BS6399-2 Wind
1997
2.2.2.1
Vs = Site wind speed
Vb Sa Sd Ss Sp
Fig 6
Vb = basic hourly mean wind speed
2.2.2.2
Sa = altitude factor
D = altitude in metres above mean sea level
2.2.2.3
Sd = direction factor
2.2.2.4
Ss = Seasonal factor
2.2.2.5
Sp = probability factor
=
=
=
=
=
=
=
21.50 m/s
21.00 m/s
1.02
24.00 m
1.00
1.00
1.00
2.2.3.2
Table 4
2.1.2.1
qs = Dynamic pressure
0.613 Ve2
2
0.85 kN/m
Walls
Fig 12
Pe
D/H
D
H
=
=
=
=
qs Cpe Ca
span ratio of building
width of building
height of building
Table 5
Cpe (windward)
Cpe (leeward)
Cpe (sideface)
2.1.3.4
Cae
a
Cpe
0.60
-0.50
-0.90
=
=
=
8.11 m
107.00 m
13.20 m
Pe (kN/m2)
0.45
-0.38
-0.68
=
=
0.89
21.00 m
21.3m
31.3m
20.7m
33.2m
~200m
Span 4
Span 3
Span 2
q = 0deg
Span 1
q = 90deg
Wind Direction
(zone B with
funnelling effect)
Line B
Span 3 worst case
Rev
Date:
Output
zone B with
unnelling effect)
Project:
Lea Crossing Bridge
Part of Structure:
Loadings
Drawing Ref:Calc By:
ND
Calculations
CROSSRAIL
Ref
Job Ref
Calc sheet
2
Check By:
Date:
5/9/2012
Rev
Date:
Output
Roof
Span 4
Span
Span 1
Span
~30deg
~30d
~30de
~30de
Calculation of roof windload assuming the curved roof is multi-bay duo pitch roof
External coefficient (Cpe)
Cpe
Pitch angle
q=0
Zone C
-0.20
+30 deg
0.40
Table 10
Cpe
q=0
Zone G
-0.50
-0.50
Cpe
q = 90
Zone C
Cae
0.92
0.92
0.92
0.92
Dim a
21
21
21
21
-0.60
Dim a
13
13
13
13
*q = 90
Cae
0.90
0.90
0.90
0.90
Line B
Span 3 worst case
Table 12
Tab 18
Fig 4
Cai
a
Pi (kN/m2)
0.53
-0.38
0.33
=
=
=
0.74
107.3 m
11.1 m
Line B
Span 3 worst case
CROSSRAIL
Project:
Lea Crossing Bridge
Part of Structure:
Loadings
Drawing Ref:
Job Ref
Calc By:
ND
Calc sheet
3
Check By:
Date:
5/9/2012
Loadcase Calculations
Date:
Output
Rev
0.83
Span 1
P
0.83
0.00
-0.30
Span 2
-0.30
-0.30
Span 3
Span 4
0.00
A9/10
0.22
0.25
-0.01
0.69
0.28
0.06
0.14
0.63
-0.01
0.28
0.56
0.06
0.14
0.56
0.14
0.14
0.13
A11/12
Span 1
P
0.13
-0.70
-1.01
Span 2
-1.01
-1.01
Span 3
Span 4
-0.70
-0.48
-0.75
-0.72
-0.01
-0.64
-0.08
-0.72
-0.65
-0.14
-0.64
-0.65
-0.56
-0.56
-0.14
-0.56
-0.56
Rev
Date:
Output
-0.30
-1.01
CROSSRAIL
Project:
Lea Crossing Bridge
Part of Structure:
Loadings
Drawing Ref:
Job Ref
Calc By:
ND
Calc sheet
4
Check By:
Date:
5/9/2012
Loadcase Calculations
Rev
Date:
Output
-1.21
A8
Span 4
P
-0.08
-0.91
-1.21
Span 3
-0.08
-0.91
Span 2
Span 1
-1.21
A8
P
-0.99
-0.99
-0.99
-0.99
-0.99
-0.99
-0.99
-0.99
Rev
Date:
Output
-4.04
-4.04
-4.04
-4.04