ffi

FARAKKA SUPER THERMAL POWER


STATION, STAGE-lll (1x500 MW)

TARIFF PETITION

FOR THE PERIOD


01 .10.201 1

TO 31 .03.2 014

RAL ELEC
NEW DELH!

MMISSION

PETITION NO: ....../201


IN THE MATTER OF

Petition Under Section 62 and 79 (1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, l ggg for approval of tariff of Farakka Super Thermal Power Station Stage-lll (1x 500 MW) for the period from the date of anticipated commercial operation i.e. 01 .10.2011 to 31 .03.2014.

AND IN THE MATTER OF Petitioner


NTPC Ltd. NTPC Bhawan Core-7, Scope Complex 7, lnstitutionalArea, Lodhi Road New Delhi-110 003

INDEX
Sl. No.
2

Description

Page No

Aifidavit
Petition for Approval of tariff of Farakka Super Thermal Power Station, Stage-I (1x500 MW) for the period from 01.10.201 1 to 31.03.2414
J
5

1-2 3-r
I

6
7

Appendix-I Annexure-A Annexure-B- Investment approval Annexure-C-MoP Allocation letter dtd. 09. 12.20 I 0

12-99
100-1 13

I 14-1

15

116-t17

ffi

i
DELHI
NEW DELHI

8959 42

f,
a

PETITION NO: ....../201


IN THE

t
$

MAT|ER OF

fl

Petition Under Section 62 and 79 (1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for approval of tariff of Farakka Super Thermal Power Station Stage-lll (1x 500 MW) for the period from the date of anticipated commercial operation i.e. 01 .10.2011 to 31 .A3.2O14.

AND

t
fl
7

Petitioner

I
F
r

NTPC Ltd. PC Bhawan 7, Scope Complex , lnstitutional Ar:ea,'Lodhi Road Delhi-1 10 003

it

Respondents

West Bengal State Electricity Distribution Co. Vidyut Bhawan, Block-DJ, Sector-ll, Salt Lake City Kolkata - 700 091
and 5 others

L,td.

n"u,

AFFIDAVIT

l, A. Basu Roy, son

of

Late Shri S. C. Basu Roy, aged about 52 years, resident of

D-54, Samridhi, NTPC Township, Sector-33, Noida, U.P.201301 do solemnly


affirm and state as follows:

1. tam working as Deputy General Manager (Commercial) with NTPC Ltd., the Petitioner in the above matter and am duly authorized to make this
atfidavit.

2. The statements rnade in the accompanying

Petition are based on official

records maintained during course of business and I believe them to be true.

Verification
Solemnly atfirm at New Delhi on this 26th August, 2011 that the contents of the above affidavit are based on the records maintainecj in the Petitionerrs company in

the ordinary course of business and believed to be true, no part of it is false and
nothing material has been concealed therefrom.

(DEPONENT)

AUg 20ll

ITY RE

PETITION NO: ....../2011


IN THE MATTER OF

Petition Under Section 62 and 79 (1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, l ggg for approval of tariff of Farakka Super Thermal Power Station Stage-lll (1x 500 MW) for the period from the date of anticipated commercial operation ie. 01 .10.2011 to 31 .03.2014.

AND IN THE MATTER OF Petitioner


NTPC Ltd. NTPC Bhawan Core-7, Scope Complex 7, lnstitutional Area, Lodhi Road New Delhi-1 10 003
1

Respondents

West Bengal State Electricity Distribution Co. Ltd. Vidyut Bhawan, Block-DJ, Sector-ll, Salt Lake City Kolkata - 700 091
Bihar State Electricity Board Vidyut Bhawan, Bailey Road Patna - 800 001 Jharkhand State Electricity Board Engineering Bhawan Heavy Engineering Corporation Dhurwa Ranchi-834 004

2.

4.

GRIDCO Ltd. Vidyut Bhawan, Janpath Bhubaneshwar - 751 007


Damodar Valley Corporation DVC Towers, VIP Road Kolkata - 700 054 Power Department Govt. of Sikkim Kazi Road, Gangtok Sikkim -737 101

5.

6.

The Petitioner humbly states that.

1) The Petitioner NTPC Ltd., hereinafter called ,NTPC,, is a


Government company within the meaning of the companies Act,

1956. Further, it is

'Generating Company, as defined under

Section 2(28) of the Electricity Act, 2003.


2)

The Petitioner is having power stations/ projects at different


regions and places in the country. Farakka Super Thermal power

station stage-l & Stage-ll is one such station in the State of west
Bengal having an installed capacity of 1600 MW (3x200 + 2 x 500

MW) which has already been commissioned, operating and


supplying power
3)

The petitioner is setting up an expansion project, named Farakka

super Thermal Power Station stage-lll (hereinafter referred to as


Farakka-lll) having approved instalted capacity of 500 MW (1 x 500

MW). The investment approval of the project was accorded by NTPC Board at its 291't meeting held on 30.10.2006 at an estimated project cosi of Rs. 2570.44 Crore
12

,d

etr., 2006 price

level). The corresponding indicative completed cost of the project

is

2882.84 Crore. Farakka-lll has been synchronised on 07.03.2011 and is expected to be declared for Commercial
.

Operation w.e.f. 01.10.2011 4)

The allocation of power from Farakka-lll has already been notified by Ministry of Power, Govt. of lndia vide letter dtd. 9.12.2010 and
is as follows:

S. No.

State/
Beneficary

Allocation (%)

Equivalent Quantum
in IC (MW)

Bihar DVC Jharkhand Orissa

10.1

^nq
31 8 32.5
83.1

2
3

6.36 6.5
16.62

4
5

West Bengal
Sikkim

29.44 0.98

147 2

4.9

Further, Ministry of Power, Govt. of lndia has allocated 15

o/o

i.e.

75 MW power from Farakka-lll to be sold outside long term ppA by NTPC. Accordingly, the tariff for the balance quantum of power
corresponding to long term allocation of 425 MW is sought in the
petition.

The power generated from Farakka-lll is proposed to be supplied


to the beneficiaries to whom power has been allocated, as per the

Power Purchase Agreements signed with them. A copy of power


Purchase Agreement entered into with WBSEDCL is enclosed as sample for reference at Annexure-A.
5)

The Hon'ble Commission, under Section 7g(1) (a) of Electricity


Act, 2003, is vested with the jurisdiction to regulate the tariff of the

Generating Companies owned


Government.
6)

or

controlled

by the

Central

The Hon'ble Commission has notified the Central Electricity Regulatory Commission (Terms & Conditions of Tariffl
Regulations, 2009 (hereinafter 'Tariff Regulations 2009') which

have come into force from 1.4.2009 specifying the terms

&

conditions and methodology of tariff determination under section

62 & 79 of the Electricity Act, 2003. The Petitioner is filing the present petition for determination of tariff for Farakka-lll for the
period from anticipated Commercial Operation date of 01.10.2011 to 31.3.2014 as per the Tariff Regulations, 2009.

7)

ln terms of the Tariff Regulations, 2009, NTPC has filled in the formats in regard to the estimated capital expenditure for the period from anticipated COD i.e. 01 _10.2011 up to 31.3.2014.
The projected estimated capital expenditure claims made by NTpC

8)

are based on expected capitalization as on COD. The projected


additional capital expenditure up to projected cut off date is within

the original scope of work of Farakka-lll and is in accordance with


Regulation 9 (1) of the Tariff Regulations, 2009. lt is submitted that

such expenditure estimated by the petitioner may not

be

considered as the ceiling expenditure. The capital expenditure is

only a provisional estimate to be incurred up to the cut off date of the station and actual expenditure shall be submitted at the time of

truing up before the Hon'ble Commission in respect of instant


station.
e)

ln this tariff petition, the formats provided at Appendix I to the Tariff Regulations, 2009 have been filled in and enclosed as Appendix-!.

10)

The charges for water intake at the Station are levied by the
respective state governmenV state government agencies. Various

state governments have resorted to and may be resorting to manifold increase in water charges. The increase by the State
Government is resorted to for increasing the revenue of the state.

It is submitted that the O&M expenses norms for 2009-14 are based on actual expenditure of 2004-05 to 2007-08 The Tariff
Regulations 2009 provide for an escalation of 5.72% per annum in O&M Expenses during 2009-14. The escalation rate of 512% was

arrived at based on the WPI & CPI data for the previous period.
Escalation rate based on this data is expected to cover the normal

escalation in prices/ costs. Any abnormal

/ unnatural increase in

any cost component which is beyond the reasonable control of the utility cannot be covered by the normal escalation factors and such abnormal increase in cost has to be reimbursed separately. ln the recent past, the state governments of Orissa, Chhattisgarh &

Madhya Pradesh have resorted to abnormal increase in water charges. This increase has been affected through issuance of
notifications by the respective State governments and is beyond

any control of NTPC The increase is far above the 5.72o/o p.a.
escalation allowed in tariff. The total annual impact of the increase of water charges in the stations of these states is about Rs. 119.04

Cr. lt is also submitted that the increase in water charges is purely


due to increase in rate by the respective State Governments and is

not due to increase/ decrease in the water consumed in relation to

PLF. There is no way that the Generator can absorb this steep hike in o&M expenditure allowed in tariff based on past actual. It is
therefore submitted that additional cost incurred in respect of the

increase in water charges over and above as allowed for O&M expenditure be permitted to be billed and recovered additionally
from the beneficiaries.
11)

It is submitted that CERC (Payment of fees) Regulations, 2008


provide for payment of tariff determination fee by a generator for the entire tariff period or alternatively for such payment to be made on yearly basis. The Petltioner has opted for the yearly payment of

fees and as such tariff determination fee for the year 2011-12 is being paid at present. lt is submitted that the Petitioner may be allowed to directly recover the filing fees paid from the various
beneficiaries. 12) It is submitted that Regional Load Despatch Centre (RLDC) levies

fees and chai"ges for the sei-vices i"endei'ed by it to the usei-s of the transmission system. As sale of electricity by NTPC is on ex-bus

basis, prior
beneficiaries

to

31.3.2009, these charges were paid

by

the

of NTPC stations and the same had no

financial

implication on NTPC.

The O&M expenses norms for 2009-14 are based on actual expenditure incurred in the various generating stations of NTPC
during the period 2004-05 to 2007-08

The methodology for working out the allowable O&M expenses for the tariff period 1.4.2004 to 31.3.2009 thus did not account for the
RLDC fees & charges payable w.e.f. 1.4.2009.

The additional cost due to RLDC fees & charges is purely due to

issuance of the CERC (Fees and charges

of

Regional Load

Despatch Centre and other related matter) Regulations 2009. Till

the issuance of these Regulations, the Petitioner was neither liable

nor paying for such charges. There is no way that the Generator can absorb these additional charges in o&M expenditure allowed
in tariff which are based on past actual.

Accordingly, it is respectfully submitted that that additional cost incurred in respect of the RLDC fees & charges be permitted to be

billed and recovered additionally from the beneficiaries as an

additional component under O&M Expenses from


at the norm for O&M expenses for period 2009-14.
13)

the

Respondents as the same is not included in the base whire arriving

Subsequent to the statement of Hon'ble Union Minister of power

in the Parliament

on 21.7 .2009, Government of lndia vide its letter

dated 27.4.2010 has notified the Scheme for provision of supply of electricity within a radius

of

5 Km of power stations set up

by

Central Public Sector Undertakings (CPSUs) around Central Power Plants. Under the Scheme, the concerned CPSU is
required to create infrastructure for supply of reliable power to the
rui'al households of the villages within a radius of 5 km of existing

and upcoming power stations of the CPSUs. Further, as per the


scheme, Appropriate Commission shall consider the expenditure incurred by the CPSUs for implementation of the Scheme for the

the tariff of the respective CpSU generating station. ln accordance with the provlsions of the Scheme, the petitioner, which is a CPSU shall carry out the
purpose
determining

of

its power stations including Farakka Super Thermal Power Station. As the Detailed project Report (DPR) for implementation of Scheme is under preparation and
required work around all
may take some more time, the estimation of projected expenditure

in respect of implementation of Gol Scheme is not possibre at this

stage. The petitioner shall


Commission
thereafter.

be

approaching

the

Hon'ble
in

for

consideration

of the cost incurred

implementation

of the above GOI Scheme for tariff

purposes

The above may kindly be considered by the Hon'ble Commission


while determining the tariff of the station.
14)

Farakka-lll project was developed based on a coal linkage from


Brahmini coal block of ECL. This was subsequently augmented by linkage from Chichro Patsimal coal block. However, till now, work

has not started in these coal mines & coal supply from these
mines would not

be available before at least 3-4 yrs. Linkage from

the nearby Lalmatia mines of ECL connected by MGR is provided

to

Farakka-l,ll(1600 MW)

&

Kahalgaon-l (840 MW). Against a

requirement of 16.55 MMTPA, (corresponding to 85 % availability),

these mines have actually supplied

I94

MMT & 10.01 MMT in

2009-10 & 2010-11 respectively which is about 60% of total coal

requirement. Kahalgaon-ll has been developed with a linkage


from Chuperbhita & Hura-C mines of ECL, Rajmahal. However,
work by ECL is yet to start in these mines too. NTPC has through concerted efforts also, tied up coal from various others sources
like MCL, NECL, BCCL, NCL including importing of coal which are

transported

to the stations by lndian Rail network.

However,

owing to congestion in the lndian Railway network only 7.73 MMT

could be transported in 2009-10. This has resulted in substantial

shortfall

in coal for meeting

Normative Target Annual Plant

Availability of 85 %. Annual Plant availability of Farakka, Stage-

l&ll, Kahalgaon Stage-l & Kahalgaon Stage-ll in 2009-10 was 73.36 o/o, 68.74 % & 65.08 % respectively. This has already
brought to the notice of the Hon'ble Commission through a petitlon

(Petition no-189/2010) which is under active consideration of the Hon'ble Commission.

Further, due

to continuous following up by NTPC, Coal

India

Limited has allocated 2.31 MTPA of coal for Farakka-lll ('1 MTPA

for

2011-12) from ECL mines which

is only 70 Yo of

coal

requirement in 2011-12. However, since the production atthe local

mines is grossly inadequate to meet the requirement of existing stage, it is apprehended that there would also be constraints in

transporting the full quantity through the same lndian Railway


network, which is already overstretched.

ln view of the above, it is prayed that the Normative

Target

Availability for Farakka-lll for the period from CCD till 31.03.2014

may be relaxed to 80 % under the Regulation 44 of Tariff Regulation, 2009. ln case of improvement, the Hon'ble
Commission may be pleased to review the same.

15.

lt is further

submitted that levies, taxes, duties, service tax etc.

levied by the various authorities on Petitioner in accordance with


law shall be billed to beneficiaries separately.

Praver:

ln the light of above submissions the Petitioner, therefore, prays that the
Hon'ble Commission may be pleased to:

i)

Approve the tariff of Farakka Super Thermal Power Station Stage-lll from the anticipated COD i.e. 01.10.2011 till
31

.03.2014 to be charged

for the 425 MW of power to be sold through long term PPA.

Allow the recovery of filing fees as & when paid to the Hon'ble
Commission and publication expenses from the beneficiaries.

ilr)

Allow billing & recovery of RLDC fees & charges additionally from the
beneficiaries.

tv) Allow billing & recovery of water charges paid over & above the normal
escalation rates allowed in tariff.

V)

Aliow inclusion of expenditure incurred due to implementation of GOI scheme regarding providing electricity in
power plants as part of capital cost.

5 Km area around CPSU

Vl) Allow relaxation of Target Availability for Farakka-lll to 80% under Regulation 44 from COD of the unit till 31.03.2014 and in case of
improvement, the same may be reviewed by the Hon'ble Commission.

Vii) Allow billing & recovery of levies, taxes, duties, service tax etc. levied by
the various authorities on Petitioner in accordance with law additionally
from the beneficiaries.

Vlll) Pass any other order as it may deem fit in the


mentioned above.

circumstances

( Petitioner

@n" )
I

New Delhi 26th Augusl,2o11

APPEilD=H-=

PART.I

EARIFF FIL|NG F*=ilG (T1+=Rtu?eL?

PART-I

Checklist of Forms and other information/ documents for tariff filinq for Thermal Stations
Form No. trnDM-

Title of Tariff Filinq Forms (Thermal)


irrmmarv Sheet
Salculation of RoE PIant Characteristics

Tick

FORM-1A FORM-2

FORM.3
FORM- 4

Normative parameters considered


rnmnr rt:iinnc Details of Foreion loans Floirilc nF Fnreinn Fnr rihr

for

taril
Y

FORM.4A
FORM-5 FORM-5A

Abstract
Drniartc

of Admitted

Capital Cost

for the

existinl
NA

Abstract

of

Capital Cost Estimates and Schedule o


fnr thc ltlcrlr nrnioatq

a^mmicci^nin^

FORM-58

Break-up oF Capital Cost


Break-up

for Coal/Lignite

basec

of

Capital Cost for Gas/Liquid fuel based


NA

FORM-5C

Dr^ia.l'c 3reak-up of Construction/Supply/Service packages

FORM.5D
FORM- 5 E.lpM- 7

FORM.8
FORM-9 FORM.9A

:inancial Packaoe uoto COD )etails of Proiect Snecific Loans )etails of Allocation of corporate loans to variour
arniaalc

FORM-98

itatement of Additional Caoitalisation after COD itatement of Canital Cost qhtFment of Canital Works in Prooress
Financino of Additional CaDitalisation alrr rlafinn nF Denreai2tinn Relc

NA NA

FflPM. I O
FORM- 11

L2

FORM.13

Statement of Calculation of Weighted Average Rate of Interest or


A.Fr rll I ^rncl Calculation of Interest on Normative Loans

FORM.13A
FORM- 138

3alculation of Interest on Workino Caoital

Y
8

FORM.14
Form 14A

Draw Down Schedule for Calculation of IDC


Financing Charges

Actual Cash Expenditure


Y

Form 15
FORM-16

Details /Information to be submitted in respect o Fr ral fnr .^mnr rlefinn nf Fnernv Charnes Details/Information to be Submitted in respect ol Limestone for Computation of Energy Charge Rate
NA

Other Information/ Documents Information/Document Sl. No.

Certificate
Association,

of

Commencment

Articles of Association ( For Nevr Station setup by a company making tariff applicatior for the first time to CERC) Stationwise and Corporate audited Balance Sheel and Profit & Loss Accounts with all the Schedules I annexures on COD of the Station for the new statior

&

of

incorporation, Certificate
Business, Memorandum

for ol

NA

NA

looies of relevant loan Aqreements


3opies of the approval of Competent Authority for
'ha a>nil.rl fnci rn/ Einrnrirl nanlzrno N

4
5 7

3opies

of the Equify

participation agreements anc

1a.6ccrn/ annrmral fnr fho fnrainn eor rihr 3opies of the BPSAiPPA with the beneficiaries, if any
N

8
q

Detailed note giving reasons of time and cost over


rr

Anrr

rn if rnnlirahla nthcr relerranf infnrmatinn IPlpaqe snecifi\

N N

Noter Electronic copy in the form of CD/Floppy disc shall also be furnished.

$ rl I

(J N N rO

Y (o co co t\

o |r)
(o

q,

N
co

(r)

o o

(o f\
(.)

FE

IE

d
E =
x

r{ o N
(Yl

G}

o,
ro

$ o 6l
o) (o

or (o

!c

o ro

c,
q,

\ \., \\ UI :) \Z
F

r{ I N
l.|

(r) rt) f.-

l\

(1I1

ct
(f)

o s @
CO

t\ tt

N @ lf) (o w N

o o

!+ N lo

la)

rt o

F @

o? Or

ao ao

o o t)

o N

(o (.,

2F

>\o >h{
lU

6
L
IE

oz =u) Br: Eo -..v gI YE E.E tY:-LtiA


Mr

s _E FI 3E t{ tr.: A s 3E E.E fi=


,E fiti

E#rs N ELa
HLJ

ois 3
n.

(9 (o f.- O) @ c) (f) st
@

t\

s o,

(o (o (o N (o f.-

o o

@
c")

\i t rf,

ol
(Y'

t o
6)
@

(\l FN (o

\l

f.E6c t1 !| u': R" ii

\t

(Y',:

N rf
Fl
I

cc
(14 F{

F
I

E E E o o L l_ !r o LL tL tJ- II o c o o LL

.x 'lf, cr) I C

a s I
G

= -o
I

E l-

E
L

d
+,
G

si

o o
t{f,

o
q)

s
-Y

-o (o .9
vl lG
(E (,l-

= o
!

6 o
t\
G ('

o
(u

.a (t
:f
I

(L

>E trU)
-tr -tr *, *!
lF rl-

o Ptr
.g
E,]

)lJ

* c
G It

o.

IE

eo oo
zz

--L OO

GrO ELO, d FE
lll

g
lg

o
tr

oo oo trE GG

o
E'

d,

z uio

c c E E (o o 3 oe ! u o C c o x (o (g s (o o F TU 'If @ (I] # E U a c U () 0.) o G E C a E L L L L f, c o E U o o p +J & od (J U G) 0) o o o c d. C o a U a r-.1 n ol v tr? q \ oq Fl -j


o E J tu o q c
o '= c
AJ

tr

+J

!L

c c

o = o (J o o
ah

o (J

o Q o E (! (o
OJ

.9

a
_o

:*'

x o) o
(5 o)

v.
o) L
(I,

-C

OJ

o o c ul o ll.

o) $

3 = ro (\t

F{

1-{

F{

F{

T<

o.E

tT (Etr

ro

@ rO $ N t/) @
oo '!c) Ot 00 co co r{ st

(O
t/,) cr)

\o

o lt

E =

o o tn
x
F{

rt

t N

N Fi \r Ol @ \o O q ?.i cr) cr) N N N


F{

o GI
(a

'\ :i\E tb bF E

o N
(j

lU

o-

ht t{ FI

\t

cn rl N

o
o
-J 'ljra

o El o +J

o c{
N
I

\o

LN

O N
@

r.o

o N
O
d

(O

no co

ol FI
N N

Ot

tr-)

00

o (\l
co

r!
cn r-{ N

r.o 0.) r-l

qo t @N (O @
r\l

rl trl

:-N

JrU

Yo
FIL

' -ri :9e CC.lNr(Y)

oo YAt

tf), rl ro $ N

N
F{

oo

C\l
I

\ cfl

cn

t N t o c\

c{ ro
rr)

co

cf) oo

O
s?-l
r--l

Fl r{ N N oo Ol

"E-

r!
(E

t q@ 0r) \ \o cf) r+
N

c o
:H
E UJ

(E

o o U
C
th

o o ()
o a (o E
.9
C

o
q
(g

o a (o
(J

:E
.N

c o
(o
ro

o (u o o
L

o_

= o_
c)
{F)

o
PP
*

r!
(J
!

5.9 o-rE
o tr

L?

c o
rg (o (g

:ll o
P

>ig

o.

lE

.N

(g

J o!

d
o

o_

.e ea ba E
)?F =

H.b E>

(l,o

II lE

;HP rFi}.

oo e?
Glg zz

OO

o I.IJ E U U -U o AJ o O c.l .c +) c o (E E Cf,l C .9r -(O E Q LN (E 'r Pc Ao. (u c) o LS o 4., OC o o Xft L >( (J LUC z.= lJoff) o o- (J <F z. u-

o U E., Ofi (tr (J+ H 0Jr o o-? (g

*) tt)

P o-

(Ju o

U U

(g

E o)

.?6

(g E = !E t: ..u' c] (E 9-r (J o org (g r.r

o o (J c o U o U
'?6 P

(J

|g
P

o (t+J (n v)

oo

ss
!

+J '= o o

'3 '=

u-l uJ

19

E C
:l

o o c L L
d. d

o +J o

trE

r{
r{

(o

_o

E o

q
F{

q
il

q
Fl

Fl

ry
Fi

cr)

q lr
FI

PART.I FORM.2

Plant Characteristics
Name of the

Company

NTPC Ltd.

Name of the Power

Station

Farakka Stage-III (1 x 500 MW)


Unit-l

Unit(s)/ Block(s) Parameters

Pressure (Kg/cm2)

179

Temperature

At Superheater Outlet At Reheater Outlet

540 540

Guaranteed Design Heat Rate (KCal/kWh)

Turbine Cycle -1944.4 KCat/kWh, Boiler efficiency83.39 , Designed heat rate is derived as2332 KCalikWh

Conditions on which quaranteed % MCR % Makeup Desiqn Fuel Desiqn coolinq water Temoerature Back Pressure

100
3

396 MT/hr

JJ 77 mm of Hq

Note: ln case guaranteed unit heat rate is not available, then furnish the guaranteed turbine cycle heat rate and guaranteed boiler efficiency separately along with conditions of quaranteeType of Cooling Tower lnstalled Capacitv (lC) Date of Commercial Operation (COD)
Type of cooling systeml

lnduced Draft
5OO MW

01.10.201 1 ( Anticipated)

Closed circuit cooling Motor driven & steam turbine driven Coal HFO,LDO

Type of Boiler Feed Pumo2 Fuel Details' Primary Fuel Secondary Fuel Alternate Fuels

PART.I
FORM-3

Normative Parameters considered for Tariff Computation


Name of the Company Name of the Power Station Installed Capacity (MW)
NTPC LtD

Farakka Stage-III 500

(1x

5O0 MW)

Particulars

Unit
2 kCal/kWh
o/o o/o o/o o/o

20LL.L2 20L2-L3 20L3-L4


3
aaa.

