Western Australia
Revision Register
REVISION REGISTER
Date 3-May-11 12-Aug-09 24-Apr-09 Item Number 302.1 503.08 502 504 30-Jan-08 02-Feb-07 28-Sep-06 07-Sep-06 Description of Revision Amended duplicate numbering for 302.10 Geotextile Reinforced Seal added Stone Mastic Asphalt has been added Reference to Polymer Modified Binder added MPCMP SO SO SO Authorised By A/MPCMP PSM A/SCO
References to 'Particular Preambles' amended to 'Contract Specific Preambles' 204.07 Unit corrected from 'Item' to 'No.' General Items - Section numbers added and Item numbering Series 100 amended General "Revision Register" created General Some section/specification titles updated Further Note added Examples Author's Notes Reference to "Particular Preambles" added
MAIN ROADS
W estern Australia
Contents
EXAMPLE OF FORMAT AND LAYOUT SAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES CONTRACT No. ??/?? SCHEDULES OF RATES/BILLS OF QUANTITIES
CONTENTS
page THIS PAGE - CONTENTS SCHEDULE No. 1 - GENERAL ITEMS SCHEDULE No. 2 - ROADWORKS SERIES 300 - EARTHWORKS SERIES 400 - DRAINAGE SERIES 500 - PAVEMENT & SURFACING SERIES 600 - TRAFFIC FACILITIES SERIES 700 - ELECTRICAL & LIGHTING SERIES 900 - MISCELLANEOUS SCHEDULE No. 3 - PROVISIONAL SUMS SCHEDULE No. 4 - DAYWORK BILL No. 1 - BRIDGE No. ? OVER ? SUMMARY 1 2 6 7 9 13 16 18 20 22 24 26 37
Page 2
MAIN ROADS
W estern Australia
Summary
SUMMARY
Page 3
MAIN ROADS
W estern Australia
Summary
EXAMPLE OF FORMAT AND LAYOUT SAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES CONTRACT No. ??/?? SUMMARY
SCHEDULE No. 1 - GENERAL ITEMS SCHEDULE No. 2 - ROADWORKS SERIES 300 - EARTHWORKS SERIES 400 - DRAINAGE SERIES 500 - PAVEMENT & SURFACING SERIES 600 - TRAFFIC FACILITIES SERIES 700 - ELECTRICAL & LIGHTING SERIES 900 - MISCELLANEOUS SCHEDULE No. 3 - PROVISIONAL SUMS SCHEDULE No. 4 - DAYWORK BILL No. 1 - BRIDGE No. ? OVER ? GST EXCLUSIVE AMOUNT ESTIMATED GST PAYABLE TOTAL OF TENDER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
Page 4
MAIN ROADS
W estern Australia
General Items
Page 5
MAIN ROADS
W estern Australia
General Items
Item
Description
Unit
Qty
Rate
Amount
CONDITIONS OF CONTRACT
GENERAL CONDITIONS OF CONTRACT GCC.01 Insurances in accordance with the General Conditions of Contract GCC.02 Contractor's superintendence during the execution of the Works GCC.03 All charges, costs and obligations relating to the General Conditions of Contract not provided for elsewhere SPECIAL CONDITIONS OF CONTRACT SCC.01 All charges, costs and obligations relating to the Special Conditions of Contract not provided for elsewhere Item 1 Item 1
Item
Item
1 1
Item
1 1 1
1 1 1
Item Item
1 1
Page 6
MAIN ROADS
W estern Australia
General Items
Item
Description
Unit
Qty
Rate
Amount
103.09 Removal of the Superintendent living facilities 103.10 Superintendent's meals 104 ENTRY TO LAND 104.01 Entry to land 105 WATER SUPPLIES 105.01 Supply of water 106 UTILITIES AND SERVICES 106.01 Liaison, programming, location and protection of utilities and services 106.02 Relocation of ? mains 106.03 Relocation of existing street lighting
Item M/day
Item
Item
Item
Item Item
1 1
1 1 1 1
Item
Item
Item
1 1 1 1
Page 7
MAIN ROADS
W estern Australia
General Items
Item
Description
Unit
Qty
Rate
Amount
204.06 Protection of public and property 204.07 Pre-construction property inspections 204.08 Dust control
1 1 1
To Summary
Page 8
MAIN ROADS
W estern Australia
Roadworks
Page 9
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
ha ha
ha
m m m m m m
m m
m m m
Page 10
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit m
Qty
Rate
302.17 Embankment construction in widenings using site excavated material and borrow material 302.18 Embankment construction for noise bunds using site excavated material SUBGRADE 302.19 Subgrade improvement ? thick using select borrow material 302.20 Subgrade 302.21 Subgrade in road widenings 302.22 Subgrade to principal shared path 303 - PITS AND QUARRIES EMBANKMENT MATERIAL BORROW PITS 303.01 Establishment of embankment material borrow pits 303.02 Reinstatement of embankment material borrow pits EXISTING PAVEMENT MATERIAL BORROW PITS 303.03 Reinstatement of existing pavement material borrow pits
