Integration: Develop the Project charter (initiation) Inputs Tools & techniques Project statement of Work Expert Judgment

Business case Contract Enterprise Environmental Factors Organizational Process Assets Outputs Project charter

Inputs Tools & techniques Develop the Project management plan (planning) Project charter Expert Judgment Enterprise Environmental Factors Organizational Process Assets Inputs Tools & techniques Direct and manage project execution (Executing) Project Management Plan Expert Judgment Approved Changed Requests Project Mgmt Information System Enterprise Environmental Factors Organizational Process Assets

Outputs Project Management Plan

Outputs Deliverables Work Performance Information Change Requests Project Management Plan updates Project Document updates Outputs Change Requests Project Management Plan updates Project Document updates

Monitor and Control Project Work (MAC)

Inputs Tools & techniques Project Management Plan Expert Judgment Performance Reports Enterprise Environmental Factors Organizational Process Assets

Perform Integrated Change Control (MAC)

Inputs Tools & techniques Project Management Plan Expert Judgment Work Performance Information Change Control Meetings Change Requests Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Accepted Deliverables Organizational Process Assets Tools & techniques Expert Judgment

Outputs Change Requests status updates Project Management Plan updates Project Document updates

Close Project or Phase (Closing)

Outputs Final Product, services or results transition Organizational Process Assets updates

Integration: Develop the Project charter (initiation) Inputs Project statement of Work Business case Contract Enterprise Environmental Factors Organizational Process Assets Tools & techniques Expert Judgment Outputs Project charter

Inputs Develop the Project management plan (planning) Project charter Enterprise Environmental Factors Organizational Process Assets Inputs Direct and manage project execution (Executing) Project Management Plan Approved Changed Requests Enterprise Environmental Factors Organizational Process Assets

Tools & techniques Expert Judgment

Outputs Project Management Plan

Tools & techniques Expert Judgment Project Mgmt Information System

Outputs Deliverables Work Performance Information Change Requests Project Management Plan updates Project Document updates Outputs Change Requests Project Management Plan updates Project Document updates

Monitor and Control Project Work (MAC)

Inputs Project Management Plan Performance Reports Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Work Performance Information Change Requests Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Accepted Deliverables Organizational Process Assets

Tools & techniques Expert Judgment

Perform Integrated Change Control (MAC)

Tools & techniques Expert Judgment Change Control Meetings

Outputs Change Requests status updates Project Management Plan updates Project Document updates

Close Project or Phase (Closing)

Tools & techniques Expert Judgment

Outputs Final Product, services or results transition Organizational Process Assets updates

Scope: Inputs Tools & techniques Outputs

Collect Requirements (Planning)

Project Charter Stakeholder Register

Interviews Focus Groups Facilitated Workshops (JAD or QFD) Group Creativity Techniques Group Decision Making Techniques Questionnaires and Surveys Observations Prototypes Tools & techniques Expert Judgment Product Analysis Alternatives Identification Facilitated Workshops (JAD or QFD) Tools & techniques Decomposition

Requirements Documentation Requirements Management Plan Requirements Traceability Matrix

Define Scope (Planning)

Inputs Project Charter Requirements Documentation Organizational Process Assets

Outputs Project Scope Statement Project Document updates

Create Work Breakdown Structure (Planning)

Inputs Project Scope Statement Requirements Documentation Organizational Process Assets

Outputs WBS WBS Dictionary Scope Baseline Project Document updates Outputs Accepted Deliverables Change Requests Project Document Updates

Verify Scope (MAC)

Inputs Project Management Plan Requirements Documentation Requirements Traceability Matrix Validated Deliverables

Tools & techniques Inspection

Control Scope (MAC)

Inputs Tools & techniques Project Management Plan Variance Analysis Work Performance Information (WPI) Requirements Documentation Requirements Traceability Matrix Organizational Process Assets

Outputs Work Performance Measurements Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Time Management: Define Activities (Planning) Inputs Scope Baseline Enterprise Environmental Factors Organizational Process Assets Tools & techniques Decomposition Rolling Wave Planning Templates Expert Judgment Tools & techniques Precedence Diagramming Method (PDM) Outputs Activity List Activity Attributes Milestone List