I
Guaranteed Desion Heat Rate Base Rate of Return on EouiW

4
2332
4C
E

5
2332 15
5

15.: 33.9!
B50l

Tax Rate Taroet Availabiltv


Auxillarv Enerov Consumotion Gross Station Heat Soecific Fuel Oil Consumotion Cost of Coal/Lionite for WC1 Cost of Main Secondary Fuel Oil for WC

33 9!
85o/(

33.9

850i

b.t
2443.11

6.:
2443.11
1

6.:
2443.11
1

Ratel

kCal/kWh

ml/kWh in months in months Rs. Lakhs/ MW % of O&M in months


"/o

O&M Expenses Maintenance Spares for WC Receivables for WC Prime Lending Rate of SBI as on
01.04.2011

14.53 20 2 11.75

15.36

16.24

20
2

20
2

\J
11.75 11.75

l.Grossstationheatrateisderivedasl.065X2294

kCaUkWhasperRegulation26(ll)B

PETITIO{GR

[\^t,

CJ

>E o,q
op-E

6U oE C^,
!!

c E E o o oE
6J

c: <E a* oo i-.> o!
o

lk

OH -d

tra

oA, o! r^ Os

'EU
64 u6
E =
O 6O ch -i ov

z
O !O

> l! !I EhE

*o! Qd

!x
OH 6-'

L !o ^.t !oo qo - oE !6oOrcq : O;,E ocdi

o E>ts

o=

oo L
= q o o "a o

:t 5l !?6 FE ZL

OEE
>! -;",oo E6E I .g:

-qc r= oxc-.o ru +
3
o
O
14

E H ts o= u ! xYd-_c Q c.=
>_!: c !E PJ!*

coc

r-x-

3X, oEE
: Hf
cu-x G-=6

< c

= *

PART.I
Detairs of Foreiqn (Details only in respect of Equity infusion, if any applicable to the prciect under petition)

Eouity

FORM- 4A

Name of the ComDany Name ofthe Power Station Exchanqe Rate at COD Exchanqe Rate as on 31.03.2009

NTPC Limited

Farakka Staqe-UI

(l

x 5OO MW)

I l.lame of the currency to be mentioned e.q. US $, DM, etc. etc.


2

In case of equiw infusion more than once durinq the year, Exchanqe rate at the date of ach drawl to be qiven.

\s

PART.
FORM.]

Name of the

Company Station

NTPC Limited

Name of the Power

Farakka Stage-III (1 x 5O0 MW)


Crore

Capital Cost Admitted by CERC Capital Cost Admitted as on


(Give reference to the relevant CERC order with Petition No. & Date) Foreign Component, if any

(in

Million

US $ or the relevant Currency)

Doemstic Component (Rs. Cr.)

N/A

:oreign Exchange rate considered for :he admitted Capital Cost


Hedging Cost, if any, considered for the admitted capital cost Total Capital Coat as on 31.03.2009 (Rs. Cr.)*

\1

PART-I FORM.5A

Abstract

of

CaDital Cost Estimates and Schedule of Commissionino for the New oroiects

Name of the Company

: :

NTpC Limited

Name of the Power Station

Farakka Stage-III (1 x 500 MW)

New Proiects
Capital Cost Estimates

loard of Director/ Agency approving the


:ost estimates:

Capita

NTPC Board

of Directors

Date of approval of the Capital cost estimates:

30.1C.2005

Current Cost
Prlce level of approved estimates 2
nd

Completed Cost

etr, 2006

Foreign Exchange rate considered for the Capita cost estimates

46.40

46.40

Capital Cost excludino IDC &

FC

=oreign Cornponent,
"elevant Currency)

if any (In Million

US

$ or thr

1.55

1.63

)omestic ComDonent lRs. Cr.)

2229.7

2508.68
2516.21

Capital cost excludins IDC & FC (Rs. IDC &


FC

Cr)

22Z6,9

Foreign Component, relevant Currencv)

if any (In tviillion US g or thr

41,54

45,bt
L54.70

Domestic ComDonent (Rs. Cr.)

140,79

rotat rDc & Fc (Rs.cr.)


Rate of taxes & duties considPrPd

333.s6

366.53

Capital cost Including IDC &


Foreign Component, relevant Currenry)

FC

if any (In Million

US

g or th(

43.09

47,30

fomestic Comoonent (Rs. Cr.) Capital cost Including IDC & FC (Rs. gy; **

2370.4A 2570.44

2663.38 2882.84

5qhdgle of Commissionino
:OD

:xpected

COD on 01.10.201

In case of Cost over run, a detailed note giving reasons of such time and cost over run should be submitted clearly bringing out the lgenry responsible and whether such tlme and cost over run was beyond the control of the generating company.
1.

,r*

Lo

Projects

Name of the Company Name of the Power Station

NTPC Limited

Farakka

Rs. Lakhs

reatment plant,Effluent treatment plant,

incl in 2.2.11 Station Piping & Fuel oil handling system

Bus ducts & HT bus duct

Cabling,Earthing& station Lighting System,Lighting ProtectionDiesel Generator,DC Battery & Charger,LT indoor transformer incl construction &

otal plant & equipment including

cost excludino IDC & FC

PART.I

Break-up of Capital Cost for Gas/Liquid fuel based projects


NTPC

FORM.5C

timited

Farakka Stage-IIJ (1 x 50O MW)

NA

Note:

1' In case of time & cost over run, a detailed note giving reasons of such time and cost over run submitted clearly bring out the agency responsible and whether such time & cost over rufl was beyond of the oeneratino comoanv.

ro
I

a o

UI

E38 'a6o
Gig .JP3
< Ax
I

n @
c!
N

d 6

\
q

d
q.

G'

o-

d =
lJ.

o o

ti d

o o

"rg
<f,-

r c2
@

o
ci

I -1

ooix FEci
odo oIE uii! J4iiu

r o

o r N o oi N

q
N

<Pa
PE3
c

= o
E o
U
! B
@ oq

;
E
>

o a
+
@

!
N

q o N
o o q c]
@

+
N N

o o rt

E =

o q

o ri

o q

; -

N
ei

ri

o o o q I q

x
t

ts

o o

o
c!

og
ELL XZ

O:O

En

::E
+ao
o o 6 o o o C') o
I t!

N N

q o

@ o o q

|E

q o

c.! @

(o

o N o o o N c! N o q @ d o
@

r o O
N l-

ci

.Y
lE

lt

EL

o o

.>

(,
L J L L f
E

o F
tco

rl n

o U
U o

(,
o

U F F

E=
EcL otr
ilE

(9

o
o 3
a.
q .9
6

L
c

t
U

U J I g .9

z o T B q n U o
od

o F q
F

z
U

o
o o
o o

6(.) rts
rEc

z = e
:) F
F

F d

'C

os, =1ts ?o .t q,

q)

o o o
E

= ,2

(, E
o

z
3 L

o I

z -6 o c tr
od

.:

.2 z = F. F U Q z

E .9

&
f

.P-

& F
(J F

(, o
L

.g

z
G

z
F

o !g U F o U

o
G

t u t B U F F
I =

a o
oa

&
1--

U
G

= oU

o z & 1 ts o
=

Z c c L .o o
d

d oa

z
F

o o o c o tr a U

.9

s
C

.!

EE fnz

IE

= oo -ag8:
9Y "E.ge

r{)

d E o

c 6 c

q o @

o si N o

E 5 L3

j!

o o q N N o q c o N N o @ N o @ q $ a o; N
@ oq

N o

o N o q o N o

N N o N.

a
!i
N

q
o

ootr
:?JF

q
a

c!

@ N

q e @ N o o o q o a o o N d o; o o s N

c!
@

b
@

a o

@
oq

fl P n';

P3H;
L

8r9 u1q: rtJg < f, -'l !!:Eg

oq

o
o

s
N

o o

N N N

( o
o

o a

6;

q o o o o N

e N e d

tr IU

o-

HXSe
o

sc >.9
o-E

o o ul a

o u 6

'= o

6 o

c s
o o o
I,JJ

E 6 6 o t

c o

.o
6 6 E

E
-g

o
ul

o .9 .o 6 _6 o o o o o
trJ

g .=

ul

IIJ

-_

.;

;:

s 6 o
o

o
N

E E E t = .; .; '= = = '= 3 ; ; o s o o o t= o o N q c? @ N N o o si o ci N N

trl

Lil

o o 5 6 6 o o 6 tll LrJ t E

o E o o 6 6 o o
I,lJ UJ

tr

co9 6:
s!

'
>c

o C
g
C

o q

6
.c

55
LLc -.9
_o

c =
f= o 6

N
.E

o-oo Et oo<

o iJ o o

-o

o
6

o ( io t(
S
o

-Eo E: 9u. ca)


G;O

}
E
6

o ;
o iJo) -U

o o 9 c
N

o o

o o

o o o

a o

o =

o o:

e; Ar

f.-

o c
c
F--

Ic
N C

(o
c

o o o c! O c! o o c o @ o N
o

ts

c c 6

o o o o -o IE o o Ic 6 o o o o N r N N o o q o o c! q c! b o @ @ I q o q
o
@

(
I

z
N

o o o o o b o o N o
L =
@

3G o: .=G!
Hq >=Xi

-OC 60 a6O

oi
N @

5'l (:

6
,c

o c

o o o r N o o o o o o q q cj ct N N N N q q q o @ d s 0 c

E9 Lo
)-6

Hq 5: ;-9 eo
iX); =>

,P-soc 12b (!Co6


o c :G>@

iiG
=$ Otr

;t

E^,

.c

tP;
o!

96

; E 35
$

E;
\C =ACa tr -o -!

Eg
o:o ()

}EEi
tr* I O ar

!*o .) !

;;EI ; EO

c0

c0

dl

d) C

co d] () dl O dl O O

Es
v

EE
Eq'i 6oa o I

5;e t r +! H.!:!

,: i: c-rO-d6-

EpEH ;E
cA

qE

9Pii
u
+ U
Lll

ET

.EEgE

(n

r +

U ul

U)

U)

u +
E

trJ

U)

U,

U)

U)

U)

+ o

ul

o
F (9 F q f d

U
I q

o o

U
F

U U
@ oa J G L

= U L
od
G)

:0fiEb. S*,s 6E=nfr, dqSE ,.35E


>---L 99.=9>O

=O6'--U

:B

E" l?
3;

:
o
a

c\
d U

x U
&

u
&,

= :) o
@

c !
(, a I
U
F

o
q)

o u
&
F d

.9
E

o
6

z
o F
d U {o !

od

a o F z U
F J
c6

3
:l

o u

z
G F

c o

(
l
J

o
G

c
(9

q
@

z z f
N

& F o F c

z
= F

o Y o o
l

i
j

d U F

(9

o U
G F

r
6

o 4

U U U

! 6

o U F

2 2 o 6

E
(-)
od

a
0)

o f

c o
E

fiEEE ,,r E =H +:;E


lO'"aroL 'E^-C;oq)
P

EEH,+

!E
EE EH

z U
o

t o
o

&

U B

.]
@

U U J

C =

(
q

c = a o o c o o
N

o E (J o o
a E d <t)

{
o

o () s

o. E

6 (\ u = o o @
a
od

: o

o o 6

;o);-o(E -':<!ss _t 6 ur6:.i >

EP
O-

>:P

>X 6o)

r)
@

.\*HB
och!0) :x-f zrONo

Eh

PART.I
FORM.6

Financial Package uPto COD Name of the ComPanY Name of the Power Station Project Cost as on CODI Date of Commercial OPeration of the Stationz Debt : EquitY Ratio Financial Package as
NTPC Limited

as on 31.03.2011

Farakka

lII

Financial Package
as on COD

CENTML BANK OF INDIA.III

Life lnsurance Corporation Of India-III


AL BANK OF COMMERCE.I

rt\lsuuruce CoRPoRATION OF INq4:]y

Power Finance Corporation Ltd-V

Power Finance Corporation Ltd-V Power Finance CorPoration Ltd-V Power Finance Corporation Ltd-V Power Finance Corporation Ltd-V

State Bank Of India-IV State Bank Of India-IV STATE BANK OF INDIA.V ATE BANK OF INDiA-V STATE BANK OF INDIA.VI UNITED BANK OF INDIA-II
VI.]AYA BANK-iII

Bond Series-XXIl

Bond Series-XXVIII

Bond Series-XXXIl Bond Series-xXXN Bond Series-XXXVIII

(RS. LAKHS)

Sr. No Loan
1

Particulars

Total

Amount aod date of Repayment


35 00 02-07,ZO1 j

Repayments upto
01.'10.2011

BOND XXII

Repayment
Date
oF

repayment

35 00

BOND XXIII

Repayment
Date

of.epaymant

70.00 05-08-201 1

Life lnsurance Corporation

6t

tnOla-ttt

Repyment Date of repayment

450_00 450.00

450.00

31-12-2007 3G06-2008 31-12-2008 30-06-2009 31- I 2-2009 30-06-201

450.00

450.00 45o.OO o 31

450

_ 1

2_201

0o 450 0o o 30_06-201
1

Punjab National Bank-ll

Repayment Dale of repayment

89.29

446.43

26-0&2011 26-09-2011

state Bank of tndia-tv T2D1

'Repayment
.

Oate of repayment

28-02-2010..2S-OS-201

171.43 1285.71 1285.71 o 28-02-201

257.14 28-08-201 1

- 'Stqte-BariGr

rnJiiMizof -

i
.

Repayment Date of repayment

803.57
28-08-201
1

803 57

VIJAYA BANK.iII

Repaymenl Date of repayment

714.29 28-09-201

Unrted Bank of tndia-lt

Repaymenl
Date of

repayment

214.29 28-09-201 1

State Bank of tndia-V T1 Ol

Repayment
Date of

repayment

714.29 30-Og2O1 l

10

stare Eank of lndia-v T1 D2

Repayment
Date of

607 14
30-09-201

repayment

vr

PART-I

FORM.7 Details of Project Specific Loans


Name of the Company Name of the Power Station
NTPC Limited

Farakka Stage-III (1 Packaqel


2

s00 Mw)
Amorrnt in

Particulars
1
Source of Loanr
3urrency2

Package2 lPackase3 lpackaqea Tpackaoes Remarks 3 4 5 6 7

Amount of Loan sanctioned Ailruull ur uro55 Loan orawn upto 31.03.200g/COD 3,4,s,111s Interest TvDe" Fixed Interest Rate. if aoDlicable lase Rate. if Floatind Tnterpst/ \'larqin, if Floatino Interest"

\re there anv Caos/Floore If above is ves.sDecifu cans/floor


tuloratorium Periodlo
14oratorium dfective from

NA

Repayment Periodl!
ReDaVment effective from

Repayment Frequencyl2

leoavment Instalmentrs'14
Base Exchanqe Raterb qre foreiqn currencv loan hedoed?

If above

is ves. soecifv detailslT

' '
4

source oF loan means the agency from whom the loan has been taken such as wB, ADB, wMB, pNB, sBI, Currency refers to currency of loan such as US$, DM, yen,indian Rupee etc.

ioCI,

IFC, pFC etc.

'Details are to

be submitted as on 31,03.2004 for existing assets and as on COD for the remaining assets. Where the loan has been refinanced, details in the Form is to be given for the loan reflnaced. However, the details ofthe original loan is to be given seperately in the same form.
5 o

If the Tariff in the petition is claimed seperately for various units, details ln the Form is to be given seperatety lor all the units in the same form, Interest type means whether the interest is flxed or floating. / Base rate means the base pLR, as UBOR etc. over which the margin is to be added. Applirdble base rate on difFerent dates from the date of drawl
may also be enclosed. Margin means the points oyer and above the floating rate. times caps/floor are put at which the ftoating rates are frozen. If such a condition exists, specify the limits.

'At
r0
11
12

Moratorium period refers to the period during which loan servicing liability is not required. Repayment period rneans the repayment of loan such as 7 years, 10 years, 25 years etc.

Repayment frequency means the interual at which the debt servicing is to be done such as monthiy, quarterly, half yearly, annual, etc. 13 where there is more than one drawal/repayment for a loan, the date & amount ofeach drawal/repayement and its allocation may also be given seperately

t'If
15

furnished seperately.
16

the repayment instalment amount and repayment date can not be worked out from the data furnished above, the repayment schedule to be

In case of Foreign loan,date of each drawal & repayment alongwith exchange rate at that date may be given.
Base exchange rate means the exchange rate prevailing as on 31.03,2009 for existing assets and as on

coD for the remaining

assets.

"
13

In

case of hedging, speciry details like type of hedging, period of hedging, cost of hedging etc.

At the time of truing up rate of interest with relevant reset date (if any) to be furnished separately

'e At the time of truing up provlde details of refinancing of loans considered earlier. Details such as date on which refinacing done, amount of

reflnanced loan, terms and conditions of refinanced loan, financing and other charges incurred for fjnancing etc.

NTPC Loan Accounting System

statement Giving Details ot eroFcllgrnceo tnrougn a cornbination of toan

Source of Loan

Allahabad Bank-lll
INR
:

Currency:
Amount Of Loan lnterest Tvpe

s000000000 3000000000
Floating

Total Drawn amount:


:

Fixed lnterest Rate: Effectve lnterest Rate


:

D00001 -8. 5/D00002-9.00

Margin, lf Floatinq lnterest: Frequencv of lntt Pavment:

50bps
Monthly No Not Applicable
3 years

Are there anv Caos/ Floor:


lf Above is.yes, specity Caps/

Floor:
Moratorium Period: Moratorium effective from Repayment Period (lnc
:

28-Sep-10
10 Years

Moratorium):
Reoayment Freouencv: Repayment Type
:

14 Half-yearly

AVG 28-Mar-14 Rupees


:

First Repayment Date: Base Exchanqe Rate: Date of Base Exchanqe Rate Proiect Code

N.A.

Proiect Name
BONGAIGAON
FARAKKA-III

Amount s[0,000,000
200,000,000 150,000,000 400,000,000 250,000,000

MAUDA
RIHAND.III SIMHADRI.II stPAT-il VINDHYACHAL.IV

l,300,000,000
350,000,000

TotalAllocal :ed Amount

3,000,000,000

1,q

NTpC Loan Accounting System Statement Giving Details of project Financed through a combination of loan
Form 8

Loan Code

Source of Loan urren Amount Of Loan Date of Drawl lnterest Type


: :

Allahabad Bank -lll


INR

5000000000 2000000000 28-Sep-10


loating

Total Drawn amount:


:

Fixed lnterest Rate: Base Rate, lf Floatinq lnterest Margin, lf Floatinq lnterest:
FrequencV of lntt Pavment
11.00o/"
12.50o/o

Monthly
,

Are there anv Caps/ Floor

Yes / NO

lf Above is yes, specify Caps/

Floor:
Moratorium Period: Moratorium effective from Repayment Period (lnc Moratorium) . Repayment Frequency: Repavment Tvoe
:

3 Years

28-Sep-10
10 Years

14 Half Yearly

AVG 28-Mar-14
Rupees
:

First Repayment Date: Base Exchanqe Rate.


Date of Base Exchanqe Rate

N-A

Proiect Code

Proiect Name Vindhyachal lV Rihand-lll Sipat ll Farakka - lll

Amount

Simhadri- ll
Bonqaiqaon Mauda

350000000 400000000 300000000 200000000 250000000 350000000 1 50000000 2000000000

TotalAllocated Amount

..--.ld.+'+1rqi#a

i|fi':a#1$;;if j

dEsrF*

NTpC Loan Accounting System


Statement Giving Details of project Financed through a Combination of
Loan packages

FORM.

'"'''^ 3::ii{l...:=;?T:ii,,|;ff;h;;?i,'.'il::ffi;'ode
: 42100? an Code : 421003
an
code
Source of Loan
:

>:

ANEA0'1; project code >=

vSSr04,
corp.ny

T0000,t T0000.1
rfuR--'

::i:iiil:
iirituo

01-Apr-2009
,

9:38:50PM

unsecured Loan from rnfrastructure Deveropment Finance Unsecured Loan from Central Bank of lndia lll

)
---t
I

CENTML BANK OF INDIA


: :

Currency:

Amount of Loan

- -_----.,]
I

Jotal

Drawn

amount
:

-6,soo"ooo.ooood "
Floating

5 500,000,000.00

-Jnterest

Type

Fixed lnterest Rate.: Base Rate ,lf Floating lnterest Margin, lf Floating

/ /

D00001-12.5

/ /

D00002_12.5

D00003-12.s

lnterest

D00001-3.5

D00002_3.5

/ 000003_3.5

!
lf

there

any

CapsiFloor:

Y/N
Monthly
:

t requency of Int. payment

{9f-i!J"r,specify
:

Caps/Floor

Moratorium Period

3
:

Years

Moratorium effective from

23-Jun-2008
10 14

_Xepayment Peliod (l1c Moratorium): Repayment Frequency:

Years HaltY

llcpayment Type

AVG.
:

r..qEjtllg!1g'-

Datc of First Repayment

23-Decernber-20

1 1

Date of Base Exchange Rate:

BASTO
FSSTO3

Barh STPP
I,I

00,000.000

Farakka STPP Kahalgaon STPp Mauda Thermat power project

KHSTO2

700,000,000 250,000,000 700,000,000 1,000,000,000 1,000,000,000 250,000,000 500,000,000 5,500,000,000

MASTOl
NCSTO2 SISTO2
SPSTO2

NCTPP Dadri
SimhadriSTPP SIPAT STPP
Tapovan Vishnugad Hydro power project

TVSTOI

Total Amount

7t

4i

statement Giving Detairs of project Financed through a combination of loan


Form
8

NTPC Loan Accounting System

Loan Code 421003

T0000

entral Bank OF tndia Central Bank of lndia- ill ount Of Loan


.

D00003
ttt

Total Drawn amount Date of Drawl


:

Fixed lnterest Rate : Base Rate, lf Floatinq lnterest lf Floatinq lnterest


Frequency of lntt

Moratorium effective from Repayment Period (lnc Repayment Freq

10 Years

First Repayment Date Bqse Exchange Rate

Date of Base Exchanqe Rate

ect Name
Farakka - lll

Total Allocated Arnouni

+-r\/

Statement Giving Details of project Financed through a combination of toan


Form 8
Loan Code 420985

NTPC Loan Accounting System

Source of Loan Amount Of Loan Total Drawn amount

ration Bank - ll

D00001-7 2ao/, Base Rate, lf Floatinq lnterest Margin, lf Floatinq lnterest Frequency of lntt Pavment
Are there any CaDS/ Floor Yes
:

/ No

Moratorium Period. Moratorium effective f,rom Repayment Perrod (lnc


14 Half Y

First Repavment Date Base Exchanqe Rate


.

Date of Base Exchange Rate

Korba - lll

Farakka - lll TotalAllocated Amount

,tb

NTpC Loan Accounting System Statement Giving Detairs of project Financed through a combination of roan Form 8
T00003

Source of Loan

Bank - ll

Amount Of Loan

l-ctal Drawn amount

Fixed lnterest Rate


Base Rate, lf Floatinq lnterest in, lf Floatinq lnterest

Are there any Caps/ Floor:

04-Jul-05 Repayment Period (lnc


14 Half Yearl Frrst Repavment Date Base Exchanqe Rate Date of Base Exchanqe Rate
.

04-Jan-09

Korba - lll

Farakka - lll
Total Allocated Amount

q
t\

I
NTpC Loan Accounting System Statement Giving Detairs or through a combination of roan g

pro;eciiliili
Form

Amount Of Loan : Total Drawn amount:

rixeo
Fixed lnterest Rate

witrreseE@Z?
1

D0000

-e.