m m m
Item Item
1 1
Item
304 - REVEGETATION AND LANDSCAPING 304.01 Seed collection 304.02 Transplanting ? Plants 304.03 Herbicide treatment 304.04 Ground preparation 304.05 Erosion control netting type? 304.06 Imported topsoil, ? thick 304.07 Seed mixture type ? 304.08 Seed mixture type ? by hydro-seeding 304.09 Grass turf 304.10 Grass stolons planted at the rate of ?m of turf to cover ?m of ground 304.11 Grass seeding planted at the rate of ?m of seed to ?m of ground 304.12 Plants type? 304.13 Mulch, ? thick, in plant beds hr No. ha m m m ha m m m
No. m
Page 11
MAIN ROADS
W estern Australia
Roadworks
Description
Qty
Rate
304.16 Reinstate existing verges including landscaped areas, irrigation, etc. 304.17 Irrigation system installed complete including connection to scheme water supply 304.18 Establishment of vegetation To Summary
Item
wk
Page 12
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
m m m
m m No. No.
No.
No.
m m m m
Page 13
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit m No.
Qty
Rate
404.08 Extra over culverts for excavation in rock 404.09 Precast concrete end treatment to suit ? diameter pipe Redundant Culverts 404.10 Removal of existing ? diameter pipe culvert and backfilling excavations 404.11 Removal of existing ? diameter pipe culvert (No backfilling - culvert replaced) 404.12 Removal of existing ? x ? box culvert and backfilling excavations 404.13 Removal of existing ? x ? box culvert (No backfilling culvert replaced) 404.14 Extra over removal of existing ? diameter pipe culvert for delivering salvageable pipes to Main Roads depot at ?
404.15 Removal of existing culvert end treatment (All sizes) STORMWATER DRAINS Reinforced Concrete Pipes Class ? 404.16 ? Diameter drain in trench, depth not exceeding 1.5m 404.17 ? Diameter drain in trench, depth exceeding 1.5m but not exceeding 2.5m 404.18 ? Diameter drain in trench, depth exceeding 2.5m but not exceeding 3.5m 404.19 ? Diameter drain in trench, depth exceeding 3.5m but not exceeding 4.5m All Stormwater Drains 404.20 Extra over stormwater drains for cement stabilised backfill 404.21 Extra over stormwater drains for excavation in rock Redundant Stormwater Drains 404.22 Removal of existing ? diameter pipe drain and backfilling excavations
No.
m m
m m
404.23 Extra over removal of existing ? diameter pipe drain for delivering salvageable pipes to Main Roads depot at ? 405 - DRAINAGE STRUCTURES MANHOLES 405.01 Manhole type ? GULLIES 405.02 Gully type ?
No.
No.
Page 14
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit No.
Qty
Rate
405.03 Gully type ? with silt trap CATCHPITS 405.04 Catchpit type ?
No.
ALTERATIONS TO EXISTING DRAINAGE STRUCTURES 405.05 Breaking into existing drainage structure and building-in ? No. diameter pipe 405.06 Breaking into existing drainage structure, building-in ? diameter pipe and alteration of structure and cover to suit new finished level 405.07 Alteration of structure and cover to suit new finished level No.
No.
405.08 Replacement of existing non-trafficable cover with trafficable cover type ? REDUNDANT DRAINAGE STRUCTURES 405.09 Removal of existing drainage structure 406 - ROCK PROTECTION ROCK PROTECTION 406.01 ? Rock protection to embankments GROUT ROCK PROTECTION 406.02 ? Grouted rock protection to embankments SPALLS 406.03 ? Limestone spalls 407 - KERBING 407.01 Kerb type ? 407.02 Temporary kerb type ? laid on and including plastic sheeting 407.03 Kerb opening type ? 407.04 Extra over kerbs for pedestrian ramp type ? 407.05 Extra over kerbs for driveway kerb 408 - REVETMENT MATTRESS 408.01 ? Thick revetment mattress 408.02 Extra over ? revetment mattress for footing including excavation 410 - LOW STRENGTH INFILL REDUNDANT STORMWATER DRAINS
No.
No.
m m
No. No. m
m m
Page 15
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit m
Qty
Rate
410.01 Filling of existing redundant ? diameter pipe drain with low strength infill REDUNDANT DRAINAGE STRUCTURES 410.02 Filling of existing redundant drainage structure with low strength infill To Summary
No.
