Concenterate on the target below & complete that bsc in 3-4 days Day 1 SOW Sl No Work To Do

1 Escalation of C-Number for License == (match from top of bsc & through c ommand) (ZQNI:;) 2 Installation Post Checks == (all catridrigdes are properly installed)

3 Power Supply Check at Cabinet == (-50 to -55v,) ---- TWO FUSE REQ. SITAU TED AT SMPS--4 ---) Inter & Intra Cabinet Cabling Check == (WITH THE HELP OF CABLING DOC

5 ---Jumper Setting Check of Plug in Units == (NO NEED TO DO CHECK ESB-24 D, POWER CARD, DCAR & CPU rest all card) 6 ---ox no.) Insertion of Plug in Units == (According to Cartidge serial no. & B

7 ---Start Up Log of OMU & rest comp units == (omu,mcmu,& bcsu from push button & J7 port of Unit)---LOGIN SAPRETLY IN ALL THOSE UNITS? 8 Time / Date / IP / Name Change in BSC == (ZDCD (TO CHECK DATE & TIME), Z DCS (TO CHANGE), ZDCE(GMT DIFF.) THEN RESTART THE BSC (ZUSS:SYM:C=DSK)-//-ZQNM f or name & loc.-//-ZQRN FOR IP of OMU <LOGICAL=L> 172.32.172.32 & NML<NET MASK LE NGTH>=24) 9 10 11 12 13 14 ---Hard Wired Alarm Check == (Not required) External Alarm Check== (ZWAA, ZWAI & ZWAX 4000-4015) Inspection of I/O Systems == (ZISI;) ALL UNIT SHOULD BE IN WORKING, Verification of SW package == (ZWQO:CR:;) Initial Fall Back Copy of BSC == Testing of Processor Units===== (emb TESTING)

15 Diagnosis of OMU with both MCMU == (First change the state then diagnosi s OMU with ZUDU) Day 2 SOW Sl No 1 2 3 Work To Do

Diagnosis of all other units with MCMU 0 == (Keeping 1 MCMU in TE- State i.e in DGN then DGN other unit like all BCSU, CLS, CLAB, EMB, SBUS) Diagnosis of all other units with MCMU 1 == (Keeping 0 MCMU in TE- State i.e in DGN then DGN other unit like all BCSU, CLS, CLAB, EMB, SBUS) ET Attach as per Transmission Plan

4 5

ET Diagnosis

STMU attach & diagnosis == (First connect STMU with ZWUC (Both STMU <0 & 16> with two different BCSU <At the time of stmu attech keep the BCSU in SE-nh State, after connecting bring the state in te state>) then DGN STMU) 6 7 8 9 Fall Back Copy of BSC-PR File Implementation-- (FTT) BCF Pack Implementation-- (FTT) License File Implementation -- (FTT) (Create user with all power in user acc, if it is given in pr then ok with ZW7L::ON; And Then run ZW7I:LIC,<FULL> & <LIM>;) CD Implementation (up to date)---- (FTT) Fall Back Copy of BSC Health Check of BSC

10 11 12

Day 3 SOW Sl No Work To Do

1 Intergration data creation for MSS as per availability planned data & ac tivation of same as per media availability on the same day 2 BTS site creation as per plan received from RF planner & integration of BTS with BSC 3 Creation of Gb link over IP (in case availability of router at site) or else over frame relay on any ET & made it through with the higher node 4 Creation of X.25 over IP (in case availability of router at site) or els e over TDM on any ET & made it through with the higher node 5 Call Test in BSC - AMR Call Test - EFR Call Test - GPRS call Test Fall Back Copy of BSC Health Check of BSC

6 7

Day 4 SOW Sl No 1 2 3 Work To Do Health Check of BSC Fault Diagnosis if any occurred Clear of Alarms in BSC wrt Faults

Handover to GNSC & Local BSS Suport

Day 5 SOW Sl No 1 2 Work To Do AT Processes Sign Off of AT Document