Sub Name Sub Code Course Semester : Well Design : PE 0502 and Completion Unit : I LP Rev. No: 00 Date: Page 1 of 5

: B.E Petroleum & Offshore Engineering : V

Unit syllabus: Prediction of formation of pore pressure, Causes of abnormal pressure, Abnormal pressure evaluation, Formation integrity test, fracture gradient determination. Objective: To know the basics of formation pore pressure and fracture gradient for the planning of a well.
.
Teaching S.No

Topics to be covered

Time

Ref

Method

Date

Sign.

1 2 3 4 5

Prediction of formation of pore pressure Causes of abnormal pressure Abnormal pressure evaluation Formation integrity test Fracture gradient determination

3 Hr 3 Hr 3 Hr 1 Hr 1 Hr

1,2 1,2 1,2 1,2 1,2

WB WB WB WB WB

AMET UNIVERSITY
(Under Sec. 3 of UGC Act 1956)

LESSON PLAN
Sub Name Sub Code Course Semester : Well Design : PE 0502 and Completion Unit : II LP Rev. No: 00 Date: Page : 2 of 5

: B.E Petroleum & Offshore Engineering : V

Unit Title: Casing properties: functions of casing, Casing properties, Casing specifications, Casing connectors, Casing Design principles: Data collection, Factors of influencing casing design, design criteria, Cementing, Drilling Fluids Objective: To know about the design of casing, cement slurry and drilling fluids. .
S.No

Topics to be covered

Time

Ref

Teaching Method

Date

Sign.

6 7 8 9 10 11 12 13 14

Functions of casing & Casing properties Casing specifications Casing connectors Casing Design principles Data collection Factors of influencing casing design design criteria Cementing Drilling Fluids

2 Hr 1 Hr 1 Hr 3 Hr 1 Hr 1 Hr 1 Hr 2 Hr 2 Hr

1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2

WB WB WB WB WB WB WB WB WB

AMET UNIVERSITY
(Under Sec. 3 of UGC Act 1956)

LESSON PLAN
Sub Name : Well Design Sub Code Course Semester : PE 0502 and Completion Unit : III LP Rev. No: 00 Date: Page : 3 of 5

: B.E Petroleum & Offshore Engineering : V

Unit Title: Drill Bits: Bit selection guide lines, IADC Bit classification for Roller cone Bits, PDC Bits, Diamond and TSP Bits, Drilling cost calculation, Drill String Design: Drill pipe selection, BHA selection, Drill string design criteria Objective: To know how to Design a Drill bit and Drill String.
Teaching Method WB WB WB WB WB WB WB WB

S.No

Topics to be covered

15 16 17 18 19 20 21 22

Bit selection guide lines IADC Bit classification for Roller cone Bits PDC Bits Diamond and TSP Bits Drilling cost calculation Drill String Design BHA selection Drill string design criteria

Time 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr

Ref 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2

Date

Sign.

AMET UNIVERSITY
(Under Sec. 3 of UGC Act 1956)

LESSON PLAN
Sub Name : Well Design Sub Code : PE 0502 Course Semester : V and Completion Unit : IV : B.E Petroleum & Offshore Engineering LP Rev. No: 00 Date: Page : 4 of 5

Unit Title : Directional Drilling , Horizontal and Multi lateral wells: Horizontal wells, Extended Reach wells, Multi lateral wells, Multi lateral well planning consideration, HPHT wells, well costing Objective: To know the basic designing ideas of about Directional, horizontal, multi lateral and HTHP wells .
S.No

Topics to be covered

23 24 25 26 27 28 29

Directional Drilling Horizontal wells Extended Reach wells Multi lateral wells Multi lateral well planning consideration HPHT wells Well costing

Time 3 Hr 2 Hr 1 Hr 1 Hr 3 Hr 2 Hr 2 Hr

Ref 1,2 1,2 1,2 1,2 1,2 1,2 1,2

Teaching Method WB WB WB WB WB WB WB

Date

Sign.

AMET UNIVERSITY
(Under Sec. 3 of UGC Act 1956)

LESSON PLAN
LP Rev. No: 00 Sub Name : Well Design Sub Code : PE 0502 and Completion. Unit : V Date: Page : 5 of 5

Course : B.E Petroleum & Offshore Engineering Semester : V

Unit Title: Well Completion: Definition of Well Completion, Types of completion, Open Hole or Barefoot Completions, Perforated Completions, Naturally Flowing Completions, Artificial Lift Completions, Artificial Lift Methods, Single Zone Completion, Multiple Zone Completions, Phases of Well Completion, completion selection and design criteria. Objective: To know about the well completion Techniques
Teaching Method WB WB WB WB WB WB WB WB WB

S.No

Topics to be covered

30 31 32 33 34 35 36 37 38

Definition of Well Completion Types of completion Open Hole & Naturally Flowing Completions Perforated Completions Artificial Lift Completions Artificial Lift Methods Single Zone Completion &Multiple Zone Completions Phases of Well Completion Completion selection and design criteria

Time 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr

Ref 2,3 2,3 2,3 2,3 2,3 2,3 2,3 2,3 2,3

Date

Sign.

Name Designation Date

Prepared By Hisham C Rasheed


Assistant Professor

Approved By Dr. P.N.Ananthanarayanan Professor & Head of the Department

References: 1) Well Engineering & Construction- Hussain Rabia 2) Drilling operation manual P.S. Bais, ONGC, 1994, 3) Schlumberger completion primer