Está en la página 1de 3

Subsea Operations Training Acronym list

INTRODUCTION TERM AD AMV API AS AVV AWV BTC BV CI CID CID1 CID2 CID3 CIT CIV C/P DAS DCP DHPT DHPTT EDU EFL DEFINITION OF TERMS Asphaltene Dispersant Annulus Master Valve American Petroleum Institute Asphaltene Solvent Annulus Vent Valve Annulus Wing Valve Tubing Hanger Running Tool Bottom Test Cap Branch Valve Chemical Injection Chemical Injection Downhole Chemical Injection Line No. 1 Chemical Injection Line No. 2 Chemical Injection Line No. 3 Chemical Injection Tree Chemical Injection Valve Corrosion/Paraffin Inhibitor Data Acquisition System Data Collection Point Downhole Pressure and Temperature Downhole Pressure and Temperature Transducer Electrical Distribution Unit Electrical Flying Lead TERM RIT SAS SCM SCM1 SCM2 SCMMB SCPC SCSSV SEM SFL SIT SPCTU SRT ST5007 SV1 SV2 THL THLV THUL THTS TT TTC DEFINITION OF TERMS Receiving Inspection Testing Subsea Accumulator Skid Subsea Control Module (i.e. POD) Scrams Line No. 1 Scrams Line No. 2 Subsea Control Module Mounting Base Subsea Control Personal Computer Surface Controlled Subsurface Safety Valve Subsea Electronic Module Steel Flying Lead System Integration Testing Subsea Power & Communications Test Unit Running Tool Secondary Release Tool Umbilical storage fluid (40% Glycol) SCSSV Line No. 1 SCSSV Line No. 2 THRT to Tubing Hanger Lock Function THRT to Tubing Hanger Lock Function Verification THRT to Tubing Hanger Unlock Function Tubing Hanger Test Standard Temperature Transmitter Tubing Hanger Test Cap

TERM EH EHDM ELE1 ELE2 EPROM EPU ESD ETU FAT

DEFINITION OF TERMS Electro-Hydraulic Electro Hydraulic Distribution Module DHPTT Line No. 1 DHPTT Line No. 1 Erasable Programmable Memory Electrical Power Unit Emergency Shut Down Electrical Termination Unit Factory Acceptance Testing

TERM TUTU Unpoppeted Coupler UPS USV UTA UTAJ UTH UTA UTAJ

FLOT GLL GL HDM HFL HFT HP HPU HST HW540 HWL HWLV HWUL LP MBV MCS

Flowline Orientation Tool Guideline Less Guidelined Hydraulic Distribution Manifold (subsea on UTA) Hydraulic Flying Lead Hydrate Formation Temperature High Pressure Hydraulic Power Unit Tubing Hanger Annulus Seal Test HP/LP Hydraulic Fluid (40% Glycol) Tubing Hanger to Wellhead Lock Function Tubing Hanger to Wellhead Lock Function Verification Tubing Hanger to Wellhead Unlock Function Low Pressure Manifold Branch Valve Master Control Station

UTB UTH UTP VIS VSE VSS WETU XOV XT

DEFINITION OF TERMS Topside Umbilical Termination Unit Open to seawater during make/break Uninterruptable Power Supply Underwater Safety Valve Umbilical Termination Assembly Umbilical Termination Assembly Jumper Umbilical Termination Lead Umbilical Termination Assembly (subsea) Umbilical Termination Assembly Jumper (two per UTA) Umbilical Termination Box (top of I-tube on Auger TLP) Umbilical Termination Head (subsea end of umbilical) Umbilical Termination Panel (on Cellar Deck Auger TLP) Vendor Information Server Valve Signature Enclosure Valve Signature Server Wonderware Electronic Test Unit Crossover Valve Xmas Tree

TERM MeOH MMI MQC PIV PLC PLET PMV Poppeted Coupler PSD PSDV PSI PSL PT PWV QTP RCJ

DEFINITION OF TERMS Methanol Man Machine Interphase Multi Quick Connection Plate Pigging Isolation Valve Programmable Logic Control Pipeline End Termination Production Master Valve Isolated from seawater during make/break Process Shut Down Production Shutdown Valve Pounds Per Square Inch Product Specification Level Pressure Transmitter Production Wing Valve Qualification Test Procedure Riser Crossover Joint

TERM

DEFINITION OF TERMS

FAABBBCD or SAABBBCD F = FAT Procedure S = SIT Procedure AA = year BBB = Sequential Number C = Rev Level D = Product line (1=Subsea, 2=Subsurface)

También podría gustarte