0/D

o0

ob'zI3s-'

Are there any Caps/ Floor:

Date of Base Exchange Rate

I,100,000,000

TotatAtrocEteoTEiGi

) //\ NTPC Loan Accounting System i StatementGivingDetailsofProjectrin,n"ejtn],oughaCombinationor#Form g

Loan Code 4Z1OO2

T00001

D00002

Source of Loan

Infrastucture Deve

Amount Of Loan : Total Drawn amount:


Date of Drawl
:

Fixed lnterest Rate Base Rate, lf Floating lnterest


:

lf Floating lnterest
Frequency of lntt pavment

:
:

Are there any Caps/ Floor: lf Above is yes, specify Caps/

Floor:

lVoratorium period

Moratorium effective from Repayment eerioOlGE Moratorium) : Repayment Freq

First Repayment Date Base Exchange Rate

Date of Base Exchange Rate

NCTPP-II

700000000

Totat

A[ocatedEil6Gt

\b

ilrf i*"jb*

,..lllLfir-*!* I ,'q'tl"i rnir'^E:tirj I


r:.., I

NTPC Loan Accounting System


Statement Giving Details of project Financed through a Combination of Loan packages
FORM - 8

terra

Loan Code
420980
:

>:

rn

Drawl Date >=0 I -Apr- 1999; Drawl Date <=3 I _Mar_2009

420902, Loan Code <= 42lOl6;Pro.iect Code >= ANEA0I; project Code >: vSST04:
Unsecured Loan from Life lnsurance Corporation of
LIFE INSUMNCE CORPOMTION OF INDIA

Pnnt Date Print Time

: :

01-Apr-2009 9:38:50pM

Code:

lndia lll

Source of Loan Cuirenc'y


:

Amount of Loan

: :

40,000,000,000.00 20,000,000,000.00

Total D6wn amount


lnterest Type
:

Fixed Interest Rate: Base Rate ,lf Floating lnterest : Margin, lf Floating Are there

D00002{.31s

/ D00003-8.2771 /

D00004.7281

D00005-8.7575

lnterest

any

Caps/Floor:
Half-Yearly

I.

lucncy ofInt. Payment

Moratorium Period

3
:
1

Years

Moratorium effective from

5-Jan-2004

Repayment Period (lnc Moratorium): Repayment Frequency


:

14
AVG

Years

l)ate of I'irst ReDayment


Base Exchange Rate
:

31

-December-2007

Rupees

Date of Ease Exchange Rate:

N.A.

49

-tr

r.r+ri&i"k

qIFi=,*
--.-.d

.t Vfu''?.AlI fy.E!'{: !vi., +q;r

NTPC Loan Accounting System


Statement Giving Detairs of project Financed through a combination of Loan packages
FORM - 8

rria

r Code:

Loan Code >= 420902; Loan code <= 421016; project code >= ANEA0 l; project code Drawl Date >=0 I -Apr- l 999; Drawl Date <=3 I -Mar-2009
420980

>-

Print Date

vSSTO4;

Print Time

: :

01-Apr-2009

9:38:50pM

T00004

Unsecured Loan from Life lnsurance Corporation of

lndia lll

ANRN{01 BASTOI BDSTOI FGRMOI


FCSTO3

Anta Gas Power Project Barh STPP


Badarpur Thermal Power Station Unchahar STPP Unchahar STPP Farakka STPP Farakka STPP

00,000,000

I,000,000,000
2,250,000,000 50,000,000 r,080,000,000
r

FSRMOI
FSSTO3

90,000,000

900.000,000
I

KDSTOI KHSTO2

Koldam HPP Kahalgaon STPP Korba STPP Korba STPP

50,000,000

2,7s0,000,000 60,000,000 200,000,000 950,000,000


5l

KSRMOl
KSSTO3 NCSTO2 RHSTO2

NCT?P Dadri
Rihand STPP
Ramagundam STPP Ramagundam STPP

0,000,000

RSRMOl
RSSTO]
SPSTO
I

60,000,000 200,000,000 2,650,000,000 3,200,000,000


2 r 0,000,000

SIPAT STPP SIPAT STPP Singrauli STPP


Tanda

SPSTO2 SSR*MOI

TARMOI
TSSTO2

Thermal Power Station

350,000,000 400,000,000 370,000,000 550,000,000 I I0,000,000


1,7 I

Talcher STPP

TTRMO3 TVSTOI VSRMOI


VSSTO3

Talcher New Taken over from OSEB


Tapovan Vishnugad Hydro power project

Vindyachal STPP Vindyachat STPP Total Amount:

0,000,000

20,000.000,000

I
50

{b4

statementGivingo",
Loan Code 420980

jil:io',.:ilffi:::t*r,rll.,:lnacomoinationorroan
Form g T00004 D00002

Life lnsuranG

Scurce of Loan

Life lnsurance Corporation of lndia lll


:

Amount Of Loan Date of Drawl

Total Drawn amount:


:

Fixed lnterest Rate:


Base Rate, lf Floating lnterest Margin, lf Floatinq lnterest : Are there an Floor: lf Above is yes, specify Caps/
:

8.31s0%

Floor:

Moratorium Period

Moratorium effective from Repayment pEriodlinE

31-Dec-07 Base Exchanqe Rate: Date of Base Exchange Rate

Vindhyacnar STpF-lii

Farakka - ttl TotalAltocateO AmoGt

I
/b\

statement Giving Details of project Financed thiough a combination of loan Form 8

NTpC Loan Accounting System

Source of Loan

Life Insurance Corooration of India-t\/


INR
:

Currency:
Amount Of Loan lnterest Type

Total Drawn amount

0000000000 -:-:UUUUUUUUUU
1 I

FxeAD0000 l-9.64 tD00002-9.7 7

Fixed lnterest Rate

Base Rate, lf Floatinq lnterest Margin, lf Floatinq lnterest Frequency of lntt Payment
:

Monthly No Not Applicable 4 years 18-Mar-08


12 Years

Are there any Caps/ Floor: lf Above is yes, specify Capsi Floor:
Moratorium Period: Moratorium effective from Repayment Period (lnc Moratorium) : Repayment Frequency: Repayment Type
:

14 Half-Yearlv

AVG 4-Auq-12
:

First Repayment Date Base Exchanqe Rate Date of Base Exchanqe Rate

Ruoees
:

N.A.

Project Code

Project Name
BARH-I BARH-II BONGAIGAON FARAKKA-III KAHALGAON-II KORBA III LUI.IAI(I NAG-PALA NCTPP-II SIPAT
II

Amount
900,000,000 2,300,000,000 1,700,000,000 400,000,000 800,000,000 700,000,000 300,000,000 1,700,000.000 800,000,000

TAPOVAN VISHNUGAD urat Ailocafeq Amount

400,000,000

10,000,000,000

SygLm Statement Giving Details of project financet-tnrough a Combination of loan g


Form

NTeC Loan AccountiggF

[-oan Code 421001

tirelnsurah@
Source of Loan Amount Of Loan Total Drawn amount:
:

T00001

Life lnsurance Corporqtion of lndia

lV

Date of Drawl

Fixed lnterest Rate Base Rate, lf Floating lnterest , lf Floating lnterest


: :

of lntt Payment: Are there any Caps/ Floor: lf,Above is yes, specify Caps/
Yes / No

Floor.

Moratoriurn period Moratorium effective from Repayment eEioolGI lVloratorium) : 14 Half Yea Repayment Type
:

Flrst Repayment Date

Date of Base Exchange Rate:

arakka - lll

Totat

RrrocatEdIiliGt

@
h\

NTpC Loan Accounting System Statement Giving Details of Project Finariced through a Cornbination of loan
Form 8 Loan Code

420998

Tn^nn{'

Oriental Bank of Commerce

Total Drawn amount: Date of Drawl


:

lnterest Rate:
Base Rate, lf Floatinq lnterest
in, lf Floatino lnterest
: :

Frequency of lntt Pavment Are there any Caps/ Floor:

lf Above is yes, specify Caps/ Floor


:

Moratorium Period

Moratorium effective from Repayment Period (lnc Moratorium) :

First Repayment Date: Base Exchanqe Rate


:

Date of Base Exchanqe Rate

NCTPP-II

arakka - lll

TotalAllocated Amount

N/

ffiffi1 doi?"F)*
E--r--..d

NTPC Loan Accounting System


Statement Giving Details of project Financed through a Combination of

':::il:'.'
teria

Loan Code >= 420902; Loan Code

<=

Drawl Date>=01-Apr-1999; Drawi Date <=3 l-Mar-2009

42lOl6;projecr Code >= ANEAo I ; project Code >= VSST04;

Print Date Print Time

: :

01-Apr-2009 9:38:50pM

rn Code:

420998

T00001

Unsecured Loan from Oriental bank of commerce


I

Source of Loan Currency


:

ORIENTAL BANK OF COMMERCE

---l
s,000,000,000 00
:

Total Drawn amount lnterest Type


:

5,000,000,000.00 Floating

_____l
I

Base Rate ,lf Floating lnterest : Margin, lf Floating

D00002-12.5

D00003_12.s

D00004_12.s

lnterest
:

000001-3.75

/ 000002_3.7s / D00003_3.75 i

000004_3.75

I I

here

any

Caps/Floor

Y/N
Monthly

!'rcqucncy of Int. ?ayment


lf above is yes,specify CapslFloor:

I i

3
Moratoriu m.effective from
R e,p

Years

__l

l l

15-Dec_-2007
m) :

ayrnent Period (lnc

[o y{o1u

10

Years

_ _ ____l
I
I I I

lepayment Fre!!9lcy:

14
AVG.
:
1

Hall-ylely

Itcpaymglt Iyqe

)ntc of H irst Repayment


Base

5-June-201

1
I

Exchangg.ElI___

Rupees

Date of Base Exchange Rate:

N.A.
I

FSSTO3

Farakka STPP Koldam HPP Korba STPP

400,000,000
1,000,000,000

KDSTOI
KSSTO3 NCSTO2 SISTO2
SPSTO I SPSTO2

200,000.000
r,r

NCTPP Dadri
Simhadri STPP SIPAT STPP SIPAT STPP

00,000,000

400,000,000 1,500,000,000 400,000,000

Iotal Amount:

5,000,000,000

q
66

A\

ir""Tun T.f.I l F#':$"Sr&4:: | i:r\ffi--al

.{

. .

NTpC Loan Accounting System


Statement Giving Detairs of project Financed through a combination of Loan packages

FORM.8

iteria

;
.

Loan Code >= 4209Q2; Loan Code <: 4zr0r6;projecr code >= ANEAOT; project code Drall Date >=0 I -Apr- I 999; Drawl Date <=3 _Mar_200
I

>: VSsr04;

Print Date

Print Time

: :

01-Apr-2009 g:38:50pM

an

Cocje

:
:

42'1005

T00001

Unsecured Loan from pFC V

Source of Loan

Currency

POWER FINANCE CORPORATION LTD


:
1

Amount of Loan

Jotal

Drawn

rmo*t
_. -.
:

00,000,000,000.00

lnterest trp.

'

s,000,000 000.b0 Flnelinn

Fixed lnterest Rate

Base Rate ,lf Floating lnterest: Margin, lf Floating lnterest


:

/ I

D00001-9,85 D00001{

/ /

000002-8.52

45

D00002{.45

there

any

CapslFloor:
.

l.'rcq ue.n.cy

9ll{. J3.Il91t
:

lf above is yes,specify_C:ps/Floor Moratorium Period

Moratorium effective from

-4- -Y:*'
_16:?'9?S8

Repayment Period (lnc Moratorium):


_Repaymeni Frequency
:

14 Years 48 . t.ral1"Ji;
1VC
1

llcpayment'[ype

l)1t: 9fJirct.!9p-ayment
Base
_Date

Erchangel{g,

5-Juty-201 3

of Base Erchange Rate:

FSSTO3

Faral,cka STPp

KDSTOI
I(HSTO2

7i0,000.000
I

Koldam HPP
Kahalgaon STpp

800,000,000 400,000.000 600.000,000


I

KSSTO] LNSTOI MASTOI


SISTO2

Korba STPP Lohari Nagpala Hydro power project


Mauda Thermal power project 00.000,000

Simhadri STPp
Tapovan Vishnugad Hydro power project

1,200,000,000 950,000.000 200,000,000 5,000,000,000

TVSTOI

Total Amount:

73

A\

I
Statement Giving Details of project Financed through a combination of roan Form g
Loan Code 421OOs
T00001

D00001

Source of Loan

Power Finance

Amount Of Loan
Date of Drawl:

TotaL Drawn amount

lnterest T Fixed lnterest Rate


:

Base Rate, lf Floating lnterest

Margin, lf Floating lnterest : Frequency of lntt payment: Are there any Caps/ Floor:

Moratorium period: Moratorium effective frorn nepaymGnt perioElGE Moratorium) :


:

First Repayment Date . Base Exchange Rate :


Date of Base Exchange Rate
:

15-Jut-13

Kahalgaon

STffi

Farakka - ilt
Totat

AttocaGE7ilffi

hr.t

statement Giving Detairs of project Financed through a combination of roan


Form g Loan Code 42100s Power
T00001

NTPC Loan Accounting System

Finan?eE6?Fiffii

D00002

Currencv:
A.mount Of Loan
:

Total Drawn amount:


Date of Drawl
.

Fixed lnterest Rate

Base Rate, lf Floatinq lnterest


in, lf Floating lnterest
:

Are there any CaDS/ Floor:


lf Above is yes, specify Caps/

Yes / No

Floor:
Moratorium effective frorn Repayment Perioffic Repayment Freouencv First Repayment Date: Base Exchanqe Rate
:

15-Jul-1 3

q{g rf Base Exchanqe

Rate

arakka - lll Simhadri- ll

TotalAllocated Amonnt

state

me

nt

G ivi

ns

o*ii]:fr::i"1iffi:[H,ilJEl' a c o,
Form g

natio n or roa n

Source of Loan

Currency:
Amount Of Loan lnterest Type
:

INR

100000000000 3000000000Fixed with reset of 3 years


D00007-8.04/ D00008_8.06/ D( )0009-8.06/ D000010_8.13/ D00001 t_8.28/ D000012_ 8.26l D0000 I 7-A ) d./ Dnnnf! Ll
J.O.ZVI IJUUUUIO.U.IE

Total Drawn amount:


:

D0000 l-7.93/ D00002-8. r 7/ D( )0003-8.23l D00004

Fixed lnterest Rate

Base Ratq lf Floating lnterest Margin, lf Floatinq lnterest: Frequency of lntt payment
:

Monthly
No Not Applicable
4 vears

Are there any Caps/ Floor: If Above is yes, specify Caps/

Floor:
Moratorium Period: Moratorium effective from Repayment Period (lnc:

26-Dec-O8
16 Years 48 Quaterlv

Mqratorium):
Repayfnent Frequencv: Repaymgnt Type
:

AVG 15-Jul-13 Ruoees


:

First Repayment Date: Base Exchange Rate:

Lqle of Base Exchanqe Rate


Proiect Code

N.A
Project Name
BARH-II

Arnount
2,100,000,000 3,950,000,000
1,500,000,000

BONGAIGAON
FARAKKA.III

KOLDAM
KORBA-III

1,650,000,000 2,650,000,000
1,550,000,000

MAUDA
NCTPP.II

RIHAND-III SIMHADRI.II
SIPAT-I

4,750,000,000
1,050,000,000

6,000,000,000
1,000,000,000

ToE1Atom

TAPOVAN VISHNUGAD VINDHYACHAL-IV

1,100,000,000 2,700,000,000

30,000,000.000

pt

statement Giving Detairs of project Financedthiough a combination of loan


Form 8

NTPC Loan Accounting System

Loan Code 421OOs Power Scurce of Loan


:

T00002

rinanceco67fti

D00002

Power Finance

Arnount Of Loan

Total Drawn amount:

Fixed lnterest Rate: Base Rate, lf Floatinq lnterest lVargin, lf Floatinq lnterest :

of lntt
Are there any Caps/ Fioor:

Moratorium effective from Repayment Period (tnc

First Repayment Date Base Exchanqe Rate


:

15-Jul-13

Date of Base Exchanqe Rate

Farakka - ltt

Total AttocateOTEouni

EL

s ta te m e n t G ivi

r",

j;l

l::rl3ilffi:ffitfl'Ji
Form 8
T00002

ln

"

c o,"n ur n ati o n or roa n

Loan Code 421005

D00009

Source of Loan

Power Finance Corporation V


:

P,mount Of Loan

Total Drawn amount:


Date of Drawl
:

'14-Jan-10

Fixed lnterest Rate: Base Rate, lf Floatinq lnterest Margin, lf Floatinq lnterest: Frequency of lntt Are there any Caps/ Floor:

Moratorium effective from Repayment Period (lnc Moratorium) :

First Repayment Date Base Exchanqe Rate


:

15-Jul-13

Date of Base Exchanqe Rate

Proiect Code

Farakka - ltt totatRttocateO Rm6Gt

statement Giving Details of Project rinanceitnrough a combination of loan


Form

NTPC Loan Accounting System

Loan Code

421005

-r^^^^.
ower Ftnance Corporation V

Source of Loan Currency


:

lrNR

Amount Of Loan Total Drawn amount:


Date of Drawl
:

18-Mar-10

lnterest Type Fixed lnterest Rate Base Rate, lf Floatinq lnterest Margin, lf Floatinq lnterest
:

Fixed
8.28o/o

Frequency of lntt payment

Yes / No

Are there any Caps/ Floor: lf Above is yes, speciiy Caps/ FIoor: Moratorium Period
:

4years
26-Dec-08
16 Years
zlt{
(

Moratorium effective from Repayment Period (lnc

Moratorium):
Repayment Frequency: Repayment Type

Jt

t2tprl\/

AVG
15-Jul-13 Rupees
:

First Repayment Date


Base Exchange Rate: Date of Base Exchanqe Rate

Farakka - lll

NTPC Loan Accounting System


Statement Giving Details of Project Financed through a Combination of Loan Packages

FORM
Loan Code
Source of Loan 421 005

.8
Unsecured Loan from PFC Y

T00003
Power Finance Corporation Ltd

Currency

l
:

INR
100,000,000.000 30,000,000,000
Fixed with reset
:

Amount of Loan
nterest Type:

Total Drawn amount:

of3

years

:ixed lnterest Rate

D0000 r -7.75l D00002-7

.8u D00003-8.74t D00004-8.89/ D00005-9.34/

D00006-9. 84/ D00007-9.87/ D00008-9.87/ D00009-9.86/ D00001 0-9.861 D0000 l 1 -9.86 Base Rate, lf Floating lnterest Margin, If Floating lnterest Are there any CapsiFloor: Frequency of IntL Payment
lf above is yes, specify Caps/Floor :
:

Y/N
Monthly

Vloratorium Period

I Years
:

lloratorium effective from

l6-Dec-08
16.5 Years
18

R,epayment Period (lnc Moratorium):

Repayment Frequency:

Quarterly
3

lepayment Type )ate of First Repayment


3ase Exchange Rate:

{VG.
I

5-Jul-

Rupees

late of Base Exchange Rate:

N.A.

Tacher-ll Rihand-ll

300,000,000
150,000,000

Vindhyachal lll
Vindhyachal lV Rihand-lll
NCTPP-II Sipat|

500.000.000 2,050,000,000
1,450,000,000

2,850.000,000 900,000,000
2. I 00.000.000

Koidam
KhSTPP.II

200.000.000 550,000,000 /50,000,000


1,500,000,000 1,600,000,000

Taoovan

Korba-lll
Farakka-lll

Simhadri-ll
Bongaigaon Barh-l
Barh-l
I

3,350.000,000 5,350,000,000 2,700,000,000 2,450,000,000 400,000,000


150,000,000
I

Mauda Pakri Barwadih

fanda

&M <orba R & M


R

s0.000,000

rTPSR&M
Unchahar-lll Total Allocated Amount

350,000.000 200,000,000 30,000,000,000

l_

statement Giving Details of project Financed'through a combination of loan


Form g Loan Code 421OOs

NTPC Loan Accounting System

Source of Loan Currency Amount Of Loan


Date of Drawl
:

Power Finance Corporation V


INR
1

00000000000

Total Drawn amount: lnterest Type

4000000000
22-Nov-1 0
rxeu

Fixed lnterest Rate

8.89%

Base Rate, lf Floatino lnterest Margin, lf Floatinq lnterest Frequency of lntt Pavment Are there any Capsi Floor:
lf Above is yes, specify Caps/
:

Monthly Yes / No

Floor.
Moratorium Period
:
:

4 years

Moratorium effective from Repayment Period (lnc Moratorium) : Repayment Frequencv Repavment Tvoe
:

26-Dec-08
16 Years

48 Quaterly AVG
15-Jul-1 3

First Repayment Date Base Exchanqe Rate:


Date of Base Exchanqe Rate
:

Rupees
N.A.

Prcject Coce

Prolect Name

Talcher-ll Rihand ll Vindhyachal lll Vindhyachal lV Rihand-lll


NCTPP-II Kol Dam

Arnount

500000000 350000000
1

I\anatqaon-ll Farakka - lll Simhadri - ll


Bonqaiqaon Barh-ll Mauda Pakri Banrvadih

00000000

r4sooooooD 1 0000000c
550000000 400000000

uncnanar-llt TotalAllocated AmounI

4000000000

NTpC Loan Accounting System Statement Giving Details of project Financed through a combination of loan Form 8
Loan Code 421005

toooo3
Power Finance Corporation V
INR
1

nnnonq

Source of Loan Currency


:

Amount Of Loan Total Drawn amount:


Date of Drawl lnterest Tvpe
:
:

00000000000

3500000000

31-Dec-10 Fixed

Fixed lnterest Rate:

9.34%

Base Rate. lf Floatino lnterest


Marqin, lf Floatinq lnterest Frequencv of lntt Pavment
:

Monthly Yes / No

Are there anv Caps/ Floor


lf Above is yes, specify Caps/

Floor:
Moratorium Period
:

4 years
:

Moratorium effective from Repayment Period (lnc Moratorium) : Repayment Frequency


:

26-Dec-08
16 Years

48 Quaterlv AVG 15-Jul-13 Rupees N.A.

RepaymentTvoe: First Repayment Date:


Base Exchanqe Rate
:

Date of Base Exchanqe Rate

Frclect Ccce

Prclect Name
Vindhyachai l\./ Rrhand-lll NCTPP-II Kol Dam Tapovan Korba - lll Farakka - lll

Amount

25000cc00
500000000 100000000 100000000 1 50000000 2s0000000 i l qnnnnnnn 100000000 400000000 1 000000000 250000000 250000000 3500000000

Simhadri- ll
Bonqaiqaon Barh

Barh-ll
Mauda

TotalAllocated Amount

ta , |l

statement Giving Detairs of project Financed through a combination of roan


Form 8

NTPC Loan Accounting System

Loan Code 421005

Source of Loan

Power Finance Corporation V

Amount Of Loan
Date of Drawl

Total Drawn amount:


:

Fixed lnterest Rate: Base Rate, lf Floatinq lnterest


encv of lntt

Are there any Caps/ Floor: lf Above is yes, specify Caps/

Yes / No

Floor:
Moratorium Period
:

Moratorium effective from Repayment Period (lnc Moratorium) :

First Repavment Date.


Base Exchanqe Rate
:

15-Jul-13

Date of Base Exchanqe Rate

Project Code

Project Name Vindhyachat tV Rihand-lll


NCTPP-II

Amount
1 00000000 200000000

Sipat I Farakka - lll


Bqngaigaon

6^^^^^^^^

?0no00000

IZV\JtJUUUUU OUUUUUUUU

Barh-ll
MauCa
1

000000000

TotalAllocated Amouni

3000000000

6t

.t

Statement Givins Loan Code 420996

".,ill::r::,1iffi:::,#,i[.fif , combination or roan Form 8


T00002 National Bank ll

Source of Loan

Punjab Nationai Bank


:

tr

Amount Of Loan

Total Drawn amount lnterest T Fixed lnterest Rate : Base Rate, If Floating lnterest lf Floating lnterest : Frequency of Intt pavment Are there any Caps/ Floor:
.

D00001-9.75%

Yes / No

Moratorium period Moratorium effective from Repayment pGnodfi;


:

10 Years

Frrst Repayment Date

26-Mar-10

Base Exchange Rate : Date of Base Exchanqe Rate

Korba - lll Farakka - ili

lo!q,lAitoiateoAmffi

NTPC Loan Accounting System Statement Grving Details of project Financed through a combination of loan

'

.FormB

Loan Code 420996

1oooo2
Punjab National Bank ll
INR

nnonnl

Source of Loan Currency


.

Amount Of Loan
Total Drawn amount Date of Drawl lnterest Type
: :

2500000000 2000000000 29-Nov-07 Floating


9.75%

Fixed lnterest Rate-: Base Rate, lf Floatinq lnterest Margin, lf Floatinq lnterest Frequency of lntt Pavment Are there any Caps/ Floor
:

Monthly
Yes / No

lf Above is yes, specify Caps/

Floor:
Moratorium Period
:

3 years
:

Moratorium effectrve from Repayment Period (lnc Moratorium) : Repayment Frequency Repayment TVpe
:

27-Sep-06
10 Years

14 Half yearly FIFO

First Repayment Date Base Exchange Rate


:

26-Mar-10 Rupees
:

Date of Base Exchanqe Rate

N.A.

