KAZTEC ENGINEERING LTD.

Contract Title: TB 1921 Adanga Redevelopment Phase II and III


Job Safety Analysis (JSA)

JOB:

Pipeline Hydrotest
JSA NO:

DATE: ANALYSIS BY: Other Safety Equipment/Requirements [x ] [x ] [] [] [] Workvest Safety Harness Face Mask Ear Protection [x ] [] [] [] Fire Extinguisher Gas Detector B.A. Set Safety Signs [] [] [] [x ] Barricades Tag Out/Lock Out General Permit Hot Work Permit [] [] current N/A

DEPARTMENT: Rigging Required Personal Protective Equipment (PPE) Hard Hat Safety Shoes Safety Glasses Face/Welding Shield Goggles [x ] [x ] [x ] [] [] Cotton Gloves Rubber Gloves Leather Gloves Gauntlets Leather Apron

Sequence of Basic Job Steps


Conduct pre job safety meeting prior to commence of job Install blind flange at the top of the riser Fill pipeline with sea water, pressuring up to given test pressure

Potential Accidents OR Hazards


Review work to be performed with workers assign to do the job Pinch points

Recommended Safe Job Procedure


Ensure all participating crew understand their roles and responsibilities to perform the task safely and successfully. Use chain falls and other lifting tools. Check tools prior to use.

Hoses, fittings etc, under pressure

Maintain test pressure at given hrs. as per hydrotest procedure Depressurize pipeline

Hoses, fittings etc., under high pressure High pressure water discharge

Only responsible/authorized person to handle hydrotesting equipment Cordon off working area Ensure all components, fittings etc., are of adequate pressure capacity, and are installed properly. Same as above Authorized person to monitor equipment at all times. Ensure nobody is in front of the discharge valve. Use adequate PPE/and proper valves and fittings.