Corrigendum

Name of Work: Beautification of Hathmati Main Canal B Zone between Ch. 2500 to 5200 ft.
Sr. Page Clause No. No No. 1 20 Volume: I Section 2 1.17 Description As work is to be carried out in existing canal it is likely that water may be released as per demand of farmer & schedule, no representation on account of irrigation shall be entertained. Corrigendum Stagnant pool of water or canal flowing condition will exist during the entire construction period and bidder should take care of this condition during construction period. No variation on this account will be paid. Work is to be carried out in canal running/operating condition and extension of time limit on account of this condition can not be granted. The borrow area for the earthwork is in the scope of bidder and no extra payment will be made for variation in lead and lift Various clauses and section mentioned in column 2 are not resembling with various clauses Date and time in various clauses shall be as per page no.3 i.e Details about the tender. Total Qty. of steel shall be procured by the contractor from approved prime manufacturer i.e. SAIL, VIZAG (RINL) and TATA steel only. Work is to be carried out

20

Volume: I Section:2 1.18

40

Volume: I Section:2

The borrow area for earthwork shall be discovered within mentioned lead & got appro0ved from the competent authorities by the contractor at his own risk & cost. Appendix to letter for submission of tender

Volume: I Volume: II 88 Volume: II Section III 16.5 Steel

Date and time are differed in various clauses. like on Total Qty. of steel shall be procured by the contractor

117

Volume: II

1.0 Care and Diversion of

HCP Design and Project Management Pvt. Ltd.

Section VI 1.0

Canal..

7 8

116 170

Volume: II Section VI Index Volume: II Section VI 1.7 Volume: II Section VI 1.11 Volume: II Section VI Chapter -7 7.1 All the material.

in canal running condition. Work of lining and cleaning is to be carried out during canal non operating condition, however during lining, cleaning or other activities in canal, stagnant pools of water will exist and dewatering is envisage and bidders cost include above all scenario and no extra payment on this account will be payable. Index sr. no. is not matching. The borrow area for the earthwork is in the scope of bidder and no extra payment will be made for variation in lead and lift The compaction of canal embankment shall be as per Item No. 3 on page 196. (b) the work includes.. in position high yield strength deformed (HYSD)/TMT/ (Fe -500) steel bars procured from approved prime manufacturer i.e. SAIL, VIZAG (RINL) and TATA steel only as reinforcement for concrete. a) Type of steel to be used shall be for the various kind of steel viz. HYSD/TMT (FE-500) Steel reinforcing bars shall be placed in Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually
2

171

10

188

(b) the work includes.. in position high yield strength deformed (HYSD)/TMT/(Fe -415) steel bars and mild steel (MS) bars as reinforcement for concrete.

11

189

Volume: II Section VI Chapter -7 7.3.1 Volume: II Section VI Chapter -7 7.4

12

193

a) Type of steel to be used shall be for the various kind of steel viz. HYSD/TMT (FE-415) Steel reinforcing bars shall be placed in . Measurement and Payments for Reinforcement.

HCP Design and Project Management Pvt. Ltd.

used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tonnes on the basis of IS : 1732. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement 13 196 Volume: II Section VII Item wise technical specification Item No.3 3.1 Volume: II Section VII Item wise technical specification Item No.3 3.6.4 Volume: II Section VII Item wise technical specification Item No.26 The earth work The earth work is to be carried out only from borrow area approved by the client.

14

201

Measurement and Payments

The earth work is to be carried out only from borrow area approved by the client.

15

277

Providing and laying HDPE pipe of ..

Entire item no. 26 to be change instead of HDPE pipe Providing, laying and fixing 500 mm dia pipe made from 2mm thick GI sheet as a void former for RCC bridge work.

16

278

Volume: II Section VII Item wise

6MM thick pre coated MS profile deck sheet (Rolla Deck)

1.2MM thick pre coated MS profile deck sheet.

HCP Design and Project Management Pvt. Ltd.

17

technical specification Item No.30 Volume: II Schedule B Item No 26

Providing and laying HDPE pipe of ..

Entire item no. 26 to be change instead of HDPE pipe Providing, laying and fixing 500 mm dia pipe made from 2mm thick GI sheet as a void former for RCC bridge work. Unit : Rmt. Qty : 120 1.2MM thick pre coated MS profile deck sheet. Unit : MT Qty : 1.5

18

Volume: II Schedule B Item No 30

6MM thick pre coated MS profile deck sheet (Rolla Deck)

HCP Design and Project Management Pvt. Ltd.