Inputs Sequence Activities (Planning) Activity List

Outputs Project Schedule Network Diagrams

Activity Attributes Milestone List Project Scope Statement Organizational Process Assets Inputs Activity List Activity Attributes Resource Calendar Enterprise Environmental Factors Organizational Process Assets Inputs Activity List Activity Attributes Activity Resource Requirements Resource Calendar Project Scope Statement Enterprise Environmental Factors Organizational Process Assets Inputs Activity List Activity Attributes Project Schedule Network Diagram Activity Resource Requirements Resource Calendar Activity Duration Estimates Project Scope Statement Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Project Schedule Work Performance Information (WPI) Organizational Process Assets

Dependency Determination Apply leads & Lags Schedule Network Temples

Project Document Updates

Estimates Activity Resources (Planning)

Tools & techniques Expert Judgment Alternatives Analysis Published Estimating Data Bottom-Up Estimating Project Management Software Tools & techniques Expert Judgment Analogous Estimating Parametric estimates Three-Point Estimates Reserve Analysis

Outputs Activity Resource Requirements Resource Breakdown Structure (RBS) Project Document Updates

Estimating Activity Duration (Planning)

Outputs Activity Duration Estimates Project Document Updates

Develop Schedule (Planning)

Tools & techniques Schedule Network Analysis Critical Path Method Critical Chain Method Resource Leveling What-if Scenario Analysis Applying Leads and Lags Schedule Compression Scheduling Tool

Outputs Project Schedule Schedule Baseline Schedule Data Project Document Updates

Control Schedule (MAC)

Tools & techniques Performance Reviews Variance Analysis Resource Leveling What-if Scenario Analysis Project Management Software Adjusting Leads and Lags Schedule Compression Scheduling Tool

Outputs Work Performance Measurements Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Cost Management: Inputs Tools & techniques Outputs

Estimate Costs (planning)

Scope Baseline Project Schedule Human Resource Plan Risk Register Enterprise Environmental Factors Organizational Process Assets

Expert Judgment Analogous Estimating Parametric Estimating Bottom-up Estimating Three-Point Estimates Reserve Analysis Cost of Quality Project Management Estimating Software Vendor Bid Analysis Tools & techniques Cost Aggregation Reserve Analysis Expert Experiments Historical Relationships Fund Limit Reconciliation

Activity Cost Estimates Basis of Estimates Project Document Updates

Determine Budget (Planning)

Inputs Activity Cost Estimates Basis of Estimates Scope Baseline Project Schedule Resource Calendar Contracts Organizational Process Assets Inputs Project Management Plan Project Funding Requirements Organizational Process Assets

Outputs Cost Performance Baseline Project Funding Requirements Project Document Updates

Control Costs (MAC)

Tools & techniques Earned Value Management Forecasting To-Complete Performance Performance Reviews Variance Analysis Project Management Software

Outputs Work Performance Measurements Budget Forecasts Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Quality Management: Plan Quality (Planning) Inputs Scope Baseline Stakeholder Register Cost Performance Baseline Schedule Baseline Risk Register Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Quality Metrics Work Performance Information (WPI) Quality Control Measurements Tools & techniques Cost-Benefit Analysis Cost of Quality (COQ) Control Charts Benchmarking Design of Experiments Statistical Sampling Flow Charting Tools & techniques Inspection Cost of quality Cost-benefit analysis Control charts Benchmarking Outputs Quality Management Plan Quality Metrics Quality Checklists Process Improvement Plan Project Document Updates

Perform Quality Assurance (Executing)

Outputs Change Requests Organizational Process Assets updates Project Management Plan Updates Project Document Updates

Design of experiments Statistical sampling Flowcharting Proprietary quality management methodologies Additional quality planning tools Plan Quality and Perform QC tools Quality audits Process analysis Cause and effect diagrams Histogram Pareto chart Inputs Project Management Plan Quality Metrics Quality Checklists Work Performance Measurements Approved Change Requests Deliverables Organizational Process Assets Tools & techniques Inspection Cause and effect diagrams Control charts Flowcharting Histogram Pareto chart Run Charts Scatter Diagram Statistical sampling Approved Change Requests Review Outputs Quality Control Measurements Validates Changes Validated Deliverables Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Perform Quality Control (MAC)

Human Resources Management: Develop Human Resources Plan (Planning) Inputs Activity Resource Requirements Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Enterprise Environmental Factors Organizational Process Assets Tools & techniques Organization Charts and Position Description Networking Organizational Theory Tools & techniques Pre-assignment Negotiation Acquisition Virtual Teams Tools & techniques Interpersonal Skills Training Team-Building Activities Ground rules Co-Location Recognition and Rewards Outputs Human Resource Plan