Project Code

Project Name NCTPP-II Kol Dam Korba - lll Farakka - lll

Amount 500000000 500000000 500000000 500000000 2000000000

TotalAllocated Amount

NTPC Loan Accounting Systenr Statement Giving Details of project rrnanceo triough a combination of ioan . Form B Loan Code 420994 State Bank of lndla Source of Loan Curre State Bank OF tndia lV
1

Amount Of Loan
Interest T

5000000000

Total Drawn amount Fixed lnterest Rate

2000000000

Base Rate, lf Floatinq lnterest Margin, lf Floatino lnterest


:

/ D00001-12.75 I D00002_ / D00001--2.25 / D00002-_2


Monthly

of lntt Payment
there any Caps/ Floor
:

Moratorium Period Moratorium effective from Repayment RerroO ltnc Moratorium


:

28-Feb-07

Frrst Repavment Date

Base Exchanqe Rate : Date of Base Exchanqe Rate

Proiect Code

Proiect Name NCTPP Dadri Talcher ll Vindhyachat STPp-il1 Kahal Gaon ll Korba lll Farakka - lll Kayamkulam Swi Faridabad Switchyard

Unchahar llt

TotalAllocated Amount

statement Giving Detairs of project rinanceo triough a combination of roan


Form 8 T00002

NTPC Loan Accounting System

te Bank of lndia lV
Source of Loan State Bank OF India tV

Amount Of Loan
Date of Drawl lnterest T

Total Drawn amount


.

17-Sep-07

Fixed lnterest Rate

Base Rate, lf Floatinq lnterest Margin, lf Floatinq lnterest


:

encv of Intt Are there any Caps/ Floor lf Above is yes, specify Capsi
:

Yes / No

Floor.
Moratorium Period Moratorium effective from Repayment peiioffic
10 Years
*^^r ilrellt -r-l

14 Half

Repayment T First Repayment Date Base Exchanqe Rate


:

Date of Base Exchanqe Rate

Project Name NCTPP-II

Vindhyanchat STppJil Farakka - lll Unchahar TPp-ilt TotalAllocateO nmoInt

Siatement Giving Detairs of project Financed through a combination of loan


Form
B

NTPC Loan Accounting System

Loan Code 420994 State Bank of tndia lV Source of Loan


.

State Bank OF lndia lV

Amount Of Loan
Date of Drawl

Total Drawn amount.


:

Floating Fixed lnterest Rate


:

Base Rate, lf Floatinq lnterest Margin, lf Floatinq Interest . Frequency of lntt pavment Are there any Caps/ Floor
:
:

Moratorium Period

Moratorium effectrve from Repayment eenoO ltnc Moratorium) .

10 Years

First Repayment Date


.

9ase Exchanqe Rate Qglq of Base Exchanqe Rate

Proiect Code

Talcher-ll
Vindhyachat STPpJil

Total Allocated Anrou nt

yL

statem en t

G iv

ns

o",li] :i*:ilffi:Ht$ttiHEin
Form 8

ac

o,

oi n ati o

n or oa n
r

Source of Loan

Vijaya Bank-ilt
INR
:

Currency:
Amount Of Loan lnterest Type

2250000000
1

Total Drawn amount:


:

000000000

Floating

Fixed lnterest Rate

Effective lnterest Rate

lJvuuu t-o. / o

Margin, lf Floating lnterest: Frequency of lntt Pavment


:

/5 bps
Monthly
No

AIe there any Caps/ Floor:


lf Above is yes, specify Caps/

Floor:
Moratorium Period: Moratoriurn effective from Repayment Period (lnc
:

Not Apolicable

-.EF-_-_
28-Mar-08
10 Years 14 Hatr-yearty

3 vears

IVoratorium):
Repayment Frequencv: Repayment Type
: :

AV(i
28-Sep-1
1

First Repayment Date Base Exchange Rate:

Ruoees
:

pelg et Base Exchanse Rate

N.A.

Project Code

Project Name
FARAKKA.III

Amor rnf 1,000,000,000

uldt Allgcat eo Amount

1,000,000.000

g\

NTpC Loan Accounting System Statement Giving Details of Project rinanceitnrough a combination of loan
Form g 8

Loan Code 420959

T00003

D00001

Bank lll

Amount Of Loan

Total Drawn amount:


31-Mar-10 lnterest T Fixed lnterest Rate
:

Base Rate, lf Floatinq lnterest

lf Floatinq Interest of lntt Pavment


Are there any C

Moratorium Period

2B-Mar-08

Repayment RerioO ltnc


10 Years P.epayment Fre

Repayment Tvpe

First Repayment Date Base Exchanqe Rate


:

Date of Ease Exchanqe Rate

Amount
1

000000000 000000000

Tota I Allocated Arnouni


1

I
t\/

NTPC Loan Accounting System


Statement Giving Details of Project Financed through a Combination of Loan Packages

.
Loan Code

FORM

.8
T00002

Unsecured Loan from SBI

Vl

Source of Loan Currency


:

State Bank of hrdia

Vl

INR
:

\mount of Loan
nterest Type:

85,000,000,000 12,250,000,000
Floatir.rg

iotal Drawn amount:


:ixed lnterest Rate:
3ase Rate, lf Floating Interest

D0000 I -7.50/ D00002-7.50/ D00003-7.60/ D00004-8.25i D00005-8.2sl

D00006-8.25l D00007-8.25
Margin, lf Floating lnterest Are there any Caps/Floor: Frequency of lntt. Payment lf above is yes, specify CapslFloor Vloratorium Period
: :

D0000 l - L90/ D00002-1.90/ D00003-1.90/ D00004_1.90/ D0000s- 1.90/ D00006- 1.90/ D00007-1.90

YI

Monthly

3 Years
:

Moratorium effective from

14-May-09

Repayment Period (lnc Moratorium): Repayment Frequency: Repayment Type

l0 Years
I4 HallYearly AVG,
3O-Seo- 1 2 Rupees

)ate of First Repayment


3ase Exchange Rate:

./

)ate of Base Exchange Rate:

N.A.

/indhyachal lV
Rihand-lll
NCTPP.II

1,300,000,000 1.500.000.000 750,000,000 2,350,000.000 800,000,000 450,000,000 250,000,000 500,000,000 ]50,000,000 250,000,000 700,000,000

iipat-l
Sipat-ll Koldam
KhSTPP-II

Tapovan Korba-lll Farakka-lll Simhadri-ll Bongaigaon Barh-l Barh-ll Mauda Pakri Barwadih

050 00fl 000

500.000,000 350,000,000

750000000
400,000.000 12,250,000,000

Total Allocated Amount

-*

NTPC Loan Accounting System Statement Giving Detairs of project Financed through a combination of roan
Form 8

Loan Code

T00002 of lndia VI
:

D00005

Source of Loan

State Bank OF lndia Vl


:

Amount Of Loan Date of Drawl

Total Drawn amount:


:

21-Feb-11 Floating

Fixed lnterest Rate

BaseRate, lf Floatinq lnterest


Margin, If Floatinq lnterest
uency of Intt Pavment
:

Are there any Caps/ Floor: lf Above is yes, specify Caps/

Yes

/ No

Floor:
Moratorium Period: Moratorium effective from Repaynrent Period (nc
:

First Repayment Date Base Exchanqe Rate

Date of Base Exchanqe Rate

Proiect Code

KhSTPP-II Farakka - ltl

TotalAllocateA Amount

N.^U
[\

-<

statement Giving Details of Project rinanceitniough a combination of loan


Form 8

NTPC Loan Accounting Systbm

Loan Code

421000 - -

-r^n^^i
T00001

ited Bank of lndia il Source of Loan Currency


:

lUnlteO Bank of tndia


Irrun

It

Amount Of Loan Total Drawn amount:


Date of Drawl lnterest Type
:

l+oooooooo
I

soooooooo

105-Aus-08

lg.zs"t" Fixed lnterest Rate Base Rate, lf Floatinq lnterest Margin, lf Floating lnterest:
:

Frequency of lntt pavment

Monthly

Are there anv Caps/ Floor lf Above is yes, specify Caps/

Yes / No

Floor:
Moratorium Period
:
:

J years 28-Mar-08
10 Years

Moratorium effective from Repayment Penod (lnc

Moraiorium)

Repayment Frequencv: Repayment Type


:

14 Haif vearlv

AVG
:

First Repayment Date Base Exchange Rate

28-Seo-1'1

Ruoees
:

Date of Base Exchanqe Rate

N.A.

Farakka - lll

TotalAllocated Amount

L(

} ,, .1,]a:\t,]

.r!!:&*r

;.r';;111$;$.$$

i N'*"{*F.^* + a.!.s s s'{$"ss{"$is8

NTPC Loan Accounting System


Statement Giving Details of project Financed through a Combination of
Loan packages

FORM.8

jteria

: '

Loan code

>:

Drawl Date

42ogo2; Loan code <= 421016;Proiecr cocle >= ANEA0t; pro.ject code >= vSST04; >=01-Apr-1999;
Drawl Date <=3 l-Mar_2009
T00001

Print Date Print Time

: :

01-Apr-2009 9:38:50pM

an Code:

421000
:

Unsecured on loan from United Bank ll

Source of Loan

UNITED BANK OF INDIA


INR

Amount of Loan

: :

4,000,000,000.00 4,000,000,000.00 Floating


:

l
/ D00003_13.2s / D00004_13.25
D00004_4

Jotiroiiwn imoJnt
_-lnterest Type
:

-l
I

---l

F_ixed Interest Rate

Base Rate ,lf Floating Interest Margin, lf Floating

D00001-13.25

I I I I

D00002_13.25

lnterest

/ D00001--4 /
Y/N
Monthly

D00002_4

/ D00003-4 /

.l
i
I I

lltgg_Tl:ryf I!! r^y, u,t


_Moratorium ne!9U , Moratorium effective from
:

l i

i
I

Years
I

28-Mar-2008
10
1A

Repayment Period (lnc Moratorium):

Years
Half-Y

_!!paVment R"P,Y_T:I1

Frequen_cy :

ta

ryp.

__

AVG.
2B-September-201
1

Date of First Repayment :


Base Exchange Rate
:

I I I

Rupees

3,h

{ ltlE'hry*t9:
FSSTO3

_L_l

A.

Farakka STPP

300,000,000

KDSTOl
KHSTO2

Koldam HPP
Kahalgaon STPP

r,000,000,000 250,000,000
500,000,000

LNSTOl
NCSTO2
SISTO2

Lohari Nagpala Hydro power project

NCTPP Dadri
Simhadri STPP SIPAT STPP Total Amount:

r,000,000.000
750,000,000 200,000,000 4,000,000,000

SPSTOI

ryL
68

EF

.,.:,-!..n.i..!.+

'""1:5,.i.$SSU$

I s*+*-w*.s j \e.*'wi
./..
iteria

Lr:""{-R*:

iITPC Loan Accounting System


Statement Giving Details of project Financed through a Combination of Loan packages
FORM - 8

Loan code

>:420902;

Loan cocle

<=

421016;project cocle >= ANEA0l; pro.iect cocle >= vsST'4;

Print Date Print Time

: :

01-Apr-2009 g:38:50pM

an

Code:

421009

T00001
QTA TE

Unsecured Loan
BANK OF INDIA

from

State Bank of lndia V

Source of Loan

--l
-.! n

INR

Amount of Loan

iotar oriwnimouni
'

15,ory,0"00pry!q.-_-_.5,000,000,000 00

Fixed Interest Rate :


Base Rate ,lf Floating lnterest
:

/ /

D00001-12.25

I I

D00002_12.25

Margin, If Floating lnterest

D00001-2.25

DOO0O2_2.25

A
l

here

any

Caps/Floor:

Y/N
Monthly
|q g

Frecl uc ncy 9l
r
ab

ll!:Ily*g1
git_t!!{f
:.

ov e

.vu_.,_.-p g

Moratorium Period

3
ryLgirto
ri u m ) :

Years

20-Mar-2008

_!e

g-a

yg

e n

t_Puf q.q_(hf !

Repayment Frequency:

10 14
AVG

Years Ha[-y

I{epaynrent Type

Rupees

Date of Base Exchange Rate:

BASTO2

Barh STPP Bongaigaon STpp


Farakka STPP

BOSTOI
FSSTO3

400,000,000 400,000,000

KDSTOI
KHSTO2
KSSTO3

r,850,000,000
400,000,000 500,000,000 600,000,000 200,000,000 300,000,000 3s0,000,000 Total Amount: 5,000,000,000

Koldam HPP
Kahalgaon STpp

Korba STPP Lohari Nagpala Hydro power project

LNSTOI
NCSTO2
SISTO2

NCTPP Dadri
SimhadriSTPp

'17

statement Giving Details of Project Financeithrough a combination of loan


Form 8 Loan Code 421OOg
T00001

NTpC Loan Accounting System

D00001

tate Bank of lndia Source of Loan


:

State Bank OF lndia V

Amount Of Loan
Date of Drawl lnterest T

Total Drawn amount


.

23-Mar-09

Fixed lnterest Rate:

Base Rate, If Floatinq Interest in, lf Floatino lnterest


:

Frequencv of lntt Are there any Caps/ Floor : lf Above is yes, specify Caps/ Floor :

Moratorium Period

Moratorium effective from Repayment eenoO ltnc


Repayr-nent Freq

20-Mar-08

14 Hal'f

First Repayment Date

Base Exchanqe Rate : Date of Base Exchanqe Rate

Kahalqaon STpp-ll
Korba - lll

Farakka - lll

Total AllocateO nnrount

r+
68

statement Giving Details of Project Financed through a combination of loan


Form Loan Code
8

NTPC Loan Accounting System

421009
:

Tnnnni T00001

Source of Loan

State Bank OF lndia V

Amount Of Loan
Date of Drawl: lnterest T

Total Drawn amouni

Floating
:

Fixed lnterest Rate Base Rate, lf Floatinq lnterest lnterest:


of lntt Payment there any Caps/ Floor:
:

Monthly

Moratorium Period

Moratorium effective from Repayment Period (lnc

Moratorium):

10 Years

First Repayment Date Base Exchanqe Rate

Date of Base Exchanqe Rate

Proiect Code
NCTPP-II

Farakka - lll Simhadri- ll

TotalAllocated Amount

-*

PART.I FORM-9

Name of the

Company

Statement of Additional Capitalisation after COD


NTpC Limited

Name of the Power

Station

Farakka Stage-III (1 x 500 MW)

COD- Anticipated on 01.10.2011


(Rs. Lakhs
Sl.No. Head of Work/ Equipment
Regulations under ivhich claimed-

Year

,ustification

20112012-r3 12(01.10.20 1131.03.2012)

2013-14

Norks deferred for executionlnder the original scope of


llork
2

Against works deffered

7215.9:

11756.0(

7260 0(

(1) (ii)

for execution

Ash-dykei Ash Handling


System

Q,1

OE

689.0i

381.0(

e (2) (iii)

Ash related works after

cut-off date
Discharge of liabilities

Discharge of Liabilities
4 Capital

5293.0C

6020.0t
'180(

871.0(
214t

e (1) (i)
a (1) (iii)
)rocurementt of Capital jpares

Spares

btal

13319.88 20265.0( 10656.00

Note:
Fill the form in chronological order year wise along with detailed justification clearly bring out the necessity and the benefits accruing to the benficiaries. 2 In case initial spares are purchased alongwith any equipment, then the cost of such spares should be indicated separately. e.g. Rotor - 50 Crs. Initial spares- 5 Crs.

Project Cut-off date 31.03.2014

PART.I FORM-9A
Name of the Company Name of the Power lrurec Limited

Station

lFarakka Staqe-iif

(f x 500 MWj

Statement of Capital Cost


(To be given for relevant dates and year wise)
As on relevant datel

a) Ooenino Gross Block Amount as oer books b) Amount of caoital liabilities in Afa) above
c) Amount of IDC, FC, FERV & Hedqing cost included in A(a) above oJAmount Ot ltrLrL (eXClUOlng lUL, rL, rtrKV 6( Heogtng COSt)

included in A(a)above

B a) Addition of Gross Block Amount durinq the period


b) Amount of caoital liabilities in B(a) above c) Amount of IDC, FC, FERV & Hedqinq cost included in B(a) above

d)Amount of IEDC (excluding IDC, FC, FERV & Hedging cost) included in B(a)above

To be filed at the time of Truing up exercise

a) Closinq Gross Block Amount as per books b) Amount of capilal liabilities in C(a) above c) Amount of IDC, FC, FERV & Hedqing cost included in C(a) above l)Amount of ltDC (excluding IDC/ FC, FERV & Hedging cost) included in C(a)above

Relevant date/s means date of COD of unifls, station and financial year start date and end

date

PETITIONER

ty
[]

Name of the Company Name of the Power

NTPC Limited

Station

Farakka Stage-IU (1 x 500 MW)

Statement of Capital Works in Progress (To be given for relevant dates and year wise)

CWIP Amount as Der books

Amount of IDC. FC. FERV & Hedoino cost included in a above to fixed asset of cwIP

To be filed at the time of truing up exercise

Amount of IDC. FC, FERV &

Amount of caDital liabilities in a cost included in a above


1 Relevant date/s means date ot COD of univs, station and tinancial year slart date and end date

,*m*"

tio

ir{

?= o.d

o l!

s
,E
P

n$
ba
qt

8E
oc

c o
E

! o

o
G

IE

.E frl

t, o
(\l

og --o o:l -o(/} oo t-, a)

Nts .Ea o-g -L)

P
CJ

o
C)
L

.9

(
F

EE

8fi

g g

>o 6f, >.Y

L G)

ag

4= EE o.o
Ex Ed
ov
GO (J
trl
IE

o G^

ol
EA

to (,
(Y|

E_.h rnC!* '-(EJ O) C (rl C(E C =(oJ o,iP c L)! iE(UU

8q.,9 qr

8= o.@ (n. E6 u)N

a6 (oLL
;a

(ot a=

to

co9 t os
(U .\

'Og cc) (t]o. .C u1 g(c

EH E

(J

IE

(l,

Eg EEE
EzlL

l-t

.Nil EO o-5 (Eo


(JT

0J -, gE A! sB
P6 !!P

5.> ct o)

N
IE

E'TEU| tr.EG 'oJi

o
G

Ee .tss
uru Eci
(u

co '5
0,)L >c -o N'F

6p
,(J

'" oJ ,i F r(J (ogJ

E8E trFl!

6 .!2 p6 a
tr
-N

'6.

a o I
o
E
E,|

CL ET UJ

oG AC u.= ..=

d(J

=rE ii .IECL culv r9L


VL

-v

I
o

E
P

o,

Elg oo(u e4E (1rotr


vvv rrl.-9 OOrts ooo EEq, LLg GGIU

q.

=
E'

oJ .I

o
G
q) IE

o. th
G
CL

v
G

lc lc lu

IE

G g

'E tr

zzo

= o

ii

lc o I I ry|,: E E trl t G ( Gl n G o lt c ol c F

lr IC

'=l o o

>{E

l(, lo ls l= lo l(a lo ld Ir!

EN oc) >s .g or UC iIE


LO

c '{= (I,q) co)

.9b or
o):
d! LC

q
G

ts.s LOJ
o
G,(U (I)o >.J

EIE o

PART.I FORM.11

Calculation of Depreciation Rate


NTPC Ltd Farakka StageJll (1 x 500 MVI

Name of the Assets

(Amount in Rs lakhs) Actiual Gross Block as Depreciation Rates as pet


on COD 30.09.201'l CERC's Depreciation Rate Schedule
4 452 5( 27.3i
J,J4

Depreciation Amount on Gross Block


30.09.201
1

Sl. No
1

Site Levelling 2 3 4
5

15 11
0.91

\pproach Roads ]RAINS


Stores Civil Works Stores -Electrification

2)6

2(

3.34

75(
9.0i

270.97

334
6.33
5.28

6 7

lonstruction Power Supoly


i4isc Civil Works-M.Plant

486't
73.4 2 6?4 31
1

o2( t30t
2A

I
0 0

;nrmney - utvtt

3.34

87.6i
7 07) 2t 761.5{ 42 2!
118.72

SG&TG
VIAIN PLANT CIVIL WORKS PKG

33.944.65 22 801 04 800.19

528
5.28 5.28

londensate Polishing Plant


2 3

lontrol & lnstrumentation


NSTRUMENTATION CABLES -SUPPLY PKG vlGR track & Signalling system

22444
165.36
1

528
5.28 103 474
1

.953.13

loal Handling Package \sh Handling System


SEPTIC TANK & DIVER. ASH LINE PED BOTTOM

934 08
9.058.'16

528
5.28 5.28

49.32

2i
|

't7
'18

2.5

]W SYSTEM.EOUIPMENT
)M PLANT & CW TREATMENT SYSTEM
looling Tower
STATION PIPING PKG Fire Detection & Protection System

20
n1

4.446.44 1 507 6C 1 369 48 256.46

5.28 79.60

23 24

a42.67 816 qa 681 214 469


'13
49.

528 528 528


5.28

:41

44 4( 35 9f
11

\ir Conditioning
r'entilation

524
5.28 5.28

.32

ienerator Blrs Dust

1 /3 3 KV & Ass Fonl

0i

24.76
.1tl 5 /

UNIT TRANSFORMER

578.06
3 402 06

528
5.28 5.28

)g
29 30 1)

STATION TRANSFORMER 3ENERATOR TRANSFORMER -T (outdoor) transformers 33KV.11 KV. 6.6 kv & 3.3 KV SWITCHGEAR LT SWITCHGEAR & LT BUS DUCTS PKG ELECTRICAL EOUIPMENT SUPPLY & ERECTIOT\ 417.98 956.85
1.122.06

16.76 179.63

528
5.28

)2 0i
50 52 59 24 96.20

5.28

't 421 at
34

rOWER CABLES.HT
POWER CABLES.LT

337.8C

528
5.28
5 )6

17

AA

35
36 39

465 2 492

Ca

24.60

lontrol Cable
4OO KV

67?
131.58
12 4!