Page 16
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
m m
m m m m
Material Supplied By Principal Free Of Charge From Stockpiles 501.07 ?mm Thick gravel subbase m 501.08 ?mm Thick gravel subbase in widenings 501.09 Varying thickness gravel subbase overlay 501.10 Final trimming of varying thickness gravel subbase overlay BASECOURSE 501.12 ?mm Thick <basecourse material> basecourse 501.13 ?mm Thick <basecourse material> basecourse in widenings 501.14 Varying thickness <basecourse material> basecourse overlay 501.15 Final trimming of varying thickness basecourse overlay m m m
m m
Material Supplied By Principal Free Of Charge From Stockpiles 501.16 ?mm Thick gravel basecourse m 501.17 ?mm thick gravel basecourse in widenings 501.18 Varying thickness gravel basecourse overlay 501.19 Final trimming of varying thickness gravel basecourse overlay PAVEMENT STABILISATION 501.20 Extra over gravel pavement for cement stabilisation, ? deep 501.21 Extra over gravel pavement in widenings for cement stabilisation, ? deep
Contract No. ??/??
m m m
Page 17
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
501.22 Extra over gravel pavement for lime stabilisation, ? deep 501.23 Extra over gravel pavement in widenings for lime stabilisation, ? deep PRINCIPAL SHARED PATH 501.24 ?mm Thick <basecourse material> basecourse
m m
Material Supplied By Principal Free Of Charge From Stockpiles 501.25 ?mm Thick gravel basecourse m 502 - STONE MASTIC ASPHALT ROADWORKS 502.01 Tack coat 502.02 ?mm Thick stone mastic asphalt 502.03 ?mm Thick stone mastic asphalt with Polymer Modified Binder (PMB) 502.04 Varying thickness stone mastic asphalt 502.05 Varying thickness stone mastic asphalt with PMB 503 - BITUMINOUS SURFACING ROADWORKS Prime 503.01 Prime coat with BAR of ? litres/m Primerseal 503.02 First coat primerseal with BAR of ? litres/m and ?mm aggregate 503.03 Second coat primerseal with BAR of ? litres/m and ?mm aggregate 503.04 Single coat primerseal with BAR of ? litres/m and ?mm aggregate Seal 503.05 First coat seal with BAR of ? litres/m and ?mm aggregate 503.06 Second coat seal with BAR of ? litres/m and ?mm aggregate 503.07 Single coat seal with BAR of ? litres/m and ?mm aggregate Geotextile Reinforced Seal (GRS) 503.08 Single coat GRS with BAR of ? litres/m and ?mm aggregate
m m m
t t
Page 18
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit m
Qty
Rate
503.09 First coat GRS with BAR of ? litres/m and ?mm aggregate 503.10 Second coat GRS with BAR of ? litres/m and ?mm aggregate BRIDGEWORKS Prime 503.11 Prime coat with BAR of ? litres/m Seal 503.12 Single coat rubberised seal with BAR of ? litres/m and ?mm aggregate PRINCIPAL SHARED PATH Prime 503.13 Prime coat with BAR of ? litres/m Primerseal 503.14 Single coat primerseal with BAR of ? litres/m and ?mm aggregate GENERAL Binder Application Rate Variation 503.15 Rate (L) for bituminous binder in $ per litre for adjustments greater than 7.5% of the tendered BAR ordered by the Superintendent. 503.16 Marking for future centreline 504 - ASPHALT SURFACING ROADWORKS 504.01 Tack coat 504.02 ?mm Thick dense graded asphalt 504.03 ?mm Thick dense graded asphalt with PMB 504.04 ?mm Thick dense graded coloured asphalt 504.05 Varying thickness dense graded asphalt 504.06 Varying thickness dense graded asphalt with PMB 504.07 ?mm Thick open graded asphalt 504.08 ?mm Thick open graded asphalt with PMB 504.09 Varying thickness open graded asphalt 504.10 Varying thickness open graded asphalt with PMB BRIDGEWORKS 504.11 Tack coat
litre
m m m m t t m m t t
Page 19
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit m
Qty
Rate
504.12 ?mm dense graded asphalt on bridge deck PRINCIPAL SHARED PATHS 504.13 Tack coat 504.14 ?mm Thick dense graded coloured asphalt 505 - SEGMENTAL PAVING PRINCIPAL SHARED PATHS 505.01 ?mm x ?mm Brick paving units on and including ?mm sand bedding 505.02 Tactile ground surface indicators MEDIANS AND TRAFFIC ISLANDS 505.03 ?mm x ?mm Brick paving units on and including ?mm sand bedding 505.04 Removal of existing concrete slab paving, storage and relaying including ?mm sand bedding 508 - COLD PLANING 508.01 Cold planing of ?mm asphalt
m m
509 - POLYMER MODIFIED BITUMINOUS SURFACING ROADWORKS Seal 509.01 Single coat PMB seal with BAR of ? litres/m and ?mm aggregate To Summary
No. No.