Acquire Project Team (Executing)

Outputs Project Staff Assignments Resource Calendars Project Management Plan Updates

Develop Project Team (Executing)

Inputs Project Staff Assignments Project Management Plan Resource Calendar

Outputs Team Performance Assessments Enterprise Environmental Factors updates

Manage Project Team

Inputs Project Staff Assignments Project Management Plan Team Performance Assessments Performance Reports Organizational Process Assets

Tools & techniques Observation and Conversation Project Performance Appraisals Conflict Management Issue Log Interpersonal Skills

Outputs Enterprise Environmental Factors updates Organizational Process Assets updates Change Requests Project Management Plan Updates

Communications Management: Identify Stakeholders (Initiation) Inputs Project Charter Procurement Documents Enterprise Environmental Factors Organizational Process Assets Inputs Stakeholder Register Stakeholder Management Strategy Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Performance Reports Organizational Process Assets Inputs Stakeholder Register Stakeholder Management Strategy Project Management Plan Issue Log Change Log Organizational Process Assets Inputs Project Management Plan Work Performance Information Work Performance Measurements Budget Forecasts Organizational Process Assets Tools & techniques Stakeholder Analysis Expert Judgment Outputs Stakeholder Register Stakeholder Management Strategy

Plan Communications (Planning)

Tools & techniques Communication Requirement Analysis Communication Technology Communication Models Communication Methods Tools & techniques Communications Methods Information Distribution Tools

Outputs Communications Management Plan Project Document Updates

Distribute Information (Executing)

Outputs Organizational Process Assets updates

Manage Stakeholders (Executing)

Tools & techniques Communications Methods Interpersonal Skills Management Skills

Outputs Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Report Performance (M&C)

Tools & techniques Variance Analysis Forecasting Methods Communication Methods Reporting System

Outputs Performance Reports Organizational Process Assets updates Change Requests

Risk Management: Plan Risk Management (Planning) Inputs Project Scope Statement Cost Management plan Tools & techniques Planning Meetings Outputs Risk Management Plan

Schedule Management Plan Communications Management Plan Enterprise Environmental Factors Organizational Process Assets Inputs Risk Management Plan Activity Cost Estimates Activity Duration Estimates Scope Baseline Stakeholder Register Cost Management Plan Schedule Management Plan Quality Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets Inputs Risk Register Risk Management Plan Project Scope Statement Organizational Process Assets Tools & techniques Documentation Review Information Gathering Technique Checklist Analysis Assumptions Analysis Diagramming Techniques SWOT Analysis Expert Judgment Outputs Risk Register

Identify Risks (Planning)

Perform Qualitative Risk Analysis (Planning)

Tools & techniques Risk Probability and Impact Statement Probability and Impact Matrix Risk Data and Quality Assessment Risk Categorization Risk Urgency Assessment Expert Judgment

Outputs Risk Register Updates

Perform Quantitative Analysis

Inputs Risk Register Risk Management Plan Cost Management Plan Schedule Management Plan Organizational Process Assets Inputs Risk Register Risk Management Plan

Tools & techniques Outputs Data Gathering & Representation Technique Risk Register Updates Quantative Risk Analysis & Modeling Technique Expert Judgment

Plan Risk Responses (Planning)

Tools & techniques Strategies for Negative Risks & Threats Strategies for Positive Risks & Threats Contingent Response Strategies Expert Judgment Tools & techniques Risk Reassessment Risk Audits Variance and Trend Analysis Technical Performance Measurements

Outputs Risk Register Updates Risk Related Contract Decisions Project Management Plan Updates Project Document Updates Outputs Risk Register Updates Organizational Process Assets updates Change Requests Project Management Plan Updates

Monitor and Control Risks (M&C)

Inputs Risk Register Project Management Plan Work Performance Information Performance Reports

Reserve Analysis Status Meetings Procurement Management: Plan Procurements (planning) Inputs Scope Baseline Requirements Documentation Teaming Agreement Risk Register Risk Related Contract Decisions Activity Resource Requirements Project Schedule Activity Cost Estimates Cost Performance Baseline Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Procurement Documents Source Selection Criteria Qualified Sellers List Seller Proposals Project Documents Make-or-Buy Decisions Teaming Agreement Organizational Process Assets Inputs Project Documents Project Management Plan Contract Performance Reports Approval Change Requests Work Performance Information Tools & techniques Make-or-Buy Analysis Expert Judgment Contract Types