SWITCHYARD PKG )omuter System

01

5.28 15.00
5 /6

83.00 17.62

T&P 40
43

0c:
43 76

Furnitures DP HARDWARE Software Sthers incl Office Equip

44
A5

495.02 291 74
46.82

6.33 15 00
15.00

702
58 r'6

46 TOTAL

923 60 204.614.57

633

10,345.92

Weighted Average Depreciation Rate (%) 5.05(


I

''lotifcation

Name of the Assets should conform to the description ofthe assets mentioned in Depreciation Schedule appended to

the

[)

P"rtm$l-

PARTTI FORM- 12

Statement of Depreciation
Name of the Company Name of the Power Station
NTPC LTD

Farakka Staqe-III (1 x 500 MW)

(Amount
Financial Year
1
zo11- 12(01.10,11It -o1-1 ? l

in Rs lakhs)
20L3-L4

2012-13

2
103s2

3
11026

4
12051

Depreciation on Capital Cost Depreciation on Additional Capitalisation \mount of Additional Capitalisation


)epreciation Amount

13320

2026s 5L2

10656

337

269

Detail of FERV \mount of FERV on which depreciation charged


)epreciation amount
10689
0

)epreciation recovered durinq the year


Advance against Depreciation recovered during

1538
0

t2320
0

the Year Depreciation & Advance against Depreciation recovered during the year
10689
1

1538

L232C

Lumurafrve aJeprectaflon

6(

Aovance
5345
16883

against Depreciation recovered upto the year ( for the oeriod)

29203

15

Calculation of

Inte.6ton &al

Loans

FORM.13

ilame of the Company Nam of th Powe. St tion

st.no.

panicutars
Bonds XXII Seris - Ooerino Cumulative repayments cf Loans upto prevrous period
Gross loan

01,10.11to 31,03.12
700.00 35.00 665.00

01.04.12to !1.03.13

01.04.13to 31.03,14

Nel loan - Ooenino Increase/ Decreas due to Increasei' Decrease due to

700.00 70.00 630 00 630.00 70.00 s60 00 595.29 8.2071a/o 48.86 1400.00 140 00 1260.00

700.00
140.00 560.00

FERV ACE

Iotal
Repayments of Loafs duflng the period Net loan Clos nq Averaoe Net Loan Rate of interest on Loan
InteresL

665.00 3s.00 630.00 647.88


B
2Q7 to/o

560,00 70.00

on loan

51.t2

490 00 s25.29 21tto/o 4t.1 I

Bonds XXIU Seri6


Gross loan - ODenrnq 1400.00

1400.00 280.00 1120 00

Cumulatrve repdyments Cf

Lens upto prevlous period

70.00 1330.00

Net loan - Ooenino lncrease/ Decrease due to FERV lncrease/ D(rease due to ACE Total Reoavments of Lcns durina the reriod Net loan - Closino Averaae Net Loan Rate oF Interest on Loan Inlerest on loan

1330.00 1260 00 I 120.00 70.00 140.00 140.00 1260.00 1120.00 980.00 1308.70 1203.62 1063.62 8.409600 8.40960/0 8.40960/0 110,36 101.22 89.45
2s00.00 0.00 2500.00

Bonds fXV Seris


Grcss oan - Ocenrno Cumulatrve fepayments of loans upto prevrous period Net loan - Ooenino Increase/ Decre3se due to FERV Increase,/ Decrease due to ACE Total Repayments of Loans duing lhe period Net loan - Closino Averaqe Net Loan Rate of Interest on Loan

2500.00 0 00 2500.00 2500.00 357.50 2t42.50


2294.8A
9

2s00.00 357.50 2142.50

2s00 00 0.00 2500.00 2500,00 9.4000% 235.64

2142.50
357.50 1785.00 1937.30

40000/0

Inie.est on loan

2t5.7t

9.4aa00k
1.82.11

Bonds XXVI Series Grcss loar - Ooentno Cum!laiive repaymenLs

4000.00
oF

4C00.00

4000.00

LoanS

rpfo prev:oLs per od

000
4000 00

Net loan - Ocenina Increase.i Dearease dle tc FERV Increase,l Decfease due to ACE,/Drawl during the penod Tofat Repayments

0.00 4000.00

s72.00
3428.00

oF Loans

during the period

Net loan - Closino Averaae Net Loan Rate ot lnterest cn Loan lnterest on loan

4000.00 3428.00 572.00 572.00 4000.00 3428.00 28s6.00 4000.00 3671.69 3099.69 9.0900% 9.0900% 9.09000/0 364.60 333.76 281.76
7500.00 0.00
7500 00

4000.00

Bonds XXVIII Seri6 - Ooenina c!m!latrve repayments or Loans upto previo!s peiod
Gross loan

Net loan

Ooenrno Increase,/ Decrease due io FERV lncrease,/ Decrease due lo,ACE/Drawl

'

00 0.00 7500.00
7500

7500.00 0.00
7500.00

du(nq the period


7500.00 0.00 7500.00 7500.00 11.03% 829.52

Tolal Repayments of Loans durinq the Derlod Net loan . Clos 1c Averaoe Net Loan Rate of lnterest on Loan Interest on Loan

7500.00 7500.00 0.00 0.00 7500.00 7500.00 7s00.00 7500.00 11.030/0 11.030/0 827.25 827 25 00 00 s000 00
5000 0 5000.00

Bonds XXX Seris


Gross loan - ODentna 5000.00

Cumulat ve repayments of Loans upto prevrous period


Net

000
5000.00

0.00 5000.0c

l@n - Ooenrfo

Increase/ Oec.ease due to FERV Increase/ Decrease due to ACE/Drawl d!nng the period Tot3l Repavments of Loans dur no the oeriod Net loan - Closina Averaoe Net Loan Rate of Interest on Loan lnterest on loan 5000.00 0.00 5000.00
5000.00
7.92o/a

397.08

5000.00 0.00 5000.00 5000.00 1 92'k 196.00

5000.00 0.00

s000.00 5000.00 7.920k 396.00

Catcutation
Name

ofr.tersr

on Acruat Loan(

ofthe company Nane of the power sration

51,

no, I
Ailahabad Bank-III
Gross loan - Orenina

pafticut.rs

01,1O,11 to

01.04.12

31,03.12

to 31.03,11

01,6,1J to
31,03,14

Cumulatve repayments of.Loans upto previous period Net loan - ODeninA Increase/ Decreaw due to FERV lncrease/ Decrease due to ACE/Drawt during the perjod Total
ReDavments of Loans durina the Deriod Net loaa - Ctostno Averaoe Net Loan Rate oF lnterest on Loan Interest on loan

2000.00
0.00

2000.00

2000.00 0.00 2000.00

2000.00 0.00 2000.00

2000.00
0.00

2000.0c 2000.00

l0

00ozo

200.55

2000.00 2000.00 0.00 142.86 2000.00 1857.14 2000 00 t998.41 10.000/0 10.000/0 20c.00 199.84 7000.00 500.00 6500.00
7000.00 1500.00

central Bank of India-tli Gross lcn - Orenino Cumulative repayments of Loans upto prevlous pericd
Net loan - ODenlnq Increase/ D{rease due to FERV Increase/ Decrease due to ACE/Drawl durinq the Dertod

7000.00

0.00 7000.00

5500.00

Total Reoayments of Loans durinq the Dericd Net oan - Cosino Averaoe Net Loan Rate of Ifterest on Loan lnterest cn loan

7000.00 500.00 6500.00

6]26.78
10.25o/o

691.38

6s00.00 5s00.00 1000,00 1000.00 5s00.00 4500.00 5978.08 4978.08 t0.25o/o 10.25./o 6t2.75 510.25 2000.00 0.00 2000.00 2000.00 0.00 2000.00 2000.00 7.200/o r44.0a 7000.00 0 00 7000 00
2000.00 0.00 2000.00

10

CorDora[on Bank-ll 6ross loan - ODenino Cumulattve repnyments

2000.00
oF Loans

upto previous period

0.00 2000.00

Net loan 'ODenino Increase/ Decrease due to FERV Increase/ Decrease due to ACE/Drawl durinq the period Total Reoayments of Loans dunnc the ftrod Net loan ' Closina Averaee Net Loan Rate of Interest cn Loaf Interest on ioan

2000.00 0.00 2000.00 2000.00


7 20o/o ).44.39

2000.00 285.71

t714.29
1931.90 7.20ak

1t9.1C

11

IDFC,I1 Gross loan .Ooenrna Cumulative reCayments

7000 00
Of

Loans upto orevrous peiod

7000.00
525
CO

0.00
7000.00

Net loan-Orenina lnc.ease/ Decrease due to FERV lncrease/ Decrease due to ACE/Drawl during the period Tota Reoavments

6475.00

oF Loans

durina the oeriod

Net oan.Closlno
Averaqe Net Loan Rate of Interest on Loan Interest on loan

7000.00 0.00
7000.00

7000.00
8.980/o

630.32

7000.00 6475.00 s25.00 700.00 6475.00 5775.00 6865.75 6208.12 8.980/0 8.98% 616.54 557.52 9000.00 4500.00 4s00.00 4500.00 900.00 3500.00 4498.77 8.32yo 374.A7 4000.00 0 00 4000.00 4000.00 57 t .43 3428.57 3768.30 9.640k 363.26
9000.00
5400.00

'12

fe Insurance Cormration Of

lndia-[I
9000.00 3600.00
5400.00

Gross loan - ODeninq

C!mulaUve repayments of Loans Upto previous period

Nel oan - Ooentno Inc.ease/ Decrease due to FERV lncrease/ Decrease due to ACE/Drawl during the period
Total Reoayments of Loans durinq the oeriod Net loan " ClosrnO Averaqe Net Loan Rate oF Interest on Loan lnterest on loan

3600.00

5400.00 900.00 4500.00


5173.77 8.32Vo

3600.00 900.00
270A.00

3598.77
8.320/0

431.38

299.24

13

LIC-rv Gross

oan, Ooenina

Cumllal ve repaymenls of Loans upto previous per od


Net loan , Ooentna lncrease/ Decrease due to FERV Increase/ DecreaSe due to ACE/Drawl durlnq the pefiod Total Reoavments of Loans durinq Lhe oericd Net loan - Closino Averaae Net Loan Rate of Interest on Loan Interest on loan

4000.00

4000,00
571 43

000
4000 00

3428.57

4000.00 0.00 4000.00 4000.00


9.64qo

3q28.57 57 1 .43

2851.14 3196.87
9.64a/a

386.66

308.18

Catcut.tio.
Name Name

oflnterst or Actu.t

Loans

ofrhe Company ofthe powersbtioo

Sl,

no,

parti.utars

01.10,11 to 31.03.12

01.M.12

to 31.03,13

O1.q.l3 to
3r,o3,14

14

Orenlat Benk ofComfrerce


Gross loan - Ooenina Cumutative repayments of Loans upto previous FEnod Net loan - Ooenino Increase/ Decrease due to FERV lncrease/ Decrease due to ACE/Drawi durjng the perjod Total Reoayments of Loans durina the oeriod Net loan - Closina Averaoe Net Loan Rate of interest on Loan Interest on loan 4000 00 0.00 4000.00

4000.00 57r.43 3428.57 3428.57 571.43 2857 14 3117 81 10.000/0 311 78


37500

4000.00
1142.86

2857.!4

4000.00 571.43 3428.57 354s.67 10 00% 3s5.54

2851.14
571.43 2285.71

2546.38
10.000/0

254 64

15

Power Finance Corporation V {Consolidated) Gross loan, Ooenina


Cumutative repayments of Loans upto previous period Net loan - Ooenina Increase/ Decrease due to FERV Increase/ Decreae due to ACE/Drawl during the period Total
ReDayments of Loans durina the Deriod Net loan - Cjosino Averaoe Net Loan Rate of Interest on Ldn

37500 00 0.00 37500.00 0.00 0.00 37500.00 0,00 37s00,00 37500.00


8.890/o

00 0.00

37500 0o 0.00 37500.00 0.00 0.00 37500.00


2343.75

37500.00

0.00 0.00

37500.00

37s00.00
37500.00

0.00

3s156,2s

Interest on loan

3344.59

8.890/0 8.890/o 3335.45 3239.50

3G2t23

'16

Punjab National Bank,II Gross oan - Ooenrno Cumu at ve repayments of Loans upto previous period Nei loan, Ooeninc increase/ Decrease due to FERV Increase/ Dsrease due to ACE/Draw, during the reriod Total Reoayments of Loans durino the oeriod Net loaf - Closino Averaoe Net Loan Rate of lnterest oo Loan Interest on loan

5000.00
515.7
1

4464.29

5000.00 5000.00 1428.57 2321.43 3571.43 2678.57 3571.43 892.86 2678.57 3792.16 9.25% 354.77 3000.00 1000.00 0 c0 0.00 0.00 0.00 0.00 1A 254/o 0.00 4s00.00 3214.29 1285.7i 1285,71 1285.71 0,00 524.8s t4.250/o 53.80
10000.00
2678.57

4464.29 892.86
3571..43

892.86
1785,71

4449.65
9.250/0 41.2.72

2888.94
9.250/a

)67 )1

17

state Bank or tndia-lv r2Dl Gross toan ,ooeninq Cumulatrve repayments oF Loans upfo prevrous period
Net loan - ODenino

3000.00 3000.c0 0.00

lc00.o0 l0oo 00
0.00

1.cr$sel

Decrease due to FERV Increase/ Decrease due to ACE/Drawl durrng the period

Total Reoavments of Lans durinq the reriod Net toan - Closino Averaoe Net Loan Rate of Interest on Loan lnterest on loan

0.00 0.00 0.00 0.00 ra.25ak 0.00

0 00 0.00 0.00 0.00 10.25% 0.00

18

State Bank of India-lv T2D3 Gross oan - Ooenino C!m!lative repayments of Loans upto previous period Nei loan - Ooenina increase/ Decrease due to FERV Increase/ Decrease due to ACE/Drawt durinq the oeriod
Tota
I

4500.00 803.57 3696.43

4500.00 4500.00 0.00

Reoavments of Loans durinq the oeriod Net loan - Closino Averaoe Net Loan Rate of interest on Loan Interest of loan

3696.43 24t0.7 |
1285.71

326r.7

$.250k

0.00 0.00 0.00 0.00

t0.250k
0.00

19

VIJAYA BANK,III Gross loan - Ooenina Cumulative repaymenLs of L@ns upto previous perDd

10000.00
7

10000.00

14.29

Net loan , Ooenino Incre.se/ Decrease due to

9285.7t
FERV

1428.57 8571.43 8571.43 t428.57 7142.86 8201.57 10.25% 840.66

2857.14
7142 86

Increase/ Decrease due to ACE/Drawl durrnq the Oerlod Totat ReoavmenB of L@ns durino the oeriod Net loan - Closinq Averaoe Net Loan Rale oF Interest on Loan Interest on loan
9285.71

7142.86
1428.57

9270.10
10.250/0

57t4.29 6172.99
10.250/a

952.79

694.23

calculation of rntersr Nahe ofthe Compa.y N.me of the Powr sbtion

on Actoet Loans

prti.ulars

01.10.11 to 31.03,12

01.04.12

to 31,03.13

01,04,13 to 31,03,14

20

State Ba4k oF India-vl Gross oan - Omorna C!mutative repaymenls of Loans upto previcus oeriod Nel loan - Ooenino Increase/ D(rease due to FERV Increase,/ Decrease due to ACE/Drawl during the period Total
ReDayments
NeL
oF

2500.00

000
2s00.00

2500.00 2500.00 0 00 351.t4 2500.00 2142.86


2500.00
357. 14 2t42.86 2449 49 10 15% 244.56

2500,00 Loans Curina the oeriod

2142.86
357.14 1785.71

loan - Closino Averaoe Net Loan Rafe oF Interest on Loan Interest on loan

0.00 2500.00 2500.0c


1C.15% 254.45

2052.35
r0.150/o 208.31

21

Unrted Bank oF India-ll Gross loan - Orenina

Cumulatrve repayments of Loans upto Dreviou5 oeitod Net loan 'Ooenina Increase,/ Decrease due to FERV Increasej/ Decrease due to ACE/Drawl durinq the oeriod Total
ReDavments of Loans durjno the reriod Net loan - Closina Averaqe Net Loan Rate of Interest on Loan lnterest on loan

3000 00

2785 7r

00 57 257t.43
1000 428

3000 00

857

l4

2142.86

2785.7\
214.29 2511.43 2781.03

r0.15% 283.0s

25'1r.43 2142.86 428.57 428.51 2t42.86 1714,29 2460.47 2031.90 10.150/0 10.15% 249.74 2A6.24
10000.00
10000.00

22

State Bank of tndia-V T1 D1 Gross loan - Ooeninq Cumulative repayments of Lo.ns upto previous period Net loan - Ooenrnq Increase/ Decrease due to FERV lncreasgT 5g61g35a 6re to ACE/Drawl durtnq the perlod Total Reoavments of Loans dutina the oeriod Net loan - Closinq Averaqe Net Loan Rate of Interest on Loan Interest cn loan

10000.00
7

t4.29

9285.71

1428.57 2857.14 8571.4i 7t42.86 8571.43 7142.86 1428.57 1428.57 J.42.86 5714.29 8290.27 6847.63 10.15% 10.15% 841.46 695.03
7

9?8s.71
7

t4.)9 i5%

8571.43 9369,32
10.

9s3.59

23

State Bank Gross loan

of India-V T1 D2 , Orenino Cum!iaUve repayments of Loans upto prevlous perod


Net loan - Ooenrno lncrease/ Decrease due to FERV lncreaSe/ Deciease due to ACE/DrawL aurinq il.e Denod Total Reoavments oF Loans dunna the oerlod Net loan - Closino Averaoe Net Loan Rate of Interest on LGn Inlerest on loan

8s00.00
607 .14

7892.86

8500.00 t2t4.29 728571

8500.00 2428.57

6A7143

7892 86
647 . 14

7886.22
10.250/o

8r0.s5

7285.71 6071.43 t214.29 1214.29 6071.43 4857.14 6977.98 s763.70 10.2s% 10 25% 7t5.24 590 78
140100.00
140100.00

TOTAL LOAN
Gross loan " Ooenino

C!mulative repayments of Loafs upto previous period Net loan - Ooenina Increase/ Decrease due to FERV Increase/ Decrease due to ACE/Drawl durinq the Oenod Tolal
ReDayments of Loans durinq the re.icd Net loan - Closina Averaqe Net Loan Rate of Interest on Loan Interest on loan

140100.00 10294.29 129805.71 0.00 0.00 129805.71 7630.00 L22L75.71 128420.82


9.48o/o

t7924.29 29667.36 t22175.7t L70432.64

0.00 0.00

0.00 0.00

1186s0.90

t22!75.71 110432.64 L1743.07 13404.68 110432.64 97027.95

72777.77

11176.90

9.42o/o

106363.50
9.39o/o

99a9.76

9,
1\

calculation oflnt6resr on Actuat Loans


Name Name

ofhe Compa.y
ofthe
Power

St,ri6n

51,

no.

padcutars

Loans for Financing of


Bonds XXIX Series

Repayment
!plo
prevrouS period

01.10,11 to 31 03 12

01,&.12

to 31.03,13

01.04,11 to 31.03.14

Gross oan , Orenina cumulatrve repaymentS of Loans

1200.00

0.0c
1200.00

Net oan - Orenina


Increase,/ Decrease d!e to FERV Increase/ Deciease due to ACE/Drawl during the period

1200.00 0.00 1200.00 1200.00 0.00 1200.00 1200.00 8.6800/o 104.16 00 0.00 1000 00
1000

1200.00 0.00 1200.00

Totat Repayments of Loans durinq the period Net loan - Closina Averaoe Net Loan Rate of Interest on Loaf Interest on loan

1200.00 0.00 1200.00 1200.00

1200.00

0.00
1200.00 1200.00 8.580o/o 104.16

8.680%
104.45

Bonds XXXII Seri6


Gross loan - ODentna Cumulative repayments
1000.00
oF Loans

upto previous penod

1000.00 0 00 1000.c0

0.00 1000.00

Net loan - Ooenino Increase/ Decrease due to FERV Increasei/ D{rease due to ACE/Drawl dunng the penod Totat Reoavments of Loans durina the rerjod Net loan - Closino Averaoe Net Loar Rate of Interest on Loan Interest on loan

1000.00

0.00
1000.00 1000.00

8.8793%
89.04

1000.00 1000.00 0.00 0.00 1000.00 1000.00 1000.00 1000,00 8.87930/0 8.8?93vo 88,79 88.79 1200.00 0 00 1200.00 1200.00 0.00 1200.00 1.200.00 8.74ak 104.88 00 0.00 3000 00
3000 1200.00 0.00 1200.00

Bonds )OO(IV Series


Gross loan - Omnino 1200.00

Cumulative repayments of LoanS upto previous pericd Net loan-Ooenino lncrease/ Decrease due to FERV Increase/ Decrease due to ACE/Drawt durinq the renod Total Reoavmenls of Loans durino the oeriod Net loan - Cosina Averaoe Net Loan Rate of Interest on Loan Interest on loan

0.00
1200.00

i200.00 0.00
1200.00 1200.00
8.?40/a

1200.00

0.00
1200.00 1200.00
8.740/o

105.17

104.88

Eonds XXXVII Series


Gross loan - Ooenino

Cumulattve repayments of Loans upto previous period Net loan - ODenrna lncrease/ Decrease due to FERV lncrease/ )ecrease due to ACE/Drawt durng lhe penod
Tot3t ReDavments of Loans durinq the reriod Net oan - Closino

3000.00

3000.00

000
3000.00

0.00
3000.00

3000 00
0.00

Averaoe Net Loan Rate of lnterest on Loan lnterest on Loan

3000.00 3000 00 8.960%

3000.c0 0.00 00 3000.00 8.9600/0 268.80


3000

3000.00 0.00 3000.00 3000.00


8.9600/0

268.80

Bonds

SXVIII Seris
- Ooenino
100.00

Gross loan

Cumulative repayments of Loans upto previous period Net loan - Orenino Increase/ Dsrease due to FERV Increase/ Decrease due to ACE/Drawl durjng the period
Tota
I

0.00
100.00

100.00 0.00 100.00 100.00 0.00 100.00 100.00 9.170/0 g.tt

100.00 0.00 100.00

Reoavments oF Loans durinq the oeiod Net loan-Closino Averaae Net Loan Rate of Interest on Loan Interest of loan

100.00

100.00

0.00
100.00 100.00
9.170/0

0.00
100.c0 100.00 9.r70/o

9.20

9.r7

TOTAT LOAN Gross loan - Openinq Cumulative repayments of Loans upto previous period Loans For Financinq of Repayment Gross loan - Revised Cumulative repayrnents of Loans upto Previous Oeriod Net loan - Openinq Increase/ Decrease due to FERV Increase/ Decrease due to ACE/Drawi durjng

140100.00 10294.29

6500.00
1

36105.71

136305.71

136305.71 19373.A7 16932.64

000
136305.71

7630.00
128675.71

0.00 0.00
136305.7
1

0.00

0.00 0.00

the oeriod
Total Repayments of Loans durinq the period Net loan - Closing Averaqe Net Loan Rate of Interest on Loan
Interest on loan

0.00
128675.71

7630.00
128675.71 134920.82 9.45380/o 12755,09

116932.64 13404.68 116932.64 103527.96 125150.90 112863.50 9.3908o/o 9.36l4a/o 11152.70 10565.56

t1743.07

Catcul.tion of Intereston Actual Loans


Name Name

ofthe Cohpary ofthe Pow.. SEtion


(Amount in

Sl.

no. 'l

p.rti.utars Power Finance Corporaiion V T1 01 Gross loan - Oreninq Cumulative repayments of LGns upto previous perlod Net loan - Ooenina Increase/ Decrease due to FERV lncrease/ Decreas due to ACE/DrawL d!rtng the period Total Reoavments of Loans durjnq the Deriod Net oan - Closino Averaoe Net L@n Rate of Interest on Loan Interest on loan

01.10,11

to 11.03,12
2s00.00 0.00 2500.00

O1.O4.12

l.e) to 31.03.13

01,04.13 to

31.03.14 2500.00

2500.00

00 2s00.00
0

0.00
2500.00

2500.00 0.00 2500.00 2s00.00 10.30% 258.2t

0.00 2500.00 2500.c0 10.300/0 257.50 5000.00 0.00 s000.00 5000.00 0.00
5000.00 5000.00

2500.00

2500.00

1s6.25
2343.75 2428.08
10.300/0

250.09

Power Finance Corporation V T1D2 Gross loan - Orenino Cumulative repayments of Loans upto previous period
Nel loan - ODenrna Increase/ Decrease due to FERV Increase/ Decrease due to ACElDrawt dur 19 the perjod Total
ReDavments of L@ns durinq the oerjod Net loan - Closino Averaoe Net L@n Rate of Interest on Loan Interest on toan

s000.00 0.00
5000.00

5000.00 0.00 5000 00

5000.00 0.00
5000 00

s000.00 112.50

5000.00 8.910k
449 73

4687.50 4856.16
8.9fo/o

448.50 7000.c0 0.00


7000.00 7000.00 7000.00 7000.00

8.970/0

435.60

Power Finance Corporation V T2D2 Gross loan - Ooenrna Cumuiative repayments of Loans !pto previous period Net loan - Ooeninq lncrease/ Decrease due lo FERV Increase/ Dsreap due to ACE/Drawl during the period
ToLai

7000.00 0.00 7000.00

7000.00 0.00

7000.00

7000.00

Reoavments of L@ns duilno the oer od Ne[ loan - Closino Averaae Net Loan Rate of lnterest on LGn lnterest on loan

0.00 7000.00
7C00.00 8.17Vo

0.00

7000.00

437.50 6562.s0
6798.63
8.170/0

573.47

8,170/0 571.90

555.45

Power Finance Corporation V T2O9


Gross loan - Orenino

5000.00 0.00
5C00 00

Cumulative repayments of Loans upto previous period Net loan - Ooeninq Increase/ Decrease due to EERV Increase/ Decrease d!e to ACE/Drawi during the rcrrod

5C00.00

5000.00 0.00 5000.00

0.00 5000.00
5000 c 5000 5000

Iotal
Reoavments of Loans durina the oerlod Net oan , Costna Averaoe Nef Loan Rate of Ifterest on Loan Inlerest on loan

s0c0.00

0c0
s000.c0
5000.00
8.060/o

404.10

00 s000 00 00 312 50 00 4687.50 c0 4856.16 B.C6o/o 8.06ry0 403.00 391.41


3000.00 0.00

Power Finance Corporation V T2Dl 1 Gross oan - ODenlno Cumulative repayments of LoanS upto previous period Net loan ' Ooeninq Increase/ Decrease due to FERV Increaf/ Decrease due to ACE/Drawl durinq the pertod Tota Reoavments of Loans durin0 the oeriod Net loan - Closno Averaae Net Loan Rate oF Interest on Loan lnlerest on loan

3000.00
0.00

3000.00

3000.00 0.00 3000.00

300c.c0

3000.00 0.00 3000.00 3000.00


8.280/o

249 0B

3000.00 3000.00 0.00 187.50 3000.00 2812.50 3000.00 2913.70 8.280/o 8.280/0 248.40 241.25 2s00.00 0.00 2500.00
2500.00 0.00

Power Finance Corporation V T3D4


Gross ioan - Ooenlno

2500.00 0.00 2500.00

Cumulative repayments of Loans upto previous perlod Net loao - ODeninq Increase/ Decrease due to FERV Increase/ Decrease due to ACE/Drawl during the perjod Total Reoavments of Loans durino lhe Deriod Net Loat - Closlno Averaoe Nef Loan Rale ol Interest on Loan Interest on loan

2s00.00

2s00.00

000
2500.00
2500 00

8.89% 222 86

2500.00 2500.00 0.00 156.2s 2500.00 2343.75 2500.00 2428 08 8.390./0 B.B9% 222.25 215.86

ts\

Calcul.tion oflst

rest on Act!.1 Loans

tam ofthe company Name of 6e Power Station

padiculac

01.10.11 to 31,03.12

01.04.12

to 31,03.13

O1.q.1l to
31,o3.14

Power Finance Corporation V T3D5 Gross loan - Oreninq Cumulative repayments of Loans upto previous
Net ioan -

period

l50o.00
O.0O

Ooenino

1500.00

lncrease/ Decrease due to FERV Incieasei' Decrease due to ACE/Draw1 d!rinq the reriod Tolal Reoavmenls of Loans durino the oeriod Net loan - Closino Averaoe Net Loan Rate of lnterest on Loan Interest on loan rs00.00 0.00
,.5C0.00