No.
No.
No. No.
Page 20
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
601.07 Major sign RELOCATION OF EXISTING SIGNS 601.08 Single post sign 601.09 Double post sign 601.10 Major sign REPLACEMENT OF EXISTING SIGN COMPONENTS 601.11 Post type ? 601.12 Sign panel type ? 602 - GUIDE POSTS 602.01 Guide post 602.02 Guide post with footing cast into concrete edge wall 602.03 Guide post (supplied by Principal free of charge from Main Roads depot at ?) 602.04 Removal of existing guide post 602.05 Relocation of existing guide post 603 - ROAD SAFETY BARRIER SYSTEMS BARRIER 603.01 Galvanised W-Beam barrier 603.02 Galvanised Thriebeam barrier 603.03 Galvanised Thriebeam/W-Beam transition 603.04 Galvanised modified eccentric loader terminal (MELT) WIRE ROPE ROAD SAFETY BARRIER SYSTEM 603.05 Wire rope road safety barrier system complete 603.06 Anchor block to wire rope road safety barrier REDUNDANT ROAD SAFETY BARRIER SYSTEM 603.07 Removal of redundant W-Beam guardrail INSITU CONCRETE BARRIER 603.08 Cast insitu concrete barrier complete 603.09 Transition treatment between instu concrete barrier and W-Beam barrier 603.10 Insitu concrete end treatment 604 - PAVEMENT MARKING
No.
No. No.
No. No.
m m No. No.
m No.
m No.
No.
Page 21
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
ROAD PAVEMENT MARKINGS 604.01 Line type ? 604.02 Chevron marking type ? 604.03 ? Turn arrow 604.04 Removal of redundant road pavement markings RAISED PAVEMENT MARKERS 604.05 Raised pavement marker type ? 604.06 Temporary raised pavement markers 604.07 Removal of redundant raised pavement marker 605 - GRAB RAILS AND BOLLARDS GRAB RAILS 605.01 ? Wide x ? diameter pipe grab rail type ? 605.02 Removal of redundant grab rail 605.03 Relocation of existing grab rail BOLLARDS 605.04 ? Diameter bollard type ? 605.05 Removal of redundant bollard 605.06 Relocation of existing bollard To Summary
m m No. Item 1
Page 22
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
No. No.
No.
No.
m m m
No.
Item
704 - CABLE CONDUITS FOR INTELLIGENT TRANSPORT SYSTEMS 704.01 ?mm Diameter heavy duty PVC conduit in trench 704.02 Extra over conduit in trench for excavation in rock 704.03 Extra over conduit in trench for directional drilling under existing roadway 704.04 Lockable cable pit type ? 712 - TRAFFIC SIGNALS m m m
No.
Page 23
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
? STREET INTERSECTION 712.01 Traffic signal controller 712.02 Traffic signal poles 712.03 Traffic signal aspects 712.04 Traffic signal detection loop 712.05 Pedestrian push button 712.06 Advanced flashing warning signal mounted on double poles 712.07 Red light infringement camera and housing 712.08 Red light infringement camera pole 712.09 Traffic signal cable pit type ? 712.10 ? Diameter heavy duty PVC conduit in trench 712.11 Extra over conduit in trench for directional drilling under existing roadway 712.12 ? Core ?mm diameter cabling between traffic controller and traffic signals, (pedestrian push buttons, red light infringement camera and advanced flashing warning signal > as required <) 712.13 Connection to consumer mains To Summary
Item
Page 24
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
m No.
m No.
m m
No.
