK OK OK : OK : (values in Ohms) (Using 5 & 0.5 KV Megger) Range: 0.5-5KVSl. No.VE-2644 Cali due Date:14.12.2010 After HV Test Cable-1 Cable-2 786000 174000 323000 182000 246000 176000 928000 986000 846000 994000 967000 976000

Before HV Test Cable-1 Cable-2 848000 183000 414000 194000 374000 196000 >1T >1T 994000 >1T >1T >1T

REF

R ph to Earth + Y + B Y ph to Earth + B + R B ph to Earth + R + Y

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA

Page No
Sheet No 4 of 9

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available) 1 2 3 4 Check cable proper clearance Check cable earthed or unearthed, When earthed cable should be earthed Cable end lugs properly crimped After Hi pot test terminals tightness to be checked OK OK OK OK

7. Remarks

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA TEST REPORT FOR HI POT TEST
1. Equipment Details :

Page No
Sheet No 5 of 9

Make : UNIVERSAL CABLES Type : XLPE/ AI ARM Size/ Length : 3CX400 SQ MM System : Earthed Rated Volts : 11KV Rated current : 400A Cable Tag no : P1-Z- 023 Cable RUN : 2 2. Location & Feeder Name :11KV MRS S/S [MRS VCB 22 TO TPO S/S INCOMER-1] 3. General Inspection 4. Insulation Resistance Test Make: KYORITSU REF R ph to Earth Y ph to Earth B ph to Earth R ph to Y ph Y ph to B ph B ph to R ph 5. DC High Voltage Test Voltage Applied between Leakage current in Micro Amps Start Finish Cable-1 Cable-2 Cable-1 Cable-2 80 82 109 102 69 77 82 94 74 78 97 96 Result OK OK OK : OK : (values in Ohms) (Using 5 & 0.5 KV Megger) Range: 0.5-5KVSl. No.VE-2644 Cali due Date:14.12.2010 After HV Test Cable-1 Cable-2 228000 132000 499000 982000 462000 966000 967000 978000 982000 996000 992000 986000

Before HV Test Cable-1 Cable-2 244000 135000 698000 >1T 542000 >1T >1T >1T >1T >1T >1T >1T

REF

R ph to Earth + Y + B Y ph to Earth + B + R B ph to Earth + R + Y

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA

Page No
Sheet No 6 of 9

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available) 1 2 3 4 Check cable proper clearance Check cable earthed or unearthed, When earthed cable should be earthed Cable end lugs properly crimped After Hi pot test terminals tightness to be checked OK OK OK OK

7. Remarks

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA TEST REPORT FOR HI POT TEST
1. Equipment Details :

Page No
Sheet No 7 of 9

Make : UNIVERSAL CABLES Type : XLPE/ AI ARM Size/ Length : 3CX400 SQ MM System : Earthed Rated Volts : 11KV Rated current : 400A Cable Tag no : P1-Z- 023 Cable RUN : 2 2. Location & Feeder Name :11KV MRS S/S [MRS VCB 24 TO MPO S/S INCOMER-2] 3. General Inspection 4. Insulation Resistance Test Make: KYORITSU REF R ph to Earth Y ph to Earth B ph to Earth R ph to Y ph Y ph to B ph B ph to R ph 5. DC High Voltage Test Voltage Applied between Leakage current in Micro Amps Start Finish Cable-1 Cable-2 Cable-1 Cable-2 Result OK OK OK : OK : (values in Ohms) (Using 5 & 0.5 KV Megger) Range: 0.5-5KVSl. No.VE-2644 Cali due Date:14.12.2010 After HV Test Cable-1 Cable-2

Before HV Test Cable-1 Cable-2

REF

R ph to Earth + Y + B Y ph to Earth + B + R B ph to Earth + R + Y

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA

Page No
Sheet No 8 of 9

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available) 1 2 3 4 Check cable proper clearance Check cable earthed or unearthed, When earthed cable should be earthed Cable end lugs properly crimped After Hi pot test terminals tightness to be checked OK OK OK OK

7. Remarks

TESTED BY RAILWAYS

FOR L&T

FOR INDIAN

TEST REPORT FOR 11KV HT CABLES

DATE :

CLIENT : INDIANS RAILWAYS WORKSHOP PROJECTS,PATNA PROJECT : 132/11KV-CHAPPRA CASTWHEEL MFG.PLANT,CHAPPRA

Page No
Sheet No 9 of 9

TESTED BY RAILWAYS