Project Document Updates

Outputs Procurement Management Plan Procurement Statement of Work Make-or-Buy Decision Procurement Documents Source Selection Criteria Change Requests

Conduct Procurements (Executing)

Tools & techniques Bidder Conference Proposal Evaluation Technique Independent Estimates Expert Judgment Advertising Internet Search Procurement Negotiations

Outputs Selected Sellers Procurement Contract Award Resource Calendars Change Requests Project Management Plan Updates Project Document Updates

Administer Procurements (M&C)

Tools & techniques Contract Change Control System Procurement Performance Reviews Inspection & Audits Performance Reporting Payment System Claims Administration Record management Tools & techniques Procurement Audits Negotiated Settlements Record Management System

Outputs Procurements Documentation Change Requests Project Management Plan Updates Organizational Process Assets updates

Close Procurements (Closing)

Inputs Project Management Plan Procurement Documentation

Outputs Closed Procurements Organizational Process Assets updates

Time Management: Define Activities (Planning) Inputs Scope Baseline Enterprise Environmental Factors Organizational Process Assets Tools & techniques Decomposition Rolling Wave Planning Templates Expert Judgment Outputs Activity List Activity Attributes Milestone List

Inputs Sequence Activities (Planning) Activity List Activity Attributes Milestone List Project Scope Statement Organizational Process Assets

Tools & techniques Outputs Precedence Diagramming Method (PDM) Project Schedule Network Diagrams Dependency Determination Project Document Updates Apply leads & Lags Schedule Network Temples

Inputs Estimates Activity Resources (Planning) Activity List Activity Attributes Resource Calendar Enterprise Environmental Factors Organizational Process Assets Inputs Estimating Activity Duration (Planning) Activity List Activity Attributes Activity Resource Requirements Resource Calendar Project Scope Statement Enterprise Environmental Factors Organizational Process Assets

Tools & techniques Expert Judgment Alternatives Analysis Published Estimating Data Bottom-Up Estimating Project Management Software Tools & techniques Expert Judgment Analogous Estimating Parametric estimates Three-Point Estimates Reserve Analysis

Outputs Activity Resource Requirements Resource Breakdown Structure (RBS) Project Document Updates

Outputs Activity Duration Estimates Project Document Updates

Develop Schedule (Planning)

Inputs Activity List Activity Attributes Project Schedule Network Diagram

Tools & techniques Schedule Network Analysis Critical Path Method Critical Chain Method

Outputs Project Schedule Schedule Baseline Schedule Data

Activity Resource Requirements Resource Calendar Activity Duration Estimates Project Scope Statement Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Project Schedule Work Performance Information (WPI) Organizational Process Assets

Resource Leveling What-if Scenario Analysis Applying Leads and Lags Schedule Compression Scheduling Tool

Project Document Updates

Control Schedule (MAC)

Tools & techniques Performance Reviews Variance Analysis Resource Leveling What-if Scenario Analysis Project Management Software Adjusting Leads and Lags Schedule Compression Scheduling Tool

Outputs Work Performance Measurements Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Cost Management: Estimate Costs (planning) Inputs Scope Baseline Project Schedule Human Resource Plan Risk Register Enterprise Environmental Factors Organizational Process Assets Tools & techniques Outputs Expert Judgment Activity Cost Estimates Analogous Estimating Basis of Estimates Parametric Estimating Project Document Updates Bottom-up Estimating Three-Point Estimates Reserve Analysis Cost of Quality Project Management Estimating Software Vendor Bid Analysis Tools & techniques Cost Aggregation Reserve Analysis Expert Experiments Historical Relationships Fund Limit Reconciliation Outputs Cost Performance Baseline Project Funding Requirements Project Document Updates

Inputs Determine Budget (Planning) Activity Cost Estimates Basis of Estimates Scope Baseline Project Schedule Resource Calendar Contracts Organizational Process Assets Inputs Project Management Plan Project Funding Requirements Organizational Process Assets

Control Costs (MAC)

Tools & techniques Earned Value Management Forecasting To-Complete Performance Performance Reviews Variance Analysis Project Management Software