m
Page 25
MAIN ROADS
W estern Australia
Roadworks
Item
Description
Unit
Qty
Rate
To Summary
Page 26
MAIN ROADS
W estern Australia
Roadworks
KS
Page 27
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 28
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 29
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 30
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 31
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 32
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 33
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 34
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 35
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 36
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 37
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 38
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 39
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 40
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 41
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 42
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 43
MAIN ROADS
W estern Australia
Roadworks
Amount
Page 44
MAIN ROADS
W estern Australia
Provisional Sums
Page 45
MAIN ROADS
W estern Australia
Provisional Sums
Item
Description
Unit
Qty
Rate
Amount
PROVISIONAL SUMS
SUPERINTENDENT'S TELEPHONE AND FACSIMILE CALLS PS.01 Allow the Provisional Sum of $? (? Thousand Dollars) for the cost of metered telephone and facsimile calls of the Superintendent EARTHWORKS PS.02 Allow the Provisional Sum of $? (? Thousand Dollars) for the removal and replacement of unsuitable material PS.03 Allow the Provisional Sum of $? (? Thousand Dollars) for the excavation of rock PS.04 Allow the Provisional Sum of $? (? Thousand Dollars) for landscaping DRAINAGE PS.05 Allow the Provisional Sum of $? (? Thousand Dollars) for the removal and replacement of unsuitable insitu bedding material PAVEMENTS AND SURFACING PS.06 Allow the Provisional Sum of $? (? Thousand Dollars) for backrolling of sealed sections of MISCELLANEOUS PS.07 Allow the Provisional Sum of $? (? Thousand Dollars) for fencing BRIDGEWORKS PS.08 Allow the Provisional Sum of $? (? Thousand Dollars) for pile set-up tests PS.09 Allow the Provisional Sum of $? (? Thousand Dollars) for load testing of falsework SERVICES PS.10 Allow the Provisional Sum of $? (? Thousand Dollars) for the relocation of existing ?? Mains To Summary P.S. P.S. P.S. P.S. P.S. P.S. P.S.
P.S.
P.S.
P.S.
Page 46
MAIN ROADS
W estern Australia
Daywork
Page 47
MAIN ROADS
W estern Australia
Daywork
Item
Description
Unit
Qty
Rate
Amount
DAYWORK
LABOUR DW.01 Allow the Provisional Sum of $? (? Thousand Dollars) for labour of the Contractor only expended on persons employed on daywork DW.02 Labour on-costs MATERIALS DW.03 Allow the Provisional Sum of $? (? Thousand Dollars) for the net cost of delivered materials of the Contractor only expended on daywork including delivery to site DW.04 Materials on-costs PLANT DW.05 Allow the Provisional Sum of $? (? Thousand Dollars) for the cost of plant of the Contractor only expended on daywork DW.06 Subcontractors on-costs SUBCONTRACTORS DW.07 Allow the Provisional Sum of $? (? Thousand Dollars) for the cost of labour, materials and plant of Subcontractors expended on daywork DW.08 Subcontractors on-costs To Summary P.S. P.S. P.S. P.S.
Page 48
MAIN ROADS
W estern Australia
Bridge
Page 49
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit
Qty
Rate
Amount
m3
m3
m3
m3
m3
m3
m3
m3
m2
Item
m2 m2
1 1 1
Page 50
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit
Qty
Rate
Amount
808.04 Launching of deck segment 810 - DRIVEN STEEL PILES 810.01 Mobilisation and demobilisation of piling plant 810.02 ?UC? Steel pile (In ? No. piles) 810.03 ?UC? Steel pile extension (Provisional Quantity) 810.04 Extra over ?UC? steel piles and ?UC? steel pile extensions for galvanising (Provisional Quantity) 810.05 Preparation, handling and pitching of ?UC? steel pile 810.06 Driving of ?UC? steel pile (Provisional Quantity) 810.07 Site welded splice to ?UC? steel pile (Provisional Quantity) 810.08 Re-driving of ?UC? steel pile (Provisional Quantity) 810.09 Cutting off top of ?UC? steel pile and preparing head for bonding into structure 811 - DRIVEN CONCRETE PILES 811.01 Mobilisation and demobilisation of piling plant 811.02 ? x ? Concrete pile, ?m long 811.03 Preparation, handling and pitching of ? x ? concrete pile 811.04 Driving of ? x ? concrete pile 811.05 ? x ? Concrete pile extension 811.06 Re-driving of ? x ? concrete pile 811.07 Cutting off top of ? x ? concrete pile and preparing head for bonding into structure 819 - FALSEWORK 819.01 Provision and erection of falsework 819.02 Maintenance of falsework 819.03 Removal of falsework 820 - CONCRETE FOR STRUCTURES ABUTMENTS AND APPROACH SLABS Plain Insitu Concrete Class ? 820.01 ? Blinding layer under abutment footing (In ? m2)
Contract No. ??/??
No.
Item t t t
No. m No.
m No.
m m m No.