1500.00 0.00 1s00.00

1500.00 0.00 1s00.00

Is00.00
9.340/0

140.48

1500.00 1500.00 0.00 93.7s 1500.00 1406.25 1500.00 1456.8s 9.34o/o 9.34ak 140,10 136.07 9000.00 0.00 9000.00 9000.00 0.00 9000.00 9000.00 9.86qo 887.40 2000.00 0.00 2000.00 2000.00 00 00 2000.00 7.824k 156.40
0 2000

Power Finance CorDoration V T3Di1


Gross loan -

ODenino period

9O0O.0O O.0O

Cumulatrve repayments of Loans upto previous


Net toan

9000.00 0.00 9000.00

'ODenina

gooo.oo

Increase/ Decrease due Lo FERV Increase/ Decrease due to ACE/Drawl dlrrnq the period
Total ReDavments oF Loans durine Lhe oerod Net loan . Closino Averaae Net Loan Rate cf Interest on Loan Interest on loan

9000 00 0.00 9000.00 9000.00 9.864k 889.83

9000 00 562.50 8437.50 8741.10


9.86a/o

861.87

Power Finance Corporation V T4D2


Gross loan -

Ooenina

Cumulative repayments of Loans upto previous


Net ioan

period

2000.00

2000.00 0.00 2000.00

0.00 2000.00

ODenino

Increase/ Decrease due to FERV Increase/ Decrease due to ACE/Drawl d!rinq the Oeriod Total
Reoavments OF LOanS durjnA the Oenod Net loan 'Closinq Averaqe Net Loan Rate of Interest on Loan Interest on loan

2000.00 0.00
2000.00

2000.00
125 00 1875.00 1942.47

2000.00
7.82a/o

7.820h
151.90

1s6.83

Power Finance Corporation V (Consolidated) Gross loan - Ooenina Cumulative repayments of Loans upto previous period Net oan - Ooenina Increase/ Decrease due to FERV increase/ Decrease due lo ACE/Drawl during the perrod Total
ReoaymenLs of Loans durinc the Net loan - Closina

37500.00

000
37500.00

000 000
37500 C0

ftflod

000
37500 00
37500 00 8 890/"

Averaqe Net Loan Rate of Interest on Loan Interest on loan

3344

5C

00 000 37500.00 000 000 37500 00 0 00 37500 00 37500 00 8 89% 3335 45


37500

37500 00

000
37500 00

000 000
37500 00

234315
35156 25 36421 23
8 890/0

3239 50

gV

PART.I FORM. 13A Calculation


Name of the Company Name of the Power Station

of Interest on Normative
NTPC LtD

Loans

Farakka Stage-III

(1x 500 MW)


(Rs. Lakhs)

Particulars
1
Gross loan - Ooeninq

201112(01.10.1131.03.12)

20L2-L3

20L3-L4

2 743320
0 743320

3
L52644 5345 147300 14186
11538

4
166830 6883 149947 7459 12320 145086
1

Cumulative repayments of Normative Loans upto previous year

Net Normative loan - Ooenino Increase/ Decrease due to ACE during the Year Repayments of Normative Loans durinq the vear Net Normative loan - Closinq Averaoe Normative Loan
Weiohted averaoe Rate of Interest of actual Loans Interest on Normative Loan

9324
5345 147299 145310
9.45380/o

t49947
1,48624 9.39080/c

1475t7
9.36140/o

t3737

13957

13810

B}

PART-I FORM. 138

Calculation of Interest on Working Capital


Name of the Company Name of the Power Station
sl
No

NrPC

LtD
I I

Farakka Stage-III (1 x 500 MW


Amount

in

Rs lakhs

Particulars

20LL-!2 3
21519

20t2-L3

20L3-14

2
1

4
21461 243 640 1536 30986 54866 11.75 6447

4
5

6 7
B

Cost of Coall Cost of Main Secondaru Fuel Oill O & M expenses Maintenance Spares Recievables Total Workino Caoital Rate of Interest Interest on Workinq Capital

2t46t
243 677 1624 3t357
55361

243 60s 1453 30s92 54414 17.7s 6394

tL.75 6s0s

s^

I
r-EEi':!:ss
a::E:q
*9 "Q3 1;i; i-;+
N :-

J:

-?

_ =: -= =

33339 33333 333Sil 3333! 3E383 33383353356333333 3o-;E:-"3H E--ES P..F* E__EE E_.8[EC.-CF31-a.6E 6 6 . 6- x - BH H-Bh &x3B*v HH H == = s 3 s s 9 s333i, ;338I ?ss?? -;^{i ooooa N ; 3 I - ! ooo-9 3< F-oNa :; E-"sg d 3 R s : =: E g : i ; ts x I
!oo*odonl

\\

: 56 d--9 I -L d

tsoo\q 6dooo

H-9? -i
n ^
I

S o 3
-

3 6

5;

l: qq = i-"1 n
a5 u

ae9@a 9qqoq

3..;- 3"-*. s.-;. + c 4 S 3 3


5338: [33!R :oo:E ts Foo:- ; R t ; i X
toog\ oe q a e or

6066-

=q

- t^ : :3 =^-*) ro?=
=-r -c _

333SS ;a;;i

R g
6

e -66 ooooo
o

F E Erg SflE Es dIITINN


-RR ia-72 9+ iosJ X =i
a = r--i x

8 SFEB BiEr
oY=6 @:!6

rB 6Y I
I

3
ooooq

3 i',8

R :C
!

949@6 99oo!

B-.9! : : 38333
!oo!I !

6oo-a . g ,ir E

i6-aN

3 P

SU
P

.r^
-l =5 :i

R33P3 ts383S
--o-+ o6 a i foofNBeooe9 r ! !6 -o: F r !,o 6ul o

*on3 x t'i =
n-di pv== != g* -9

::

E o

C"4

=3
N d

YO

];

3..333:-o:33\"-\3 o-:o orPo e


s v -

,a

:
lo<< =-zr X =l
A lr = - L:r Yi =

erx_ n1x\ -NXr

: xE 33 3

-oxo \qx^ --:o

B Yg 3g3R
ooodo.,

h. g

9991e

3*

R3 aR
n

*ooio

\cq\9qroqno

io!'i
-

- -: = \i3=l
a d i-. : = ^

q t

rF

\- 3
Noo\o

3^

\oo\q oP9qo

X ?z

i {*o <. =

"i
PN

Pi.i
N

P
N

&
Qn
-:

PN
&
N

I 6

3
N X-,d

Ffr q 5.6
: ,t :N N

i5 XN

E E5 N HF

;
:

r :5 EE i E; :
gd+i FE
H
YN

EE

EE
;; E.9 ;

E , .; B Eq E

.
5

EEEEs!:EE:ceEiE=stEE:EseEEE:ecEaSgseEEsEscEiE:siE!
-

P .- s

= E,== E,==

EeEiiE=El;i:ieE;'E:rE:sE:E!;iE:E!:;EiEEgiE:EiiiEEeE:iiiil#i:Ei;i:
-

i53EE*;EirEitB

,\ -*

g\\.

",*-: : n;
{,8
i:>

trxE *9

i';E:l n _ j3
= JX
=

:.i"i

E-=gFfi==slE33i$fr==EF

EiE?x 3333? 3383! s3s3E 8383$ 3s: B==x' i==;* $==E* 5==Fu 5==5* E==E* g==5* E==E* g==E*86==HrE$==$E EEEEX ;33;8 c33?s +33;; e

SiHRXXEE
NN;;i;E

g fi ;
r
E

r"_I- H-.H" E--fi" 3;:;3 $}HH*E;:


;FF;: x33x3 333s= 33335 :oo. xoo:^ roo;v N a-sFPEcXE glEA;:i4 N<HpBS

3385: R33Q* 3333: se:se

ge ; F

R -

NN -o

* Js a 7!. ?^

qEqs! R33RN 333sq f.-f- H==H^ E:B:+ ;==;E : :;*gAH:T \Ni;YjEE :


*

\E!

= :3 =-).)
.9

-ess: s!Egc s ce;gg=,;Sss=*c; eEsH:Et: : a:g ; g si : eEs: e!; PE=eEEEcETE E;ui "v6YjEOU:9-EOa?Oe jE pEEii:erEsE=&srElE E !l:; EE;;iEEE;iE i!!;tE: IE;!E:EE;;E:EE:f I:EE5i Ei PPsaEEe9";Fi!E=:i
e

g_

_ g _ g -

g-

:=i::dssii,i6==Ei:

rE*Ei

g\' -A\
r I r r q r

I
I

r o- = -2) 3<:
q q

\
I

a 6

q
*F
^ l],'

o o
o

? a

6 a

c
6

r: q

q r: o o I

r.i

9 a

a,

:
6 o
o

o,^

oid. if" E=3

33

9 q I

c q o

o q

a o 6

c
r o a

o 3
I

FP

q o o

<2

o
I

o
c

o q c

c c

o c o

r o
f

: n
r
6

x<=

o 9 r r o
e

I o o

c c

o o c

I q

:
c I

a o

r 6 F

o o

c q I

C;

e o

q 6

o 6 6

a q

ci

o I o r r

o q r o q o o a

6 o 5 r

9 ?

P=<

I o
O

+";
!:i
l!

q o o

o o

q q

o 9 o

I I
@

c.

o r q

o q

o o

c o o o

o q q c q o r r

o q o

o q

o I q 9 o

o c

q o

q q q I

8"1

*i6

r
o q q
r. o c

tr
'"8 -iF FE< dF=

J d

a^

c
C

? q

o q

o c

sPg

;1i
o
c

a a

o^ ri
a;< x?:

I o

o q o q c o I

<?

o.

9 o 9 r c I

9 c I

q q

? o q o

o q I

o q 9

c 5

q o

q o I

c I 9 o o o o I

q I o o q

o 6 a r 6

I q
r

o o

!
2

i
2

i
a
=

? =
a 2

:
a 'z

'", a.

:
3

6
Y Y
d
o

o
E

s
E

o 0-

4
e

F Z

z
3

E g

c*

t
q

o r
h

--..\ \ , .>t
r
r

r r

-e-

-t

o o

o o

^z) 3<:

9 .: o

a:

q q

^l

t r

q
*!
^ L:,,.

I 6

q
5 6

o o

I q

q q q q

: r
o o I o I q o a
o

q r r

r I r i

q q

9
o r o I o q o r o o 9 o 9 I q o I o o
a

o^
oid.

o
N

o r

I r r

:
o r

o o

E"?

-==3
!P :Y qq7

q q o o o r o = r

q q

o o

o q 9 o o 9 o o

o I o q o o o ! o

c o
a o

o o

c o
9
r=

:
r

r r q o c o

r
6

r r
o o o r

r
F

o o o I q 9 o q o o o o ei o 9 q o o d
c:

-; a7< x;>
s=l

d,

I o o

..i

q 9 o q o 9 o I
6

q o

q o

o o r

55
o o

9
6 6

c I o I o I 9 c I I I I

q o 6

o 6

gs

o
rro

oi

c q o

o o o

o q o

o o c q

c I i c

o e

o q

o q q

o ?

o o

9 c I 9 ci

oi

o 2

) d TIE FE<
IE

o^

:
o

czF:

IPg
a

o e

Ft

-J&,

o q o o o o <i

c I a I o o I

q o q q o

q q o

o q c o q c o o

o 9 o q o o o

o o q o

o o

t o

n-5 =i< :1,

o,^ s9

*ri

q q

o o o q q q

o o

o o

o q q q

q o q o

o o o

o o o o

xoa d--t

c o o I o o o o o o r o

o o

=
=

a =

:,
a

a
!

tr( dd F< ZL

j)z

3< EY
E

7
=

:
L

h\

\.

r
d
a E

r c.i r
6

o a o o
I

\
a

a o

o
qi

\
6

:i\ - g
r
6

o
-E.L

c O

.t

o o o o

r
a

O O

r
a

O O O

O O O

o o O o q O n O o d i a O c a
@

6 I a

c c c

o o i

q O q o
a o

O O O

a
N

o a s 5 6"

O q O

o q o o o o d

o q
O

r 5
6

o o a O o
N

q r o O o q o oi O O C
O

..j N a

o a c o

r
o
:
-,!

o 5 o o a

r o 6
c O a

.] o o N o C r c c c O c c. q o r c O c O s o o r 6 r 6 6 o 6

ci
o!

r O o c1 q C

r
O I

O a

q a O q a a O q q O O q o 6 o o oi c o 6 s a
O

O O O

o.

a o I o O a o o o
O O O O

O I O O I

6 N o

a q O o o q O o 6 o o o N
a

O e O I

o o o q a a O

c o C ? O c o o O C O a O a c

o
aa

c.i

O C o

o o i

c-j

O O q q O o

q o o a o
O

a O

a o o

.a

a a 6

a a o o o o

r
I

:
O C ol c O o O c O O c o N

I a
o r
O

q o o c o O I O a
o
N

O O O

o o

x,a

a o O a O

o o q c O o o o
5 a

O O a O <? O O, q 3 O o 6 O O

O o O o O O

9
a t

O c c

o q
O

: =.
-EI :<

c c a c r c
.a

q a

O
I

o o

O O O

r
a I

O o O

O r a a

q o q c O

6 r

a a

:
o c o q
O

o q
>

o o o

q o o o o o c O
O

O O O

O O <? o a O o I al .o

o c o o o q ? q c c 1 o O c
O

3 c c

e O c

6 3 o c 6 o C ? c @

c o

:
a r

O O q O a O O O C o a

o a cl 6

O o q c O o

o q o c o s c O
ol 6

N 6

o q o

c O c

a S o r

O O

o q

O c c

r o 5
c

r o o
=
c

e c

; ;
r

o O
O

e a a

o
O a c o o O

od r r

o o a r r

o o
d

r r a
O O O O

r r

rn
a c q c o c
6 a

a q a

c o O O O q q q o q c o o O

O O O

N N.

O C c O 6 O o q o q O i oi O O c
N

o q q
o
I O

O o C O C

a O O o

r.

r a r c q i o
S c c O O o

a C

r c
6 5

O N O O N O O O o O O O 6 O o 6 d

o o

a
O

O O O O c i c 5 a I a O C

o a O O,
O O

:
O O a O o c r 3 C r

r r

o a a r r C

O O O O c a c c N O r O o O O at O a C c

bi

?:

c o o

q o O a O q O o c O c a O
O

N O O -l c C O O O 6

1 r 5.
o 1.

O o O c o O o o c o o a O c a O c o O o c 6 o 5 c o @ c 3 3 N

o o c C a C q o q q r O o r o 9 o o c o O O a o c r
a o s
C

o o o

O c

al O O N

o c c c c

a O al o N O 6 r

c o a o r r

c c o

C C

O c O

=
c o o
C c q c O c O O q q O c

?
o a N o r
O

=
c C q c o o o c O o O o r 6 r

og a
-:a

o o

O C

o i

a O I q I O O

O O o

3O q O )? O O o O q q O q o O O O O O

r o N o O O N, r o,
6 O q a

O r C dt O O a

o O q o o o o o r o 6 N o @

a o q q
C

c o 6 N a

c o

c O c O c c o O i

c a

o q o a
O O 6 O

O O

o o
O

o a

a
O O

O O

6 o 6

I
c'!

O O O

O o a o
N

O 6 O q O I c o

O O c

o o c o. o a
O

O o O o O O

o o c o c o O c c O C i

O q o O o O O O o N

o<l

1?
c
.9

-"

N a

O O c N a

o c i

a o

a.

a at

r r o c o o r r
N

o o a c

O O O c O ? a: o c c O O c

r r
N

c c c O C c

5
E

I
o
E

34

o
H H

5
o

G 6

o
v

I
e

o
7

E E

c
P

a
E

qE

t
o
E E

o a

a c

'

!-

a z

tr
c0

5' E< rY O< o_d F< ZL

c
o
E

E E

o o
G

6
i
P

z
'E

o_

N N
o o 6
o_

r r o

r r
a

a a a a a
e

r
o

r n r
E

c a

a r

a
6 6

r
E 6 6

r
I

r
c o o o O o

c o o o o o o

r
I

r o a o
O

E\
s
a o a

q r O s
o q a o o O O o

c c s O O o c q o O c

o o
6

o o c o a

.a

o o o

O q O

o o q o
O

O I c

i5-:.
o c c a c 5 0.E I =o
O

r o

o c o O O c o o o

r .1 r

5
N

O I O O O o N a

...1

N 5 r c 6

o q

6 r o 6

a O o o O -t o C 6l o O o o O o o 6 O O O O c O a a 5 O o O O O O O c o

c o c q c q r o i r c o I r r a
I

o o c q ? c o o c o o o a o N

c"i

O o O o o O

a a

6 6

o o o

c O o

5 6

o O O o O r O O o q o r o o q o q o o a O O O O
o O 6 o a
O O O O O

O O o

c O o O o a o o o o O O

o
o
O O O o O O O O q O O O q o o O o o O O
N

^i

o o o d o

6i

o q o

o N o
O q

6 O o a o o c o o

a O O

o o o O i O

:
I a I

O O o e O O

a a a

O O o

a
c"i

o q o c
O

.n O N

6t O

o o o a o N
O

c ol

o O O c O .a q O C o O O o O

o q o

C O A

r o o c o

r q o c a

o q o

9
a

^i

c o O O o c O oi A O

= I
c O o
C

o
N 6

I r

O n O o -{ o o C o a O O r r =

O 5

c q a c

a o

c O s O o O o a 6

c ? c

o o O a O O O a O c

r O q O 1
a o

c o O

r o q c 1
a

o O o
=4
4

c O O

o 3 c o q

O c

@ .a

r r
O

c c c o ? 9 <a o 9 o a o O a c a r 6 o r

O o a O

o c c c

c c O

c c c a o o o o O o o c o c c o c c d C 6 c o 3 a o a o
a

! a
o a

c o O c al O O ct 3 O c o c o c o o 6 o O o r r O O

o o o c CI a O o

c o O o c c a c O q O O O q O ..i O c a o c 1 O r O 6 6 c a O O O O

a r

r r

r o r
o o o
O 6 O O q ai o O. O O

r r

r F
O O q C O c

r r

r r
O O O

9
a

r r
O O O O O c O q O O O O

r r

?
I C C o O

o- ^

c O ? o
c

O C 6 O c C N O a O

r o
N

6
N

a
I

a a

O o i o O O o

O O o

o o a q O q d o

O q O O

O O o O O d

...1

r
O O O q o a

r l c O
O O
O.

a r O o
O O o o C C O a O C o O O q c O O c O O O ci O o

O c
6 r O

o o

O C

r q
S I o o

O O O O O O O

o q a r o N
N a 6 O

o a O n o o ."; o c O c o a I a
O o O

-; a
a N
O

q
O

r o

c c
O O $ O c O O O

c 3 a O
O

O c O O O c O

O a

o N c o O c
c c O

6 o r

a O q o o c q o o c o c
O

=
c9

O O o

c o o o oi
C
al

O O O C O O c c

c c

o o

o o
O c c a O e o c c o O 5 O c 6 5 a

I r o

1 r 5
O c c O o O O O oi o

-a a.

O Y C O c a o O c C a a O o c N

O c C c O c O c O O 6 6 O o O c
@

6 a

c O c o c i
o 6

c q o

C c O

O 3 6

o = c o

c c O

- -

c c O c c o o O O o i a

C o d 6 a

x.'o
6=o

r a q

o o a a o O o o c

6 r o o o o o o e o 6
@

c c c i r c C
O O
O o O

a O c c q o a o a i N O
o 6

O Y o

l ;
6

r
O O O O 6 o O o O o O e o o O q O o O O c o c.j O O 6j a O 6 O O 6 r r I @ 6 a O a o O O a O q ..; o O i o 6 6

a
c c C O a

C 3 c o O C a O i O o a a c o o o ol O O

r c o r c c c O o a O o o c a a a N N
N

o r

o o c

O o O C o a O o o
O.

c O A

I 6

a O a r

a O a

c c c

I O

r c a N r o

c c c

c r c c ci o
O I

3
c

o s c O c O 2 o r O o o O

c c a

c c

c
r o a

o N r

o
E

f
E

c
e

i t

o
c

o z
=

z
H

a z

I
6

t z

6r
JY

o
o
E

=<

o s

s
a

O< o-d F< ZL

g
o* --o
38
,C' FLIJ -

-)
I I

m^
(o

t-cr F

OOTOOTOL1.;n

o)

tfl

o
ooooororoo)6)
E F

a a o o o N + ii I ;ro\roou-joiNN;_ (ossN@coNuu =lqlotooroNro:fiN


N

o)

.r

(o

0)

r\ i-

_oaoooF=N trl ro o 5 c"jcoccicic.i

N N Joo:;;

ro

co

_.
ri

l;O

tuJ

o_

'i
,>,

0(

Qe

9q +
OOrF(O
I,

5
E

B B Bf,BEBS s\i.+_+N$ce
Ecoco@ogccjocjod 9so)(oON66a(co (o@@o)oNNNo,jv
_____r-

=
UJ

cD(oaooa?aaoogooooo rN$+v9oCq--555o

tr (!

;O a o

rrl

o ro
I

l+ o
o
E

ol -E

ca

-l

-f

-qi-] o)

iq>t-:r..,1' o: O to r N ci rCOoo--6dEo

q\
O O O
O

C) o

pf._oooa-;;.o NSu:tri_ocjN=.r
-N-

o
o
C)

o o

o
l

be (!ts i6E B)i


l'=
o o

E E

9co$cDo)@o)ov :;S;ji:[:E:sBEsBsbs r 99Q-r:Oo)r$rr) co ro N L.) o, olQc(, +Uo;

NCD",."N8NRDg8NE8S
---rrc\

o, lc q,

6i

co d

: I

'I

o,
o

U S ;?r-

(o

N c") FC(oN
rrr

F_ ro + ;

co r 6dc

co

* t

o lJ.

(!
-l

o E o
..t_

or

ni a a a c') $
)

o co co d co - - co 9 co r: - - : ; ; ; co = cD i6 i6 ce co ;6 6
f.(o

FFFFFHHRHRRRHRHRFHH o) N (D (o oj o.i q? to oj N 9? g) ; ;.,1 ; (o ; ;.1 orooC-o55.:oddi_oooo


_ -,
O N O O (\
@
(r')

eaLNNN@oo6m6

,;r, 9! 9? a y. N ci d s o o p A qr a tf, r N co s a a E D b a o a a o =.
c.)

_ c") o ; cf) ci c") co r c.)


O O

O O O
O')

o N

C)

Form- 14 B

lnterest Rates as applicable upto expected COD for loans carrying Floating rate of lnterest.
Name of the Company Name of the power Station

S.No.
1

lnterest Details
Bank Name

Drawl Amorrnt
1,00,00,00,00(

Drawl Date
23.03.200!

w.e.f

ROt

23-Mar-o!
29-Jun-09 01-Apr-10
2

t0.0@t 9.5ff1
9.50.1

1-Oct'10

9.60% 70.00% 70.25%

03-Jan-1 1 14-Feb-1

85.00.00.00(

30.03.2009

30-Mar-09
29J un-09

LO.W.
9.gtr/"
9.5A%

01'Ao r'1
2

1'Oct-1

9.60%
10.00%
10.250/"

03-Jan-11

14-Feb-11

lllahabad Bank ilt

20,00,00,000

28-09-2010

28-Sep-10 01-Oct-10 14'Dec.10


01-Feb-11

8.50%

9.00%

950%
10.00%

:entral bank of india lil

70.00.00.00c

t7.t2.2AOt

17-Dec,0t 12-lan-0!
0

9.75% 9.04% 8.50./.


9.OOat

1-Apr.0!