Outputs Work Performance Measurements Budget Forecasts Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Quality Management: Plan Quality (Planning) Inputs Scope Baseline Stakeholder Register Cost Performance Baseline Schedule Baseline Risk Register Enterprise Environmental Factors Organizational Process Assets Inputs Project Management Plan Quality Metrics Work Performance Information (WPI) Quality Control Measurements Tools & techniques Cost-Benefit Analysis Cost of Quality (COQ) Control Charts Benchmarking Design of Experiments Statistical Sampling Flow Charting Tools & techniques Inspection Cost of quality Cost-benefit analysis Control charts Benchmarking Design of experiments Statistical sampling Flowcharting Proprietary quality management methodologies Additional quality planning tools Plan Quality and Perform QC tools Quality audits Process analysis Cause and effect diagrams Histogram Pareto chart Tools & techniques Inspection Cause and effect diagrams Control charts Flowcharting Histogram Pareto chart Run Charts Scatter Diagram Statistical sampling Approved Change Requests Review Outputs Quality Management Plan Quality Metrics Quality Checklists Process Improvement Plan Project Document Updates

Perform Quality Assurance (Executing)

Outputs Change Requests Organizational Process Assets updates Project Management Plan Updates Project Document Updates

Perform Quality Control (MAC)

Inputs Project Management Plan Quality Metrics Quality Checklists Work Performance Measurements Approved Change Requests Deliverables Organizational Process Assets

Outputs Quality Control Measurements Validates Changes Validated Deliverables Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Human Resources Management: Inputs Tools & techniques Outputs Develop Human Resources Plan (Planning) Activity Resource Requirements Organization Charts and Position Description Human Resource Plan Enterprise Environmental Factors Networking Organizational Process Assets Organizational Theory Inputs Tools & techniques Project Management Plan Pre-assignment Enterprise Environmental Factors Negotiation Organizational Process Assets Acquisition Virtual Teams Inputs Project Staff Assignments Project Management Plan Resource Calendar Tools & techniques Interpersonal Skills Training Team-Building Activities Ground rules Co-Location Recognition and Rewards Tools & techniques Observation and Conversation Project Performance Appraisals Conflict Management Issue Log Interpersonal Skills Outputs Project Staff Assignments Resource Calendars Project Management Plan Updates

Acquire Project Team (Executing)

Develop Project Team (Executing)

Outputs Team Performance Assessments Enterprise Environmental Factors updates

Manage Project Team

Inputs Project Staff Assignments Project Management Plan Team Performance Assessments Performance Reports Organizational Process Assets

Outputs Enterprise Environmental Factors updates Organizational Process Assets updates Change Requests Project Management Plan Updates

Communications Management: Identify Stakeholders (Initiation) Inputs Project Charter Procurement Documents Enterprise Environmental Factors Organizational Process Assets Inputs Stakeholder Register Stakeholder Management Strategy Enterprise Environmental Factors Organizational Process Assets Tools & techniques Stakeholder Analysis Expert Judgment Outputs Stakeholder Register Stakeholder Management Strategy

Plan Communications (Planning)

Tools & techniques Outputs Communication Requirement Analysis Communications Management Plan Communication Technology Project Document Updates Communication Models Communication Methods Tools & techniques Communications Methods Information Distribution Tools Outputs Organizational Process Assets updates

Inputs Distribute Information (Executing) Project Management Plan Performance Reports Organizational Process Assets

Manage Stakeholders (Executing)

Inputs Tools & techniques Stakeholder Register Communications Methods Stakeholder Management Strategy Interpersonal Skills Project Management Plan Management Skills Issue Log Change Log Organizational Process Assets Inputs Project Management Plan Work Performance Information Work Performance Measurements Budget Forecasts Organizational Process Assets Tools & techniques Variance Analysis Forecasting Methods Communication Methods Reporting System

Outputs Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Report Performance (M&C)

Outputs Performance Reports Organizational Process Assets updates Change Requests

Risk Management: Plan Risk Management (Planning) Inputs Tools & techniques Project Scope Statement Planning Meetings Cost Management plan Schedule Management Plan Communications Management Plan Enterprise Environmental Factors Organizational Process Assets Inputs Risk Management Plan Activity Cost Estimates Activity Duration Estimates Scope Baseline Stakeholder Register Cost Management Plan Schedule Management Plan Quality Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets Tools & techniques Documentation Review Information Gathering Technique Checklist Analysis Assumptions Analysis Diagramming Techniques SWOT Analysis Expert Judgment Outputs Risk Management Plan