1 1 1
m3
Page 51
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit
Qty
Rate
Amount
820.02 ? Blinding layer under abutment capbeam and wingwalls (In ? m2) 820.03 ? Blinding layer under wingwall (In ? m2) 820.04 ? Blinding layer under approach slab (In ? m2) 820.05 ? Blinding layer under dual use path (In ? m2) Reinforced Insitu Concrete Class ? 820.06 Abutment footing 820.07 Abutment wall and wingwalls 820.08 Abutment column 820.09 Abutment capbeam and wingwalls 820.10 Wingwall 820.11 Approach slab 820.12 Dual use path PIERS Plain Insitu Concrete Class ? 820.13 ? Blinding layer under pier footing (In ? m2) Reinforced Insitu Concrete Class ? 820.14 Pier footing 820.15 Pier 820.16 Pier column 820.17 Pier capbeam RETAINING WALLS Plain Insitu Concrete Class ? 820.18 ? Blinding layer under retaining wall footing (In ? m2) Reinforced Insitu Concrete Class ? 820.19 Retaining wall footing 820.20 Retaining wall DECK Reinforced Insitu Concrete Class ? 820.21 Deck slab, diaphragms and beams 820.22 Dual use path Post-tensioned Prestressed Insitu Concrete Class ? 820.23 Deck slab, diaphragms and beams 821 - FORMWORK
Contract No. ??/??
m3
m3 m3 m3
m3 m3 m3 m3 m3 m3 m3
m3
m3 m3 m3 m3
m3
m3 m3
m3 m3
m3
Page 52
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit
Qty
Rate
Amount
ABUTMENTS AND APPROACH SLABS Formwork Class ? 821.01 Sides of abutment footing 821.02 Sides of abutment wall and wingwalls 821.03 Sides of abutment wall and wingwalls, curved on 821.04 Sides of abutment column, curved on plan 821.05 Sides of abutment capbeam and wingwalls 821.06 Sides of wingwall 821.07 Sides of wingwall, curved on plan 821.08 Sides of approach slab 821.09 Sides of dual use path PIERS Formwork Class ? 821.10 Sides of pier footing 821.11 Sides of pier 821.12 Sides of pier, curved on plan 821.13 Sides of pier column, curved on plan 821.14 Sides and soffit of pier capbeam RETAINING WALLS Formwork Class ? 821.15 Sides of retaining wall footing 821.16 Sides and ends of retaining wall 821.17 Sides of retaining wall, curved on plan DECK Formwork Class ? 821.18 Sides of diaphragm 821.19 Soffit of deck slab 821.20 Sides of deck slab and upstand 821.21 Sides and soffit of diaphragm 821.22 Sides of kerb/edge beam 821.23 Sloping soffit of diaphragm 821.24 Sides of dual use path
m2 m2 m2 m2 m2 m2 m2 m2 m2
m2 m2 m2 m2 m2
m2 m2 m2
m2 m2 m2 m2 m2 m2 m2
Page 53
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit
Qty
Rate
Amount
Permanent Steel Formwork 821.25 ? Bondek to soffit of deck slab Permanent Void Formwork 821.26 ? Diameter x ? thick helical lock seam corrugated galvanised steel pipe void former (In ? No.) 822 - STEEL REINFORCEMENT ABUTMENTS AND APPROACH SLABS Reinforcing Bars 822.01 Bars less than 16 diameter in abutment footing 822.02 Bars less than 16 diameter in abutment wall and wingwalls 822.03 Bars less than 16 diameter in abutment column 822.04 Bars less than 16 diameter in abutment capbeam and wingwalls 822.05 Bars less than 16 diameter in wingwall 822.06 Bars less than 16 diameter in approach slab 822.07 Bars less than 16 diameter in dual use path 822.08 Bars 16 - 36 diameter in abutment footing 822.09 Bars 16 - 36 diameter in abutment wall and wingwalls 822.10 Bars 16 - 36 diameter in abutment column 822.11 Bars 16 - 36 diameter in abutment capbeam and wingwalls 822.12 Bars 16 - 36 diameter in wingwall 822.13 Bars 16 - 36 diameter in approach slab 822.14 Bars 16 - 36 diameter in dual use path Reinforcing Fabric 822.15 ? Fabric in approach slab 822.16 ? Fabric in dual use path PIERS Reinforcing Bars 822.17 Bars less than 16 diameter in pier footing 822.18 Bars less than 16 diameter in pier 822.19 Bars less than 16 diameter in pier column 822.20 Bars less than 16 diameter in pier capbeam
m2
t t
t t
t t t t t t t
t t t
m2 m2
t t t t
Page 54
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit t t t t
Qty
Rate
Amount
822.21 Bars 16 - 36 diameter in pier footing 822.22 Bars 16 - 36 diameter in pier 822.23 Bars 16 - 36 diameter in pier column 822.24 Bars 16 - 36 diameter in pier capbeam Reinforcing Wire 822.25 Wire less than 16 diameter in pier column Reinforcing Fabric 822.26 ? Fabric in pier capbeam RETAINING WALLS Reinforcing Bars 822.27 Bars less than 16 diameter in retaining wall footing 822.28 Bars less than 16 diameter in retaining wall 822.29 Bars 16 - 36 diameter in retaining wall footing 822.30 Bars 16 - 36 diameter in retaining wall Reinforcing Fabric 822.31 ? Fabric in retaining wall DECK Reinforcing Bars 822.32 Bars less than 16 diameter in deck slab, diaphragms and beams 822.33 Bars less than 16 diameter in dual use path 822.34 Bars 16 - 36 diameter in deck slab, diaphragms and beams 822.35 Bars 16 - 36 diameter in dual use path 822.36 ?mm Diameter mechanical splice Reinforcing Fabric 822.37 ? Fabric in deck slab, diaphragms and beams 822.38 ? Fabric in dual use path 824 - PRESTRESSING OF CONCRETE DECK 824.01 Stressing anchorage type ? 824.02 Dead end anchorage type ? 824.03 Coupler type ?
