Está en la página 1de 123

SECTION I

Page
1.1

INSTALLATION

1.2 1.3 1.4 1.5

Handling Cleaning Floor Plan Foundation Power Supply Initial Setting Anciliary Equipment

II

OPERATION

2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8

Machine Controls J-Head Controls 2J2-Head Controls Mechanical Table Feed Infinitely Variable Table Feed M-Head Controls E-Head Controls Heidenhain Digital Read Out VRZ 7 10

Ill

LUBRICATION

3.1 3.2 3.3 3.4 3.5

Basic Machine J-Head 2 J2-Head Feed Boxes M and E-Head

IV

MAINTENANCE GENERAL

4.1 4.2 4.3


J-HEAD

Table Screw Assembly Cross Screw Assembly Gib Strip Adjustment

4.4 4.5 4.6 4.7


ZJZ-HEAD

Belt Replacement Brake Shoe Replacement Balance Spring Replacement Feed Trip Adjustment Collet.Aligning Screw Quill Removal

4.8 4.9 4.10

Motor Removal Belt Replacement Brake Shoe Replacement

Index

También podría gustarte