16-4ug-1 08-Nov-1f 15-Dec-10

9.25"1 9.7501

u)-r eD-t I

r0.25%

IDFC II

70.00,00.000

30.1 1.2009

30-Nov-09
30-lu n-1

8 68% 8.98%

lriental

bank of commerce

40.00.00.00c

t5.1,2.2007

15-Dec-07

9.50"/.
70.00.1

15-lul-0f
1

1-Aus-01

t0.25%
9.50%
8.75./"

07-Nov-08 14-Jan-09

01-Aor-0!
06-Aus-10 15-Dec-10 02-Feb-11

8.25%

a.ts%
9.50%
L0.0@/"

)FC V

25,00,00,000 s0,q0,00,000 70,oo,00,ooo s0,00,00,000J 20,00,00,000 25,00,00,000 15,00,00,000 90,00,00,000

I I I

26.1

2.2008

26-Dec-0t

LO.30%

28.0i]ooeT 18.0e.20otl
14.01.20 10
I

28Jan-0!
18-SeD-O(

8.97% 8.17v" 4.06%

14-Jan-l

30,0qo0,0007 18.03.2010
5.06.20 10 22 11 2010

18-Mar1(
15-Jun-10
I

8.281
8.890r

22-Nov-10
3

31.12.2010 30.03.201
1

1-Dec-10

9.34% 9.86%

30-Mar-11

q2_

'9
Page 1 of 2

Name of the Company Name of the power Station

United bank

tt

State bank of india

tV

b National Bank-ll

TATE BANK OF INDIA-VI

Life lnsurance Corporation Of lndia-il1

tIFE INSURANCE CORPORATION OF INDIA.IV

q3

*L
Page 2 of 2

rfornli l4C

(RS. LAKHS) Total

Repayments upto

Weiohted

Repayment Date of repayn ent Days upto COD Repaymert COD

35.00 O2-A7.2Oj 1
91

01.10.2011 35 00

AVeraoe No or oays

-.

lnterest

rO

9.4538%

91

0.82

Date or repayrent 05-08-201 Days upto s7


1

7l

O0

70.00

57

1.03

Bspqyn]glt
COD COD

Dare or repayment 11_12_2oo/ 30_06-ro0s 31_12.2008' 30_06-2009 1lr9gllg!?y[ent : 31-12-2007 30_06-2008 31_12-2008 )ays upro g?3 .1

1sq,q0
rgTb-

4so

oo'

450

00'
i

4s0.00

188

1004,

450 450 00 450 00 3" -12-2oog 30-06-2010 31-12.20. A 30-06-201'1 274 93

0o

450.00 458

3600 00

731 go
l
l

681 72

639

as Date of repayment 26-03-201 1' ZO-Og-ZOj t Days upto t 5

zd
89

qa6

qz:

-l
l l

55s

zt

4.95

Repayment Date g! 19p;y1ent qys u!-tq qOD _

171

43

1285.71 1285.71' Zit.tq'


O
Za-OZ-ZO| t,ZA-oa_ZOt

Za-OZ,2q O, zo-Oe-ZOt

_ -

580, "- 399 -' -l l-

lc!1vG!t- --.--aoasi Days upto COD 34'


ofrepayment
upto

itS* -'i
l

t'
l

eooo. oo

299 34 3 3

232 49

34' 803.57

I -

7A8

714.29
28-A9-ZO|1
3

714.2g

056

coD

Repayment COD Repayment


ate of

214 29

Date of repavment 28-09-201 l Days upto 3


714 29 30-09-201 1
1

214 29

017

repayment

714 29

AVS UOIO

L;Ut]

Repayrrent 607.14 Date ol repaynent 30-09-201 l Days upto COD


1

607.14

01

10294.29

otal urawai

for

refinancing

Weighted Average No 01.10.2011 of days

upto

lnterest @
9.4538%

Drawal
e of drawal

200

04-02- 2009

1200

969

301 17

upto COD awal Date of drawal Days upto COD lJrawal Date of drawal upto COD

969.00

'
,

1000

25-03-2010 555.00
1200

555

143.7 5

10-0q 2010
478.A0

478

148 57

Date of

Drawal drawal

3000

19-01-2011

zis.
I

lga r+

Days upto COD

'1 255.00
100

Drawai
Days upto

D;iilid,-u*ut-'iz-oi-ioiif
COD
193.00 6500

193

Part

Form 15 Details / information to be submitted in respect of Fuel for computation of Enrgy Chargesl
Name of the

Company:
Station

NTPC Ltd
Farakka Stage-lll (1 x 500 MW)

Name of the Power

Sl.No.

Month
Quantity of Coal supplied by Coal /Lignite Adjustment(+i-) in quanlity supplied made by Coa Company
Coal supplied by Coal Company
(1

Unit
(MT)

For Preceeding 3rd

Month,

For Preceeding 2nd Month,


May.11

ror Preceeding lst


l/lonth, ,une

April,tl
1

584007
2 (MT)

61

0346

537020 -4806 532214 4258 527956 2718240116


0

-3984
(MT)

-4636
60571 0

+2)

580023
4

Normative Transit & Handling Losses (For coal based projects)*

(MT)

464A
{!itT}
(Rs)

4846 600864
JJZb
I

5 5 7

!et Coal Supplied


\mount charged

(3-4)

575383

by the Coal Company

2672145707
\djustment(+/-) in amount charged made by Coal 3ompany Totqal amount charged (6+7) Transportation charges by rail i ship / road transport Adjustment (+l) in amount charged made by Railwaysffransport Company
(Rs)

SbOOJ

0
(Rs)

I
9 10
11

2672145707
(Rs)

33261 5666:
12'1
1

2718240116 115027735
0 0 5313441

87445802
{Rs)

8558
0

0
(Rs)

)emurrage Charges, if any


Cost ofdiesel in transporting coal through MGR system, if applicable

-538400
5285238

l2
13 14 15

(Rs)

5331 944
(Rs)

Iotal Transportation Charges (9+/-10-1 1+12) Ither Charges


otal amount Charged for Coal supplied including ransportation (8+1 3) /vergnleo average Liuv
oT

9277774e
(RS}

125932426
8540080

120341176 7903889
28464851

7866492
(Rs)

2772789945
16

3460629169

8C

uoar as flreo

{kcaUKg}

3943

3606

3697

,=Mr-

qf

Part-l Form-15A Details / information to be submitted in respect of Fuel for computation of Enerqv

Charqesl
Name of the Company
NTPC Limited
Farakka Stage-III (1 x 500

Name of the Power Station

Mw)

Sl.No.

Particulars
Quantitv of HFOsupolied bv Oil comoanv

Unit
(KL)

l/larch,l I

2756.54

Adjustment(+/-) in qnty.supplied made by Oil Comopany HFO suoplied bv Oil comoanv (1+2) Normative transit & Handlino losses
Net Oil supplied (3-4)

(KL) (KL) (KL) (KL) (Rs.) (Rs.) (Rs.) (Rs.)


1

2756.54
0

4
5

2756.54 10670617a

6
7

Amount charqed by Oil Companv Adjustment in amount charged made by Oil Companv Total amount charqed (6+7) Transportation charqes bv rail/shipkoad Adjustment(+/-) in amount made byRailways/ Transoort Comoanv Demurraoe Charqes. if anv

I
9

067061

7t

'l '15499

10
11

(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Kcal/Ltr)


11

12
13

lost

of Diesel in transportinq HFO, if applicable


0+'1
1

Total Transoortation Charoes {9+/-'l

+12)

54999
0

14
15 16

Sthers/E.TAX Total amount charoed for HFO (8+'13+14) Weiqhted averaqe GCV of Oil as fired (HFO)

107861174
9690

Avq

Weiqhted averaqe price of HFO per KL

39129

391 29

Avq

Weiqhted averaqe qcv of HFO (kcal/Kq)

969C

969C

Note: HFO was last procured in Feb,201 1. No


HFO was procured in the last three preceding months, i.e. April,May & June 201 1
.

rb

.T

s r
cf)
I

O)

co

o.
CL

q
O

s lo
o

rO

(o

co rO

o o
o o ro
o o ()

ro

\t

o N
cf)

r o,
co

N r O N N rI r r O N
E =

q o
r
o)

s rf)
@

ro (o
CO

T\ ro

4i\

c)

q o
o o)
'lC

s lO

(o
(f,

(o

(0

\f

5T 6g
J tt

o o

(E

:=

o 6
= LL
l-

C
0_

o
(E

(6

rso. S.EE'
Er
Ii
tr'.!l,l

-= ci- dlr c(E @6 <tL

9a

#EE c2'[
o o o o
tr

o-rrs

.9
o.
L

E ) (5 o> z a o ZO >o_ z<

#L (U= o tra .9 or a =C al .9 o oo )g

orE rou) o} >:= >= '-o

ia

'its x )P C()

.E

a ol (0 (El o ol
C)

rF

o-l
(Ul
0)

Pt = Po
F: L(E

-o (5

lui5 6qd
L

ttr xo

l,
ld ( lo -

laa lc c
(E

lo

E H=
Y

= C
l

v =

lo: E a
U)

l?z lO

\o
TL

(5

IO- -O -c (t lx :l -:<

=-9099o (Eq,?

lul lr -

osE ..dE
og

II

LL

a
J N

TL

zz

Ets (UG

z
a

o-

z o z
Cq

O $

rf

Capacity

Name of the Company Name of the Power Station

Calculation of Energy Charges for IWC Purpose


NTPC Ltd. Farakka Stage-lll (1 x 500 MW) 500 MW

Calculation of Enerov Charoes


241 1- 12

Descriotion lnstalled Caoacitv Gross Station Heat rate Soecific Fuel Oil Consumotion Aux. Enerqv Consumotion Weiohted averaoe GCV of Oil Weiohted averaoe GCV of Coal Weiqhted averaqe Price of Oil Weiohted averaoe orice of Coal Heat contributed from SFO Heat contributed from Coal Specific Coal Consumotion ESO

(Leap Year) MW Kcal/kwh


ml/kwh
Yo

2A12-13
50c 2443.11
1

2013-14
500
2443.11
1

50c 2443.11
1

6.5 9690

6.5

6.5 9690

Kcalil Kcal/ko
Rs./Kl Rs./MT

3749
391 29

5328
9.7

9690 3749 391 29 5328 9.7 2433.4 0.6 3481.0

3749
39129

5328
9.7 2433.4 0.6 3481.0

Kcal/kwh Kcal/kwh
Kq/kwh
MU

2433.4 0.6 3490.5

Rate of Enerqv Charqe from Coal Rate of Enerov Charqe ex-bus sent from Coal Enerqv charses calculated on the Tarqet Availability Z Months Enerov Charoes on the Taroet Availabilitv

Paise/kwh Paise/kwh Rs. in Lakh Rs. in Lakh

345.86 369.90
1

076C

21519

345.86 369.90 1 0730 21461

345.86 369 9C
1

073C

21461

v
7g

o N o
-l EI cl ol
ol

o o
N

<l
@

I I

, , c : t

o
E

o c o c o o l) o

tc

i
o ri q

a P 6 o E F

i c

c
o
o N o

I
E E

d
E

u
L

c
E

t c

tc

o N.

d.Y o$

fto

Nt@o rtm6 v+60 :i@$@ at.ioo

tF
x l

3st
= 4ilil -o gE,
!

?
f.

==o e o x

o;" f ! E_;
r=
Od

I
d

x
-s

=o oaY r-i OI
Ill

ilt
il

'i6
'f6

o! E: zL

':LL qg g,o
dC

E6 of

.! U -E-

0 I
A ;
E

-{ o

EE
c> qE

6d_ U t oo .:
oo
oi

F
E

g,^
3

o
c
E

AE 8U E}
uc

EO*

oi^-

OUE =T E* OE EliA

EA: EPO
Y Lia
d

EE
6:

E6 *
> : -y NE o E Ioou

3-s i:
zz
oo EP EE
EO

fl8E fS
=an

a oE Ef oa OC ao (/)O

5= o agP Eo 9a fi.i LUb z' b<


Oc O-

0,0- tr.6

-*onexur+,"

A.

a:frX
^""liJr

l,l
II

..-i'

"'..jF.'::

, , ,., .,, " .i",l'r, -'Yf',:' ,, ,i ; l

.....-

'i.:

Eeery$t x.reqq af{"{T-ffi wssT

sHNGAx,

ii'
ir

"l

i d-.J

')'iq':il

J .' \.r

it

POWER PURCHASE AGREEMENT BETWEEN NTPC LIMITED

AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED


FOR

FARAKKA SUPER THERMAL POWER STATION Stase-lll (500 MW) THIS POWER PURCHASE AGREEMENT hereinafter called the 'lAoreement" eniered into at

!qs$idq.&^ on the,. . 13s:. .day or...1*$S1 Two Thousand ren q[3r..t1./2010) between

NTPC Limited, a Company incorporated under the Companies Act, 1956 having its registered offig:e at NTPC Bhawan, Core 7, SCOPE Complex, 7, Institutional Area, Lodhi Roacl, New De'fti - 110003 (hereinafter called'NTPC') which expression shall unless repugnant to the coqtext or meaning thereof include its successors and assigns as party of the first part; and Wett Bengal State Electricity Distribution Company Limited , A Govt. of West Bengal Enprprises having its Registered Office at Vidyut Bhawan, Bidhannagar, Block-DJ, Sector-ll, Safi Lake City, Kolkata-7.00091 (hereinafter referred to as 'VvTBSEDCL') which exprepsion shall unless repugnant to the context or meaning ther:eof i:nclude its successors and Permitted As$igns as party of the second part. Each of the parties of the first and second above is individually referred to as a "Party" and collectively as the*Padies".
li
H
H

rt

'to 0

.Ld*

-'/

-,*+

WHEREAS NTPC is a Generating Company as defined under Section 2(28) of the Etectricity Act, 2003 and is a Govt. of lndia Enterprise. AND WHEREAS NTPC is already operating Stage-l & Stage-ll sf Farakka Super Thermat Power Station (capacity. 1600 MW) at P.O, Nabarun in Murshidabad district of West Bengal State from which Buik Power Customers inciuding WBSEDCL are already drawing electricity as per Bulk Power Supply Agreement signed on 13.08.1985. AND WHEREAS NTPC is in the process of expanding the capacity at the'above mentioned Station by 500 MW in Stage-lll hereinafter referred to as "FARAKKA Staqe-lll" to be owned and operated by NfPC. AND WHEREAS WBSEDCL is desirous of purchasing electricity from FARAKKA Stage-lll and NTPC is willing to sell electricity from FARAKM Stage-lll to WBSEDCL from the date of commissioning of 500MW Unit of FARAKKA Stage-lll on mutually agreed terms and conditions mentioned hereunder.

Now, therefore, in consideration of the premises and mutual agreements, covenants and conditions set forth herein, it is hereby agreed by and between the Parties as follows: -

1.0 DEFINITIONS (a) The words or expressions used in this Agreement but not defined hereunder shall
have the same meaning assigned to them by the Electricity Act, 2003 as amended from time to time, the Rules frarned thereunder and Regutations issued by CERC from time to time.

(b)

The words or expressions mentioned below shatl have the meanings r.espectively as assigned hereunder:

Act;2003
Agreement to Hypothecate cum Deed of Hypothecation Availability

The ElectricitSr Act, 2003 as amended or modified from time to


time, including any re-enactment thereof. Shatt have the meaning as ascribed urrder articte 6.2.8
PPA.

of

this

'Availabiiity' as defined in the CERC (Terms and conditions of Tarif0 Regulations, 2009 as amended or replaced from time to time

Billing Centre

The office / RHQ as intimated by NTpC to the WBSEDCT_ from where the bills will b-e raised on them.
Bulk Power customer(s) in relation to the station shall mean the person(s) inciuding WBSEDCL to whom capacity is contracted from the station.
Busbars of the Station to which outgoing feeders are connected.

Bulk Power Customer(s)

Busbars/Ex Bus

CEA
CERC CTU

Central Electricity Authority

Central Etectricity Regutatory Commissiot"]


Competent Authority (for determin,ation of tariff). Central Transrnission UtiIity.

or any other

Capacity Charges

Capacity Charges are Fixed Charges as deternrined by CERC and shall be paid in proportion to the Contracted Capacity from time to time. Mean and include all charges including the Tariff to be paid by the WBSEDCL/BuIk Power Customer(s) in respect of supply of electricity to them from the Station in accordance wiifr the provisions of this Agreement.

Charges for Supply of Electricity

Commercial Operation Date

'Date of Commercial Operation' or 'COD' in relation to a unit means the date declared by NTPC after demonstrating the Maximum Continuous Rating (MCR) or lnstalled Capacity (lC) through a successful trial run after notice to the Bulk power Customer(s) and in relation to the generating station the date of commerclal operation iteans the date of commercial operation of
the last unit or block of the Station

Contraeted Capacity Effective Date

Capacity contracted by the WBSEDCL/BuIk Power Customer(s)


under this Agr,eement under Article 2,2

means the date of signing of this AEreement including payment security as envisaged under Arlicle 6.2.

Energy Charges

As defined

in the CERC (Terms and Condi'tions of

Tariff)

Regulations, 2009 as amended or replaced from tjme to time.


Escrow Agreement
GOr

Shatl have the meaning as ascribed under articte 6.2.8 of this ppA

Government of lndia

IEGC

lndian Eteetriclty Grid Code, as notified by CERC or any other competent authority and as amended from time to time.
means electricity generated prior to commercial operation of a unit (s) lBtock(s) of the Station

Infirm Electricity

LC

lrrevocable Revolving Letter'(s) of Credit.


Meter for measurement and checking of import/export of energy on the outgoing feeder:s of the station Busbars for Energy Accouniing.
Mega Power Policy issued by GOI and amended from

Main and Check Meter


Mega Fower Policy Mega Power

time to time.

Projects etigibte for benefits under the Mega power poticy of GOl. ,t\/IV

Project

i\il

^Vf-

Monthly

Bill

Monthly Bill as raised by NTPC as per REA in line with the CERC Regulation as amended from time to time. Provided that periodicity of billing may change as per CERC requlation from time to time.

Party/Parties

Shall have the meaning ascribed thereto in the recital to this


Agreement Have the meaning as per Article 12 of this agreement

Permitted
Assigns

Powergrid
Rece'ivabtes

Power Grid Corporation of lndia Ltd.


As defined under 6.2.8.

ERLDC ERPC

Eastern Regional Load Despatch Centre.

Eastern Regional Power Committee established under Section 2(55) of the Electricity Act, 2003.

Regional Energy Periodic Energy Account issued Account (REA) amendments thereof.

by ERPC/ ERLDC

including

Scheduled Generation
SLDC

Schedr.tled Generation as defined in the CERC (Terms and Conditions of Tariff) Regulations, 2009 as amended or replaced from time to time
State Load Despatch Centre
Have the meaning as given in the recital

Station STU
Bilr

State Transmission Utility


6.'1

Supplementary Have the meaning under the Article

.3

Target Availability
Transmission
Licensee

Availability of the Station for recovery of full Capacity (Fixed)


Charges on annual basis Have the meaning as per Electricity Act 2003

Tariff

X,i*oS]il|1"'
Third

Tariff shall constitute Capacity Charges, Energy Charges, lncentive and other charges viz taxes, cess etc for supply of electricity from as determined bv CERC or anv other competent

Party(ies)

Any person other than the person to whom electricity is contracted under this Agreement

Trlpartite Agreement (TPA)

The Tripartite Agreement dated 30.12.2003 signed by Govt of


West Bengal, GOI and Reserve Bank of lndia as per the provisions of the GOI Scheme for One time Settlement of SEBs dues

ta)

it'r**

./u"-

Unit
UI

Each Unit of the Station

unscheduted lnterchange as defined centraI Etectricity Regulatory commission (unscheduted lnterchange charges and retated matters) Regutations, 2010 as amended or repiacEd f;om tirne to time

in

2,0
2.1

GENERAL

INSTALLED GAPAGITY: The capacity of FARAKKA stage-il1 is proposed to be 500MW

2.2

ALLOCATION OF CAPACITY
by GOI based on the prevailing Govt. policy.
of West Bengal shall be as decided in favour

2.2.1 Allocation of Capacity from tl're Station to the state

2.2.2 The allocation made from the Station by GOI or any other competent authority

of the WBSEDCL shall be Contracted Capacity subject to signinE of the Agreement, opening of LC and providing appropriale payment,security mecninism as pioviJeo ai Article 6'2 in this Agreement. The WBSEDiL shall draw Ltectrlcity atainst the above Contracted Capacity lirnited to the amount of LC opened and maintalned by ii. NTpC shall i:ntimate RLDC fronn time to time regarding the quanturn of capacity WfiSe OC1 is
eligible to draw,

3.0

TRANSMISSION I WHEELING OF ELECTRICITY

sale of electricity shall be at the busbars of the station and it shall be the obligation and responsibility of WBSEDCL to nrake the required arrangement for evacuation of electricity from such delivery points of the NTPC.
J,Z

including BPTA with PowergriOl Otf,er transmission i.Jn.*"r developing the identified transmission system, corresponding to their share of alloeateo iupl"itv fiom the project.
f

For timely and expeditious development of the required transmission system for evacuation of power from the said project to its various beneficiaries, tritpC tm initiatly made application for connectivity and Long Term Access to the CTU/ Fowergrid on b-ehalf of the beneficiaries and obtai-ned open access from CTU/ Power:grid. WBSEDCL hereby consents for NTPC to make the said rppfi.rt'on on its behalf. WBSEDCL also agrees to subsequenfly sign all n".*rrr[- ,tiuu**ntr,

J.J

charges for utilisation of transmission. system(s) owned by the power.gr:id/other Transmission Licensee for wheeling of the eiectiicity beyond busbar of the- station, shall be paid directly by WBSEDCL to the Powergrid or the Transmission Licensee as the case may be. NTpc shail not be responsible for payment of such crrarges.
SCHEDULING, METERING AND ENERGY ACCOUNTING
SCHEDULING

4.0
4.1

It is understood and agreed by and between the parties that NTpc shall operate the Station as a base load station as per the manuficturers' guidelines, applicable grid X/*

operating standards, directions of the CERC and relevant statutory provisions, as applicable from time to time, Methodology of generation seheduling shall be as per IEGC and the decislons taken at ERPC forurns.

All charges/fees related to scheduling and despatch of electricity shall be bor:ne


WBSEDCL

by

NTPC shall make declaration of the capacity at the busbars of the Station after taking into account the capability of the Station to deliver Ex-Bus which shall be considered while calculating Declared Capacity (DC).

DECLARED CAPACIiY

Declared Capacity or 'DC' means the capability of the Station to deliver Ex-Bus electricity in MW declared b5r the Station in relation to any period of the day or whole of the day. duly taking into account the availabitity of Gas and Liquid fuels or coal as per the procedure laid down in IEGC.
Notwithstanding the followi:ng, Station shall be deemed as available to the extent of DC declared by the Station for any time period:

a.
b.

Failure on account of Bulk Power Customer(s) to transmit and wheel electricity from the Ex-Bus of the Statlon.

Any other reason not attributable to NTPC restricting scheduling and despatch of capacity at the Ex-Bus of the Station

4.3
4

METERING

3.1

A set of Main and Gheck Meters of 0.2S accuracy class, as per CEA (lnstallation & operation of meters) Regulations 2006/IEGC as applicable, shatl be installed by CTUISTU on all outgoing feeders of the Station. WBSEDCL shall make all necessary arrangements for installation of meters of required accuracy and specifications, at ail
its drawl polnts. at the time of installation as per the CEA (lnstallation & Operation of Meters) Regulations 2006 as amended from time to time.

4.3-2 The Main and Check Meters shall be checked jointly

4.3.3 Data shall be downloaded from the meters at regular intervals as decided by
ERPC/ERLDC for preparation of the REA/UI Account_

4.3.4 Regular cross checking and analysis of meter readings and meler failure or discrepancies shall be reckoned as per CEA (lnstallation & Operation of Meters)
Regulations 2006 as amended from time to time. If the Main Meter or Check [v]eter- is found to be not working at the time of rneter readings or at any other tinre, NTpC shall inform the CTU/ERLDC of the same.

t0f

4.3.5 ln case of failure of meters,

energy/Ut accounting for the period shall be as per procedure laid down by CERC or as per the mutually agreed procedure in RPC. ln case of absence of any such procedure, the following procedure shall be followed;

ln case of failure of Main Meter, readings of Check Meter for the corresponding period shall be considered for energy/ Ul accounting. lf both the Main and Check Meter(s) fail to record or if any of the PT fuses is blown out, energy shall be cornputed based on standby meters. ln case of dispute, the decision of Member Secretary of the ERPC would be final and binding.

4.3.6

Periodic testing of both Main and Check Meters shall be carried ourt in the presence of representatives of I{TPC and WBSEDCL as per procedure laid out in CEA (lnstallation & Operation of Meters) Regulations, 2006. For any testing and/ or replacement, notlee of seven days will be given. ENERGY ACCOUNTING tsoth the Parties agree to facilitate issue of Regional Energy Accounts by 1" day of every month. Regional Energy Account issued by ERPC/ ERLDC or any other Competent Authority shall be binding on all the parties for billing and payment purposes. methodology of Regional Energy Account shall be done only as per the decisions iaken in the ERPC forums and both the Parties agree to abide by the methodology so finalised, TARIFF Terms and conditions:
by

4,4
4.4.1 4.4.2

4.4.3 Any change in'the

5.0 5.1

5.1.1 The Tariff for the electricity supplied from the Station would be as determined
CERC from time to time.

5.1.2 Tariff
5.1.3

for sale of electricity from the Station shall comprise of Capacity Charge, Energy Charge, lncentive, Ul and all other taxes/charges.