m2
t t t t
m2
t t
t No.
m2 m2
Page 55
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit m
Qty
Rate
Amount
824.04 Prestressing tendon comprising ? No. ? diameter wires in ? diameter tendon sheathing duct (In ? No. tendons) 824.05 Stressing of ? No. x ? diameter wire tendon and grouting of ? diameter tendon sheathing duct 825 - SANDBLASTED CONCRETE FINISH ABUTMENTS AND APPROACH SLABS 825.01 Sandblasted finish to exposed surfaces of abutment wall and wingwalls PIERS 825.02 Sandblasted finish to exposed surfaces of pier RETAINING WALLS 825.03 Sandblasted finish to exposed surfaces of retaining wall 828 - PRECAST CONCRETE MEMBERS Precast Prestressed Concrete "I" Beams 828.01 ?m Long "I" beam Precast Prestressed Concrete Plank Beams 828.02 ? x ? Plank beam, ?m long 829 - PRECAST CONCRETE PARAPET PANELS 829.01 Parapet panel type ?, ? long 830 - STRUCTURAL STEELWORK 830.01 ?WB? Deck beam (In ? No. beams) 830.02 ?UC? Deck bracing (In ? No. braces) 830.03 ? x ? x ? Beam base plate 831 - MINOR STEEL ITEMS 831.01 Galvanised ? x ? x ? plate fixed to abutment wall with chemical anchors 831.02 Galvanised pier shear key 603 - ROAD SAFETY BARRIER SYSTEMS AND TRAFFIC BARRIERS FOR STRUCTURES BARRIER 603.01 3 rail RHS traffic barrier for structure complete as Drawing ? 603.02 Galvanised Thriebeam barrier system 603.03 Galvanised W-Beam barrier system
No.
m2
m2
m2
No.
No.
No.
t t No.
No.
No.
m m
Page 56
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit No.
Qty
Rate
Amount
603.04 Galvanised Thriebeam/W-Beam barrier system transition 603.05 Galvanised modified eccentric loader terminal 833 - BALUSTRADES AND HANDRAILS BALUSTRADES 833.01 Galvanised and painted balustrade complete as Drawing ? 833.02 Extra over balustrade for light pole base all as Drawing ? including conduit connection to junction box, and casting in edge plate and tie-in reinforcement to deck slab 835 - PROTECTIVE TREATMENT OF STEELWORK 835.01 Extra over ?WB? deck beam for galvanising 835.02 Extra over ?UB? bracing for galvanising 835.03 ? Coat chlorinated rubber paint to deck beam 850 - TIMBER BRIDGES 850.01 Preparation of timber decking to receive concrete overlay 850.02 Routine maintenance of outside timber stringer (In ? No. stringers) 850.03 Replacement of timber stringer with ?UB? Stringer (In. ? No. stringers) 850.04 Stringer or corbel bolting 850.05 Anti-fungal groundline treatment of timber pile 850.06 Pile repair type ? to abutment pile 850.07 Pile band to variable diameter timber pile 850.08 Bolt tightening to ? 850.09 End grain sealing to ? 850.10 Vegetaion and debris clearance below bridge 860 - BRIDGE BEARINGS BRIDGE BEARINGS 860.01 ? Diameter x ? elastomeric laminated rubber bearing including galvanised ? O.D. x ? CHS socket cast into concrete, ? diameter galvanised dowel ? long, dry pack mortars, forming horizontal recess, etc., all as Drawing ?
Contract No. ??/??
No.
No.
t t m2
m2
No.