Outputs Risk Register

Identify Risks (Planning)

Inputs Perform Qualitative Risk Analysis (Planning)Risk Register Risk Management Plan Project Scope Statement Organizational Process Assets

Tools & techniques Risk Probability and Impact Statement Probability and Impact Matrix Risk Data and Quality Assessment Risk Categorization Risk Urgency Assessment Expert Judgment

Outputs Risk Register Updates

Perform Quantitative Analysis

Inputs Risk Register Risk Management Plan

Tools & techniques Outputs Data Gathering & Representation Technique Risk Register Updates Quantative Risk Analysis & Modeling Technique

Cost Management Plan Schedule Management Plan Organizational Process Assets Inputs Risk Register Risk Management Plan

Expert Judgment

Plan Risk Responses (Planning)

Tools & techniques Strategies for Negative Risks & Threats Strategies for Positive Risks & Threats Contingent Response Strategies Expert Judgment Tools & techniques Risk Reassessment Risk Audits Variance and Trend Analysis Technical Performance Measurements Reserve Analysis Status Meetings

Outputs Risk Register Updates Risk Related Contract Decisions Project Management Plan Updates Project Document Updates Outputs Risk Register Updates Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates

Monitor and Control Risks (M&C)

Inputs Risk Register Project Management Plan Work Performance Information Performance Reports

Procurement Management: Plan Procurements (planning) Inputs Tools & techniques Scope Baseline Make-or-Buy Analysis Requirements Documentation Expert Judgment Teaming Agreement Contract Types Risk Register Risk Related Contract Decisions Activity Resource Requirements Project Schedule Activity Cost Estimates Cost Performance Baseline Enterprise Environmental Factors Organizational Process Assets Tools & techniques Bidder Conference Proposal Evaluation Technique Independent Estimates Expert Judgment Advertising Internet Search Procurement Negotiations Outputs Procurement Management Plan Procurement Statement of Work Make-or-Buy Decision Procurement Documents Source Selection Criteria Change Requests

Inputs Conduct Procurements (Executing) Project Management Plan Procurement Documents Source Selection Criteria Qualified Sellers List Seller Proposals Project Documents Make-or-Buy Decisions Teaming Agreement Organizational Process Assets

Outputs Selected Sellers Procurement Contract Award Resource Calendars Change Requests Project Management Plan Updates Project Document Updates

Administer Procurements (M&C)

Inputs Project Documents

Tools & techniques Contract Change Control System

Outputs Procurements Documentation

Project Management Plan Contract Performance Reports Approval Change Requests Work Performance Information

Procurement Performance Reviews Change Requests Inspection & Audits Project Management Plan Updates Performance Reporting Organizational Process Assets updates Payment System Claims Administration Record management Tools & techniques Procurement Audits Negotiated Settlements Record Management System Outputs Closed Procurements Organizational Process Assets updates

Close Procurements (Closing)

Inputs Project Management Plan Procurement Documentation

Scope: Collect Requirements (Planning) Inputs Project Charter Stakeholder Register Tools & techniques Interviews Focus Groups Facilitated Workshops (JAD or QFD) Group Creativity Techniques Group Decision Making Techniques Questionnaires and Surveys Observations Prototypes Tools & techniques Expert Judgment Product Analysis Alternatives Identification Facilitated Workshops (JAD or QFD) Tools & techniques Decomposition Outputs Requirements Documentation Requirements Management Plan Requirements Traceability Matrix

Define Scope (Planning)

Inputs Project Charter Requirements Documentation Organizational Process Assets

Outputs Project Scope Statement Project Document updates

Inputs Create Work Breakdown Structure (Planning) Project Scope Statement Requirements Documentation Organizational Process Assets

Outputs WBS WBS Dictionary Scope Baseline Project Document updates Outputs Accepted Deliverables Change Requests Project Document Updates

Verify Scope (MAC)

Inputs Project Management Plan Requirements Documentation Requirements Traceability Matrix Validated Deliverables

Tools & techniques Inspection

Control Scope (MAC)

Inputs Tools & techniques Project Management Plan Variance Analysis Work Performance Information (WPI) Requirements Documentation Requirements Traceability Matrix Organizational Process Assets

Outputs Work Performance Measurements Organizational Process Assets updates Change Requests Project Management Plan Updates Project Document Updates