ADHOC TARIFF

NTPC shall approach CERC for determination of fariff before Commercial Operation Date of any unit of the station. ln case this Tariff is not determined for any reason by CERC prior to commencement of commercial operation of such unit of the Station, ihi Parties agree that bilting and payment shall be done on adhoc basis as per the proposal of NTPC submitted to CERC for Tariff. NTPC shall inform WBSEDCL of such adhoc tariff and pendlng determination of such Tariff by CERC, bilting on provisional basis would be carried out, subject to adjustment aiong with applijable interest as and when such Tariff is determined by CERC.
5.2

SALE OF INFIRM ELECTRIGITY:


lnfirm electricity, i.e,, sale of electricity priorto commercial operation of the unit, will be billed by NTPC based on methodology as notified by CERC from time to time.

N-r-'

t0[

^i\6

5.3

TAXES, LEVIES, DUTIES, ROYALTY, CESS ETC.:


under this Agreement shatl be governed by the appticable CERC Regutations and the parties agree to abide by and compty such Regulations.

5.3,1 Tax on lncome: Tax on lncome appticable for the sale of power

5.3.2 Statutory taxes, levies, duties, royatty, cess or any other kind of levies lmposed/charged by any Government (eentratlState.) and/or any other local

bodiesi authorities on generation of etectr"icity inctuding auxitiary consumption or any other type of consumption inctuding water, environment protection, sale of etectricity and/or in respect of any of its instattations associated with the Station payabte by NTPC to the authorities concerned shatt be borne and additionatty paid by the WBSEDCL to NTPC in propor"tion to the attocated capagity.

6.0
6.1

BILLING AND PAYMENT B!LLING: The Charges for Supply of Electricity under this Agreement shall be bilted by NTPC at the rate as determined from time to time by the Central Electricity Regulator.i Commission and the same shall be paid by the WBSEDCL in accordance with the following provisions:

6.1.1 'NTPC shall present the bills for electricity supplied to WBSEDCL from the Station for
the previous month based on Regional Energy Account issued by ERPCi ERLDC or any other Competent Authority.

6.1.2

Billing Centr:e of NT?C shail carry out billing and associated functions. NTPC would submit the bills to the Officer to be nominated by WBSEDCL. Station shatt inctude the Charges for Suppty of Etectricity under this Agreement, taxes, duties., cess etc inctuding additional bitt (s) for the past period(s) on account of orders of CERC/Appettate Tribunat for Etectricity/Other Courts/other Competent Authority(ies) ,. lf for certain reasoRs some of the charges which otherwise are in accordance with this Agreement, cannot be inctuded 'in fhe main Monthty Bitts, such charges shatl be bitted as soon as possibte through Supplementary Bilt(s).

6.1.3 The Monthty Bitt for the

6.1.4 WBSEDCL shall arrange payment of such tt/onthly Bill(s)/Supplementary

Bill(s) promptly through RTGS (Real Time Gross Settlement ) / irrevocable Letter of Credit at -the designated account of NTPC. The date of transfer of payment to NTPC account shall be considered as the date of payment for computation of rebate or late payment of surcharge in respect of such payment. The bill(s) of NTPC shall be paid in full subject to the condition that*

there is no apparent arithmetical error in the bill(s) the bill(s) isiare claimed as per the notified/agreed tariff iii) they ar-'e in accordance with the Regional Energy Accounts issued by ERPC/ERLDC or any other Competent Authority

i)

ii)

to7

iV*1"

, . Jv,""'

/"

*--*"

6.1.5 All payments made by the WBSEDCL, shall be appropriated by NTPC for amounts
due from the WBSEDCL in the following order of priority:

i) ii)

iii)
iv)
6.1.6

towards Late Payment Surcharge, payable if an,y; towards earlier unpaid bill (s), if any; and towards the statutory dues like income tax, other tax, royalty etc [n the current
bill (s). towards the other charges in current Monthly Bill

l.n caseWBSEDCL disputes any amount, even then, it shall pay 95% of the disputed amount forthwith and file a written objection with NTPC within 30 days of presentation of the bitl, giving following particulars: Item disputed, with full detailsidata and reasons of dispute Amount disputed against each item.

i) . ii)

Provided that non-acceptance of tariffs determined/approved by CERC or any other Competent Author"ity shalt not be a valid ground for dispute

6.1.7

The amount of excess/shortfall with respect to the said g5% payment based on finally determined amount in line with Arlicle 7 shall be paldl adjusted with the applicabte interest @ 15% per annum from the date on which the amount in dispute was payable/ refundable,
RECONCILIATION
and

6.1.8 QUARTERLY AND ANNUAL

Supplementary bilts shall be subject to quarterly reconciliation at the beginning of the following quarter and annual reconciliation at the end of each Financial Year to take into account * REA, Tariff Adjustment, Payments, Late Payment Surcharge or any other reasonable circurnstances provided under this Agreement. The parties, therefore, agree that as soon as all sueh data in respect of any quarter or a full Financial Year as the case may be has been finally verified and adjusted, NTPC and WBSEDCL shalt jointly sign such reconciliation statement. On the basis of the statement suitable adjustment (if any) in payments shalt be done"

The Parties acknowledge that all payments made against Monthly bills

6.1.9

REBATE AND LATE PAYMENT SURGHARGE

Rebate and Late Payment Surcharge shall be as per Terms and Conditions of Tariff issued by CERC or any Other c-ompetent authority as applicable from time to time. No rebate shall be payable on the bills raised on account of taxes, duties, royalty i cess etc.

6.2
6.2.1

ESTABLISHMENT
MECHANISM:

OF LETTER OF CREDTT(rC) AND PAYMENT SECURITY

WBSEDCL shall esiablish one or more LC in favour of NTPC with any public sector / scheduled commercial bank at least one month prior to the commencement of electricity supply from the first unit of the StationlExpansion Stage.

N.f*

108

Y,l

6.2.2 The LC shall cover

105% of the one month's estimated billing in respect of electricity supplied from the Station to WBSEDCL. This shall be in addition to the obllgation of the WBSEDCL to establish simi,lar letters of credit for supply of electricity to the WBSEDCL from all other generating Stations of NTPC. The am,ount of LC shall be reviewed each half-year commencing April and October in a financialyear on the basis of the average of billing of previous 12 months and the LC amount shall be enhancedlreduced accordingty not later than 1" July and 1't January respectivety of the same financia[ year.

6,2.3

6-2.4 The LCs shall he established for: a minimum period of one year. WBSEDCL shall
ensure that a vatid LC is made availabte at all times during the entire/extended validity of this Agreement. New LCs shatl be furnishedlexisting LCs reinstated not later tn'an 30 days prior of expiry of existing LCs.

6.2.5 LC shall ,specify the

manner and dates when bill(s) can be presented to Bank by NTPC. The bills so presented by NTPC to the Bank shall be promptly paid on their presentation. The LC charges shall be borne by the WBSEDCL,

NTPC shall not draw upon such LC (a) prior to the LC date(s) against relevant Monthly Bill and (b) if the payment against the Monthly Bill has already been made, However, where there has been a wrongful drawal on the LC by NTPC, any charges and losses incurre.d by WBSEDCL in that connection shall be bor.ne and paid by NTPC"

6.2.6 Ail costs relating to opening and maintenance and operation of LC shall be borne by
the WBSEDCL

6.2.V ln case of drawal of the LC amount by NTPC in accordance with the terms of this
Article, the amount of the LC shall be reinstated automatically not later than 7 days from such drawal. WBSEDCL shall arrange to furnish to NTPC a certificate to this effect from Bank(s) providing LC. ln the event LC is not reinstated within 7 days, regulation of power supply to the extent of 2.5o1o of the Contracted Capacity will start with immediate effe.ct from 00 hrs on 8th day. NTPC will have right to diverl 2.5% of the Contracted Capacity to Third Party(ies) and or reduce the schedule of WBSEDCL by the same quantum.
Provided that WBSEDCL shall continue to be li:able to pay the Capacity Charges in proportion to its Contracted Capacily during the period of regulation / diversion of capacity or till the capacity is re-allocafed to other Bulk Power Customer(s)/ Third Party
(ies)

6.2.8 Provisions of Tripartite Agreement signed on 30.12.2003 between Govt. of West Bengal, Govt. of lndia and Reserve Bank of lndia under the Scheme for One Time Settlement of SEB dues shall be applicabie for supply of electricity from this station
and for safeguardine palments for the same. WBSEDCL hereby agrees to provide an alternative payment security arrangement before expiry of the TPA either by efflux of time or otherwise on assignment of bulk purchase function to a company not owned or controlled by Govt of West Bengal in the form of Escrow Arrangement as a back up to the Letter of Credit. Under this arrangement an Escrow Account in favour of NTPC shall be estabtished through which the Receivables of WBSEDCL to the extent required for the payment of dues of NTPC under this Agreement shall be routed as per the terms of Escrow Agreement. WBSEDCL hereby agrees that NTPC will have first charge on Receivables of WBSEDCL. However, such first ranking charge shall be on

A^l-

r rF

the amounts, in exeess of amounts, which have already been charged or agreed to be charged prior to the date of the execution of this Agreement and as listed in the schedule enclosed with this Agreement. WBSEDCL agrees to enter into a separate 'Agreement to Hypothecate Cum Deed of Hypothecation' whereby, WEISEDCL shall hypothecate Receivables to the extent required for Payrnent of dues of NTPC by WBSEDCL including under this Agreement by creation of first ch'arge in favour of NTPC. These Receivables shall be routed through Escrow Account for payment to NTPC in case of default in payments by WBSEDCL. "Receivables" for this pul'pose shall mean all of the pr:esent and furture payments, receipts, obliEations, monies, claims, bills and any other property whatsoever whish may from time to time be derived from or accrue or be offered or due to the WBSEDCL in respect of the sale by the WBSEDCL to the Consumers of electric capacity, energy and / or services or for any other reason whats.sever and all proceeds thereof.

6.2,9 The Escrow

Agreement and Agreement to Hypothecate Cum Deed of Hypothecation shall be established by WBSEDCL to the satisfaction of NTPC at least one year before the expiry of the TPA either by efflux of time or otherurise on assignment of bulk purchase function to a company not owned by Govt of West Bengat. ln the event befor,e expiry of TPA, WBSEDCL does not sign the 'Escrow Agreement' and 'Agreement to Hypothecate Curn Deed of Hypothecation' at least 3 months before the expiry of TPA or WBSEDCL creating any superior charge in favour of any other party on its Receivables, NTPC shall have the right to reallocate contracted capacity of WBSEDCL to Third Party (ies). ln case of termination of this Agr.eement or reallocation of capacity due to reasons stated above, WBSEDCL shatt be liable to pay capacity charges for such capacity tillthe capacity is reallocated.
Since the payments from WBSEDCL are currently secured as per the provisions of the TFA, establishing of Escrow Arrangement is not being insisted upon by NTPC presently. WBSEDCL and NTPC agree that this Agreement shall deemed to have created a legally binding first charge on WBSEDCL's Recelvables in favour of NTPC to the extent required for payment of dues of NTPC by WBSEDCL. Accordingly, WBSEDCL shall not create any encumbrance, charge, ;and lien or othenruise execute any instrument which in any way affects the first charge over the Receivables. While oreating any subsequent charge on its Receivables or agreeing to provide Escrow cover or any other form of payment security to any other entities like electricity supplier(s). banks, financial institutions etc. during the interim period till signing of Escrow Agreement with NTPC, WBSEDCL shall duly inform such electricity supplier'(s), banks, financial institutions etc. of the legally binding first charge on WBSEDCL's Receivables in favour of NTPC and the first charge of NTPC shall be in preference to any other charge that WBSEDCL may create in favour of any other purty

Except for the provisions of this Agreement other terms and conditions for operation of "Escrow Agreennent" and "Agreement to Hypothecate Cum Deed of Hypothecation" shall be in the latest issued forrnat as prescribed by Government of lndia in the "Standard Bidding Document (Case ll)" as used for competitively bid Ultra Mega Power Projects.

WBSEDCL agrees to ensure that the successor entities of WBSEDCL are duly notified of the above arrangement with NTPC and shall be bound by the terms of this Agreement as if they are parties to this Agreement.

,4n

[10

*'n?*n*

6.2.10 Notwithstanding the obligations of WBSEDCL to pay all the dues as per this Agreement, in the event of default in opening of LC of requisite amount in favour of NTPC or non - payment of bills within a period of 60 days of billing, NTPC shall be entitled to regulatei divert the contracted capacity of the WBSEDCL to any other Bulk Power Customer(s)i Third Part(ies) as per the provisions of CERC (Regulation of Power Supply) Regulations, 2010 or any other competent authority from time to time read with the provisions of TPA (during the validity of TPA) till the time default is set
right.

ln case of default in payment of bills beyond a period of 90 days of billing, NTPC shall have the right to re-allocate power to other Bulk Power Customer(s).

clarified that the ab.ove arrangement shall not be construed as relieving WBSEDCL of any of its obligations to NTPC including obligation of payment of
Capacity Charges.

It is

For the removal of any doubt it is clarified that in case of default, WBSEDCL shall continue to be liable to pay the Capacity Charges in proportion to its Contracted Capacity during the period of regulation / diversion of capacity or till the capacity is reallocated to other Bulk Power Customer(s)/ Third Party (ies).

7.0
7.1

SETTLEMENT OF DISPUTES

All differences or disputes between the parties arising out of or in connection with this Agreement shatl be mutually discussed and amicably resolved within 90 days.

7.2

ARBITRATION

7.2.1 ln the event that the parties- are unable to resolve any dispute, controversy or claim
relating to or arising under this Agreement, as stated above, the same shall be dealt as per the provisions of the Electr:icity Act, 2003. The place of Arbitration shall be at New Delhi.
8.0

FORCE MAJEURE Neither party shall be liable for any claim for any loss or darnage whatsoever arising out of failure to carry out the terms of the Agreement to the extent that such a failure is due to for:ce majeure events such as war, rebellion, mutiny, clvil commotion, riot. strike, lock-out, forces of nature, accident, act of God or dny other such reason beyond the conirol of concerned pafiy. Any party claiming the benefit of this clause shall reasonably satisfy the other party of the existence of such an event and give wriiten notice within a reasonable time to the other party to this effect. Generatron/drawal of power shall be starled as soon as practicable by the parties concerned after such eventuality has come to an end or ceased to exist.

9"0

IMPLEMENTATION OF THE AGREEMENT

All discretions to be exercised and direetions, approvals, consents and notices to be given and actions to be taken under these presents uniess othenrvise expressly provided herein, shall be exercised and given by the signatories to this Agreement or by the authorised representative(s) that each party may nominatd in this behalf and Ll*'-

notify in writing to the other parly by Registered Post. Any other nomination of authorised representative(s) shall be informed likewise in writing to/by WBSEDCL within one month of signing of the Agreement. Notwithstanding any nomination, the Regional Executive Director, ERHQ-|, NTPC Ltd., 2nd Floor, Lok Nayak Jaiprakash Bhawan, Dak Bunglow Chowk, Patna-800001 as well as Executive Director. (Commercial), NTPC Ltd., NTPC Bh,awan, Core 7, SCOPE Complex, 7, lnstitutionat Area, Lodhi Road, New Delhi-110 003 or their authorised representative(s) at its Registered Office first above mentioned shall be authorised to act severally for and on
behalf of NTPC.

1O.O NOTICE
All notices required or referred to under this Agreement shall be in writing and signed by the respective aulhorised signatories of the parties mentioned herein above, unless otherwise notified. Each such notice shall be deemed to have been duly given if delivered or serued by registered mai'lispeed post of Department of Posts with an acknowledgement due to the other parties in terms of IMPLEMENTATION OF THE
AGREEMENT at Articte

I above.

11.0

EFFECTIVE DATE AND DURATION OF AGREEMENT

agreed terms.

The agreement shall come into effect for all purposes and intent from the date of signing of the Agreement. Subject to the establishment and continuance of payment security as envisaged under Article 6.2 under ESTABLISHMENT OF LETTER OF CREDII (LC) AND PAYMENT SECURITY MECHANISM, agreement shall renrain operative upto completion of twenty five (25) years from the date of eommercial operation of tast unit of the station, unless it is specifically extended on mutually

12.0 SUGCESSORS AND PERIUIITTED ASSIGNS 12.1 ln case the functions of WBSEDCL are reorganised and/or this Agreement is
assigned to other organisation(s)/ageney(ies), partly or wholly, the Agreement shall be binding mutatis mutandis upon the successor Distribution/ Trading organisation(s)/agency(ies)/ehtities and shall c'on,tinue to rema[n valid witI respect to the obligations of the successor organisation(s)iagency(ies)/entities provided that the successor organisation(s)/agency(ies) islare owned or controlled by the Government of West Bengal
.

12.2

ln ihe event the functions of WBSEDCL are reorganised and/or privatised or this Agreement is assigned to Priv-ate organisation(s)/agency (ies), parlly or ''Escrow whCIlly, WBSEDCL shall ensure that the agreements namely Agreement' and 'Agreement to Hypothecate Cum Deed of Hypothecation' as mentioned at Article 6.2 under ESTABLISHMENT Of:' tEtfER OF CREDIT(LC) AND PAYMENT SECURITY MECHANISM are signed by the
assignee before assignment of this Agreement.

12.3

Only such of the successo'r entities who futfil the above requirements and execute the requisite documents as above shall be termed as the permitted assigns.

Jr

l\L

. ;-r

. "'4./' .{ i\
Ll

\d

12.4

right to terminate this Agreement. ln the event of termination of this Agreement, WBSEDCL shall be liable and continue to pay the Capacity Char*ges each

ln the event of failure to comply with the above clauses, NfpC shall have the

customers substituting the WBSEDCL is tied up.

month till firm arrangement for sale of WBSEDCL's shari with -alternate

lN WITNESS WHEREOF the parties have executed these presents through their Authorised Representatives on the date mentioned above.
WITNESS -.t

1.

'--'{,m .f'fu-* F-."--t \----*p{---"-

--':5:k) -^
_.---' ,{fi{'/ NTPC Ltd.

For and on behalf of

cfcr(,

Ssfw,S; ***! Fta6r, SSSPS Su@s L$*S!{ $B$s$. $$s}!# D$*}}t-'tt$ N

sqe*$ R&',/NTFC

&x*quti*e oirsctor {*ernmxr*xi}

wffi

B,i, 0d, \4. ftAFE*A,

*re i[to Afqf tW


NErw

{{$M}

W,S*

Ltrnlrsd

t_

.i\

r 1'l j].]t r l{i


,;
r

u{ $" Pal ^,'. r r.na{ngf "rifusPnet r -ili;\,rir "*ot;1,.'u $hawail


.--..

For and on behalf of

West Bengal State Electricity Distribution Company Limited


A,nirb* n Gl,hs

ts^oIkrlta-v r

..P,1:lll

{fres,.

i,. , rariing}

WBSEDCL, Vidyrir r,rar,, a;r, i(olklta

hnne-rurc

IYTPC

LIMITEI)

EXTRACT FROM THE MINUTES OF 289TH IIf,EETING OF THE BOARD oF DIREGTORS HELD MONDAY, OGTOBER 30, 2006

3496 ltem No.291.2.6

lnvestment Approval for Farakka STPP, Stage-lll (1xs00 MW)

stated that investment proposal

Referring to the Agenda ltem immediately preceding, Director (Technical)

for

Farakka STPP, Stag+'lll was

recommended by the Project Sub-Committee of the Board of Directors in its 35th meeting held on July 31, 2006 to the Board for its approval. The Board accorded investment meeting held on the same day. "p?r.:.11,l'$ts_289h ln view of the revised procedure for obtaining environmental clearances as elaborated in the AgendaTfer+-immediately preceding, this appioval would also have to be modified partially. The Board passed the following resolution: Resolved that in partial modification of earlier resolution passed by the Board of Directors in its 289th meeting held on July 31, 2006, wherein the lnvestment approval of Farakka Super Thermal Power Project, Stage-lll was accorded subject to 'No Objection Certificate' (NOC) from West Bengal Pollution Control Board and environmental clearance from Ministry of Environment and Forests (MOEF), the approval of the Board be and is hereby accorded pending receipt of Environmental clearance from Ministry of Environment & Forests. Resolved further that the cost and all other terms and conditions of the investment approval earlier accorded by the Board in its 289th Meeting held on July 31, 2006 shall-remain unaltered.

'

fTfiTIF

D TRI,E

U*IIY

q. S. '{*fuft A. K. RASTOGI
dq-S r{ft'E
Company Secretary q-<e\qii hfte=/ \ITPC Li.n
itect

\\A

NTPC LIMITED
EXTRAGT FROM THE MINUTES OF 289TH MEETING OF THE BOARD oF DTRECTORS HELD MONDAY, JULY 31, 2006

3434 ltem No.289.2.13 lnvestment approval for Farakka Super Thermal


Power Proiect, Stage-lll
(1

x500MW)

The Board decided to take up the captioned item before discussing the proposal for award. Director (Technical) informed the Board that the Project Sub-Committee of the Board in its Meeting held earlier in the day, had recommended the investment proposal of Farakka Super Thermal Power Project Stage-lll (1x500MW) for approval of the Board. Presenting a resume of the deliberations of the Project Sub-Committee of the Board of Directors, Director(Technical) highlighted different important aspects of the proposal.
The Board passed the following resolution:

_D^

Resolved that the investment proposal for Farakka Super Thermal Power Project, Stage'lll (1x500MW) at SBI Capital Markets Ltd. (SBl Cap) appraised current estimated cost of Rs.25704.39 million (Rs.23704.81 million + US $ 43.09 million) including lnterest During Construction (lDC) and Financing Charges (FC) of Rs.3335.59 million (Rs.1407.93 million + US $ 41.54 million) and Working Capital Margin WCM) of Rs.491.90 million at an exchange rate of 1 US $ = Rs.46.40 on the foreign component of the project cost as of 2nd Quarter, 2006 price level and corresponding indicative estimated completed cost of Rs.28828.39 million (Rs.26633.76 million + US $ 47.3O million) including IDC and FC of Rs.3666.29 million (Rs.1547.00 million + US $ 45.67 mitlion) and WCM of Rs.516.46 million at an exchange rate of 1 US $ = Rs.46.40 on the foreign component of the project cost, as per the memorandum submitted before the Board, be and is hereby approved subject to No Objection Certificate (NOC) from West Bengal Pollution Control Board and environmental clearance from Ministry of Environment and Forests

(M.EF)'

)ooo(

CERTIFIED TRUE COFY

\\6

Company Secretary

q. d. rdfi A. K. RASTOGI qir* sfu

v{A+S frh*s/ urp c

Lim

ited

No.5/51/2010-Th.ll Government of lndia Ministry of Power Shram Shakti Bhawan. Rafi Marg, New Delhi-l10001 grh December,2010
To

ffi

knnexurz-

1. Chairman,

Central Electrici$ Sewa Bhawan, R.K New Delhi

AuthoritY, Puram,

/./

./

irzCnaicman & Managing Director,


NTPC umitecl. Scope Complex, Lodhi Road New Delhi-t10003 Member Secretary, Eastern Region Electricity Board. 14, Golf Club Road, TollYgunge Kolkata - 700033

3.

Thermal Power Proiect (500 MW ,Sublec[ Allocation of power from Farakka-tll


Sir,

I am directed to state that power generated from the Farakka-llt Thennal Power Project (500 MW) of NTPC in West Bengal is allocated with effect from the date of commerciat operation of the plant as in [re following:

[f.tanre of StateAJ nion

Share in instatled caPacitY


10.1

ilgtt-orY
i Bihar
, DVq ' Jharkhand

6.5

iorissa

{Wes.t..Bengat Sikkim . Unallocated . Power to be sold .long term PPA fotal

--t
outside

16.62

29.44
15

___i

15

75 75 500

I
I

100

2.

Iire extant guidelines on

allocation

of

power have also been taken into

cogntzance rn the above allocatton.

$b

-2-

3.

The aforesaid allocation will be operative for pro-rata distribution to the quantum

of electricity mentioned above alongwith distribution of unallocated power from the declared capacity of the generating station based on auxiliary consumption, planned outage, forced outage, availability of fuel / water etc. and after taking into account
transmission losses. The above attocation will further be subject to the Power Purchase Agreements (PFAs) entered into by NTPC Limited with State Power Utilities/ Union Tenitory and witl further be subject to the beneficiaries ensuring compliance with the financial and commercial terms (including coverage for Letter of Credit) of the PPA signed with NTPC Ltd., the tariff notification and any other directives/ guidelines issued by the Government of lndia /Central Etectr.icity Regulatory Commission from time to time.

4.

5.

[n case of failure of the beneficiaries adhering to the condition mentioned above, NTPC Ltd. may shut off or restrict power supply fr.om the power station and
also reallocate the power in case beneficiaries default in payment or where they have not opened LCs of an adequate amount in favour of NTPC Ltd. NTPC Ltd. would inform Member Secretary of the Corrcqrned Regional Power Committee of the revised allocation of power in respects of the defaulting beneficiaries. Member Secretary of the concerned Regional Power Committee would reatlocate the surplus power to the other beneficiaries based on grid security and power situation.

6.

This issues with the approval of the Minster of Power. Yours faithfully,

{K1 Sharma)

lfi'*

Under Secretary to the Government of lndia Telefax 23719710