Page 57
MAIN ROADS
W estern Australia
Bridge
Item
Description
Unit
Qty
Rate
Amount
860.02 ? x ? Rubber bearing pad including ? diameter galvanised dowel cast into concrete APPROACH SLAB BEARINGS 860.03 Approach slab bearing comprising ? x ? x ? polyethylene sheet (HDPE), ? x ? x ? rubber bearing pad, galvanised dowel cap cast into approach slab and ? diameter galvanised dowel ? long cast into deck slab all as Drawing ? 870 - COMPRESSION JOINT SEAL 870.01 ? Compression seal including galvanised expansion joint edging with anchor straps cast into concrete and galvanised cover plates all as Drawing ? (In ? No. expansion joints) 875 - WATERPROOF MEMBRANE ABUTMENTS AND APPROACH SLABS 875.01 Bituthene ? waterproof membrane (? wide) applied behind contraction joint in abutment wall DECK 875.02 Bituthene ? waterproof membrane laid on deck slab under dual use path and median 908 - ANTI-GRAFFITI ABUTMENTS AND APPROACH SLABS 908.01 Anti-graffiti coating to exposed surfaces of abutment wall and wingwalls PIERS 908.02 Anti-graffiti coating to exposed surfaces of pier RETAINING WALLS 908.03 Anti-graffiti coating to exposed surfaces of retaining wall 407 - KERBING 407.01 ? x ? Overall precast concrete kerb laid on deck slab including mortar bed and all necessary insitu infill
No.
No.
m2
m2
m2
m2
m2
?M - MISCELLANEOUS ABUTMENTS AND APPROACH SLABS Expansion Joints Expansion joint between ? approach slab and abutment wingwalls including treating wingwall face with bond breaker, forming ? x ? groove at top and sealing with approved sealant as Drawing ?
M.01
Page 58
MAIN ROADS
W estern Australia
Bridge
Item M.02
Description ? x ? Polystyrene foam between approach slab blinding layer and abutment as Drawing ? Contraction Joints Contraction joint in ? approach slab comprising ? plywood ? wide set vertically and ? deep groove at top surface sealed with approved sealant as Drawing ? Diameter Class ? PVC pipe set vertically in abutment wall and tied to reinforcement behind dummy joint including end caps (In ? No.) Waterstops ? Waterstop cast into concrete RETAINING WALLS Expansion Joints Expansion joint comprising ? bitumen impregnated fibreboard joint filler ? wide with ? x ? sealant and ? centre type waterstop cast into concrete, ? diameter galvanised dowels ? long with PVC caps and bituminous paint cast into concrete at ? centres and forming groove in front face all as Drawing ? To Summary
Unit m
Qty
Rate
Amount
M.03
M.04
M.05
M.06
Page 59
MAIN ROADS
W estern Australia
Further Examples
FURTHER EXAMPLES
Page 60
MAIN ROADS
W estern Australia
Further Examples
Item
Description
Unit
Qty
Rate
Amount
m2 m2 m2 m2
Item
Page 61
MAIN ROADS
W estern Australia
Author's Notes
AUTHOR's NOTES Delete these notes from (or Do Not Print with) final tender documents
This Document must be measured and compiled in accordance with Main Roads Standard Method Of Measurement For Construction Works and incorporate the Preambles To The Schedule of Rates And Bills Of Quantities and where necessary, Contract Specific Preambles. This document must be completed by a Qualified Quantity Surveyor experienced in Main Roads WA Major Works Contracts. Main Roads' Quantity Surveyor can provide advice to ensure accuracy and completeness of these Schedules of Rates and/or Bills of Quantities and compliance with Main Roads Standard Method Of Measurement For Construction Works. The Project Description lines only need to be entered on the Contents Page. The information entered there will automatically appear on the Summary Page. Where additional items are added to Schedule 2 - Roadworks, the Contents page numbers should be checked, and when necessary manually corrected. If the "Bridge" Bill(s) is/are not required, delete the sheet and the entries on the Contents and Summary pages. If extra Bridge Bills are required, copy the Bridge Bill, and edit/amend both the Contents and the Summary page to suit. Correct the Contract number shown in ALL the footers : Press the CTRL & i keys together, and follow the prompts. With correct use of this document, ALL totals should automatically be transferred to the Section Total and Summary. However, Authors should still check that this has in fact happened. ALL items in the Schedule of Rates/Bill of Quantities that have, 'Item' as the Unit of measurement shall have the quantity of '1' entered in the Quantity column. This will encourage tenderers to provide an individual rate or price for each item, consistent with the requirements of the Preambles To The Schedule of Rates And Bills of Quantities and Clause 9.12 of the Conditions Of Tendering.
Page 62
MAIN ROADS
W estern Australia
Author's Notes
Page 63